INS T A LLA T I O N G U I D E

Similar documents
TION GUIDE ALLA T INS

GEOSYTHETIC SLOPE SPEC-V0704rev.doc STANDARD SPECIAL PROVISION FOR GEOSYNTHETIC REINFORCED SLOPE CONSTRUCTION

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

ARES RETAINING WALL SYSTEMS. installation guide and construction manual

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

Description. This work shall consist of furnishing materials and placement of modular block wall constructed in accordance with

MECHANICALLY STABILIZED EARTH (MSE) WALL SYSTEMS

Recyclex TRM TURF REINFORCEMENT MAT SPECIFICATION

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

LANDSCAPE RETAINING WALLS

GABIONS AND REVET MATTRESSES

Design Manual: Gravity Wall. Section 1

Section (02830) MODULAR CONCRETE RETAINING WALL

VERTI-BLOCK - DESIGN MANUAL

Section ( ) SPECIFICATION FOR SEGMENTAL CONCRETE UNIT RETAINING WALL

Uwall UNIVERSAL CONSTRUCTION MANUAL

Redi Rock Specification and Installation Manual

MODULAR CONCRETE RETAINING WALL

Design and Installation Guidelines for Retaining Walls. 1 P age. Geo Products, LLC 8615 Golden Spike Lane Houston, TX Phone:

G R A V I T Y / G E O G R I D

HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS

SECTION POROUS PAVEMENT SYSTEM

AEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION

TensarTech TW1 Wall System Earth Retaining Structures

Tensar TriAx Geogrids Design Site Assistance

Table of Contents > The Triton Coastal & Waterway Systems are a durable, non-corrosive solution to many coastal and inland waterway erosion issues.

Silva Cell. Silva Cell Two-Deep Installation Instructions. Helping Trees Live in the Urban Environment

TENSAR TRIAX (TX) Geogrid INSTALLATION GUIDE

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

ICC-ES Evaluation Report Issued July 1, 2011 This report is subject to renewal in one year.

Click on image to enlarge.

SECTION RIPRAP, BOULDERS, AND BEDDING

A.2.a Random Riprap... Table

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

Section 401. PIPE CULVERTS

SECTION CHAIN LINK FENCES AND GATES (PARK)

Curlex II EROSION CONTROL BLANKET SPECIFICATION

PROPOSED STOCK PILE YARD PHASE 1 SITE: MYRA FALLS MINE

Bureau of Materials Materials Approval Procedures

Wall Modular Block Mechanically Stabilized Earth, Item S.

BIO-AQUIFER STORM SYSTEM

INTERLOCK BETWEEN PARTICLES AT EACH PERFORATION

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 863 REINFORCED SOIL SLOPES. October 19, 2012

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

Specifications for the Selection and Application of Erosion Control Blanket on Slopes or Channels

Section 1I-3 - Bioswales

ENGINEERING DIRECTIVE

R-TANK SPECIFICATIONS

Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION

HEAVY-DUTY HAUL ROAD APPLICATION BULLETIN

SANDERS PRE-CAST CONCRETE SYSTEMS, INC. MSE WALL SYSTEM SUBMITTAL

NOVEMBER 2016 MAGNUMSTONE. retaining walls installation manual

SPECIFICATION FOR REINFORCED SOIL WALL

Construction Procedures

SECTION 1043 FENCE MATERIAL

PERMEABLE INTERLOCKING PAVERS

TION GUIDE LLA A T INS

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

MACHINE-LAY Installation Manual

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

BENTOMAT CL GEOSYNTHETIC CLAY LINER SPECIFICATION GUIDELINES

NOVEMBER 2016 GRANDWALL. retaining walls installation guide

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights

Geotechnical Specification and Construction Update

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1

BMP 6.4.4: Infiltration Trench

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

ODOT Design & Construction Requirements for MSE Walls

DESIGN CONSIDERATIONS FOR NSWS NATURAL STONE RETAINING AND FREE-STANDING WALL SYSTEMS

G. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations.

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL. 5.1 General Certification Fabrication...

