The frame elements, accessories and additional elements are maintenance-free!

Similar documents
CORNER ELEMENTS CENTRE SUPPORT ACCESSORY BAG PROJECTION SCREEN BAG. 4 pieces- basic frame 52x52 cm (fig.: including SET UP SUPPORT,optional)

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

Mounting systems for solar technology

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

Speedlock Pallet Racking

CEILING & WALL SYSTEMS

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

INDUSTRIAL CURTAINS INSTALLATION INSTRUCTIONS CHAIN SUPPORT MOUNTING

Optima Vector Ultima Vector

Thank you for purchasing our product. *Please read these instructions and follow them step by step.

Z5043 MAX Horizontal bracket Mounting instructions

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

This Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated by these symbols.

Conergy SolarFamulus II

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work.

Z5028 E3/Ci80 Horizontal bracket Mounting instructions

Z5033 E3 Ball joint adapter Mounting instructions

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

layout instructions provides both left and right hand facilities without the need to specify

PortaFloor PRO Rollable Event Flooring Installation and Maintenance Guide

AXIOM Indirect Light Coves

OPTIMA Vector Plank Installation Instructions

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

Sun Fire E25K/E20K Systems Unpacking Guide

A-Series Aluminum Gantry Crane

Planning book. System M Shelf System M Sideboard Table M 04 Side table M 05 Lotus table Side table Kaiser Side table Kanji

(01) Thermo Bond Buildings Military Service Shelter: DOG KENNEL OPERATING AND SETUP MANUAL MSS-RP-1-20P

MarQuee LED TM. Quick Install Guide. Safety Notices and Warnings. Cleaning of Outside of Unit

HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION

SECTION ACOUSTICAL PANEL CEILINGS

2. Standard assembly system for roofs 2.1 Connection to the roof substructure 2.2 Assembly system 2.3 Module level

FITNESS PLAYGROUND ITEM NO: 8010

Conversion Station Model 711

All panels can be supplied in a range of styles, to suit the applications pictured below.

Platform stair lift PLG7

PORTA-FAB Cleanroom Wall Systems

Optima Vector Plank. Installation Instructions. Ceiling

ASSEMBLY AND OPERATING MANUAL LTW EG CORNER - MANHOLE

SECTION TOILET COMPARTMENTS. A. Section Metal Fabrications: Concealed steel support members.

Box Rail. Single Box Rail Bracket

INDUSTRIAL THERMOMETERS

Trench Duct Class Catalog 5230CT9601R10/08

SECTION Summit Phenolic Lockers (Solid Phenolic Lockers)

Vision Platform System

Installation & User Manual

TOLL FREE: (866) VANITY SPECIFICATIONS. VANITY COMPONENTS Model VG09008

Smarter. Safer. Leaner.

Simple Solutions Prices. Corex with Econo Stand. Vertical Banner with Bracket System. Billboard with Holder. Bailey Signage Solutions

HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION

Original Scandinavian rainwater system

BoSS Climalite Camera and lighting tower

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use

Construction. Injectable hose for sealing construction joints in watertight structures. Product Description. Product Data. Tests.

eos LightPanel Systems User Guide

Installation Instructions

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS

General Guidelines. Tools Required. Instructions for Part # SC500-AF. Safety

Axiom Building Perimeter System

Thank you for purchasing the SC-CONVERSION System 500/600 Conversion Kit. This Kit is available in two different versions:

Leap Walk In Enclosure

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Aqua Swing Tub Door & EX/RT Panel

ASSEMBLY AND OPERATING MANUAL LTW SHORING BOXES VB 100

New consumer units. Design and functionality in plain sight.

Lionel Truss Bridge with Flasher and Piers Owner s Manual

Air flue duct for use with ecotec boilers

Stainless steel. 1.6 Stainless steel IP 69 K. Premium Panel, protection category IP 69K

Installation Instructions. Important. Recommended Tools. Palladium Rigid Sheet/Rubrail or Palladium G2 Sheet/Rubrail. Storage

PS-31 (SUS304, 300 mm) PS-31 (SUS304, 1,000 mm)

CLINICS. LABS. PHARMACIES. PREP AND PACK.

Introduction. Before You Begin

Owner s Manual.

PE45 AMAZON MONKEY BARS OWNER'S MANUAL

Student Services & Classroom Addition

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

MOUNTING SYSTEM FOR PITCHED ROOF WITH TILES. mounting system for pitched roof with tiles for solar panels in landscape setup. Rev

TRUSS DOCK INSTRUCTIONS

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.

Z5010 (Version 2) TV spigot with fixing plate Mounting instructions

Adjustable Pallet Racking Installation Guide

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

ARMSTRONG SHALL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF THE USE OF ANY OF ITS GUIDE SPECIFICATIONS. SECTION PERIMETER TRANSITION SYSTEM

Universal Tactical Light

SECTION SOLID COLOR REINFORCED COMPOSITE TOILET PARTITIONS

These instructions must be left with the user

HRO-50 Water Purifier

TI-LINE TILUX DURABASE. Borderless Shower Areas

SOLAR SHADING SYSTEMS - Manual Solar Shade SECTION ROLLER WINDOW SHADES

SECTION LIGHT DUTY SLIDING AND STACKING GLASS DOOR SYSTEMS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

Keylar Shelving (QLD) Pty Ltd

OPTIMA Vector ULTIMA Vector

TP LITE. Office Partitions. Technical guide

Design Technology Details. Partition System Orga

Transcription:

