Exploring the benefits of modularization

Similar documents
Packaged AHR (Advanced Heat Recovery) Systems for Engines, Gas Turbines, & Industrial Waste Heat. Tom Pierson

Westinghouse AP1000. Reactor

Barilla Cogeneration Power Plant main tips

Proper Selection of Compressor Trains

Pratt & Whitney. Power Systems MOBILEPAC. Gas Turbine Package. It s in our power.

Heat Recovery Systems and Heat Exchangers in LNG Applications. Landon Tessmer LNG Technical Workshop 2014 Vancouver

Industrial Power. SGT-800 Gas Turbine. Power Generation: (ISO) 47.5 MW(e) / 50.5 MW(e) / energy

LNG PROCESS USES AERODERIVATIVE GAS TURBINES AND TANDEM COMPRESSORS

Combined Cycle Power Plants. Combined Cycle Power Plant Overview (Single- and Multi-Shaft) Training Module. ALSTOM (Switzerland) Ltd )*+,

Nuclear Power A Journey of Continuous Improvement

A class of its own JUMAG STEAM BOILER COMPACT INFORMATION STEAM BOILER WATER SUPPLY MODULES BLOW DOWN VESSEL COMPACT STEAM SYSTEM.

FlexEfficiency* 60 Portfolio

Westinghouse SMR & Nuclear Fuel Overview

SCALING PEM ELECTROLYSIS TO 100MW HANNOVER MESSE APRIL 2017 SIMON BOURNE CTO

FLEXI BURN CFB WP4: Boiler design and performance

ElectroChemTM Advanced EDR

The Westinghouse Advanced Passive Pressurized Water Reactor, AP1000 TM. Roger Schène Director,Engineering Services

2. TECHNICAL DESCRIPTION OF THE PROJECT

Drive Selection for LNG FPSO

Full electrical LNG-plant: Highest availability and energy efficiency trough overall system design

Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017

Your partner for the right solution

GE Energy H SYSTEM WORLD S MOST ADVANCED COMBINED CYCLE TECHNOLOGY

B. System Design and Performance Requirements

Cutting-Edge Pumping Solutions for the Concentrated Solar Power Generation

Introduction of Gas Turbine- Powered, LPG Fueled Ship. Byeongyeol Baek Advanced Lead Engineer GE s Marine Solutions March 6 to 7, 2018

MLNG DUA DEBOTTLENECKING PROJECT

Carbon Capture and Sequestration: Kiewit s Petra Nova CCS Project

Equipment Design. Detailed Plant Conceptual Design. Version 9.0

9HA.01 SETS EFFICIENCY WORLD RECORD

Power cycle development

LNG Experience. Owner & Investor Project Management

Complete cooling performance. Air cooled exchangers for the oil, gas and power markets

Welcome to. Kendal Power Station

Adoption of USC CFB Technology to Achieving Lower Cost Generation and Environmental Sustainability. Gerd Heiermann & Douglas Spalding

Process Compressors. Designed to optimize your business. Answers for energy.

APPLICATION OF THE LATEST AERODERIVATIVE GAS TURBINE TECHNOLOGY

Ample supplies of LNG have created a low

Gastech Singapore October Capital Cost and Efficiency Data for the ZR-LNG Dual Methane Expander Liquefaction Technology

The Westinghouse AP1000 : Passive, Proven Technology to Meet European Energy Demands

Industrial Application of Thermal Energy Harvesting

A perspective on managing market changes and planning for the future

CO 2 Capture Utilization and Sequestration (CCUS)

MITIGATION OF SEASONAL PRODUCTION LOSS FOR THREE PARALLEL 4.7MMTPA

Hitachi H-25 & H-80 Gas Turbine. Bucharest, Apr.23, 2013

Engineered Hot Water Systems. For your specific requirements

At Elliott Group, we are committed to providing each customer with the best possible solution to the challenges they face. Japan

CCI. Aftermarket. Services

ENERGY SOLUTIONS FOR THE OIL AND GAS INDUSTRY POWERING THE FUTURE

HEATMAX. Mechanical Installation and Commissioning Instructions HEATMAX

Alaska South Central LNG (SCLNG) Project

TCO Future Growth Project - Wellhead Pressure Management Project Construction Contractors Forum

FS 1000/3000 SIP BIOREACTORS/FERMENTORS FOR INDUSTRIAL PROCESSES

ORegen TM Waste Heat Recovery: Development and Applications. Andrea Burrato GE Oil & Gas Rotterdam October 8 th, 2013

Steam Turbines. Leading Technology for Efficient, Reliable Generation Siemens Steam Turbines from 90 MW up to 1,900 MW.

