COSVR95 SQA Unit Code HL88 04 Install sheeting and cladding systems on roofs and walls

Similar documents
COSVR186 - SQA Unit Code FW1A 04 Remove existing wall cladding systems

COSVR184 - SQA Unit Code FW15 04 Install wall cladding systems

COSVR11 - SQA Unit Code DY13 04 Erect structural carcassing components

COSVR69 - SQA Unit Code DY3K 04 Lay sand and cement screeds

COSVR290 - SQA Unit Code H36A 04 Erect timber roof structures

COSVR50 - SQA Unit Code DY9V 04 Repair and maintain masonry structures

COSVR272 - SQA Unit Code DY1C 04 Install roofing backgrounds and components

COSVR10 - SQA Unit Code F Install second fixing components

Overview COSVR678. Service and maintain or commission door, gate or shutter systems

COSVR664 - SQA Unit Code H4HB 04 Diagnose faults in plant or machinery systems or components

FY4W 04 Operate Plant or Machinery for Accessing (Mobile elevated working platform boom self propelled)

Overview COSVR681. Install external blinds, screens or solar shading systems

COSVR649 - SQA Unit Code H0WP 04 Produce stencils designs using pre-cut stencil plates

COSVR477 SQA Unit Code HM2F 04 Machinery and equipment maintenance

COSVR643(SQA Unit Code-FN2V 04) Move, handle or store resources

COSVR332 - SQA Unit Code F Prepare surfaces for painting/decorating

COSVR468 - SQA UNIT CODE F28C 04 Produce sawn wood and wood-based products

COSVR333 - SQA Unit Code F Apply paint systems by brush and roller

COSVR472 - SQA Unit Code F28P 04 Produce wood and wood-based products using computer numerically controlled/numerically controlled (CNC/NC) machinery

components in the workplace

SKSVR332 Prepare surfaces for painting/decorating

Level 2 NVQ Diploma in Trowel Occupations (Construction) (QCF) Qualification Specification

Installing door ironmongery in the workplace

Preparing and Operating Industrial Counterbalanced Forklifts to Lift and Transfer Loads in the Workplace

Level 2 NVQ Certificate in Erection of Precast Concrete (Construction)

Level 2 NVQ Diploma in Associated Industrial Services Occupations Passive Fire Protection (Construction)

Level 2 NVQ Certificate in Wall and Floor Tiling (Construction) Qualification Specification

Level 2 NVQ Diploma in Wood Occupations (Construction)

Level 2 NVQ Diploma in Construction Plant or Machinery Maintenance (Construction)

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Highways Maintenance (Construction)

Construction, Planning and the Built Environment Unit Content and Assessment Guidance (Attachments pathway)

Level 2 NVQ Diploma in Wood Occupations (Construction) (6571) September 2017 Version 2.6

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

Level 2 NVQ Diploma in Roadbuilding and Maintenance (Construction) Pathway 29: Plant Road Sweeping. Qualification Specification

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services - Roadbuilding (Construction)

Insulation and Building Treatments (Cavity Wall Insulation) Qualification Specification

COSVR641 Conform to general workplace health, safety and welfare

Qualification and Assessment Specification

COSVR728 - SQA Unit Code F3H7 04 Evaluate and select work methods

COSVR705 - SQA Unit Code H6AP 04 Allocate and monitor the use of plant, equipment or machinery

Qualification and Assessment Specification

Level 2 NVQ Diploma in Decorative Finishing and Industrial Painting Occupations (Construction) (6572) September 2017 Version 1.1

Cskills Awards L2 NVQ Diploma in Maintenance Operations (Construction)

COSCCOMO01 (SQA Unit Code - HA32 04) Maintain health, safety and welfare systems in construction contracting operations management

COSCCOMO01 - SQA Unit Code FM74 04 Maintain health, safety and welfare systems in construction contracting operations management

Qualification and Assessment Specification

Specification. Edexcel Level 1 NVQ Diploma in Construction Operations and Civil Engineering Services (Construction) (QCF)

Pearson Edexcel Level 2 NVQ Diploma in Decorative Finishing and Painting Occupations Painter (Construction)

Conforming to General Health, Safety and Welfare in the Workplace

Pearson Edexcel Level 2 NVQ Diploma in Site Logistics Operations (Construction) (QCF) Specification

COSBEDO01 - SQA Unit Code F50H 04 Produce and recommend detailed design solutions in built environment design

BBA 001 Documents included under the scope of BBA s ISO UKAS accreditation

ASTCO3 Ensure that your own actions reduce risks to health and safety

Level 2 NVQ Diploma in Decorative Finishing and Industrial Painting Occupations (Construction) (6572) July 2013 Version 2.0

REFLECTIVE TECHNOLOGY CONSTRUCTION MEMBRANES

This standard deals with the following:

Protan Exposed Membrane Roof. Your design - Our solution

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

Standard specification for the application of Danosa Two-Layer waterproof roofing membrane to plywood & concrete surfaces.

