Bid Document Amendment Reference Number:

Similar documents
STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR ENERGY SECTOR: CASE STUDY OF OLKARIA GEOTHERMAL EXPANSION PROGRAMME IN NAKURU COUNTY, KENYA.

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08

Chapter 13 Management and Implementation

Contractor Management and Purchasing

Environmental Management Programme (EMP)

WORK HEALTH AND SAFETY AUDIT STANDARD

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Code of Practice

CHAS Assessment Standards

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17

Hazardous Materials and Chemicals

OPERATION PHASE: ENVIRONMENTAL MANAGEMENT PROGRAMME

Canadian Solar Developers Ltd.

NATIONAL ENVIRONMENT MANAGEMENT AUTHORITY

ISO 9001:2015 ISO 14001:2015 OHSAS

Site Safety Plus. Site Management Safety Training Scheme (SMSTS) Course appendix G

INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM

POSITION DESCRIPTION

Level 5 NVQ Diploma in Controlling Lifting Operations Planning Lifts (Construction)

Technical Guidance Document for Operational Environmental Management Plan (OEMP)

Contractor Selection & Management Guideline Rev01. Revision 00. April 2011

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

Environmental Conditions Laboratories (for commercial use) Group

Occupational Health and Safety Management Manual v2.2

Mini Tender PART B External Wall Insulation, Mechanical and Electrical Installation

Policy Work Health and Safety (WHS) RCPA Introduction WHS legislation

Photographic Processing Facility Sector Control Policy

WHS Management Plans

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

EXXARO SUPPLIER CODE OF CONDUCT

ENVIRONMENTAL AND OPERATIONAL MANAGEMENT PLAN

Dangerous Goods Safety Management Regulation 2001

California Resources Corporation. Health, Safety & Environmental Management System

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

Transport Sector Portfolio

Environmental, Health and Safety Policy for Contractors

8 ENVIRONMENTAL MANAGEMENT PROGRAMME (PROJECT ENVIRONMENTAL SPECIFICATION)

Project & Environmental Review. Guidelines Demolition. May 2016

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

SITE SAFETY RULES - SILVERSTONE CLASSIC 2018

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd

CONTENTS MANAGEMENT STANDARDS ANGLO OCCUPATIONAL HEALTH WAY MANAGEMENT SYSTEM STANDARDS INTRODUCTION 1 3 LEGAL AND OTHER REQUIREMENTS 10

MANUAL HANDLING PROCEDURE

SUBCONTRACTOR MANAGEMENT

WATER SERVICE SYSTEM

Construction Regulations 2014 vs Construction Regulations 2003

Quality, Health, Safety & Environment Manual

Section Safety Section Cleanup. None Required

ABIOSH INTERNATIONAL CERTIFICATE IN OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT (ICERT)

INTERNATIONAL CYANIDE MANAGEMENT INSTITUTE Cyanide Transportation Verification Protocol

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

National self-insurer OHS management system audit tool. Version 3

FORT BENNING. Environmental Management System (EMS) Training. January 2014

A-one+ Supply Chain Standards

Presentation to RCCAO: Excess Soil Management: A Guide for Best Management Practices. Central Region Operations Division.

CONSTRUCTION SAFETY GUIDE

ENVIRONMENTAL AND OPERATIONAL MANAGEMENT PLAN

Murra Warra Wind Farm Project Environmental Management Plan

HFM Asset Management Contractor Induction Queens Riverside Apartments

SHELL ONSHORE OPERATING PRINCIPLES

ENVIRONMENT, HEALTH & SAFETY POLICY Up date

Abu Dhabi Environment, Health and Safety Management System (In Food Sector)

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP)

CHEMICAL CONTRACTORS DC WATER CONTRACTOR SAFETY PROGRAM CONTRACT PROVISIONS FOR CHEMICAL DELIVERIES 1. RESPONSIBILITY FOR COMPLIANCE

5.43 NOSA CMB

Environmental Policy and Guide December 2010

Works, services and infrastructure code

IMS (Quality, Environment, Occupational Health & Safety) Awareness Training Course As per ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:

Water Dependency of Geothermal Power Generation Systems

LEVEL 3 HEALTH & SAFETY IN THE WORKPLACE

HEALTH, SAFETY & ENVIRONMENT MANAGEMENT SYSTEM MANUAL AJM-HSEMS-MAN NOVEMBER 2016

A2B. Construction (Design and Management) Regulations 2015 PRE CONSTRUCTION INFORMATION PACK (V ) PROJECT:

Policy No: 67. Driving at Work Policy

ENVIRONMENTAL AUDITING GUIDE TD 16/16/E

University of Birmingham

DRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park

RB s Policy on Human Rights and Responsible Business* - Detailed Requirements

HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE

Exhibitor Guidelines for Booth Display Rules and Regulations

Health and Safety Management Standards

Health, Safety and Welfare Policy

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

Prevention and Early Detection

GUIDE TO THE PREPARATION OF A WORKING PLAN SCRAPYARD / ELV FACILITY

INDUSTRIAL HYGIENIST, 2330 SENIOR INDUSTRIAL HYGIENIST, 2331

Environmental and Social Review Summary. Ejuva One and Ejuva Two Solar Projects

SECTION XIV: BACKFLOW PREVENTION AND CROSS-CONNECTION CONTROL Backflow Prevention & Cross-Connection Control Program Purpose

Appendix G: Source Control Mitigation Measures Intentionally Left Blank

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

WE EEN Wizard of the Environment: the Enterprise Europe Network. Eurosportello del Veneto Via delle Industrie 19/C Venezia

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Water Pollution Control for Work in Sensitive Areas

BEAU CHÊNE HOMEOWNERS ASSOCIATION, INC. CROSS CONNECTION CONTROL RULE

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Transcription:

Bid Document Amendment Reference Number: KGN-BDD-10-2016 _Addendum 5 Tender for EPC+F of Modular Geothermal Power Plants at Olkaria The following should be amended on the Bid Document; Insert the following at the end of Section VI; Appendix C (pg 96): Appendix D: Environmental Management Plan Bidder are required to comply with the requirement of the Environmental Management Plan (EMP) at all times during construction activities. All costs that are associated with compliance to this EMP must be included in the EPC financial proposal (EPC contract price). 1 EPC+F Modular Geothermal Power Plants_Addendum 5

ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR THE PROPOSED MODULAR GEOTHERMAL POWER PLANTS PROJECT TO BE LOCATED AT OLKARIA GEOTHERMAL FIELD, NAIVASHA SUB-COUNTY Prepared by: Cornelius Ndetei Philip J. Barasa & Principal Environmental Scientist Environmental Officer January, 2017 2

Project Objective: Design, procure (manufacture), supply, install and commission modular geothermal power plants including all related infrastructure and services, to be located at OW-733 and OW-R5 sites within Olkaria. The wells earmarked for the modular geothermal power plants include: OW-733, OW-733A, OW-733B, OW-732B and OW-734B and OW-40A, OW-40V, OW-50A and OW-50B. ENVIRONMENTAL MANAGEMENT PLAN FOR THE PROPOSED MODULAR GEOTHERMAL POWER PLANTS PROJECT AT OLKARIA GEOTHERMAL FIELD, NAIVASHA SUB-COUNTY Environmental/Social Potential Impacts Proposed Mitigation Aspect Measures (A) Construction Phase Time Frame Responsibility Hiring of casual labour -Conflicts with local community leading to suspension of construction activities -Recruitment of all unskilled labour to be done through the Stakeholders Coordination Committee. -Main Contractor Noise emission Environmental/Social Aspect -Interference with animal bahaviour -Public nuisance -Provision of ear muffs to workers exposed to noise levels above 85dB(A) -Adverse human health -The noise level from each equipment shall be less than 85 db(a) at 1m distance as specified in the tender document -Use of appropriate sound proof materials in areas where workers are likely to stay for eight or more hours. Potential Impacts Proposed Mitigation Measures Throughout Time Frame Main Contractor Responsibility 3

Dust emission -Public nuisance -Adverse health impacts of workers -Dampen bare earth surfaces through sprinkling water -Provision of personal protective equipment -Main Contractor -Spread ballast in all exposed surfaces around the well head to suppress dust emission -Use of dust nets where necessary -Covering of trucks transporting loose materials with canvas -Stock piles of loose materials to be protected against wind erosion Vegetation clearing -Loss of animal habitat -Emergence of invasive species -Soil erosion -Conflicts with Hell s Gate Management Committee -Maintain the construction footprint as per the approved layout plans. -Habitat restoration (landscaping and re-vegetating with native species of trees/shrubs and grass) to be undertaken simultaneously with construction works. Construction phase -Main Contractor -Control of invasive species via regular inspections and uprooting programme 4