Combined cycle with detailed calculation of Cp in the HRSG

The H-25/H-15 Gas Turbine A Product of Hitachi Quality

Improving Flexibility of the Combined Cycle Power Plant Hamm Uentrop to Cover the Operational Profiles of the Future

Modular Oil & Gas Equipment Onshore & Offshore

Worldwide Pollution Control Association. August 3-4, 2010

Alstom Cogeneration Plants Meeting the Requirements of the Asian Energy Markets

Westinghouse s plant for the Nuclear Renaissance : AP1000. AP1000 Advanced Passive Plant

5.2 MW Solar Mobile Power Unit

Cogeneration. Thermal Chillers. and. .. ASHRAE National Capital Chapter. Arlington, VA 10/10/2012

OUR EXPERIENCE: BALLAST WATER MANAGEMENT SYSTEM (BWMS) RETROFIT

MODERN COKE OVEN GAS TREATMENT TECHNOLOGY AT A NEW COKE MAKING PLANT IN BRAZIL*

Course 0101 Combined Cycle Power Plant Fundamentals

Technical Innovation for Floating LNG. Bengt Olav Neeraas & Jostein Pettersen, Statoil ASA

A COMPLICATED PROJECT FOR POWER AND WATER CO- GENERATION: THE RAF SITE

CONVERTING DOMINION COVE POINT LNG INTO BIDIRECTIONAL FACILITY

Turbine Inlet Air Chilling

WXH Utility Grade Multistage, Ring Section Pump

Field Technology Services

High Bridge Combined Cycle Plant

Dynamic Modeling of a Combined-Cycle Plant

FULL PAPER FP_A.5_CLP_CCGT Upgrade

SmartSPEND. KBR SmartSPEND SM. The Economic Approach to Project Development and Execution that Delivers Maximum Project Returns

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile

Industry the world we live in. MCE Group

Ten Year Retrospective Look at HRSG FAC Assessment and Incidence. Peter S. Jackson, PhD, PE, David S. Moelling, PE, Mark Taylor, Mech. Eng.

Polaris VCD. Efficient and Effective WFI Solutions WATER TECHNOLOGIES

Bi-Directional Static Load Testing of Drilled Shafts

FULL-CYCLE GLOBAL ENERGY SOLUTIONS

COMBINED CYCLE OPPORTUNITIES FOR SMALL GAS TURBINES

NSSS Design (Ex: PWR) Reactor Coolant System (RCS)

Water-Cooled Screw Chillers and Water/Water Heat Pumps

Environmental Control Solutions

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

UPDATE ON THE KEMPER COUNTY IGCC PROJECT Gasification Technologies Conference

FIRSTS IN THE LNG MARKET Approximately one-third of the LNG produced is produced using Dresser-Rand compressors.

Gain control of your fuel consumption

Geothermal Power Plant

nalcofabtech.com A Nalco Champion Company

The H-25/H-15 Gas Turbine A Product of Hitachi Quality

Gas Turbines Addressing Middle Eastern Power Generation Needs

COMPUTER SKILLS : Windows, MS Office, Internet : EMPAC (Enterprise Maintenance Planning and Control) System

STANDARD PLANTS FULLY-PACKAGED MODULAR SOLUTIONS

R-TANK SPECIFICATIONS

Design Considerations for Advanced Combined Cycle Plant Using Fast Start Drum Type HRSGs

About Praxair. Air Separation. Applications. our purpose. 1 Where your talent makes an impact

Transcription:

Exploring the benefits of modularization EMANUELA SILENZI GE OIL & GAS MODULES PRODUCT MANAGER

Agenda GE OIL & GAS HERITAGE & CAPABILITIES MODULARIZATION EVOLUTION GOING MODULAR CASE STUDIES: AdvantEDGE* Power Plant (Atish Roy-Choudhury), Gas Processing (Alicia Trent) *Trademark of General Electric Company 2