SEMPEO SQA Unit Code FP2D 04 Producing aircraft detail assemblies

1. Maintain a safe and healthy ICT working. environment

Overview COGESA4.10. Solve explosives process problems. This standard comprises the following elements:

SEMFWE3-11 SQA Unit Code HF38 04 Preparing resistance spot, seam and projection welding machines for production

Building Systems and Design Elements included in SliDeRulE

Level 2 Diploma in Construction Operations (Construction)

CHAPTER 3: Modern Methods of Construction (MMC)

WORK HEALTH AND SAFETY AUDIT STANDARD

TRAPEZOIDAL SHEET METAL RAIL

ROOF RENOVATION OVERSHEETING SYSTEM

ST-AK 1/12. Photovoltaic Mounting Systems. Assembly Instructions. Mounting system for roofing with trapezoidal sheet metal

SEMPEO SQA Unit Code H Carrying out pipe fitting activities

Light-Metal Roof Edge, Raised

Level 3 NVQ Diploma in Controlling Lifting Operations Supervising Lifts (Construction)

Fabrications, Safety & Lighting Solutions. Product Data Sheet. Kingspan Day-Lite Upstand KS1000 DLU

Safe Work Procedure for installation of

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

Construction. S-Vap 5000E SA Self-adhesive Vapour Barrier. Product Description

Construction. Sika-Trocal SGmA 1.5 mm. Polymeric membrane for roof waterproofing. Product Description

OREGON ROOF CONSULTING - ROOF INSPECTION FORM

Onduline Oversheeting Benefits. Onduline Sheet Specification. Insulation. The Onduline colour range

Standing Seam Systems. NBS Specification. KingZip SF Standing Seam Roofing System

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

Caledonian University, Glasgow - Aluminium Rainscreen System

Level 5 NVQ Diploma in Controlling Lifting Operations Planning Lifts (Construction)

TW50. Insulation STANDARD DETAILS FOR 50 MM INSULATION BOARD IN A 100 MM CAVITY. Low Energy Low Carbon Buildings. Wall lining. Inner leaf blockwork

Guidance Document Podium Decks & Buried Roofs

Insulating systems used in agricultural and industrial buildings

PLASTICS. Chapter 5. Materials of Construction-Plastics 1

NZQA Expiring unit standard version 2 Page 1 of 5. Install and maintain roofing, rainwater handling, and cladding systems, and flashings

IMIARBG1 Contribute to housekeeping in motor vehicle environments

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

GN18: BREEAM Recognised Responsible Sourcing Certification Schemes and BREEAM Scheme Applicability V3.1

TECHNICAL SPECIFICATIONS & PROFILES PIR INSULATED EXTERNAL WALL PANEL TECHNICAL GUIDE TO CONQUEROR TM PIR INSULATED EXTERNAL WALL PANEL

Guidance document GD 20 April 2015 amended May 2017 GUIDANCE DOCUMENT ON SERVICEABILITY STATES AND DEFLECTION CRITERIA

Code Compliance Research Report CCRR-0228

External Steel Stud and Top Hat Walls. Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd

Fire Resistant: Achieves FRL levels of 90/90/90 for load bearing walls.

60 years. of progressive development

Transcription:

Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment and installing sheeting and cladding systems and components This standard is for people installing sheeting and cladding systems on roofs and walls (missing from overview on NOS db) working in the occupational area of cladding occupations and can be used by operatives, supervisors and managers COSVR95 1

Performance criteria You must be able to: P1 interpret the given information relating to the work and resources to confirm its relevance P2 comply with the given, relevant legislation and official guidance to carry out your work and maintain safe and healthy work practices P3 select the required quantity and quality of resources for the methods of work P4 comply with organisational procedures to minimise the risk of damage to the work and surrounding area P5 comply with the given contract information to carry out the work efficiently to the required specification P6 complete the work within the allocated time, in accordance with the programme of work COSVR95 2

