IEC CAB WG15 + IECRE Neil Rondorf Jonathan Colby Vancouver, Canada
Sensor Node in sleep mode Maritime Systems Operation ISR/ASW Sensors, Systems and Processing Marine Platforms Unmanned and Autonomous Systems High-fidelity Ocean Modeling and Simulation Hydrographi c Survey and Cable Operations TRAPS distributed netted acoustic system for deep sea operation THAAW sensor for Arctic awareness ASW Continuous Trail Unmanned Vehicle (ACTUV) Hydrographic survey remote operations LBS-AUV integration to operational bathymetry pipeline MIW USV integration High-fidelity stimulation Training, trainers & tactical decision aids Tactical systems development & test Survey operations & bathymetry products Precision cable operations 2
IEC/TC 114 Member Countries
Projects and Future On going project areas Design Moorings Resource (tidal and wave) Power Performance (tidal and Wave) OTEC Power Quality Scale Testing 2 nd location assessment Future areas of work Acoustics River resource and power performance Load Measurements Commissioning and Decommissioning Power assessment of arrays Personnel and Services TC-114 Plenary meeting Vancouver, BC April 2014
IEC Structure
CAB WG15 Details Formed by the CAB to provide a Blueprint of the Conformity Assessment needs of the Marine Energy Industry 8 Countries Participating US, CA, GB, DE, SE, FR, JP, KR Roughly 20 Total Members CBs, Technology Developers, CA Experts IEC Central Office Proposed a new CA System (IECRE) Partnership with Solar (TC82) and Wind (TC88)
7 th CAB WG Meeting 4/3 4/4, 2014 Geneva, IEC Central Offices (CCV) Held in conjunction with IECRE Forum (4/2 + 4/3) 15+ Participants 5 CBs (2 DNV GL, Lloyd s, ClassNK, CSA Group) 2 Developers (VP, Resolute Marine) 1 Utility (J Power) 2 CAB Representatives (CA, SE) 3 IEC (CAB, IECEx, IECEE) 3 Observers (Intertek, TC82, IEC) 6 Countries (US, CA, GB, DE, SE, JP)
Certification (Type + Project) From TC88 (61400-22)
CAB WG15 Issues Need IEC/ISO Standards for Certification Absence of International Standards Critical for TC114 and Industry Questions about short term -100 and -200 are available for use (Test Reports) Component certification (Existing Standards, ODs) Propose new work item proposal to TC114 Process Management Plan Need more participation Technology Developers, End Users, etc.
CAB Accepted IECRE System New CA System Draft Basic Rules completed -Pending CAB approval June, 2014 CAB approved Renewable Energy CA System -IECRE (Called IECRE Forum for now) Include multiple Sectors/TCs: -Solar (TC 82, TC117) -Wind Power (TC88 + WT CAC) -Fuel Cells (TC105) -Marine Energy (TC114 + CAB WG15) -Electrical Energy Storage (TC120) Interface with CAB WG11 (WG12? / WG16?)
CAB Accepted IECRE System
Conceptual Structure of IECRE System
IECRE Forum Next Steps -Submit Basic Rules to CAB -CAB Approval of Basic Rules -IECRE System Becomes Active -REMC formed and Sectors begin work -WTCAC, CAB WG15 + IECRE Forum end -REMC Kick-off Meeting (US 9/14) -Elect officers -Establish Sector OMCs -Establish Working Groups/s
CAB WG15 + IECRE Schedule 6/2014 CAB Meeting (Geneva) Approve IECRE Basic Rules Nominate Kerry McManama as Ex. Sec. Call to NCs Member Body, Officers, Meeting Dates CAB WG15 Decommissioning 7/23/2014 Conference Call RoP revision 8/20/2014 Conference Call Doc preparation ` 9/2014 IECRE Kick-off Meetings (US) 2 Day REMC, 1 Day ME OMC
Industry Next Steps and Needs -Establish a NC Member Body for IECRE System Work in conjunction with TC82 and TC88 -Determine NC Member Body Governance -Identify a NC Member Body Secretariat -Nominate officers for REMC + ME OMC -Approach CBs, TLs, etc. to join -Request Stakeholders to join Member Body