Nakhon Sawan Water Treatment Plant Nakhon Sawan, Thailand

Similar documents
Dukso Water Treatment Plant Namyangju City, South Korea

Rawal Lake Water Treatment Plant Rawalpindi, Pakistan

Jungzhina Water Treatment Plant Thimpu, Bhutan

Drinking Water Production Using Moving Bed Filtration

Chembarambakkam Water Treatment Plant Chennai, India

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado

6.5 Filtration General

EVALUATION OF A WATER TREATMENT PLANT PERFORMANCE CASE STUDY

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv

Water Treatment Overview. Gabe Sasser December 2016

ENVIRONMENTAL AND HEALTH ASPECTS OF WATER TREATMENT AND SUPPLY Design of Water Treatment Facilities - Katsuyoshi Tomono, Yasumoto Magara

Removing Heavy Metals from Wastewater

SYSTEMATIC APPROACH TO WATER TREATMENT PLANT PROCESS OPTIMIZATION

ENVIRONMENTAL ENGINEERING-I

OPERATORS PERSPECTIVE : OPTIMISATION OF A NEW PACKAGE WATER TREATMENT PLANT. Melina Entwistle. North East Water Authority

Optimizing the Ballasted Sedimentation Process at the Anacortes Water Treatment Plant Jeff Marrs Plant Manager Greg Pierson - HDR

Treatment Processes for Potable Water

CE 370. Filtration. Overview of the Process Location in the Treatment Plant

Lowering The Total Cost Of Operation

STREAMING CURRENT MONITOR FOR COAGULANT OPTIMIZATION IN WATER TREATMENT PLANTS - LAP EXPERIENCE

Seasonal Source Water Quality and Treatment Challenges Town of Newburgh s Chadwick Lake Filtration Plant

Agenda. Pretreatment Background Typical Contaminants Practical Examples Methods of Treatment and References

Side by Side Piloting of Process Alternatives Yields Direct Performance Comparison

Drinking Water Audit Report

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

Unit Treatment Processes in Water and Wastewater Engineering

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

Removal of turbidity from water by dissolved air flotation and conventional sedimentation systems using poly aluminum chloride as coagulant

Separations Overview TDRL Seminar

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

Zero Discharge for Textile Industry

Water Treatment Plant Startup Issues and Considerations

Development of Integrated Filtration System for Water Treatment and Wastewater Reclamation in Developing Countries

Evaluation of Conventional Activated Sludge Compared to Membrane Bioreactors

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY


INFLUENCE OF EFFECTIVE SIZE AND LEVEL OF SUPERNATANT LAYER IN SLOW SAND FILTER PERFORMANCE

Table of Contents. 0.0 Executive Summary Potable Water Demand Projection Introduction... 35

Tampa Bay Water (TBW) is a regional

J.K. ENGINEERING LTD. CONSULTING * RESEARCH * DEVELOPMENT

Introduction to flocculation

Evaluation of MF/UF Technology on the Nooksack River for Drinking Water Production

Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE

Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant

POTABLE WATER COAGULANT TRIALS UTILIZING POLYALUMINIUM CHLORHYDRATE. Michael Dalton. Toowoomba City Council

A Comprehensive Performance Evaluation (CPE) Approach to Addressing HABs

Drinking Water Treatment: Filtration and Disinfection


Comparison of Water Quality Parameters

AS-H Iso-Disc Cloth Media Filter

Engineered Media for Municipal and Industrial Applications

AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal

Wastewater Treatment Works... The Basics

Lagoons Operation and Management in New Brunswick

New Horizons for Slow Sand Filtration. Dr. David H. Manz, P. Eng.

Sanitary and Environmental Engineering I (4 th Year Civil)

St. John the Baptist Parish

MONTHLY OPERATION REPORT (MOR)--ALL WATER SYSTEMS

WODCON XXI, June 2016, Miami, Florida Some Proven Benefits of Polymer Use in the Treatment of Sediments in Recent Dredging Projects

Module 19 : Aerobic Secondary Treatment Of Wastewater. Lecture 24 : Aerobic Secondary Treatment Of Wastewater

Mechanism of filtration : 1- Straining action: strain particles that has a big size on the sand surface.

Granular Activated Carbon System

Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc.