Master Specification SECTION 02621

QUALITY CONTROL PROGRAM OUTLINE

MOA Project # Golden View Drive Intersection & Safety Upgrades

MSE WALLS CASE STUDIES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

Low Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade

PAVING SLABS ON A CONCRETE BASE

CITY OF FARGO SPECIFICATIONS CONCRETE SIDEWALKS AND DRIVEWAYS

StormTech Construction Guide

Series 3000 Pocket Doors

Important: Before You Start

Special Provision No. 405F03 March 2005

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

SIERRASCAPE SYSTEM DESIGN GUIDE

PRODUCT SPECIFICATION CSI FORMAT Slope and Channel Grid Systems April 2009

TYPE "A" CATCH BASIN

Lesson 7 REINFORCING CAGE. Version 1-1/

Section Soil Erosion Protection Tender No. [ ] Page 1

Construction Specification for Concrete Unit Pavers

C. Foundation stabilization for pipe and utility structures.

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

This paper describes the salient features of a

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S

Construction Inspection Checklists

Transcription:

INS T A LLA T I O N G U I D E

TENSAR GEOGRIDS The System is a costeffective and easy-to-install alternative for projects with grade changes. The System owes its long-term performance and durability to high strength Tensar Uniaxial (UX) Geogrids. Due to their stiff interlocking capabilities, Tensar Geogrids stand the test of time, performing better than other commercially available geosynthetics. The System featuring Tensar Geogrids is one of the many patented soil reinforcement systems available for a variety of grade change applications. For more information, visit www.tensar-international.com. Introduction l Architects, Engineers, Contractors and owner/developers are under constant pressure to find economical alternatives for their grade separation projects. Typical solutions call for traditional wall systems but they often find these can be expensive to install and time consuming to construct. In a range of applications, they are finding a better solution is the Wire-Formed Retaining Wall System from Tensar International (TI). The System provides a dependable and cost-effective structural solution for the most challenging grade separation applications. It is a wire-formed, geogridreinforced retaining wall system featuring a positive mechanical connection for long-term structural stability. Beyond the performance capabilities, walls are easy to install and can be built to adapt to a wide variety of project conditions, design requirements and aesthetic options. Wall Facing Options Stone facing filled with native or imported stone that can be color, size and shape specified for a desired look and feel Vegetated facing with a natural appearance that can be designed by local landscape architects to blend with the natural surroundings Architectural finishes facing is veneer treated with a stacked stone or shotcrete sculpted finish providing a unique and traditional look This manual provides a guideline for construction and quality control of the installation for both stone- and vegetated-faced walls. It should be provided to the Engineer, the construction quality assurance inspector and the Contractor. For more specific instructions on installing special architectural finishes, please contact your local Tensar Representative. System s Components Component Tensar Geogrids Facing Units Locking Tail Struts Geotextiles Turf Reinforcement Mats Full Engineering and Construction Services Function High-density polyethylene (HDPE) structural geogrids internally reinforce the fill materials. Inert to chemical and biological degradation, they can be used with non-select fill or even recycled concrete. Galvanized welded wire baskets provide permanent facial stability during placement and compaction of fill material, and simplify facing alignment. Locking struts hold down the geogrid to the basket tail, and help stiffen the facing element to maintain alignment. Separation filter fabric provides a barrier between the reinforced backfill material and the stone fill at the face. Permanent, erosion-control blankets that aid in vegetation establishment and provide long-term turf reinforcement. Only used in vegetated-faced applications. Detailing, design, site assistance and stamped drawings for each project upon request.

1. Responsibilities for Construction Compliance l 2. Materials & Handling l The Contractor must construct the wall in accordance with the contract documents, plans and specifications. The Contractor is also responsible for the verification of line, grade and other physical features. The Tensar technical advisor may assist the Contractor and the inspection staff with the procedures within this manual and the contract plans, documents and specifications. The advisor may be onsite at the start of construction and thereafter only as requested or necessary. MATERIALS SUPPLIED Tensar Uniaxial (UX) and Biaxial (BX) Geogrids Facing Units Locking Tail Struts Non-woven needle punched geotextile, Erosion Control Blanket (ECB), or Turf Reinforcement Mat (TRM) from North American Green (depending on facing option) The Tensar technical advisor is not authorized to countermand any details or instructions in these guidelines, or on the approved construction drawings, without the express written agreement of the Engineer. Tensar Uniaxial Geogrid Tensar Biaxial Geogrid Tensar Uniaxial Geogrid Locking Tail Strut Erosion Control Blanket Locking Tail Strut Galvanized Facing Unit Connection Facing Unit Connection Stone-faced option Vegetated-faced option 2

