Draft RSPG Work Programme for 2018 and beyond

Similar documents
DRAFT RSPG 2010 WORK PROGRAMME

RADIO SPECTRUM POLICY GROUP

BEREC, ACER, ERGP, IRG-Rail one year down the road: Does every sector need to have one?

Authorized Shared Access (LSA/ASA)

RADIO SPECTRUM POLICY GROUP. RSPG Opinion on Licensed Shared Access

Correction of errors of a clerical, formatting and coding nature, as well as correction of crossreferences and the use of certain defined terms.

RADIO SPECTRUM COMMITTEE

CONF/PLE(2009)CODE1 CODE OF GOOD PRACTICE FOR CIVIL PARTICIPATION IN THE DECISION-MAKING PROCESS

Official Journal C 271 A. of the European Union. Information and Notices. Announcements. Volume 60. English edition. 17 August 2017.

Analogue switch-off: the implications of ITU recommendations for policy makers and regulators

ASEAN AUSTRALIA DEVELOPMENT COOPERATION PROGRAM (AADCP) PHASE II TERMS OF REFERENCE FOR

Keynote ECTA Conference

Business plan

REAP 1. BACKGROUND 2. CONTEXT

ERAC-GPC 1304/17 AF/nj 1 DG G 3 C

Consultation on proposed strategies for Digital Terrestrial Broadcasting, Third-Generation mobile telephony (UMTS), and Fixed Wireless Access (FWA)

Joint Action on European Health Workforce Planning

Audit of the Management Control Framework (MCF) Spectrum Telecommunication Program (S/TP) Final Report. Audit and Evaluation Branch.

SUMMARY REPORT OF WORKSHOP: "ERA-NET as a tool for facilitating Cooperation between Ministries Managing RTD Programmes", Brussels 23 May 2006

Memorandum of understanding between the Competition and Markets Authority and the Office of Communications concurrent competition powers

Clean Power for Transport. Implementaton of Directive 2014/94/EU on the deployment of alternative fuels infrastructure

1. Council conclusions on strengthening the balance in the pharmaceutical systems in the EU and its Member States

ANNEX 3. MASP Rev v1.1. Governance Scheme

BEREC STRATEGY

EUROPEAN LOCATION SERVICES VISION AND STRATEGY. Securing the long-term future of authoritative geospatial information and services

European Parliament resolution of 8 March 2011 on the revision of the General Product Safety Directive and market surveillance (2010/2085(INI))

The below represents a summary of Section 2 of Chapter 9 of the National Integrated ICT Policy White Paper.

EUROPE 2020 A European strategy for Smart, Sustainable and Inclusive Growth

Vice-President for the Digital Single Market

TAP TSI Update and Masterplanning. Brussels 26 January TAF/ TAP Masterplanning kick-off 1

ICB Industry Consultation Body A high level vision for achieving the Single European Sky

Consultation Paper. Draft Regulatory Technical Standards

European regulatory networks in the telecommunications sector

Office of the Minister for Government Digital Services and Minister of Broadcasting, Communications and Digital Media

DOCSIS3.1: THE PRACTICAL REALITIES OF IMPLEMENTATION

Regulatory framework for electronic communications in the European Union. Situation in December 2009

EUnetHTA. European network for Health Technology Assessment. European network for Health Technology Assessment JA

Position Paper. Cable Europe position paper on the Telecoms Review. Executive Summary. Policy objectives

4G radio spectrum auction: lessons learned

14186/17 CB/OTS/ek 1 DGE 2B

Vassilis DEMETRIADES Directorate-General for Mobility and Transport

14060/1/14 REV 1 AM/am 1 DG E 1A

Executive Summary. 1

Peer Review Report. Peer Review on Corporate Social Responsibility Helsinki (Finland), 7 November 2013

UNI Europa Guidelines on. European Works Councils

TITLE OF CONSULTANT: Individual Consultant (IC) to Develop a Strategic Plan and Implementation Program for Business Botswana

