PRINCE2 - Plan. Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Mind Map Plan template

Similar documents
PRINCE2 - Project Brief

PRINCE2 - Quality Management Strategy

PRINCE2 - Product Description

PRINCE2 - End Stage Report

PRINCE2 - Project Initiation Documentation

PRINCE2 - Configuration Management Strategy

The Pen Project A fully documented sample PRINCE2 project

Managing Projects (Course Code: 5927A) Course length: 3 days

Microsoft Office Project 2007, Managing Projects

FROM PRINCE TO 2009

Project Management Concepts, Tools & Techniques

Primavera P6 R8.3 Professional Fundamentals Training Course Outline

Risk Management User Guide

Microsoft Office Project 2010 Basic Course 01: Getting Started

PRINCE2 Sample Papers

Project Planning and Control Using Oracle Primavera P6 : P8.3, 8.4, 15.2

7.11b: Quality in Project Management: A Comparison of PRINCE2 Against PMBOK

Sampler For the PMBOK Guide 5 th Edition. Summary Edition For the PMBOK Guide Fourth Edition

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

Exam Duration: 2 hours and 30 minutes

Primavera Training - P6 Basic Course (102)

Buy:

1.Which of the items listed below is not one of the software engineering layers?

EHR Site Visit Questionnaire

Carry out rule-based statistical analysis

CA Clarity PPM 13.3: Project, Resource, and Portfolio Management 200 Bundle

A Primer for the Project Management Process by David W. Larsen 1. Table of Contents

Developer Constructed Headworks Process. Information Guide. 1. watercorporation.com.

Asta Powerproject NEW FEATURES IN VERSION elecosoft.com. Asta Powerproject: The power behind successful projects

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3)

Initiation Group Process. Planning Group Process

Project Management Assignment Guidelines Tri 2. Andre Samuel

PMBOK Guide Fifth Edition Pre Release Version October 10, 2012

CMMI Project Management Refresher Training

Quality Management System. Manual MASTER COPY

How to perform PPAP Level 1 Level 2 Level 3 Level 4 Level 5

PRINCE2 walkthrough and Roadmap. Dave Litten

Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition, and ISO 21500

Release & Deployment Management PinkVERIFY

Managing Successful Projects with PRINCE2

So, let s look to what we ve discussed up to this point:

Project Scope Management. Dr Usman Ali & Dr Adnan Albar CPIS 334

ALM 11 Training. Material contained in this document is priority to Northway Solutions Group.

The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th

3-Day Oracle Primavera P6 Professional Fundamentals - Training Outline -

[Company] [Company Address] [Project Name] [Sub-Project, phase, etc.]

Certificate IV in Project Management Student Assessment Guide

GUIDE TO THE CHANGES IN PMP simpl learn i

PRINCE2 Foundation Revision Notes. Introduction

Managing Successful Bids with PRINCE2 2009

MBP1123 Project Scope, Time and Cost Management Prepared by Dr Khairul Anuar

Plan Your Work, Work Your Plan. Dr. R. Rockland Chair and Professor, Department of Engineering Technology New Jersey Institute of Technology

Task Control for bpm'online. User Manual

PRINCE2 FOUNDATION INSTRUCTOR LED TRAINING

How to Effectively Build a Project Schedule in MS-Project

COSBEDMO09 - SQA Unit Code FM6F 04 Conduct condition surveys in built environment design management

Glossary. BoM Bill of material. CAPM Certified Associate in Project Management. CCB Change Control Board

Introduction to Project Management (PM101) Course 6 Scope and Requirements

Evaluation Inception Report Draft Template

SQF 2000 Guidance. Guidance for Food Sector Category 4 Fresh Produce Pack House Operations. 1st Edition

RISK MANAGEMENT SUPPLEMENT TO IEEE

Product Documentation SAP Business ByDesign February Business Configuration

Continuously improve your chances for project success

Project Initiation Document

PRINCE Pilot. Case Study. Sarah Chambers, Head of Programme Management, Global Information Systems. Case Study. AXELOS.com. The APM Group 2009

HOW TO WRITE A WINNING PROPOSAL

MS-55034: Project Server 2013 Inside Out

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu

D107: DEMO OF ISO: FOOD SAFETY DOCUMENT KIT Price 360 USD

PRINCE2 and the National and International Standards

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL

IBM Integrated Product Development (IPD)

stakeholdermap.com Project Management, project planning, templates and advice <PROJECT NAME> RESOURCE PLAN VERSION <1.

26 November Nikki Kaye Chairperson Education & Science Committee Private Bag Wellington Dear Nikki Kaye

Higher National Unit specification. General information for centres. IT in Business: Spreadsheets. Unit code: F84V 34

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT AHWMMA POST-CLOSURE PERMIT APPLICATION CHECKLIST

Implementing Costpoint 7 from GCS Premier: Planning for Success

A semaphore telegraph, optical telegraph, shutter telegraph chain, Chappe telegraph, or Napoleonic semaphore is a system of conveying information by

Microsoft Project 2016

The Structural Engineer and Curtain Wall Design. The design of curtain walls entails numerous inputs, including the following

Article from: CompAct. April 2013 Issue No. 47

Estimating Project Schedule-Time and Cost

Procedure 14 Internal Audits

Production I in Microsoft Dynamics AX 2009

Construction Software Suite

Topic # 12. CIS Project Management: an overview

Software Engineering II - Exercise

Chapter 3 Managing the Information Systems Project

To control the design and development of new products. This procedure applies to new product as well as changes and improvements of existing product.

