Nelson Hospital Redevelopment. Proposed Approach to Business Case Development

Similar documents
BUSINESS CASE FRAMEWORK AND PROCEDURES

Electricity Network Innovation Strategy

Transformation Programme. Sourcing Workstream PROCUREMENT PLAN. Inland Revenue. 28/06/2013 v1.0 FINAL Reference:

Electric Forward Market Report

BETTER BUSINESS CASE - EFFICIENT DECISION MAKING Chris Purchas, Tonkin + Taylor Limited

Invitation to tender

Governance, Risk Management & USE Workshop. 1 & 3 March 2011

Regional Analysis of Policy Reforms to promote Energy Efficiency and Renewable Energy Investments Interaction with National Participating Institutions

Dounreay Socio-Economic Development Plan

Re-design of the CPC Training Package: Carpentry, Joinery and Formwork/Falsework Qualifications

Minnesota District Freight Plans - Work Plan

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Overview of the New Zealand Natural Capital Assessment May 2014

Application for Recognition as a CA Business Valuation Specialist

Technical and Vocational Education & Training (TVET) Reform Project. Phase 1 Workplan (Dec 2007 Dec 2009)

Gas Network Innovation Strategy

AoC and Organizational Reviews: Supporting ICANN Accountability. ICANN53 24 June 2015

Application for Recognition as a CA SMSF Specialist (Regulation CR6/1403)

Project Manager Facilities and Development

Western Power Distribution Workplan to Improve Connections Performance 2014/ Quotation and Acceptance

Quality Impact Assessment Procedure. July 2012

5 Star London Hotels - Example Report

Request for Proposal (RFP)

FY17-FY18 Audit Plan. Office of Internal Auditing

Kingston Hospital NHS Foundation Trust Recovery Plan Update. Trust Board Meeting 29 th July 2015

Aligning Process Redesign and Change Management with Project Management (System Implementation Projects)

Raynet Software Lifecycle

From Both Sides: TSP from Within & Beyond

Better Business Cases. Guide to Developing a Single Stage Business Case

REQUIRED DOCUMENT FROM HIRING UNIT

Independent Formative Evaluation of the World Health Organization

North York Moors National Park Authority Finance, Risk Audit and Standards Committee

AXIS FAMILY RESOURCES CONTRACT EFFICIENCIES AND FLEXIBILITY INITIATIVE SCOPE STATEMENT

9100 Team July, IAQG is a trademark the International Aerospace Quality Group. Copyright 2014 IAQG. All rights reserved.

Dominican Republic Mid-Term Report. Pedro García Brito Climate Change Director Focal Point for REDD+

Victorian AMI Program Stephen Thomson, AMI Program Director Principal Consultant Marchment Hill Consulting

Better Business Cases. Managing Benefits from Projects and Programmes

Brand Plan Sample Template. Akademia Marketingu Farmaceutycznego

Better Business Cases. Guidance on Using the Five Case Model: An Overview

2017 Project Prioritization & Budgeting Process

APPLICATION INFORMATION: 1. All five sections of the application must be completed.

Storage as a Transmission Asset:

Illawarra Health and Medical Research Institute BOARD CHARTER

The City of Oregon City Oregon City Tourism Strategic Plan - Scope of Work. May 30, 2017 Submitted by Coraggio Group coraggiogroup.

Michigan Integrated Food and Farming Systems 2005 Marketing & Communications Plan

Better Business Cases. Guide to Developing the Detailed Business Case

MiFID II Extraterritorial Impacts. Product Manufacturing and Distribution

Terms of Reference Governance Committee

Update on Supply Chain Risk Management [SCRM] Standard

Planning Performance Agreement. In respect of. The Grahame Park Estate, Colindale, NW9 ( the Site )

The BIM Toolkit. Sarah Delany February 2015 v2.0

Business Practice Manual for The Transmission Planning Process

CLOSING DATE: 27 TH SEPTEMBER 2013

Commission Workshop Building Success

DoD Hazmat Business Process Reengineering: Environment, Safety and Occupational Health (ESOH) Transformation

Paper 8: IATI Governing Board paper on Long-term Institutional Arrangements

ON-THE-JOB TRAINING BLUEPRINT

Brighton & Hove is committed to providing restorative practice that is safe, secure and effective and compliant to national standard

Financial Intelligence NCIA 2016 National Training Conference Pittsburg April 18 th & 19 th

Meter Data Management System (MDMS) Sharing. Ricky Ip CLP Project Manager

CHILDREN'S SOCIAL CARE SERVICES ALTERNATIVE DELIVERY MODEL BUSINESS CASE APPROVAL

Campus Solutions 9.2 Upgrade Functional Testing Kickoff. panthersoft.fiu.edu

Traffic Division Public Works Department Anchorage: Performance. Value. Results.