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR RESEARCH & INNOVATION

e-sens white paper D3.4 Preliminary Proposal for a governance body Instruments Deliverable 3.4, version 3

Benefits of harmonized regulations for placing in service of railway equipment - European experiences. Peter Mihm Head of Technical Cooperation

The promotion of economic instruments for a green economy in the EU

The BEREC Opinion on the draft. methodologies. Dr Iris Henseler-Unger, Vice President BNetzA 8th EETT International Conference Athens, 16/17 May 2013

7800/16 AFG/evt 1 DG G 3 C

Core Skills: Contributing Skills: Role Title: Senior Project Manager EXAMPLE. Reference: SFIA level 5

Digital Dividend Review. A statement on our approach to awarding the digital dividend

Clean Power for Transport. The Directive on the deployment of alternative fuels infrastructure

mb item 5 doc 5 - EFSA External Evaluation - Prioritisation of recommendations from external consultants Management Board 14 March 2013 Parma

CEOs OF LEADING EUROPEAN ENERGY COMPANIES CONTRIBUTION TO THE EUROPEAN COUNCIL, MARCH 2014

United Nations Children s Fund (UNICEF) Phnom Penh, Cambodia

Local and Regional Competitiveness Project

REPORT ON FEEDBACK ON MONEY LAUNDERING AND TERRORIST FINANCING CASES AND TYPOLOGIES 1. (Good practices)

Corporate Reporting - Future Directions John Collier, Secretary General, Institute of Chartered Accountants in England and Wales

Sri Lanka: National Water Resources Authority

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL AND THE COMMITTEE OF THE REGIONS

COUNCIL OF THE EUROPEAN UNION. Brussels, 16 May /14. Interinstitutional File: 2013/0027 (COD)

GUIDING FOR ACCOUNTABILITY:

105th plenary session, January 2014 OPINION. European single market for electronic communications

Territorial development

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

CAPITALISATION PLAN MED PROGRAMME

EU Telecoms Sector: Regulatory Developments, Threats and. Opportunities

DECISION No on the

AN ASEAN COMPETITION ACTION PLAN ( )

CSR Europe The European Business Network for Corporate Social Responsibility

European Railway Agency. Impact Assessment Report. Single Safety Certificate

9138/17 CB/ek 1 DGE 2B LIMITE EN

EFSA Discussion Group on E-SUBMISSION (MATRIX Project)

Commissioner for International Cooperation and Development

Thus, let s focus on 35% 30% 25% 20% 15% 10%

Implementing the EU Food and Drink Industry s Ambition for Growth and Jobs

Guidelines on transboundary consultations, public participation and co-operation

Consultation on an EU strategy for liquefied natural gas and gas storage

Commissioner for Competition

CMD(h) GUIDANCE FOR MAHs ON THE PHARMACOVIGILANCE SYSTEM AND RISK MANAGEMENT PLAN IN THE MUTUAL RECOGNITION & DECENTRALISED PROCEDURES

Final Audit Report. Follow-up Audit of Emergency Preparedness and Response. March Canada

Belgian Civilian Crisis Management Strategy

(Non-legislative acts) REGULATIONS

XT 21001/17 1 UKTF LIMITE EN

Horizon 2020 Proposal Writing: Part A and Part B. Name: Function:

ERAC 1204/17 MI/evt 1 DGG 3 C

5117/18 TP/cb 1 DG G 3 C

Work Plan and IV&V Methodology

Job description and person specification

Proposal for a Regulation on Electronic identification and trust services for electronic transactions in the internal market

CALL FOR APPLICATIONS FOR THE SELECTION OF MEMBERS OF THE STRATEGIC FORUM FOR IMPORTANT PROJECTS OF COMMON EUROPEAN INTEREST

DRAFT MOTION FOR A RESOLUTION

(Adopted by the Board of Directors on 13 May 2009 and amended on 24 September 2009, 13 September 2012 and 27 November 2013)

Competency Framework For the HR Profession Developed by the Singapore Human Resources Institute