FULLWHITE MANUAL

GENERAL QUALITY AND SAFETY: This projection screen is in accordance with the safety regulations in DIN standard 19045. The screen fabric is comply with DIN 4102 part 1 and the specifications of the according data sheet. WARRANTY: The warranty period for production deficiencies is 5 years for the frame elements and 24 months for the projection surface. The projection screen is developed for indoor use only. Any damage and consequential damage caused by outdoor use is not covered by warranty. FRAME ELEMENTS: The frame elements, accessories and additional elements are maintenance-free! PROJECTION SURFACE: The projection surface is packed into a separate soft bag to avoid any damage by the frame parts, bleaching and discoloration. Additionally following handling instructions have to be adhered to:! Do not bring printed and coloring objects (instructions, magazines, etc.) in contact with the projection surface! Do not mark the projection surface! Colors penetrate the projection surface and cannot be cleaned anymore! Store the projection surface cleaned and dry at room temperature only! When transporting the projection surface at low temperatures, do not mount the surface unless it has reached its full elasticity at room temperature. Otherwise there is the risk of cold break of the projection screen. FOLDED STORAGE The projection surface has to be folded with the front layer inside and we recommend to lay out the enclosed foamed plastic foil between the surface layers to avoid permanent marks, soil and damage. ROLLED STORAGE Packing the projection surface we recommend to lay out the enclosed foamed plastic foil between the surface layers to avoid permanent marks. CLEANING OF THE PROJECTION SURFACE: Use a white clean cotton cloth saturated with clear water (optionally mild soap water) and gently wipe the area in one direction (no circular motion). Wipe dry with another cotton cloth. To clean a stubborn stain, use methylated spirit and follow the same procedure. Clean rear projection surfaces in case of imperative only! Subject to modifications, errors expected!

OVERVIEW Further development of the mobile projection screens for applications where technology plays a secondary role and puristic design is required. With the minimalistic design this projection screen fits easily in every optical superior installation. Universal, invisible mounting options as well as high stability and flexibility are essential features of this projection system. SYSTEM COMPONENTS: clamp connector with clamping profile (red) The hollow chamber profile with trapezoid shape gives an extra high stability and allows a perfect wrinkle-free application of the projection surface on the backside of the profile with hooks or Velcro. The clamp connectors with the patented shape of the clamping profile (red) guarantees a secured and solid connection, like a monolithic system. frame profile clamp screws frame profile The corner parts are designed as a single piece construction with a minimum tolerance, thereby ensuring the highest precision.

FRAME SET UP In case a positive connection is required, each clamp connection can be secured with the enclosed red locking plate. Insert the red locking plate into the inner slot, according to the picture on the left. or Stick together each straight frame profile with a clamp connector with the subsequent frame section according to the labels. The connection is secured with a screwdriver by turning the two clamp screws clockwise.

CONNECTION PLATE Slide the connection plate (red) over the securing holes as shown on pictures and tighten the locking pins with the enclosed screwdriver completely.

FRAME SET UP 7 Put together the connected upper and lower straight horizontal frame elements with corner parts on each end. Clamp the connection by turning the two clamp screws clockwise and secure the connections with the red locking plates.next plug in the vertical elements, clamp and secure them in the same way.the vertical connections must always be secured with the locking plates!

CENTER SUPPORT 1 2 3 4 1-2 Put together the center support according to the labels and secure the connections with the two wing nuts. 3 Detach the pivot nuts from the top and bottom center support element and insert them into the inner slot of the horizontal frame bar. 4 Place the center support and secure it on top and bottom with the Phillips screws.

PROTECTIVE FOIL ATTENTION!! Before you unroll the projection surface with the projection side down, the floor has to be cleaned completely and the supplied protective foil has to be laid out. The protective foil is to prevent contamination and damage to the projection side of the projection surface. SURFACE MOUNTING 3 The frame now needs to be placed flat onto the backside of the projection surface according to the photo.this step has to be carried out with several people to avoid any damage of the projection surface! PROJECTION SURFACE WITH VELCRO Fold the surface to the backside of the frame and thighten it with the Velcro. PROJECTION SURFACE WITH HOOKS Fold the surface to the backside of the frame, thighten it and fix it with the hooks in the slot The projection surface is kept in position by the special corner clips.

MOUNTING OPTIONS MOUNTING BRACKET FOR WALL MOUNTING Optional as vertical or horizontal mounting point Vertikal mounting Horizontal mounting MOUNTING BRACKET FOR CEILING SUSPENSION MOUNTING POINT FOR LEGS: Individually movable mounting points with M8 threaded inserts for legs can be mounted at the back of the frame profile.

PIVOT NUTS 1 General attachment of pivot Nuts M8 2 3 DISASSEMBLY The dismantling is done in reverse order. The black colored clamp points should stay connected with the frame profile (see photo).

ACCESSORIES MOUNTING PLATE The installation of the projection surface with large FULLWHITE is done by using mounting plates.these mounting plates lifts the frame and it floats above the ground about 11cm (4.5 inches). Through the gained ground clearance the projection surface can be strached around the frame and hooked into the underlying groove easily. Using this mounting plates it is no longer neccessary to lay out the surface on the floor. These mounting plates are attached to the two pivot nuts M8 in the inner groove and required for the period of assembly only. The mounting plates shall be allocated next to the four corners and the remaining plates should be mounted regularely on the horizontal and vertical bars. After the attachement of the projection surface the mounting plates can be removed.