Construction Standard No: 8.3.3

Similar documents
Model # 358-R48. 7/7/2011 Page 1 of 11

INSTALLATION INSTRUCTION (U.S.A) FOR LUMI-O DRY NICHE INGROUND LIGHT.

PVC Project Assembly Guide a FORMUFIT field manual

thermoweld The Contractors Choice GREAT PRODUCTS GREAT SERVICE GREAT PEOPLE

Training Guide Electric Arc Welding (non code).

24 Portable Saw Mill OWNER S MANUAL

Model # BARK-358-RDP

Model # 338S-OP. 9/30/2011 Page 1 of 13

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS

Model # 158-P4. 12/12/2013 Page 1 of 11

Model # 238HS-P8. 4/27/2011 Page 1 of 11

EVERHOT INC. Everhot PEX Tubing for Potable Water Applications & Radiant Floor Heating

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

ZS880 Linear Shower Drain Installation Instructions

Cutlass Fasteners, Inc. 83 Vermont Ave., Unit 6, Warwick, RI Tel: (401) Fax: (401) cutlass-studwelding.com

Series 2000PV Mechanical Joint Restraint for PVC Pipe

General Guidelines. Tools Required. Instructions for Part # SC500-AF. Safety

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

Operating Instructions

Model # 358H-PR. 4/8/2011 Page 1 of 12

Series 1100 Mechanical Joint Restraint for Ductile Iron Pipe

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

SAVE THIS INSTRUCTION MANUAL

Installation Instructions - Pipe & Fittings

SECTION HVAC PIPING INSULATION

SECTION SEISMIC CONTROL OSHPD

Fig. 1 - Standard Clevis Hanger

SMITH/ACO DRAINAGE SYSTEMS

ERICO CADWELD INSTALLATION AND INSPECTION GUIDE. ERICO

Application Guidelines

Preparation and Installation of the FA, FAV, and FAS Type Rupture Discs in Forward Acting Insert, Full Bolted, and Union Type Holders

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)

1. METALS 2. FERRIC METALS 3. NON-FERRIC METALS 4. WORKING WITH METALS 5. METAL FORMING TECHNIQUES 6. ENVIRONMENTAL IMPACT OF METAL EXTRACTION

FW66 FORESTRY WINCH FW66. Owner s Manual 19/02/2016

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

SECTION CHAIN LINK FENCES AND GATES

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.

Installation instructions LORO-DRAINJET. siphonic scupper drainage system with clamping flange, without roof penetration

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION DECORATIVE METAL AND GLASS RAILING

Liner Replacement Instructions:

Model # 922-S4. 12/18/2013 Page 1 of 8

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

ROOF MOUNT KIT OWNERS MANUAL

Cathodic Protection Catalog

Conergy SolarFamulus II

Air flue duct for use with ecotec boilers

Operate Manual. DA-1600i Stud Welding Machine. DA-2000i Stud Welding Machine. DA-2500i Stud Welding Machine

Installation Instructions

Daytona Beach Pier Building Renovation Jun 2010

SECTION HANGERS AND SUPPORTS FOR PLUMBING

12.1 MUELLER TAPPING MATERIALS AND SPECIALTY VALVES. MUELLER Tapping Sleeves and Crosses. MUELLER Tapping Valves. MUELLER Stainless Steel Tapping

Applied Maintenance Supplies & Solutions

Page 1. A combination of Century-Line Sleeves and Link-Seal Modular Seals perform a No Leak Solution for this pump room application.

B R OA DWAY RAC K. High Security

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

GroundTrac. Installation Manual

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

Valance Installation. For Units with Beam Style Coils

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION DUCTILE IRON PIPE, FITTINGS AND SPECIAL ITEMS

Soil Volume Change Meter (PVC)

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section DUCTILE IRON PIPE AND FITTINGS

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

Construction Specification for Cathodic Protection of New Watermains

Ion Collector Kits for Manual Guns (Versa-Spray and Versa-Spray II)

INSTALLATION MANUAL PIPE SUPPORT

B-500 / B-600 SERIES

ROLLING RACK. Simple Security

Technical Specification for Live Line Tap Connectors

Student Services & Classroom Addition

SECTION SLUICE GATES

D-1 FIRE PROTECTION PRODUCTS TAPPING VALVE. MUELLER Tapping Valves. MUELLER Tapping Sleeves and Crosses. MUELLER Stainless Steel Tapping Sleeves

OPERATOR S SAFETY MANUAL

GGI-750. Gravity Grease Interceptor Technical Data. Submittal Special Precautions Specifications Installation

WELDING AND FABRICATION ENGINEERING CRAFT PRACTICE

9MAY15 U.S. Rack Inc Falcon Drive, Madera, CA

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

Schmidthammer. 06 High current carbon brushes. Elektrokohle GmbH. Transmission systems with linear adjustable telescope holders p.

Industrial flue gas probes. Instruction manual

Section 3 Fusible PVC Pipe Connections

SECTION CHAIN LINK FENCES AND GATES (PARK)

PIP PNSC0011 Installation of ASME B31.3 Metallic Piping

ECONO 200 INPLANT OFFICE

Sheet Metal Connectors, Inc.