Council of the European Union Brussels, 30 November 2017 (OR. en)

DCMQC - Briefing Paper 2. Developing a Market Position Statement

Success factors for governments and business in standards-based cross-border implementations: the case of e-procurement

Transcription:

EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Radio Spectrum Policy Group RSPG Secretariat Brussels, 21 November 2017 DG CONNECT/B4/RSPG Secretariat RSPG17-040 FINAL RADIO SPECTRUM POLICY GROUP Draft RSPG Work Programme for 2018 and beyond

RADIO SPECTRUM POLICY GROUP RSPG Work Programme for 2018-2019 This document describes the RSPG Work Programme which was adopted by the RSPG Plenary meeting (DD-MM-YY). The RSPG approved its previous Work Programme 2016 and beyond in February 2016 and the outputs and activities specified in that Work Programme were delivered by the end of 2017. Some of the work areas during 2016-17 will be on-going, and this new Work Programme defines new terms of reference for their next stage. Other new, strategic work areas are also set out. This Work Programme seeks to guide the work of the RSPG against a background of some uncertainty, in the light of the ongoing negotiations for a new legislative framework. As a result, some deliverables are difficult to define at the time of writing. The RSPG therefore anticipates the need for a revision of this Work Programme during the period 2018-19, following the outcome of the legislative negotiations. The original draft work programme was subject to public consultation between DD-MM-YY and DD-MM-YY. Respondents XXX RSPG has therefore identified the following work items to be developed during the next years: - XXX - YYY - ZZZ 2

European Electronic Communications Code, EECC The European Commission proposed in 2016 an overhaul of the regulatory framework, to be called the European Electronic Communications Code (EECC). Among the proposals were new rules on spectrum co-ordination, authorisation regimes and assignments. New roles for the RSPG were also proposed. During the remaining negotiations the RSPG will be ready to advise as required, on matters within its areas of competence, including on its own future role. When the negotiations have concluded and the requirements of the new EECC are clear, the RSPG will initiate work that anticipates the new framework and any new responsibilities, in order to scope and plan the following tasks. This will be an opportunity for RSPG to consider how it can most effectively operate and deliver appropriate advice on spectrum policy issues within the framework of the new EECC. As the EECC moves into an implementation phase, the RSPG will Consider whether to develop new RSPG work items in response to the final outcome, in a revised Work Programme; Commence any new work designed to deliver any new, programmatic responsibilities of the RSPG; Assess any impact on the current RSPP due to the new regulatory framework for electronic communications and make relevant recommendations; Identify areas of joint interest/responsibilities with BEREC and initiate common actions as necessary; The results of the working group shall be presented to the RSPG (in the form of reports and/or opinions) for consideration and possible adoption. The nature of this work item will depend on the outcome of the legislative negotiations, and specific deliverables will be proposed in response to developments in those negotiations. Throughout the period of the work programme. 3

RSPG structure and working methods The European Commission proposed in 2016 an overhaul of the regulatory framework, to be called the European Electronic Communications Code (EECC). Among the proposals were new rules on spectrum co-ordination, authorisation regimes and assignments. New roles for the RSPG were also proposed. Any new roles for the RSPG will be analysed and dealt with under a separate work item in this Work Programme (the previous item, EECC). However, in addition to such new roles, and to enable and support them, the RSPG would wish to consider changes to its structure and ways of working. This may include a consideration of working methods in relation to cooperation with BEREC, for example. RSPG will initiate work on the basis of the final agreement on the EECC and any new responsibilities therein. RSPG will also carry out an internal analysis of whether its current structure and working methods are the optimal ones for the organization s future tasks. This work item does not include delivering any new roles required by the EECC, but is a broader item on how to support these. The results of the working group shall be presented to the RSPG (in the form of reports and/or opinions) for consideration and possible adoption. The nature of this work item will depend on the results of negotiations, and on internal analysis of RSPGs working methods. The time schedule will be dependent on the final agreement of the EECC. 4

