Waterfront Lands Analysis By: BST Associates For: City of Tacoma

Similar documents
Port of Long Beach Port Master Plan Overview December 22, 2008

CONTAINER PORT ELEMENT

CONTAINER PORT ELEMENT

City of Tacoma Planning and Development Services

Waterways 1 Water Transportation History

Port Authority of Guam

Port of Vancouver USA Clark College Business Advisory Committee May 9, 2017

Partnerships in Capital Projects. AAPA Facilities Engineering Seminar and Expo

Waterfront Land Use. Michigan Coastal Community Working Waterfronts. Table of Contents. Case Studies

Current Trends in Marina Planning and Design

dpd Seattle Permits CAM Environmentally Critical Areas: Wetlands and Fish & Wildlife Habitat Conservation Areas

Memorandum. California public trust law governs the administration of tidelands and submerged lands in several ways:

The Shoreline Management Act and Use of State-Owned Aquatic Lands

Seward Chamber of Commerce Update

Conversion table working groups Name working group Old number New number Conception des barrages mobiles et de barriers anti-tempĂȘtes PIANC WG 101

SCHEDULE OF PORT CHARGES

A. THE PORT OF SEATTLE

Port NOLA Forward: Strategic Master Plan FAQs

SEATTLE DISTRICT CIVIL WORKS PROGRAM

HARBOR INFRASTRUCTURE INVENTORIES Presque Isle Harbor, Michigan

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate

Investor Presentation February 2018 Slide 1. Investor Presentation February 2018

Boat Launch Analysis. 5.1 Introduction Boat Launch Study Overview Boat Launch Site Alternatives. Chapter 5

3.8 LAND USE Introduction Environmental Setting

U.S. Department of Transportation Maritime Administration

INCORPORATING AQUATIC HABITAT RESTORATION/MITIGATION INTO DREDGING PROJECTS

PORT OF VANCOUVER USA WPPA Spring Conference May 18, 2017

Port of Los Angeles Presentation to the Los Angeles Investors Conference March 19, 2018

Company Capabilities Presentation

Rail Service at Brookley Aeroplex

LNG as a marine fuel in BC. West Coast Marine LNG Workshop 26 th June 2012

Centered on global trade.

Hudson River PCBs Superfund Site

STRENGTHENING YOUR PORT S FINANCIAL STABILITY THROUGH DIVERSIFICATION

PROJECT SUMMARY NOP AVAILABILTY AGENCY & PUBLIC COMMENTS

THE LOCAL AND REGIONAL ECONOMIC IMPACTS OF THE US DEEPWATER PORT SYSTEM, 2007 PREPARED FOR: AMERICAN ASSOCIATION OF PORT AUTHORITIES JUNE 6, 2008

The PHA s desire to develop an implement an EMS was driver by the following factors: Potential to improve environmental performance

A LOOK INSIDE. Relationship. Research. Options. SOLUTIONS.

DECC. Lafarge. Cutler Magner Coast Guard. Cargill. Northland Pier. AGP Grain. Murphy Oil CHS. Superior NORTH STAR PORT PRINCIPAL DOCK TOUR

Notice of Tariff Change Effective January 1, 2014

House Select Committee on Strategic Transportation and Long Term Funding Solutions. November 6, 2017

Select U.S. Ports Prepare For Panama Canal Expansion

Alabama State Port Authority

Marine Fueling Facility Program Update Advisory

Joint Public Notice. LOCATION: In Salmon Bay, Lake Washington Ship Canal, at Seattle, Washington.

What Does the MTS Mean to Me?

3.8 LAND USE Introduction Environmental Setting Regional Setting PMPU Area

NOTICE N-2. Wharfage Fees Tariff

Ballard-Interbay MIC Summary Statistics

Port of Newport Rates Page 1 of 8

Beneficial Reuse of Dredged Sediments in the Middle Harbor Slip 1 Fill

Note to File on Changes to Environmental Impact Report

Canada s Gateway to the West

Waterborne Commerce Statistics Center

Jacksonville Port Authority Blount Island Marine Terminal Rail Improvements Jacksonville, Florida

NC State Ports Authority. 21 st Century Transportation Intermodal Committee February 21, 2008 NC State Ports Authority Tom Eagar, CEO

vice ark Ser a#onal P N

SAINT JOHN PORT AUTHORITY TARIFF NOTICES. Effective: January 1, 2018

A Boat Building perspective on challenges and Industry growth. 14 April 2014 Vanessa Davidson CEO

November 17. Brochure.