FILTRATION INDUSTRY -An Overview

DRIP EMITTER SYSTEM STUDY GUIDE

Recent Advances in Membrane Technologies Peter D Adamo, Ph.D., P.E Spring Conference Wilmington, NC April 13, 2015

BIOMAG/COMAG FREQUENTLY ASKED QUESTIONS

OPTIMISATION OF A WATER TREATMENT PLANT FOR FLOOD CONDITIONS. John Granzien Gene Heffernan. John Granzien, Team Leader, Gene Heffernan, Operator

Key words: Integrated Membrane System, IMS, Seawater Reverse Osmosis, SWRO, SW30HRLE- 400, Ultrafiltration, UF, ZeeWeed 1000

REAL WORLD APPLICATIONS OF USING DYNAMIC SIMULATION SOFTWARE TO OPTIMIZE WATER TREATMENT PLANT PROCESS OPERATIONS

Evaluating the Use of Tube Settlers and Lamella Plates in Increasing the Efficiency of Sedimentation Tanks

OPTIMISING FILTRATION AT DUNGOG WTP. David Turner. Hunter Water Australia

Hybrid RO & Softening Birjand Water Treatment Plant

Wastewater Treatment Processes

Liquid Stream Fundamentals: Grit Removal

Biofiltration and Downspout Filter Media Evaluation for BMP Decision-Making at the Port of Vancouver, WA

Domestic Waste Water (Sewage): Collection, Treatment & Disposal

WRF Webcast Biofilter Conversion Guidance Manual

Treatment Technologies

DBP Treatment Strategies. Learning Objectives. DBP Control Options Optimize existing facilities

9-2. Wet-weather high-speed wastewater filtration system (primary treatment of untreated wastewater)

For Safe and Delicious Water

W H I T E P A P E R. The Effect of Low Uniformity Coefficient Anthracite on Dual Media Filtration

CONTENTS. Alternative water supply options are needed for those areas.

19. AEROBIC SECONDARY TREATMENT OF WASTEWATER

WEPA Nepal Dialogue Site Visit Report 13and 15 December, 2010, Kathmandu, Nepal

Study Session 5 Water Treatment Technologies for Large-scale Water Supply

Optimizing Filter Conditions for Improved Manganese Control During Conversion To Biofiltration [Project #4448]

Wastewater Treatment Processes

Removal of Manganese by Microfiltration in a Water Treatment Plant*

Guide to Inclined Plate Settlers

Water Quality. CE 370 Lecture 1. Global Distribution of Earth s s Water

Module 22 : Sludge Management

Figures...vii Tables... ix Acknowledgments... xi Foreword... xiii Preface...xv

5.2.2 Lower Mgeni System

THE EFFECT OF HYDRAULIC JUMP COAGULATION MIXER ON THE PERFORMANCE OF DRINKING WATER TREATMENT PLANT

Capital Investment Plan Quarterly Report for period ending September 2017

Transcription:

Nakhon Sawan Water Treatment Plant Nakhon Sawan, Thailand 1. Background Information Nakhon Sawan is located about 250 km north of Bangkok and marks the point of confluence of two of major Thai rivers, the Ping and the Nan. These two rivers converge to form the Chao Phraya, which flows south to Bangkok and out into the Gulf of Thailand. Nakhon Sawan water treatment plant operates as BuildOperateTransfer (BOT). The plant is operated by Nakonsawan Water Supply Company Limited under Universal Utilities Company Limited (UU). The Provincial Water Authority (PWA) signed the contract with the company on 7 November 2000 and the commercial operation of the water treatment plant commenced from 1 March 2003. Further background information about Nakhon Sawan WTP is shown in Table 1. Table 1 Overall Information of Nakhon Sawan Water Treatment Plant Constructed Year 2003 Water Source Number of connections 8,446 Population served 42,230 Peak Operating Flow (m 3 /h) 352 Design capacity (m 3 /h) 600 Peak/Design flow 0.59 No. of operators working at the plant 3 Date of access of the source information 2013 Chao Phraya River Reference (Universal Utilities, 2015) 2. Water Treatment Process The major processes are as follows: Raw water extraction (intake) Pipeline static mixing (PAC and prechlorination) Flocculation (baffled channel type) Sedimentation (rectangular, tube settler) Rapid sand filters (fine sand) Clear water tank (Liquid chlorine disinfection) High Lift Pump Building (to distribution network). Sludge generated from sedimentation tank and filter backwash are collected and sent to sludge drying bed and sludge storage pond. Figure 1 below shows the treatment process at Nakhon Sawan WTP. 1

2.1 Chemical feeding and rapid mixing Figure 1 Water Treatment Process at Nakhon Sawan WTP Two kinds of chemicals are mainly used for water treatment, solid poly aluminum chloride (PAC) as a coagulant and liquid chlorine for pre and postchlorination. PAC (Figure 2) is added at the entrance of flocculation tank. These chemicals are injected in raw water pipeline using static mixing. Figure 2 Solid PAC Figure 3 Liquid Chlorine (20kg) 2.2 Flocculation Figure 4 illustrates the flocculation basin. Nakhon Sawan WTP uses hydraulic flocculation mixing method, roundtheend baffled channel type (Figure 5). The overall detention time at this stage of treatment is 27 minutes. Here, with the help of PAC, the colloidal particles are flocculated. According to Kawamura (2000), the retention time of water in horizontal baffle hydraulic mixing is from 30 to 40 minutes. Shorter retention time might lead to reduce the quality of flocs (smaller size). To promote the connection, generally, the velocity gradient value is in the range from 60 to 70 s 1 at the first compartment. To prevent the breaking of the large flocs, the velocity gradient at the last compartment was reduced to 1030 s 1. The average velocity gradient at Nakhon Sawan WTP is 38 s 1 (Ratchanet, 2013). 2