GE & Modularization Innovation & Excellence COST REDUCTION SIMPLER DESIGN SOLUTION PROJECT EXECUTION EXCELLENCE AND RISK MITIGATION SMOOTH AND SMART INSTALLATION PARTNERING IN PROJECT DEVELOPMENT 3

Adapting to the new cycle UPSTREAM MID TERM LOCK-IN - 2017 MIGHT BE THE TURNING YEAR FOR INVENTORY REDUCTION - UP TO 7 MILLION BBL/D OF SUPPLY NEEDED THROUGH 2021 FROM UNSANCTIONED PROJECTS - MODEST SPENDING RECOVERY CONTINUES BALANCING RISKS AND REWARDS - DE-RISKING: BUDGET AND TIMING CERTAINTY - INNOVATE TO BECOME LEANER, MORE ADAPTIVE TO CHANGE - NEW TECHNOLOGY AND NEW EXECUTION MODELS 4

Building on 30+ years modularization experience 1980 1990-2008 2006-2008 2012 2016 2019 NORTH SEA BUCHAN FIELD Gas lift BRAZIL CAMPOS BASIN Power Gen & Compression KAZAKHSTAN KASHAGAN H2S Gas injection System GORGON Power gen modules (130 MW) FSNL tested UZ 750 Power gen modules (43 MW) FSFL tested TENGIZ Power gen modules (130 MW) FSFL tested 5

Yard evolution 40.000 M 2 UNTIL 2011 240.000 M 2 (2012-2019) 200.000 M 2 (FROM 2019) GORGON PROJECT - 5 PLATFORM - FULL SPEED NO LOAD (P<16 BARG) - STRUCTURE SUB-ASSEMBLED AND ERECTED IN YARD - LIFTING, STRUCTURE WELDING, SCAFFOLDING, TOUCH UP - MECHANICAL COMPLETION AND COMMISIONING (PAPER BASED) - COVERED STORAGE: 11.000 M 2-2D DRAWING - MODULE LOAD OUT LIMIT: 4000 TONS - MODULE DIMENSION LIMIT: 21 WX60 L - 10 PLATFORM - FULL SPEED FULL LOAD (P<24 BARG AND POWER 130MW...FR9) - STRUCTURE ALREADY FULLY ASSEMBLED (NO ERECTION, NO WELDING) - SKIDDING - COVERED STORAGE: 30.000 M 2-3D DRAWING - POSITIONING TRACKING SYSTEM ZADCO & TENGIZ - ADDITIONAL 4 PLATFORM - FULL SPEED FULL LOAD - (P<70 BARG AND POWER 130MW...LMS100) - HEAT REMOVAL 220 MW (EVAPORATIVE TOWERS) - FULLY DIGITIZED DOCUMENT MANAGEMENT - FOR MECHANICAL COMPLETION AND COMMISSIONING (POWERED BY PREDIX) - NO LIMITATION IN LOAD OUT & DIMENSION CAPACITY (SEA FRONT) 6

Module commissioning and testing PRE COMMISSIONING AND COMMISSIONING - MODULE QUALITY CONTROL PANEL - MECHANICAL COMPLETION - COMMISIONING PROCEDURE - CONTROL LOOP CHECKS - ELECTRIC MOTORS & PANEL CHECK - LUBE OIL SYSTEM FLUSHING - FUNCTIONAL TEST OF ALL SYSTEMS - READY FOR FULL POWER AND SHIPMENT Enabling real plug & play solutions MODULE STRING TEST - FULL SPEED FULL LOAD (UP TO 130 MW) - LOAD SHARING & SHEDDING CAPABILITIES - POWER GENERATION (AVENZA) & COMPRESSOR DRIVE (PIOMBINO) - FUNCTIONAL TEST & LOOP CHECK OF ALL SYSTEMS AT FULL LOAD - PERFORMANCE, VIBRATION, DLN MAPPING & CONTROL SYSTEM - ALL TESTED BEFORE SHIPMENT - NO ADDITIONAL TEST AT SITE REQUIRED, FULLY PLUG & PLAY SOLUTION 7

Modularization as a product APPLICABLE PRODUCT SPECS LESSON LEARNED EQUIPMENT DESIGN CUSTOMER REQUIREMENTS EXECUTION STRATEGY PLANT LAYOUT STRUCTURAL DESIGN 8