HANDLING WALL MATERIALS Tensar Geogrids are shipped in roll form. The Contractor is responsible for off-loading the rolls. Prior to the removal of the labels, the Contractor should color-code each of the geogrid types using spray paint on the edges and ends of the rolls. For physical dimensions of wall materials, see chart below. Facing Units are delivered in bundles while the Locking Tail Struts come in clear bags. Geotextile, ECB and TRM products are shipped in roll form. All materials are to be off-loaded by the Contractor. It is the Contractor s responsibility to verify the quantities shipped and the condition of the materials. CONTRACTOR SUPPLIED MATERIALS Select or plantable fill Cable ties or tie wire Utility saw for field cutting of geogrid Alignment system materials (laser, stringline, etc.) Side cut shears for field cutting of Facing Units 4 ft level All labor, equipment and supervision necessary to perform the total wall construction If certifications are required by the contract documents, and if requested by the Contractor, they will be supplied along with the material that is shipped. It is the Contractor s responsibility to ensure that the Engineer is provided this information. Geosynthetic Wall Materials type size WEIGHT UX-MSE Geogrid 4.36 ft wide x 200 or 250 ft long 70 150 lbs BX Geogrid 9.8 or 13 ft wide x 164 or 246 ft long 67 140 lbs Geotextile (stone face) 3.75 ft wide x 360 ft long 37 lbs ECB/TRM (vegetated face) 6.5 ft x 55.5 ft/6.7 ft x 108 ft 37 45 lbs

Prepare for wall construction by clearing the site and cutting and color-coding the Tensar Geogrid. 3. Wall Preparation l Verify the condition, approval and receipt of the System s Facing Units, Locking Tail Struts, Tensar Geogrid and fill materials. Materials should arrive in good condition. Tensar will not replace materials that have been accepted by the Contractor. The subgrade should be approved by the owner s Engineer before proceeding with the wall construction. Any soils found unsuitable by the Engineer should be treated in a manner approved by the Engineer. Color-code and pre-cut the geogrids and geotextiles to the lengths stated on the plans. An easy way to cut the geogrids is using a circular saw. Make the cut next to the heavy transverse bars that span the width of the rolls. As geogrids are cut, mark and tag them according to the length and type, and then stockpile them for later use. Grade and proof roll subgrade. Install offset stringline, story pole or other control to check and maintain wall alignment and grade. Locking Tail Strut Facing Unit (See Notes 1 and 2) 6 in. (typ.) Locking Tail Strut Geotextile Filter Fabric Tensar Uniaxial Geogrid in accordance with elevation view Erosion Control Blanket (ECB) Offset varies 6 in. (min.) Tensar BX1120 Geogrid 48 in. (min.) top and bottom Reinforced Fill 18 in. (min.) 2 in. (min.) 4 in. (max.) Face Stone Reinforced Fill 6 in. (min.) Facing Unit (See Notes 1 and 2) 6 in. (min.) Bottom Wrap of C350 TRM 3 in. (min.) Top Wrap of ECB extending beneath the Unit above Maximum Limit of Topsoil (see Note 3) shall not extend more than 3 in. under successive Facing Unit. Tensar Uniaxial or Biaxial Geogrid in accordance with elevation view Connection (Pull slack out of connection) Notes: 1. See Facing Unit detail for facing material and dimensions. 2. All Facing Units shall be galvanized per ASTM A123 after fabrication. 3. Optional A thin layer (2 in. min.) of finer stone (1/4 in. 1 in.) may be placed at the top of each unit to provide a level surface for the unit above. Connection (Connect Geogrid to Facing Unit and Notes: pull slack out of connection) 1. See Facing Unit detail for facing material and dimensions. 2. Facing Units shall be constructed from black steel. 3. Topsoil shall be loamy sand or finer gradation with 10% 15% organic content or material approved by a qualified landscape architect. Vegetation type shall be specified by a qualified landscape architect. Typical stone-faced wall detail Typical vegetated-faced wall detail 4