Peer review and Member State cooperation on authorisations and awards The RSPG has built on its Report on Spectrum Awards to develop a programmatic strand of work on Peer Review. It believes considerable benefits can be derived from the continued, and increased, sharing of best practices across the Member States. The goal is to deliver a level of consistency of approach, and generally to improve the quality of awards, without unnecessarily fettering the discretion of Member States to adapt to national circumstances or diminishing the potential for innovation. The RSPG has already launched a voluntary Peer Review platform allowing Member States to share documents and experiences and to seek advice from their Peers during the award design process. More recently it has held workshops to examine specific awards. The Peer Review work will continue to: Develop and make use of the Peer Review Platform where relevant information on past, ongoing and future awards are available to Member State experts Hold workshops, to be conducted by the spectrum management authority responsible for the award, at relevant stages of an award in order to share experience and thinking with other Member States Build knowledge and expertise in Member States across Europe by facilitating contact and sharing of ideas between experts. Building on its work on Spectrum Awards and the Peer Review platform, the RSPG plans to foster exchange of best practices and peer learning between Member States. RSPG Report on the continued development of the Peer Review platform for use by experts in Member States. Workshops on upcoming and past awards in order to share thinking and any lessons learnt in order to build expertise in Europe. This will generally be aimed at a Member State audience but we will also consider options and opportunities for engaging with relevant stakeholders. [To be discussed] 5

5G Implementation Challenges The European Commission presented in September 2016 an Action Plan for 5G in Europe 1 to show that Europe has the ambition to lead on the deployment of 5G and move to a gigabit society and make sure all Europeans, whether in the countryside or in cities, can get access to a quality internet connection. RSPG addressed initial spectrum strategy milestones on 5G in its Opinion of November 2016 2 and send a clear signal towards the global development of harmonised frequency bands above 24 GHz in its interim Opinion on WRC-19 3. Overall it is noted that the spectrum policy challenge on 5G is very closely related to the on-going development of 5G technology. In consequence, RSPG will continue its efforts and contribute actively to the development of Europe s spectrum policy strategy regarding 5G, including bands being studied at WRC, and other spectrum needed to deliver the services to all European citizens including for IoT/M2M and other applications such as ITS. The RSPG has developed a strategic roadmap towards 5G for Europe and plans to adopt an opinion in February 2018 (supplementary opinion on strategic issues related to spectrum regulation of 5G networks) On the basis of these, RSPG plans to present an analysis with a view on how to defragment the 3.5 GHz band in EU. RPSG will assess the impact of the future use of 5G technology in other areas than mobile broadband (internet of things, intelligent transportation and other verticals) and initiate further where necessary. RSPG will engage to enable information and experience sharing in support of a successful roll-out of 5G in EU. RSPG Opinion(s) or Report(s) as appropriate. High-level workshops could also be envisaged and used to facilitate these deliverables. Draft Opinion in November 2017/Final Opinion in February 2018 Follow up draft Report/Opinion November 2018/Final Report/Opinion in April 2019 1 COM(2016) 588 final 2 http://rspg-spectrum.eu/wp-content/uploads/2013/05/rpsg16-032-opinion_5g.pdf 3 https://circabc.europa.eu/sd/a/0cd3a364-073b-4978-8bb4-f59b44d5d9da/rspg17-010_final_interim_opinion_wrc- 19.pdf 6