Technology enablers Power density and plant simplification DRIVERS COMPRESSION DIGITAL 9

Technology enablers Power density and plant simplification LM6000PF+ 55MW IN THE SAME PF FR7EA 2 SHAFTS 120 MW HIGHER POWER AND NO VSDS HELPER MOTOR DRIVERS LM9000 65MW HIGHER POWER AND BEST MAINTANCE INTERVAL 10

Technology enablers Power density and plant simplification COMPRESSION HIGH PRESSURE RATIO COMPRESSOR FROM 2 COMPRESSOR BODIES TO 1 11

Technology enablers Power density and plant simplification Integrated Moto Compressor Suction Scrubber COMPRESSION SCRUBBER COMPRESSOR STRONG FOOTPRINT AND WEIGHT REDUCTION WET COMPRESSOR PROCESS BOP OPTIMIZATION 12

Technology enablers Design & operations simplification LIVE INSTRUMENT HEALTH MANAGEMENT SYSTEM DIGITAL DESIGN FOR MODULARIZATION (FOOTPRINT): PRESSURE SCANNERS COMPACT AND MINIATURIZED SENSORS MULTI-TASKING SENSORS WIRELESS TECHNOLOGY DESIGN FOR MAINTAINABILITY: DRONES CAMERAS REMOTE OPERATION 13

Ingredients for structural Optimization DESIGN TARGET DESIGN DRIVER OPTIMIZATION TOOL WEIGHT RATIO WR=(KG STEEL STRUCTURES)/ (KG EQUIPMENT) BENCHMARKING BOAT: 0.86 COMM. AIRPLANE:<0.30 CAR: 0.43 (STEEL FRAME) HD GT S MODULAR CONSTRUCTION ONSHORE: >0.8 - MAINTENANCE - HUMAN FACTOR - CUSTOMER SPECS - CODE & STANDARS - MAX STATIC DEFLECTIONS - DYNAMIC STIFFNESS - NEW CRITERIA FOR MODULE STATIC DEFLECTION - INTEGRATED ROTOR-DYNAMIC MODULE TYPICAL FIGURES: # PROFILES >20 # LOAD CASES> 100 # DESIGN CHECKS >3000 REDUCE MODULE STEEL STRUCTURE WEIGHT THROUGH AN OPTIMIZATION WORKFLOW BASED ON GENETIC ALGORITHMS WEIGHT RATIO TARGET<0.7 14

Module as a Product... vision Cost & Delivery time reduction up to 50% ONGOING NEXT PAST REFERENCES - 100 REFERENCES - 30 CONFIGURATIONS DESIGN TO MODULARIZATION - REFERENCE CONFIGURATION & VARIANTS - INTEGRATED ROTORDYNAMIC TECHNOLOGY - STRUCTURAL DESIGN STANDARDIZATION & OPTIMIZATION INDUSTRIALIZATIO N - MODULES PRODUCT SPEC - EQUIPMENT + MODULE INTEGRATED DESIGN - PRODUCTION ENGINEERING - SUPPLIERS ECOSYSTEM WEIGHT AND FOOTPRINT OPTIMIZATION STANDARD COST & LEAD TIME EQUIPMENT DESIGN MODULE DESIGN CONSTRUCTION & TESTING INTEGRATED MODULE DESIGN CONSTRUCTION & TESTING PROCUREMENT PROCUREMENT 15

Bigger advantages with modularization? 16

Case study Liquefaction Module GE Solutions: from truckable small scale LNG plant to Mega Liquefaction Module SMALL SCALE MODULES DESIGNED FOR REGIONAL ROAD REQUIREMENTS FLEXIBLE LAYOUT FOR CUSTOMER SPECIFICATION SMALL SCALE TRUCKABLE MODULES GE MODULES - PROCESS & 3D DESIGN THROUGH MANUFACTURING - PRE-ASSEMBLY AND TESTING DONE IN GE - HIGH WELDING & CLEANLINESS STANDARDS REDUCED ERECTION AND SITE ACTIVITIES - STANDARDIZATION TO REDUCE SITE & FACTORY REWORK - POTENTIALLY REDUCE SCHEDULE THROUGH - CONCURRENT TIMELINE AND/ OR STANDARDIZATION EXPERIENCE IN LNG PROCESS PLANT + MODULES + INNOVATION = GE MEGA LIQUEFACTION MODULES MODULE COUNT REDUCTION TOTAL PACKAGES FIELD CONNECTIONS WELDS TIME TO INSTALL DIMENSIONS BENEFITS CASE STUDY 80% reduction 50% reduction 70% reduction 30% reduction 50% reduction 148 x 72 x 57 - Fewer connections - Faster installation Single Liquefaction Process in one Module Ideal For Compact Or Multi-train Configurations 17