Figure 4 Flocculation (2 basins) Figure 5 Roundtheend Baffled Channel Type 2.3 Sedimentation Sedimentation basin is a rectangular type (Figure 6) with Vnotched weir (with tube settler installed as shown in Figure 7). The length of sedimentation basin is very short and detention time is 1.7 h with the water mean velocity of 0.72 m/min (Ratchanet, 2013). Thus, tube settlers are installed in basin and surface loading is 5.5 m 3 /m 2 h. According to Kawamura (2000), the surface loading rate of the sedimentation tank which is covered by the tube settler system should be limited between 7.5 to 8.8 m 3 /m 2.h. Sludge is removed by mechanical sludge collector. Figure 6 Sedimentation (2 basins) Figure 7 Tube Settler 2.4 Filtration The media utilized in rapid filters is fine sand with 0.7 mm of effective size, uniform coefficient of 1.4 and filter depth 63 cm. The filtration bed area is 12 m 2. This filter depth satisfies the technical design requirement (70 cm, according to AWWA (1999)). In addition, the filtration rate is maintained at 6.9 m/h. The backwash method consists of water wash with air scour. The backwash rate of 0.8 m/min. The surface of filter is cleaned manually. 3

Figure 8 Filtration (4 basins) Figure 9 Filter Control Panel 2.5 Sludge disposal There are two sludge disposal methods being used at Nakhon Sawan WTP; three drying beds in the premise of WTP and a sludge basin near the Chao Phraya River (Ratchanet, 2013). Figure 10, 11 and 12 shows the sludge disposal facilities. By using solar energy and drainage system, liquid sludge is dewatered and dried at sludge drying bed. Figure 10 Drying Bed (3 basins) Figure 11 Transport line of sludge from WTP to sludge basin 4

Sludge Sand Gravel Filtrate Under drainage Figure 12 Conventional Sludge Drying Bed 3. Aspects of treatment processes posing most difficulty for daily operation The site of treatment plant should be considered for future plant expansion as well as construction cost, accessibility, site maintenance cost, and operator safety. Nakhon Sawan WTP has narrow area, especially sedimentation basin is very small sized (installed tube settler). It is expected to have some difficulties in case of operation and maintenance (O&M) and future installation of new facilities. Dual media and deeper bed (coarse sand) are superior to conventional filter (fine sand) in terms of head loss development and filter run time (Mayer et al., 1999). There is a need to introduce these media at Nakhon Sawan WTP when the turbidity of raw water is high during rainy season. However, there is no plan yet to upgrade this WTP. Residual chlorine concentration of approximately 0.3 mg/l should be maintained in treated water at all times for preventing the growth of algae on the basin walls and the growth of microorganisms in the filter bed. But, algal growth in the effluent trough and walls of settler basin at Nakhon Sawan WTP can be observed (Figure 13). There is a possibility that prechlorine injection is not functional. Especially in the raw water, high concentration of Fe and Mn was detected (refer Table 2). It is therefore suggested for a continuous prechlorine injection. 5

Algae growth Figure 13 Sedimentation Basin with Algae Attached Color differentiation of the pipes is extremely important to avoid any mistake or confusion by the operators. Thailand has already introduced multiple colored pipeline valves system 100 years ago (Figure 14), however, Nakhon Sawan WTP has all of its pipelines in blue colour, as seen in Figure 15. Blue color Figure 14 Thai Waterworks Museum Figure 15 Pipeline Color of Nakhon Sawan WTP It is extremely important to continuously monitor water quality at all stages of water treatment process. Thus, monitoring equipment are required to be maintained properly for measuring exact value at all times. However, in this WTP, the online turbidity measurement equipment is not maintained properly, and often shows errors (Figure 16). 6