Terms of Reference (TOR) Provision of consultancy services for payroll verification exercise

Request for Proposal (RFP)

2015 IRP/RUWMP Kickoff Workshop April 8, 2015

Overview Of PJM Demand Response and Energy Efficiency. Issues September 22, Susan Covino, Senior Consultant Market Strategy

CIC Guidelines Preliminary Design

Open Networks Project Phase Project Initiation Document

EMNAMBITHI/LADYSMITH MUNICIPALITY 2011/12 IDP

Are you prepared to make the decisions that matter most? Decision making in banking & capital markets

Okaloosa RESTORE Advisory Committee (ORAC) January 8, :30 PM 4:30 PM Emerald Coast Convention Center

TERMS OF REFERENCE FOR THE HUMAN RESOURCES COMMITTEE

Management Systems. Linkage. 26 March Text #ICANN49

Better Business Cases. Guide to Developing the Strategic Assessment

STRATEGIES TO ENGAGE DISTRICTS IN HIV MANAGEMENT IN FREE STATE. Innovative Health Care Management 30 JUNE 2011

Audit Committee report

Open Networks Project

Operations/ Departmental Manager Apprenticeship. Assessment Plan

COURSE LISTING. Courses Listed. Training for Applications with Integration in SAP Business One. 27 November 2017 (07:09 GMT) Advanced

2016 Annual Work Plan EUROfusion Engineering Grants. Annex 2. Guide for applicants

Project Order Proforma 2015

QUICK START GUIDE. SQF Implementation. for.

TNTP 2012 Scope of Work. Providence Schools I November 28, 2011

PROGRAM PREPARATORY TECHNICAL ASSISTANCE. 1. The program preparatory technical assistance (TA) is required to:

Organic Produce. Data Ending 28 th February 16

DCC Business Case for DCC activities during the Transitional Phase of the Switching Programme

Royal Edinburgh Hospital Public Social Partnership Wayfinder & Gateway Health Transformation through the Third Sector

UNICEF/EAPRO, Bangkok

Inspiring today, preparing for tomorrow

PASSPORT TO PERFORMANCE Your Year-End. Empowering you to do your best work every day

TWEED HEADS HOSPITAL REDEVELOPMENT STAGE 3

NATIONAL GRID. NTS Shrinkage Incentive Methodology Statement Submitted for Approval

ENERGY EFFICIENCY OPPORTUNITIES REPORT July June 2012

Transmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008

CUSTOMER ENGAGEMENT OUTCOMES REPORT

Monitoring validated processes by using SPC

IT-28 Risk Mitigation Policy and Peer Review Process

Transcription:

1. Background 1.1 Introduction Nelson Hospital Redevelopment Proposed Approach to Business Case Development Nelson Marlborough District Health Board (NMDHB) is seeking to prepare a business case for the redevelopment of the Nelson Hospital site. Following consultation with the Ministry of Health and Treasury, the business case is expected to follow the Ministry of Health adapted Better Business Case approach. It is envisaged that this will comprise four separate deliverables: a Strategic Case, an Indicative Business Case, a Detailed Business Case and an Implementation Business Case. This document outlines the proposed approach to the development of these business cases for the Nelson Hospital Redevelopment. It is intended as an indicative approach, to enable further discussion on the proposed way forward and inform cost estimates. 1.2 Background Over the last 20 years the Nelson hospital site has undergone several partial re-developments which have seen a number of services provided with more modern facilities. More recently, plans for a full redevelopment were also completed, but challenges, primarily related to affordability, meant that these plans were not pursued. Although previous re-developments modernised a number of facilities, the main structures are now very old and some are at significant risk of earthquake damage. Demands on the site are expected to increase as a result of an ageing population and population growth in general. This is driving NMDHB to review the health services and site plans, to enable the development of a business case for the redevelopment of the site to meet the future needs of the NMDHB population. 1.3 Planning to Date Several pieces of work that have either been completed or are in progress have provided important contextual information which will inform the business case process. The Health Services Planning, Health Needs Analysis and summary Facilities Implications Reports completed by Health Partners (now Ernst & Young) have provided initial indications for how NMDHB health services should be designed, clarified the existing pressures on services and projected the future demand if a do nothing approach is adopted. Detailed seismic assessments on the main structures (George Manson and Percy Brunette buildings) have highlighted that these buildings, whilst likely to protect life after a major earthquake, are unlikely to be usable after the event. Initial work has commenced on business continuity planning and a resumption of services plan is due to be completed by the Emergency Management team in June. Work has commenced on a Primary and Community Strategy and this is due to be completed at the end of March 2016. 05.1-1