GE Gas Power Plant Solutions Modular plant outlook VALUE VAST EXPERIENCE LIFE CYCLE CUSTOMER TESTIMONIALS - SCHEDULE & COST CERTAINTY (RISK REDUCTION) - FASTER DELIVERY (NTP TO COD) - LOWER TOTAL INSTALLED COST (TIC) - FROM 30 MW TM TO 1.5 GW H CLASS PLANTS, E.G. - F-CLASS: 8 MODULAR CCPPS (~60 MODULES) - H-CLASS: 1.5 GW MODULAR CCPP IN EXECUTION (100+ SUB-MODULES) - PROVEN DESIGN INCORPORATING LESSONS LEARNT - PRE ENGINEERED - MANUFACTURED BY PROVEN SUPPLIER BASE - INTEGRATED PLAN: DESIGN- FABRICATION-LOGISTICS - LESS LAYDOWN AREA - LESS NEED FOR QUALIFIED ERECTION PERSONNEL - MINIMIZES IMPACT OF SITE INTERRUPTIONS - HIGH QUALITY SP. WELDING & CLEANLINESS - LESS COMMISSIONING EFFORT 18

GE Gas Power Plant Solutions Modular plant outlook LIFE CYCLE ENGINEERING ORDER PLACEMENT MANUFACTURE, ASSEMBLY & TESTING PACKING & DELIVERY INSTALLATION AT SITE 1 2 3 4 5 19

GE Gas Power Plant Solutions Modular plant outlook Up to 50% site man-hours Up to 10% faster power 20

Modularisation Gas Power Plants Case study CALCULATION SET UP 9HA.02 SS CC plant (804 MW*) Project site in EU Module fabrication in Western EU Data from executed projects CONCLUSION Risk reduction during execution Schedule reduction: 10% Total installed cost reduction: 6% * net output as per GE product catalogue 2017 TAKE AWAYS - GE Investing substantially in smart design, cost out, supply chain optimization of plants & modules - NPI program on modularization to develop portfolio of pre-engineered - modules GPS & GE Oil & Gas working together on design & manufacturing to leverage expertise - Target - bring maximum value to the customer - by mitigating execution risks. bring down TIC of modular solution (up to 10 %) 21

Potential modules In critical and high work density areas POWER TRAIN (GT GENO + ST) HRSG POWER ISLAND GT PRIME PACKAGING 6 MODULES AIR INLET FILTER HOUSE AND SILENCER FIRE PROTECTION COMBINED LUBE OIL SYSTEM FUEL GAS CONDITIONING GENERATOR STATOR COOLING WATER GENERATOR GAS SYSTEM GENERATOR SEAL OIL MODIFIED C FRAMES (INCL. DOWN COMERS) IP AND LP DRUMS STACK (PRE FABRICATED) HRH AND CRH VERTICAL PIPING CLUSTER VENTS AND DRAINS SILENCER AND VENT STACKS FEEDWATER RECIRCULATION BYPASS AND STEAM PIPING 3 MODULES CLOSED COOLING WATER EXPANSION TANK MODULE FEEDWATER PIPING MAIN PIPE RACK SMALL PIPE RACK MAIN COOLING WATER BUS DUCT ELECTRICAL MODULES* SAMPLING* DOSING* CEMS* FEEDWATER PUMP * CONDENSER* EMERGENCY DIESEL * AUX. BOILER * * Same delivery condition also in stick built (bts) 22

Module designs with Application Range and Options EXPANSION VESSEL CLOSED COOLING WATER MAIN PIPE RACK COMBINED LUBE OIL SYSTEM 23

GE & Modularization Innovation & Excellence COST REDUCTION SIMPLER DESIGN SOLUTION PROJECT EXECUTION EXCELLENCE AND RISK MITIGATION SMOOTH AND SMART INSTALLATION PARTNERING IN PROJECT DEVELOPMENT 24