-Contractors lay down area and residential campsite shall be as approved by KenGen taking into consideration ecologically sensitive sites -Consultations with KWS to facilitate proper siting of facilities Uncontrolled access to the construction sites Injury to domestic animals, wild animals and local community -Enclosure of the construction sites with chain link perimeter fence -Prior to commencement of construction works -Main Contractor Hydrogen sulphide gas poisoning Provision of security services Throughout construction works Main Contractor -Installation of appropriate safety signs e.g for hydrogen sulphide Throughout -Main Contractor Visual intrusion Negative perception by tourists and/or visitors -Camouflage the modular power plants structures and components like steam pipelines Prior to installation works -Main Contractor Handling and storage of flammable and/or hazardous materials -Soil contamination -Water contamination -Provide secondary containment at designated fuel and oil storage areas Throughout Main contractor -Adverse health impacts 5

-Provision of fire fighting equipment at strategic positions -Training of fire marshals -Maintain on site appropriate spill response kits including sausage booms and metallic containers -Designated storage areas for hazardous/flammable materials should be made of an impervious floor -Maintain at the point of use, Material Safety Data Sheets (MSDS) Waste disposal -Contamination of soil -Contamination of water resources -Aesthetic degradation -Provision of suitable containers for temporary accumulation of solid waste -Segregation of solid waste from the source -Contractor -Potential for injuries -Hazardous solid waste shall be disposed of via NEMA licensed hazardous waste handlers -All domestic non-hazardous waste shall be disposed at KenGen s designated sites -Maintenance of an inventory of all the waste categories 6

generated and their final disposal as approved by KenGen -Provision of suitable workers sanitary facilities -Encourage reuse and recycling of materials Health & Safety Aspects -Injuries to workers or visitors -Penalties as a result of non compliance -Adverse health impacts -Loss of life -Standard Operating Procedures including Job Safety Analysis (JSA) and method statements for critical activities shall be documented and approved by KenGens Quality & Safety Engineer -Use of permit to work system for risky undertakings -Prior to and throughout -Main Contractor -Provision & enforcement of the use of personal protective equipment -Registration of the workplace with Directorate of Occupational Health & Safety Services (DOHSS) -Establishment of Occupational Health & Safety Committee -Regular OSH committee meetings 7

-Installation of appropriate safety signs -Daily tool box meetings -Mandatory safety briefings & induction of new staff & visitors -Documentation of accidents and incidents -Maintain a standard first aid kit on site -Undertake mandatory OSH trainings e.g first aid and fire marshall training -Close supervision of workforce to ensure proper workmanship -Appointment of a qualified environment & safety personnel for the project -Conduct planned and impromptu inspections to identify gaps & recommend mitigation measures -Provide an emergency vehicle on site at all times 8

- Carry out statutory equipment inspection and maintain certificates on site -Maintain and service the fire equipment -Maintain at the site well stocked first aid kits -Provision of portable hydrogen sulphide gas detectors to workers carrying out activities in areas prone to hydrogen sulphide gas emission Staff welfare Adverse human health -Provide potable water to workers at strategic positions -Make necessary arrangements for provision of food catering services to workers by public health certified vendors Throughout construction period Main Contractor Abstraction and usage of water from Lake Naivasha -Conflicts stakeholders with -Wastage of water resulting to high water bills -Create awareness on the need to conserve water provided -Routine inspection and condition based maintenance of the water supply network construction period Main Contractor -Metering of the water provided for construction works -Use of push taps in washrooms 9

-Analysis and trending of water usage Influx of workers to Olkaria -Spread of communicable and contagious diseases like HIV/AIDS thus increasing prevalence - -Institute an appropriate awareness and education programme -Arrange for mobile Voluntary Counseling and Testing (VCT) services Throughout construction period Main Contractor -Provision of condoms at strategic positions Increased traffic -Animal kills -Conflicts with KWS -Frequent accidents leading to injuries and/or loss of life -Comply with park rules as may be directed by KWS or KenGen from time to time. This includes defined speed limit of 40km/hr -Mandatory induction on park rules by KenGens Environment Section Prior to and throughout Main Contractor -Evaluation of drivers competency -Establishment of a fleet management system -Provision of an escort vehicle for abnormal load transportation -Awareness and education creation on alcohol and drug abuse 10