2. Proposed Approach 2.1 Business Case Development Given the expected cost and level of interest in the proposed Nelson Hospital redevelopment, NMDHB will be required to produce a business case which meets Treasury and Ministry of Health Better Business Case requirements. This approach requires significant stakeholder engagement, rigorous testing of potential options and determination of a preferred approach which aligns with local, regional and national strategies. It is envisaged that the business case will be developed in stages: Risk Profile Assessment (RPA) and Scoping would be undertaken as the first step in preparing for the business case development. The Risk Profile Assessment and Scoping documents (as per Treasury Better Business Case requirements) would be completed and a discussion held between NMDHB and the monitoring agencies (Treasury, National Health Board, GCIO) to confirm the business case pathway and the level of assurance required (e.g. Gateway review). The Strategic Assessment summarises the drivers for investment and the strategic context. It outlines the expected scope of the investment and expected benefits that would arise from successful implementation. The Strategic Assessment seeks approval to proceed to the development of the business case. The Indicative business case (IBC) allows internal decision makers and monitoring agencies the opportunity to evaluate the proposed preferred approach at a relatively early stage, before significant detailed analysis is undertaken. The IBC identifies and evaluates a wide range of options and determines a preferred recommended way forward. The IBC seeks approval to proceed to the Detailed Business Case. The Detailed Business Case (DBC) undertakes detailed analysis on the preferred option. The output of the DBC is a detailed, costed proposal which identifies commercial, procurement and funding approaches as well as outlining the proposed approach to implementation. The Implementation Business Case recommends a preferred supplier and seeks final approval to proceed to enter into contracts to implement the agreed option. 2.2 Business Case Development Project Structure The proposed project structure outlined would allow control of the delivery of the elements of the business cases, and of the business case documents. Senior Responsible Owner: would have overall responsibility for the delivery of the business cases, and would be the key link with NMDHB management. Project Manager (Business Case Developer): would report to the Senior Responsible Owner. Responsible for project managing all elements of each business case, managing the specialists and DHB staff contributing to the business case, and for drafting the business case documents. 05.1-2

DHB resources: would report to the Project Manager for this project. The resource would vary between the cases. The expected requirement is administrative support throughout the project duration, plus: o Strategic Business Case: Subject Matter Experts to provide data to substantiate problems and benefits o Indicative Business Case: financial accountant, facilities project manager o Detailed Business Case: financial accountant, facilities project manager Specialist resource: would report to the Project Manager for this project. The specific requirements and the provider(s) of the resource would be determined in discussion with the DHB. The potential requirement is: o Strategic Business Case: detailed health needs analysis (by Health Partners), architect, accountant, commercial, QS, QA o Indicative Business Case: Service Planning, architect, accountant, commercial, QS, QA o Detailed Business Case: architect, accountant, commercial, QS, QA 2.3 Governance and Leadership The governance structure would be determined in discussion with NMDHB. A potential structure could be: NMDHB Board: Overall responsibility for the project development and implementation. Steering Group: reporting to NMDHB management/executives. Chaired by the SRO, membership to include the Project Manager and other key stakeholders, to be determined. This could include representatives from NMDHB, Treasury, Ministry of Health/National Health Board and, potentially, user representatives. Business Case Project Group: reporting to the Steering Group. Led by the Project Manager, with a changing membership appropriate to each of the business case stages. 3. Business Case Delivery 3.1 Proposed Consultants Sylvia Meakin: Sylvia would be the project manager for the delivery of the business case. This would include the development and writing of the business case, and management of the DHB and specialist resources assigned to this project. David Young: Peer review of the business cases would be provided by David Young, a Director of Hunter Group and Chartered Accountant. Specialists: To be employed by NMDHB, managed by the Project Manager. CVs for Sylvia and David can be provided on request. 3.2 Proposed Approach Stage 1: Pre-work. This would include: Clarification of scope and requirements, including completion of the NZ Treasury Risk Profile Assessment and Scoping Document; Convening the Better Business Case review meeting with Treasury, Ministry of Health, and other as required; Directing the delivery of detailed health service analysis from Health Partners; 05.1-3