Knowledge and understanding Performance Criteria 1 Interpretation of information K1 K2 K3 the organisational procedures developed to report and rectify inappropriate information and unsuitable resources, and how they are implemented the types of information, their source and how they are interpreted the organisational procedures to solve problems with the information and why it is important they are followed Performance Criteria 2 Safe work practices K4 K5 K6 K7 K8 K9 the level of understanding operatives must have of information for relevant, current legislation and official guidance and how it is applied how emergencies should be responded to and who should respond the organisational security procedures for tools, equipment and personal belongings what the accident reporting procedures are and who is responsible for making the report why, when and how health and safety control equipment should be used how to comply with environmentally responsible work practices to meet current legislation and official guidance COSVR95 3

Performance Criteria 3 Selection of resources K10 the characteristics, quality, uses, sustainability, limitations and defects associated with the resources and how defects should be rectified K11 how the resources should be used and how any problems associated with the resources are reported K12 the organisational procedures to select resources, why they have been developed and how they are used K13 the hazards associated with the resources and methods of work and how they are overcome Performance Criteria 4 Minimise the risk of damage K14 how to protect work from damage and the purpose of protection K15 why disposal of waste should be carried out safely and how it is achieved Performance Criteria 5 Meet the contract specification K16 how methods of work, to meet the specification, are carried out and problems reported K17 how maintenance of tools and equipment is carried out Performance Criteria 6 Allocated time K18 what the programme is for the work to be carried out in the estimated, allocated time and why deadlines should be kept COSVR95 4

Additional Information Scope/range related to performance criteria Performance Criteria 1 1 interpretation of drawings, specifications, schedules, method statements, risk assessments and manufacturers' information related to the work to be carried out Performance Criteria 2 2 avoidance of risk by complying with the given information relating to the following 2.1 methods of work 2.2 safe use of health and safety control equipment 2.3 safe use of access equipment 2.4 safe use, storage and handling of materials, tools and equipment 2.5 specific risks to health Performance Criteria 3 3 selection of resources associated with own work 3.1 materials, components and fixings 3.2 tools and equipment Performance Criteria 4 4 protection of the work and its surrounding area from damage 5 prevent damage and maintain a clean work space 6 disposal of waste in accordance with current legislation Performance Criteria 5 7 demonstration of work skills to measure, set out, adjust, align, level, plumb, fit, fix and finish 8 use and maintain hand tools, portable power tools and ancillary equipment 9 install sheeting and cladding materials to roofs and walls, to include flashings, openings, vents, up-stands, protrusions and penetrations to given working instructions for at least one of the following systems 9.1 built-up 9.2 standing seam 9.3 secret fix 9.4 composite panel 9.5 fibre-cement Performance Criteria 6 10 completion of own work within the estimated, allocated time to meet the needs of other occupations and/or client COSVR95 5

Scope/range related to knowledge and understanding Disposal of waste 1 environmental responsibilities, organisational procedures, manufacturers information, statutory regulations and official guidance Emergencies 2 operative's response to situations in accordance with organisational authorisation and personal skills when involved with 2.1 fires, spillages, injuries, falls, rescue procedures 2.2 emergencies relating to occupational activities Hazards 3 those identified by risk assessment, method of work, manufacturers technical information, statutory regulations and official guidance Health and safety control equipment 4 identified by the principles of prevention for occupational use, types and purpose of each type, work situations and general work environment 4.1 collective protective measures 4.2 personal protective equipment (PPE) 4.3 respiratory protective equipment (RPE) Information 5 drawings, specifications, schedules, method statements, risk assessments, manufacturers' information, oral and written procedures, site inductions and current regulations governing buildings and official guidance associated with the installation of sheeting and cladding systems Legislation and official guidance 6 this relates to the operative's responsibilities regarding potential accidents, health hazards and the environment whilst working in the workplace, in confined spaces, at height, with tools and equipment, with materials and substances, with movement and storage of materials, by manual handling and mechanical lifting and with mechanical access equipment Maintenance 7 operative care of hand tools, portable power tools and ancillary equipment 8 how and when maintenance should be carried out COSVR95 6