Common Policy objectives for WRC-19 The RSPG should identify common policy objectives on items which are of particular importance for EU harmonisation measures, as early as possible in the process of preparation of WRC-19. Moreover, taking account of past and current developments in the Union and at the ITU it needs to be assessed how the preparation of ITU World Radiocommunication Conferences could be improved in order to update, if needed, the recommendations provided in RSPG Opinion on The preparation of ITU World Radiocommunication Conferences 4. The RSPG plans to: 1. Assist the European Commission in formulating Common Policy Objectives based on the Interim Opinion on WRC-19 5 ; 2. Identify actions recommended to the European Commission in order to provide political support to promote common policy objectives in regular meetings between EC and non-eu countries. 3. Assess the preparation of ITU World Radiocommunication Conferences in order to update, if needed, the recommendations provided in the RSPG Opinion on The preparation of ITU World Radiocommunication Conferences The working group could propose a separate RSPG deliverable to address the task 3 and propose a revision of the time schedule according to the progress of the work. RSPG Opinion Draft Final Opinion March 2018/ Final Opinion September 2018 4 RSPG09-294 ; http://rspg-spectrum.eu/wp-content/uploads/2013/05/rspg09_294_preparation_itu_wrc.pdf 5 RSPG17-010 ; https://circabc.europa.eu/sd/a/0cd3a364-073b-4978-8bb4-f59b44d5d9da/rspg17-010_final_interim_opinion_wrc-19.pdf 7

Good offices to assist in bilateral negotiations between EU countries The RSPG s Good Offices function was established in 2012 to assist in bilateral spectrum management negotiations between its members. When Member States have difficulties in cross-border coordination or from harmful interference with another member, they may request the RSPG Chairman to put the matter on the agenda of an RSPG meeting. They would report their difficulties during the meeting and ask for RSPG to bring its good offices to bear on the issue. RSPG may decide to respond positively to this request and set up relevant actions. The Good Offices working group has assisted with cases of broadcasting interference, both UHF and FM. It has also evolved recently to take a more proactive role in relation to the repurposing of the 700 MHz band from broadcasting to mobile use: the group has sought to monitor progress by members in their frequency re-planning for broadcast TV services and in their bilateral co-ordination for this. The Good Offices working group will investigate any co-ordination issues, including harmful interference issues, brought to its attention; and propose appropriate solutions. (There are no provisions for enforcement and this work relies on the goodwill of RSPG members.) It will continue to monitor the delivery of the 700 MHz band for mobile use and the migration of the TV broadcasting below 694 MHz and address the situations where cross-border coordination agreement has not been reached as well as the issues of transition where timeline for migration is significantly different among neighbouring countries. RSPG report on lessons learned regarding the applications of the good offices for the 700 MHz band Throughout the period of the work programme. 8

European Spectrum Strategy The rapid pace of change in wireless communications technologies and markets presents immediate challenges for spectrum management such as the introduction of 5G mobile services. However, there is also a cumulative effect of these developments and a need to look beyond the current policy initiatives, to the medium and longer term. The RSPG should be leading European thinking on a longer term spectrum strategy that seeks to anticipate not just technologies currently in development but also the evolution of those technologies, and of the markets that they will deployed in. Spectrum management has the potential either to facilitate or to impede that evolution. At the same time, there is a risk that spectrum policy decisions are taken in isolation and with reference to the current policy imperatives, rather than as part of delivering a strategic vision. This is understandable for any given policy decision, but the more policy decisions can be taken with a strategic frame of the wider policy objectives, the greater the potential long term benefit. In this context the RSPG should take into account not only technical parameters but also economic, political, social, cultural and other strategic considerations impacting spectrum policy. The discussions could include the future use of certain bands, but also the relationship between decisions taken about particular bands; they could look into spectrum management principles such as sharing and authorisation that cut across different bands; they should also look to the objectives of spectrum management and its impact on other digital policy fields and should almost certainly seek to challenge established thinking about spectrum management. There will be different views on the questions to ask and answer in developing longer term strategic spectrum objectives. It will be important to seek input from external experts and stakeholders as well as from RSPG members. It will be an iterative process that builds on open dialogue. The RSPG will initiate discussions on a longer term European spectrum strategy that looks beyond the other specific Work Programme topics to the medium and longer term of spectrum management (e.g. a 10-30 year horizon). RSPG Report containing a list of concrete items that RSPG will address as a follow-up. This work will be facilitated through a series of RSPG-led high level workshops. These could be held adjacent to plenary meetings to ensure broad participation of RSPG members. Depending on the results of the workshops, further deliverables may be appropriate and advice on these would be sought from the Plenary. [To be confirmed]. 9