Miami River Freight Improvement Plan Financial Management Number:

TEXAS PORTS STRATEGIC MISSION PLAN & PORT CAPITAL PROGRAM. November 16, 2016 November Transportation Commission Workshop November 16, 2016

THE 2013 ECONOMIC IMPACT OF THE PORT OF GRAYS HARBOR

1-6 CORDOVA HARBOR, ALASKA (CWIS NO ) (CWIS NO ) (CWIS NO ) Condition of Improvement 30 September 2011

SEDIMENT CHOREOGRAPHY

ALTERNATIVES ANALYSIS LBC SHIP DOCK 5 PROJECT SWG HARRIS COUNTIES, TEXAS

CentrePort Limited General Tariff Effective 1 July 2008

WINDSOR PORT AUTHORITY

SMALL HARBOR IMPROVEMENT PROJECTS PROGRAM (SHIPP) - MUNICIPAL

The Port of New York and New Jersey. The Environment

Ohio Maritime Study. Ohio Transportation Engineering Conference (OTEC) October 10, 2017 Columbus, OH

The Port of Alpena: A Community Asset Inventory. Marc Coburn, Tatsuya Fukushige, Evan Gross, Corey Jackson, Mark Jones, and Elizabeth Masserang

Introduction: Jason Giffen, Assistant Vice President, Planning and Green Port

City of Tacoma Planning and Development Services

Trade Update & Opportunity Outlook. Gene Seroka Executive Director, Port of Los Angeles May 19, 2017

Eric Thomas Benchmark River and Rail Terminals

Woodfibre LNG Limited Response to SIGTTO LNG Ports and Risk Reduction Options

APPENDIX E. Project Description Detailed Elements

Alaska Deep-Draft Arctic Ports Navigation Feasibility Study. U.S. Army Corps of Engineers Bruce Sexauer P.E. Chief of Planning, Alaska District

Port of Thunder Bay [Lake Superior] Canada s Gateway to the West

CONSERVATION & COASTAL MANAGEMENT

Duwamish Waterway Self Guided Tour: Turning Basin Number Three and Terminal 105 Aquatic Habitat Restoration Sites

Chapter 1 INTRODUCTION AND PROJECT DESCRIPTION

Bayport, Texas August 27, 2012

OIL INDUSTRY, COMMERCIAL AND INDUSTRIAL ACTIVITIES IN THE GULF OF MEXICO

Port Demand Forecast in Korea and the ESCAP region. Port Demand Analysis Center of Korea Maritime Institute

PROPERTY OVERVIEW HEAVY INDUSTRIAL LIGHT INDUSTRIAL TRANSPORTATION AMENITIES LOCATION WHERE BUSINESS HAPPENS

Port of New Bedford. AAPA Commissioners Seminar May 17, 2011 Prosperity through Economic Development Opportunities

CITY OF VANCOUVER ADMINISTRATIVE REPORT. General Manager of Engineering Services in consultation with the Director of Current Planning

Measures for Congestion at Ports. Doug McDonald U.S. Maritime Administration Office of Policy and Plans

TRANSPORTATION 101 Today and Tomorrow. Moving People and Goods

Chapter 2 - Tacoma s Watersheds and Subwatersheds

total 2011 tonnage. The total value of Illinois domestic internal commodity movements was over $21.2 billion.