Insert the tail of the strut through the connection loops from the back and rotate upward to fasten to top of basket. 4. Wall Construction l Install the Facing Units on level grade. Butt the units end-to-end with the extended horizontal wires on one unit overlapping the adjacent unit. Note: The Facing Units may move forward during placement of the backfill and compaction. Set the first few courses 1 to 2 in. behind the face control line. Adjust setback of upper courses based on observed movements. Attach the end of the vertical wires of the adjacent units with cable ties, hog rings or wires to aid in maintaining alignment. Two full widths of UX Geogrids should be attached to each Facing Unit. The geogrid should not overlap adjacent units. The two outer ribs of the left geogrid should be placed between the outer two wires on the left side of the Facing Unit. The outer ribs of the other geogrid should be positioned between the outer wires on the right side of the Facing Unit. Two geogrid ribs should be positioned between each pair of wires. The transverse bar of the UX Geogrid will have to be cut in places to position pairs of ribs between pairs of wires. Cuts should be made only at apertures between wire pairs. Note: The transverse bar may need to be cut in a few more places to allow contact between the geogrid and the connection loops. A maximum of five cuts is allowed per geogrid roll width. Fasten geogrid to bottom wire with hog ring in areas where the geogrid is cut. Place face-backing as specified where face fill is finer than 2 in. Where 1 to 2 in. stone-face fill is specified, use BX1120 Geogrids to retain the stone. If a vegetated face is desired, use a permanent erosion control blanket from North American Green, such as C350 or SC150. The facebacking should be wide enough to cover the face and extend 6 in. under the fill. In instances where an erosion blanket is specified, the blanket should also extend 6 in. under the next installed Facing Unit. Insert the tail of the strut through the connection loops from the back and rotate upward to fasten to top of basket. Adjacent struts to be placed approximately 16 in. apart. One strut should be positioned between the two end wires to support the joint between Facing Units. When geogrid apertures do not perfectly align with the Basket s loops, cut the geogrid at the transverse bar that does not bear on a connection loop. Install Locking Tail Struts at both ends of the Facing Unit.

In preparation for fill placement, pull the UX Geogrid toward the reinforced backfill zone so that it s tight against the connection. Maintain facing alignment. Place the first 9 in. backfill lift on top of the geogrid, while maintaining an open zone at the Facing Unit for the stone fill. The backfill should be placed near the wall face first and then proceed toward the geogrid tails. This will promote further geogrid tensioning. After the backfill is placed, position the pre-cut geotextile roll along the backfill s front edge (if required). A tab of at least 6 in. of geotextile is required to extend beyond the stone facing. Install facing fill materials in 9 in. loose lifts unless the plans require otherwise. To provide a level surface for the next Facing Unit, it is optional to use a thin layer of well-graded aggregate at the top of the basket. Note: Proper compaction at the wall face will minimize pillowing of the lower facing units as wall construction proceeds. Conventional wheeled compaction equipment may be used to compact reinforced fill beyond the 3 ft face zone to 95% of AASHTO-T99 maximum dry density or as otherwise specified. The compacted lift should be no more than 9 in. thick. Alignment adjustments will be required as the type of fill, moisture content, equipment and wall height will affect the amount of movement of an individual Facing Unit. Note: Facing Units may not move uniformly. Subsequent rows of units can be set with a relative setback based upon observed movements. The Contractor should check facing alignment as every course is placed. At the end of each day, the Contractor must ensure that the reinforced backfill is graded to drain away from the face of the wall. Berms and/or ditches must also be in place and functioning to prevent the entrance of runoff into the wall construction area. Compact facing and reinforced fill materials within 3 ft of the wall face or as the plans require. A vibratory plate tamper is recommended for compaction in this area. Install backfill over the geotextile separator fabric. Place stone fill within the Facing Units. 6 6

Tensar International Corporation 2500 Northwinds Parkway, Suite 500 Alpharetta, Georgia 30009 800-TENSAR-1 www.tensar-international.com Distributed by: 2010, Tensar International Corporation. Certain products and/or applications described or illustrated herein are protected under one or more U.S. patents. Other U.S. patents are pending, and certain foreign patents and patent applications may also exist. Trademark rights also apply as indicated herein. Final determination of the suitability of any information or material for the use contemplated, and its manner of use, is the sole responsibility of the user. Printed in the U.S.A. SS_IG_10.10