Error of turbidity value measured Figure 16 Turbidity Online Measurement 4. Aspects of water services management in general posing most difficulty at the moment Water quality is degraded during distribution system by several causes, including: Contamination from external sources (i.e. nonauthorized connection) Hydraulic transients: when the velocity and pressure of a flow changes rapidly at the same time. This phenomena can damage the whole system (pipeline, pumps and valves) Deteriorated pipeline: pipelines, especially metallic pipes are corroded easily since it is exposed directly to the soil and/or atmospheric. Improperly maintained storage facilities. 5. Measures are now being taken to cope with 3) and 4) PWA is planning to establish a water safety plan (WSP) in 2015 addressing the following five parameters: raw water system, production system, chemical feeding system, quality control system, distribution system This water safety plan consists of both risk assessment and risk management for whole treatment process, from water source (catchment) to distribution to its customers. It helps to ensure that the water quality is always safe to customer s usage and the water source is always available. 6. Recent investment made for the plant s improvement Tube settlers were installed to increase the settling surface area of sedimentation tank. This modules consist of three main parts: (1) tubular channels, (2) a series of sloped, (3) a structural wave sheets. The installation footprint of sedimentation tank is reduced greatly by installing this system. The quality of effluent flow is also improved. 7

7. Technologies, facilities or other types of assistance needed to better cope with operational and management difficulties in 3) and 4) Intermittent injection of Prechlorination is not enough to remove Fe and Mn by oxidation, as well as to prevent the growth of algae in effluent trough and walls of settler basin. Thus, continual injection of chlorine is suggested. The single colored pipelines should be changed by using various colors in the pipelines to avoid confusions by the operators. 8. Customer s opinion on water quality and water services in general PWA has created a website for customer s complaint registration (http://en.pwa.co.th/complain/complain_view.php ) A consumer who is unsatisfied with the service or has any suggestion can visit this website and lodge the complaints or suggestion, or can also send it to the plant by post. Customers expect the WTP provides a better water service with sufficient supply of water with better quality. The website shows a gradual increase in the number of complaints. 9. Advanced technology used in this water treatment plant or any points to improve the process, water quality and capacity. Advanced technology: none All sampling lines are installed in the same place thus making sampling easy for each treatment process. 10. Other Highlights Chemical usage: solid PAC and liquid chlorine. Alkaline chemical is not used Water tariff: 0.4 US$/m 3 11. Water quality data The water quality data obtained from Nakhon Sawan WTP are presented in Table 2. All measured parameters are under the drinking water standard of Thailand. 8

Table 2 Raw Water and Treated Water Quality (Ratchanet, 2013) Parameters Unit Raw water Treated water Standard (Thailand) ph 7.8 7.7 6.58.5 Turbidity NTU 29.5 0.59 5 Conductivity μs/cm 197 201 Total hardness mg/l 86 89 NO 3 N mg/l 0.407 0.436 45 Iron mg/l 1.39 0.06 0.5 Manganese mg/l 0.55 0.05 0.3 Copper mg/l 0.037 0.025 1.0 Zinc mg/l 0.043 0.026 5.0 Chloride mg/l 8.0 11.3 250 12. Additional information Latitude: 15 40'57.86"N Longitude: 100 7'32.17"E Sampling line Figure 17 Sampling line Figure 18 Sampling points 13. References American Water Works Association. (1999). Water Quality and Treatment (6th edition). New York: McGrawHill. ISBN: 9780071630115. Kawamura, S. (2000). Integrated design and operation of water treatment facilities (2nd edition). John Wiley and Sons. ISBN: 9780471350934. Mayer, P. W., DeOreo, W. B., Opitz, E. M., Kiefer, J. C., Davis, W. Y., Dziegielewski, B., and Nelson, J. O. (1999). Residential end uses of water: AWWA Research Foundation and American Water Works Association Denver, CO. PWA. (2014). Private Sector Participation in PWA's Business In bzjoined_2014. Thailand: Provincial 9

waterworks authority. Retrieved on 15 th ontents/files/a bout/bzjoined_2014.pdf June, 2015 from http://www.pwa.co.th/c Ratchanet, K. (2013). Performance appraisal of the provincial water works authority water supply system in PWA region 10, Nakhonsawan, Thailand. (Master thesis No. EV1336, Asian Institute of Technology, 2013). Bangkok: Asian Institute of Technology, Thailand. Universal Utilities. (2015). Waterworks management. Retrieved on 9 th June, 2015, 2015 from http://w ww.uu.co.th/content.asp?smenuid=8&shmenuid=&nlevel=1&scontgroupid=02. 10

Prepared by: Mr. Park Dong Hak PhD Candidate Environmental Engineering and Management Program School of Environment, Resources and Development, Asian Institute of Technology, PO Box 4, Klongluang, Pathumthani, 12120, Thailand. Disclaimer: This report was prepared for the NewTap project, which is funded by the Japan Water Research Center. JWRC assumes no responsibility for the content of the report or for the opinions or statements of fact expressed in it. This report is presented solely for informational purposes. The copyright of this report is reserved by JWRC. For more details about the copyright, please refer to the site policy of the NewTap website. Date: 22 June 2015 URL: http://www.jwrcnet.or.jp/aswin/en/newtap Email: newtap@jwrcnet.or.jp 11