CONCRETE FORMWORK CHECKLIST AT SITE

PIPEWORK INSULATION. 14/ Page 1 of 10 Pipework Insulation Rev D

Fixings, bonds and clamps

UL / FM D-1 FIRE PROTECTION PRODUCTS TAPPING VALVE. MUELLER Tapping Sleeves and Crosses. MUELLER Tapping Valves

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Stainless Steel Aeration Equipment Specification

Electrical Metallic Tubing (EMT) Fittings

Mounting System MCG 1.1 Membrane-Connected Glass. System description

Chapter 32 Resistance Welding and Solid State Welding. Materials Processing. Classification of Processes. MET Manufacturing Processes

Transcription:

Page: 1 of 6 Scope: The following procedures cover the various approved methods of attaching anode leads, test leads, and trace wire to steel, ductile iron and cast iron water mains. Other methods may be considered for use with prior approval from the M.U.D. Engineering Department. Note: Use thermite bonding for steel pipe, thermite bonding or cathode-clamp for ductile iron pipe, and cathode-clamp for cast iron pipe. Thermite Bonding (Steel and Ductile Iron Pipe) A thermite bonding kit is used to attach anode leads, test leads, and trace wire to steel and ductile iron pipe and fittings. The kit consists of copper sleeves, metal melting discs, flash powder, crucible (graphite block mold), a flint gun to ignite the powder, and a tool to clean slag from the crucible. The crucible is used to control ignition and the flow of molten metal on top of the test/anode lead to bond it to the steel. 1. Clean a 2 to 3 inch square on top of the steel or ductile iron pipe, as in Fig 1, and file down to bare shiny metal. Remove 1-1/2 inches of insulation from the anode connector wire end. Slide a copper sleeve on to the connector wire end and crimp it. Cut off the remaining wire or bend the end of the connector wire over the sleeve. See Fig 2. Tug on the sleeve to ensure it is tight. 2. Place a metal disc, point down, in the bottom of the crucible and pour the flash powder (gray) on top of the disc. Ensure that the igniter powder (silver) in the very bottom of the plastic container is on top of the powder in the crucible or ignition may not take place. Keep the crucible in an upright position at all times to avoid spilling the powder. Note: The flash powder is the same for both steel and ductile iron pipe. 3. Center the copper sleeve and connector wire in the bonding area parallel to the pipe.

Page: 2 of 6 4. Place the crucible over the connector wire and hold firmly in an upright position. See Fig 3. The clip on the side of the crucible may be used to hold the wire in place. Fig 4 shows the bottom view of the crucible centered over the connector wire end. 5. Gloves and goggles shall be worn and long sleeves recommended during ignition. Warning: Make sure that no part of the body or anything flammable is directly under the pipe because molten metal may escape from the crucible and cause serious injury, damage to other pipe and fittings, and/or fire. Caution: If molten metal is released from the crucible, pipe coatings and any plastic pipe and fittings in the immediate area should be inspected for damage and repaired as necessary. 6. Close the crucible lid and ignite the powder with the flint gun through the lid opening shown in Fig 3. Hold the crucible in place for 5 seconds. 7. Remove the crucible and clean the slag from the inside and bottom of the crucible. Check the connection by tugging on the connector wire and tapping the weld with a hammer or other suitable tool as in Fig 5. 8. Apply primer and cold wrap according to Construction Standard 8.5.2. This applies to ductile iron and steel pipe.

Page: 3 of 6 Attaching Anodes To 3 18 Cast Iron or Ductile Iron Pipe * Note: Cathodi-Clamp, shown in Figures 9 through 12, is a registered trademark of CP Solutions, Inc. Materials: * Cathodi-Clamp 32# anode Wire connector Tools: Wire brush Socket or wrench Continuity tester Note: For cast iron or ductile iron mains larger than 18, contact the Corrosion Engineer. * Installation of Cathodi-Clamp 1. Clean around the cast iron pipe surface with a wire brush to remove rust scale and dirt, so the band will lay flat against the pipe. For ductile iron pipe, remove the factory coating and file to smooth the surface where the pigtail connector bolt will contact the pipe surface. ** 2. Wrap the band around the pipe with wire pigtail and connector bolt at the 12 o clock position. See Fig 6. 3. Insert the free end of band into buckle, as shown in Fig 7, making sure band is resting flat against pipe surface. * Revised Text ** Revised Drawing

Page: 4 of 6 4. Pull on free end to place band in slight tension around pipe. 5. Bend free end back against inside edge of buckle to hold band securely to pipe. See Fig 8. 6. Lightly strike fastener wings of buckle with mallet or hammer holding free end in place as shown in Fig 9. 7. Excess length of free end of band may be cut with snips (Fig 10) or may remain in place.

Page: 5 of 6 8. Loosen the adjusting nut on the top of the band. See Fig 11. 9. Using socket or wrench, hand tighten the hex cap bolt to draw the band tight around the pipe. See Fig 12. 10. Hand-tighten the adjusting nut on the top of the band do not over-tighten the bolt or nut. See Fig 13.

Page: 6 of 6 11. Verify continuity with continuity tester, one end attached to copper end of wire pigtail, the other end contacting the cast iron pipe. Note: If there is no continuity, make sure that pipe surface at contact is clean; tighten hex bolt cap ¼ turn at a time until continuity is established. 12. Place a 32# anode in the ditch; remove 1 of insulation from the end of anode wire, exposing the copper. * 13. Hold anode wire end and Cathodi-Clamp pigtail end together with ends even. 14. Screw on connector, pushing wires firmly through the pie shaped cap. No copper wire should be left exposed outside of the connector cap. See Fig 14. * Revised Text