Methods of work 9 application of knowledge for safe and healthy work practices, procedures and skills relating to the method and area of work and materials used to 9.1 identify installation quality requirements 9.2 conform to agreed specifications 9.3 conform to manufacturer s installation criteria 9.4 identify, recognise and work to gridlines and datum marks 9.5 position and secure fixings, halters, spacers, clips, fittings and sheets 9.6 deal with damaged and incorrect sheeting, cladding materials and resources 9.7 install built up standing seam, secret fix, composite panels and fibre cement systems 9.8 install decking and structural panels 9.9 maintain the integrity of surfaces, backgrounds, sheets and panels 9.10 position and secure vents 9.11 install insulation 9.12 measure, cut, fit, shape and fix flashing materials 9.13 install translucent sheets, condensation and vapour control materials 9.14 form and shape components for openings, vents, up-stands, protrusions and penetrations 9.15 ensure the integrity of joints, overlaps and interface details 9.16 apply sealants and install fillers to ensure water and airtight seals 9.17 check quality and suitability of work on completion and at the end of each working period 9.18 recognise and determine when additional specialist skills and knowledge are required and report accordingly 9.19 work from mobile elevating work platforms 9.20 work with, around and in close proximity to plant and machinery 9.21 use hand tools, portable power tools and equipment 9.22 work at height 9.23 use access equipment 10 team work and communication 11 needs of other occupations associated with installing sheeting and cladding systems on roofs and walls COSVR95 7

Problems 12 those arising from information, resources and methods of work 12.1 own authority to rectify 12.2 organisational reporting procedures Programme 13 types of progress charts, timetables and estimated times 14 organisational procedures for reporting circumstances which will affect the work programme Protect work 15 protect work against damage from general workplace activities, other occupations and adverse weather conditions Resources 16 materials, components and equipment relating to types, quantity, quality, sizes and the sustainability of standard and specialist 16.1 fixings, fasteners, flashings, fittings, halters, spacer systems and clips 16.2 insulation, vapour control, separation and breather membranes 16.3 sealants and fillers 16.4 metal and translucent sheets, built up, standing seam, secret fix, composite panels, decking panels and fibre cement systems 16.5 hand tools, portable power tools and equipment 17 identify quantity, length, area and wastage associated with the method and procedure to install sheeting and cladding on roofs and walls Security procedures 18 site, workplace, company and operative COSVR95 8

Glossary: Sheeting and cladding on roof and walls a waterproof skin (multi layered) over a structure. Single skin one layer of either sinusoidal (corrugated) profiled steel, aluminium, Polyvinyl Chloride (PVC), Glass Reinforced Plastic (GRP), Poly carbonate or fibre cement sheeting that fits directly to roof or wall without insulation, this also applies to trapezoidal (box) profiled sheet of either of the above materials except fibre cement which is only available as sinusoidal profiles. Crown highest part of the profile. Trough or pan lowest part of the profile. Standing seam sheets with a raised seam usually made from steel or aluminium. Halter the fixing connecting the sheets together, zipped, and to the structure. Clip fix sheets a variant of raised seam and halter, made from the same material as the sheets but using hidden clips, secret fix, to secure them to the structure. Twin or double skin insulated systems utilise a lining sheet and spacer system to create a void for insulation, and all other forms of sheeting and cladding can be utilised to form the waterproof skin when fixed to the spacer. Composite panels also referred to as sandwich panels, are manufactured to fit to roofs and walls in a variety of profiles and configurations and comprise two layers of metal with an insulation core, some systems are only suitable for walls. These panels come in various configurations including standing seam. Decking a profiled sheet or tray that provides a base for another roof system. Structural panels metal profiled sheeting or trays designed to span beams and columns. Specific designs of composite panels can be used as structural components. Cladding materials made from: ACM Aluminium Composite Material, Aluminium, Brick slip, Ceramic, Copper, Fibre cement, Fibre concrete, GRC Glassfibre Reinforced Concrete, GRP Glass Reinforced Plastic, Polycarbonate, Glass (non vision) Monolithic Panels, Chromatics, HPL high pressure laminate, Photovoltaic, Render, Stainless steel, Terracotta, Timber, Timber laminate, Thin stone, Weather boarding, Zinc. COSVR95 9

Developed by ConstructionSkills Version number 2 Date approved November 2014 Indicative review date Validity Status Originating organisation Original URN Relevant occupations Suite Key words November 2019 Current Original ConstructionSkills COSVR95 Roofers, Roof Tilers and Slaters Cladding Occupations (Construction) Fibre-cement; Composite panels; Flashings; Translucent-sheets; Secret fix; Standing seam; Fixings; Cladding COSVR95 10