Port of Algoma. Focal Point of the Great Lakes Region

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study

Dock Doctors. City of Burlington, Lake Champlain, VT Commercial Marina Floating Dock System EXPERIENCE

Presentation to: Washington Public Ports Association

ROTAWN ENERGY AND LOGISTICS DREDGING PROFILE

Pacific Northwest Challenges and Opportunities

Transcription:

Waterfront Lands Analysis 2008 By: BST Associates For: City of Tacoma 1

Purpose Is sufficient land available to meet the most critical needs of water-dependent uses? Recreational boating Power, sail, and hand launched boats Support services such as fuel, repair, etc Government operations Ferry terminals Fireboats Military Commercial/Industrial uses Marine terminals Boat building, ship repair, moorage of company owned vessels, manufacturers or distributors that ship and/or receive products by water) The Waterfront Lands Study evaluates existing uses and provides an estimate of the future demand by waterfront uses. It also includes an assessment of whether there is sufficient vacant or under-utilized land to meet these needs. 2

Water Depth Water depth is key, with different requirements for each type of use: Recreational boats typically require depths of 6 to 12 feet Tugs, barges, larger commercial fishing boats, small freighters, and ferries need 10 to 30 feet of water depth Larger commercial vessels (e.g. tankers and breakbulk vessels) usually need more than 30 feet of water depth Larger container vessels (8,000 TEU+) have drafts of more than 45 feet and require a depth of 50+ feet. The Ready Reserve fleet has a draft of 32 to 34 feet when loaded, needs channel and berth depth of 35 feet or more. 3

Marine Terminals Container, breakbulk, auto and grain terminals Currently comprise 854 acres Approximately 341 acres are in the 200 foot Shoreline District Terminal space is expected to reach approximately 1,477 acres by 2028 This increase of 623 acres will require a dislocation of other uses. Bulk terminals and industrial land Mainly private Handle a variety of products including petroleum products, crude minerals (aggregates, cement), scrap and ores, forest products Also includes other uses such as marine construction, and commercial vessels moorage Petroleum Products Four oil refineries and/or distribution facilities in Tacoma (approx 36.1 shoreline acres) Sound Refining Inc (Hylebos Waterway) US Oil & Refining Company (Blair Waterway) ConocoPhillips Tacoma Terminal (Thea Foss Waterway) Valero Logistics (Thea Foss Waterway) Expected to remain in operation unless dislocated by other uses. 4

Marine Terminals (continued) Crude Minerals Four terminals receive and/or ship crude minerals (approx. 12.2 shoreline acres) Glacier Northwest receives local sand and gravel as an input to cement manufacture Graymont Lime receives limestone from British Columbia as an input to lime products G-P Gypsum receives gypsum from Mexico for wallboard manufacture Walrath Trucking moves aggregates These firms will remain in their present locations through the end of the study period or be moved to an alternative site if dislocated by terminal development or another waterdependent use. Scrap & Ores (21.7 shoreline acres) Schnitzer Steel ships and receives through its marine terminal Calbag Metals, which does not ship or receive by water Expected to remain in their present locations Forest Products (approximately 144.8 shoreline acres) Manke Lumber - ships/receives by water Simpson Tacoma - ships/receives by water Buffelen Woodworking - not water dependent There has already been a significant shrinkage in the acreage, but BST Associates projects that the remaining firms will likely stay at their present locations. 5

Moorage & Related Sectors Commercial Vessel Moorage Crowley Maritime Corporation services the US Ready Reserve Fleet along Ruston Way at Sperry Dock American Construction moors company owned construction equipment on the Hylebos Foss and Crowley have moorage for company owned tugs and barges Trident Seafood moors fishing vessels and the US Army moors vessels at the end of the Blair Hylebos peninsula Additional moorage could be provided in the Hylebos from the Weyerhaeuser log dock past the Arkema property. However, water depth is limited in this area to 25 to 30 feet 6

Moorage & Related Sectors (continued) Boat Builders and Shipyards (approximately 14.6 shoreline acres) Nordlund Boat, Modutech, Metalcraft Marine, Aleutian Yachts and Northcoast Yachts manufacture recreational boats Martinac Shipyard and Marine Industries Northwest build and repair commercial vessels. Current economic conditions are hurting vessels sales, driving some firms out of business Metalcraft Marine, Aleutian Yachts and Northcoast Yachts will be dislocated by the Port of Tacoma YTTI Terminal Metalcraft Marine will likely consolidate to its headquarters in California Port is working with the others to relocate to the East Thea Foss Waterway. BST Associates projects that 10 to 20 acres may be required to meet the needs of this sector by the year 2028. A portion of this demand can be accommodated at the Wattles property on the East Thea Foss. 7