-Traffic safety awareness creation Gaseous emissions -Greenhouse effect -Adverse human health -Public nuisance -Stack emission measurements from the generator -Scheduled and condition based maintenance of equipment Throughout Main Contractor Brine discharge/overflow -Soil contamination -Legal penalties Conflicts with KWS and local community -Injuries to wildlife, domestic animals & human beings -Incorporation of a suitable reinjection system -Periodic monitoring of the pipeline connection for leakages and condition based maintenance -Proper fencing of the conditioning ponds Throughout construction operation phases and -Main Contractor -KenGens Steam field Engineers -Nuisance to the public -Proper containment of brine including provision for overflow pond (B) Operation Phase Environmental/Social Aspect Brine disposal Potential Impacts Proposed Mitigation Time Frame Measures -soil contamination -100% reinjection of brine Throughout operation -legal penalties phase Responsibility Steamfield section, KenGen 11

-Nuisance to the public Noise emission -Adverse health impacts -Public nuisance -Monitoring of noise levels -Provision of personal protective equipment operation phase Environment operation KenGen and sections, Hydrogen emissions sulphide -Poisoning of staff or visitors due to accidental release -Install fixed H2S monitors at strategic locations within the modular power plants. operation phase Environment and Operation Sections -Daily monitoring of H2S at the modular power plants and the surrounding environs. Solid waste disposal -Contamination of soil -Contamination of water resources -Aesthetic degradation -Provision of suitable containers for temporary accumulation of solid waste -Source segregation of waste operation phase -Operations section Environmental/Social Aspect Health & safety aspects -Maintenance of an inventory of all the waste categories generated and their final disposal as approved by Environment section Potential Impacts Proposed Mitigation -Injuries to workers or visitors -Penalties as a result of non compliance Measures -Document Standard Operating Procedures in line with QMS & EMS standards -Use of permit to work system for risky undertakings Time Frame operation phase Responsibility -Operations section 12

-Adverse health impacts -Provision & enforcement of use of personal protective equipment -Registration of the workplace with DOHSS -Establishment of Occupational Health & Safety Committee -Regular OSH committee meetings -Safety briefings & induction of new staff & visitors -Documentation and investigation of accidents and incidents -Maintain a standard first aid kit on site -Undertake mandatory OSH trainings e.g first aid and fire marshal trainings -Carry out planned and impromptu audits to identify gaps & recommend mitigation measures -Provide an emergency vehicle on site at all times 13

- Carry out statutory equipment inspection and maintain certificates on site -Maintain and service the fire equipment -Carry out statutory audits (C ) Decommissioning Phase Environmental/Social Aspect Potential Impacts Proposed Mitigation Measures Time Frame Responsibility Hydrogen emission sulphide -poisoning of staff and visitors -Proper capping of the wells after dismantling the steam gathering system Immediately after dismantling the steam gathering system -Contractor & -KenGens steam field section Solid waste disposal -Contamination of soil -Contamination of water resources -Aesthetic degradation -Clean up of the site to the satisfaction of KenGens Environmental Officer -Removal of all categories of waste generated for appropriate disposal as directed by KenGens Environmental Officer -upon dismantling & removal of equipment & containers from the site -Contractor & -KenGens Environment Team Visual intrusion - Negative perception by tourists and/or visitors Restoration of the affected sites (re-vegetation & watering) including well pads, campsites & brine containment ponds to the satisfaction of KenGens Environmental Officer -Upon clean up of the site - Contractor & -KenGens Environment Team 14

Health & Safety Aspects -Injuries to workers or visitors -Penalties as a result of non compliance -Adverse health impacts -Dismantling of equipment to be undertaken based on the approved Standard Operating Procedures comprising of Job Safety Analysis (JSA) and method statements -Use of permit to work for risky undertakings decommissioning phase - Contractor & -KenGens Environment & Safety Team -Provision & enforcement of the use of personal protective equipment -Proper supervision of activities to ensure good workmanship -Master valves & the side valves should be properly blanked off -Remove master valve handle to prevent interference by unauthorized persons e.g children -Use of suitable warning signs for hydrogen sulphide emissions -Provide an emergency vehicle on site at all times - Carry out statutory equipment inspection and maintain certificates on site 15

16