Detailed delivery planning, including: identification and agreement on the allocation of resources; agreement on the responsibilities; agreement on deliverables/timeframes; Completion of the project plan and agreement on the milestones for the development of the Strategic Assessment. Stage 2: Strategic Assessment. This would include: Facilitated workshops (including 2 x ILM workshops) and meetings with key stakeholders to develop the collateral for the business case, to ensure understanding of the process and buy-in to the proposal(s); Development of the business case document as per the Better Business Case standard. Stage 3: Indicative Business Case. This would include: Confirmation of scope and requirements with Treasury, Ministry of Health, and other as required; Facilitated workshops and meetings with key stakeholders to develop the collateral for the business case, including options development and options shortlisting; Development of the five cases (revisit of strategic case, focus on economic case, some high level development of commercial, financial and management cases) as per the Better Business Case standard; Production of the draft business case, management of the internal review process, coordination of responses and resolution of issues arising from feedback received; Writing of the final business case document; Writing of supporting/covering papers for internal approvals groups (if required and if agreed as being within scope). Stage 4: Detailed Business Case. This would include: Confirmation of scope and requirements with Treasury, Ministry of Health, and other as required; Coordination of Feasibility Study and development of Functional Brief; Development of the five cases (revisit of strategic and economic cases, focus on the commercial, financial and management cases) as per the Better Business Case standard; Production of the draft, management of internal review, incorporation of feedback, development of final business case document and any supporting papers all as per the IBC. Stage 5: Implementation Business Case. This would include: Confirmation of scope and requirements with Treasury, Ministry of Health, and other as required; Development of the Implementation Case to reconfirm the strategic case for investment, finalise the expected costs, confirm the commercial/contractual arrangements, specify the management arrangements and detail the implementation approach and timeline, as per the Better Business Case standard. Project Management. This would include: Project planning and management of the project progress and delivery; Management of the NMDHB resource and any specialist resource; Reporting to the SRO/Steering Group; Support for key stakeholder communications. 05.1-4

3.3 Indicative Timeline The indicative timeline is based on the assumption of 2.5 years for completion of the four business cases, excluding the pre-work which is expected to be completed by July 2016. The timeline proposed would be subject to revision following discussion with the Treasury BBC team. Pre-Work Strategic Assessment Indicative Business Case Detailed Business Case Implementation Busines Case Calendar Year 2016 Calendar Year 2017 Calendar Year 2018 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 4. Cost Estimate Based on the approach described above, estimated costs have been categorised as either Hunter Group Controlled, or Other. 4.1 Hunter Group Controlled Costs The Hunter Group controlled costs comprise the Project Manager, accountant and change management planning. The cost estimate midpoint is estimated as totalling $515,540 (excl GST), and includes travel and accommodation. Due to uncertainties at this point, the estimate proposed is a range of $438,209 to $592,871. Hunter Group Pre-work Project Manager $ 20,270 Strategic Assessment Project Manager $ 63,600 Indicative Business Case Project Manager $ 113,790 Accountant $ 47,110 Total $ 160,900 Detailed Business Case Project Manager $ 113,790 Accountant $ 55,140 Change Management planning $ 7,700 Total $ 176,630 Implementation Business Case Project Manager $ 63,240 Accountant $ 23,200 Change Management planning $ 7,700 Total $ 94,140 HG Total $ 438,209 $ 515,540 $ 592,871 05.1-5

4.2 Other Costs The remaining costs are for the other resources required to develop the inputs for the business case, and external review. Relevant information: Costs include estimates for travel and accommodation. The time and travel estimates would need to be revisited with each provider. Although indicative architect costs are included, it is emphasised that these are approximate based on other recent build projects, and are highly uncertain at this early stage. The actual cost would need to be determined following any services redesign and as part of the procurement process for architect services. All other costs for facility design (e.g. structural engineers, building services, information services, QS etc.) are not included. These will be need to be defined as part of the facilities design procurement. Costs for design and fees are usually estimated at 15-17% of the total build cost. The cost estimate midpoint is shown below, total $287,200 (plus GST). The range for this estimate is between $229,760 and $344,640. Other Pre-work Health Partners $ 36,050 Strategic Assessment QA $ 13,200 Indicative Business Case Architect $ 64,450 QA $ 13,200 Total $ 77,650 Detailed Business Case Architect $ 126,400 QA $ 21,050 Total $ 147,450 Implementation Business Case QA $ 12,850 Other Total $ 229,760 $ 287,200 $ 344,640 Gateway review (4 @ $75,000) $ 300,000 4.3 DHB Costs DHB costs for internal resource are not estimated. These include administrative support, facilities project management, time from subject matter experts/service leads, finance, communications support and the SRO. These costs are assumed to be part of ongoing DHB costs. If additional resource is required to support this project, this would need to be costed by the DHB and included in the overall estimates. 05.1-6