Moorage & Related Sectors (continued) Marinas Tacoma has recently undergone resurgence in redevelopment of its marinas with some new marinas developed and others rebuilt Tacoma has approximately sixteen moorage facilities (for permanent and transient moorage These marinas are well utilized, with a 96% occupancy rate There is a need for additional transient and permanent wet moorage facilities Replacement of mooring buoys along Ruston Way Improved facilities for hand launched and trailerable boats (up to 26 feet long) Preserve and enhance upland support activities such as repair, retail and other services Repair and retail services are provided by Commencement Bay Marine Services, Modutech, J&G Marine, Day Island Boatworks and Hyland Marine among others. 8

Shoreline Zone - S1 Narrows Marina provides recreational moorage Redevelopment opportunities in the uplands of the Narrows Marina (mixed-use development) 9

Shoreline Zone S2 through S5 S-2 contains the Tacoma Outboard Association facility in Titlow Beach Park. This is not expected to change significantly in the future. S-3 has no waterfront uses in this area, which is not expected to change. S-4 is in Point Defiance Park and has no waterfront facilities. S-5 contains the western part of Point Defiance park, and includes: Owens Beach Point Defiance Boathouse Marina Breakwater Marina Tacoma Yacht Club Point Defiance boat ramp Point Defiance-Tahlequah Ferry terminal. The current SMP encourages the development of more access in this district Tacoma Metro Parks is completing a plan for redevelopment that would enhance boating facilities in this area 10

Shoreline Zone S6 & S7 SMP encourages the development of more public waterfront access in this district. Boating access includes facilities adjacent to commercial businesses (dock at Silver Cloud Hotel et al) and at public facilities (Old Town Dock) Two marine terminals (Sperry Dock and grain elevator) Sperry Dock upgrade plans concern neighbors No anticipated changes to the grain elevator 11

Shoreline Zone S8 Thea Foss Waterway depths: 19 to 22 feet inside the East 11th Street bridge 29 feet outside the East 11th Street bridge Wheeler Osgood waterway approx. 2 ft. Several marinas and support services, with an increase in this type of activity expected Industrial operations include petroleum products, marine floats and a shipyard This area is expected to accommodate waterfront uses, and possibly office buildings transitioning to light/heavy industry Conflicting visions of industrial and mixed-use operations for the east Thea Foss Waterway 12

Shoreline Zone S9 The Puyallup River is not navigable by the general public There are no waterfront facilities Used by the Puyallup Tribe for subsistence and other fisheries. 13

Shoreline Zone S10 The Port Industrial area is well utilized, primarily by water-dependent uses. Water depths: Middle Waterway - 12 to 15 feet St. Paul Waterway - between 2 feet and 23 feet Sitcum Waterway - 51 feet Blair Waterway - 51 feet Hylebos Waterway 30 feet The Middle Waterway is used for tug moorage, and by a log lift dock and a ship yard. St. Paul Waterway has Simpson s barge dock. Sitcum Waterway is fully utilized by Port of Tacoma container and breakbulk terminals. Blair Waterway has by Port of Tacoma container terminals as well as several private terminals (Concrete Tech, GP Gypsum, Graymont Lime et al). The Blair Waterway is fully utilized. Plans to build two new container terminals could dislocate other water-dependent uses. The Hylebos Waterway is mainly used by private water-dependent firms. There are also several non-water-dependent uses. If existing non-water dependent firms cease their use of a site, it be considered for water-dependent use. A few vacant properties in this waterway could support water-dependent uses. 14

Shoreline Zone S11 & S12 Recreational boating facilities include: Chinook Landing Marina (S11) Ole & Charlie s (S11) Tyee Marina (S12) Log storage also occurs in S12 These uses are expected to continue throughout the study period A few vacant properties in this waterway could support water-dependent uses. 15