80542: Customization and Configuration in Microsoft Dynamics CRM 2013

PMKI Taxonomy. PMKI-TPI.php Industries, General & Reference PMKI-XTR.php PM History

3.1 Edition APMP Syllabus APMP

Professional Engineers Using Software-Based Engineering Tools

Quality Manual ISO 9001:2015 Quality Management System

DATA ITEM DESCRIPTION TITLE: TRAINING SITUATION DOCUMENT Number: DI-SESS-81517C Approval Date:

Welcome to the Eastwood Harris Pty Ltd PRINCE2 TM Revised 2009 and Microsoft Project 2010 training course

SAMPLE THIS IS NOT A COMPLETE MANUAL All References have been Updated to Comply with ISO 9001:2008

Internal Audit Checklist System & Process Compliance Auditing

Agenda. PMBOK Guide Third Edition. PMI Standards Background. PMI Life Cycle Plan for Standards. Presented by Kevin Chui, PMP. How Did We Get Here?

(More than 130 document files) GMP+ B3 Editable Document kit

Transcription:

<Insert Project Name> Created/updated 05/11/17 PRINCE2 - Plan Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Mind Map Plan template Project Name: Date: Release: Draft/Final Author: Owner: Client: Document Number: Note: This document is only valid on the day it was printed Revision History Revision Date Previous Revision Date Summary of Changes Date of next revision: Changes Marked Approvals This document requires the following approvals. A signed copy should be placed in the project files. Name Signature Title Date of Issue Version Distribution This document has been distributed to: Name Title Date of Issue Version page 1 of 6

Overview Purpose A plan provides a statement of how and when objectives are to be achieved, by showing the major products, activities and resources required for the scope of the plan. In PRINCE2, there are three levels of plan: project, stage and team. Team Plans are optional and may not need to follow the same composition as a Project Plan or Stage Plan. An Exception Plan is created at the same level as the plan that it is replacing. A Project Plan provides the Business Case with planned costs, and it identifies the management stages and other major control points. It is used by the Project Board as a baseline against which to monitor project progress. Stage Plans cover the products, resources, activities and controls specific to the stage and are used as a baseline against which to monitor stage progress. Team Plans (if used) could comprise just a schedule appended to the Work Package(s) assigned to the Team Manager. A plan should cover not just the activities to create products but also the activities to manage product creation - including activities for assurance, quality management, risk management, configuration management, communication and any other project controls required. Contents Advice The Plan should cover the following topics. Plan Description... 4 Plan Prerequisites... 4 External Dependencies... 4 Planning Assumptions... 4 Lessons Incorporated... 4 Monitoring and Control... 5 Budgets... 5 Tolerances... 5 Product Descriptions... 5 Schedule... 6 The Plan is derived from the Project Brief, Quality Management Strategy (for quality management activities to be included in the plan), Risk Management Strategy (for risk management activities to be included in the plan), Communication Management Strategy (for communication management activities to be included in the plan), Configuration Management Strategy (for configuration management activities to be included in the plan), Resource availability, and Registers and logs. The Plan can take a number of formats including: A stand-alone document or a section of the Project Initiation Documentation; Document, spreadsheet, presentation slides or mindmap; Entry in a project management tool. The schedule may be in the form of a product checklist (which is a list of the products to be delivered within the scope of the plan, together with key status dates such as draft ready, quality inspected, approved etc.) or the output from a project planning tool. page 2 of 6

The following quality criteria should be observed: The plan is achievable Estimates are based on consultation with the resources, who will undertake the work, and/or historical data Team Managers agree that their part of the plan is achievable It is planned to an appropriate level of detail (not too much, not too little) The plan conforms to required corporate or programme standards The plan incorporates lessons from previous projects The plan incorporates any legal requirements The Plan covers management and control activities (such as quality) as well as the activities to create the products in scope The plan supports the Quality Management Strategy, Configuration Management Strategy, Risk Management Strategy, Communication Management Strategy and project approach The plan supports the management controls defined in the Project Initiation Documentation page 3 of 6

Plan Description (Covering a brief description of what the plan encompasses (i.e. project, stage, team, exception) and the planning approach) Plan Prerequisites (Containing any fundamental aspects that must be in place, and remain in place, for the plan to succeed) External Dependencies (That may influence the plan) Planning Assumptions (Upon which the plan is based) Lessons Incorporated (Details of relevant lessons from previous similar projects, which have been reviewed and page 4 of 6

accommodated within this plan) Monitoring and Control (Details of how the plan will be monitored and controlled) Budgets (Covering time and cost, including provisions for risks and changes) Tolerances (Time, cost and scope tolerances for the level of plan (which may also include more specific stage- or team-level risk tolerances)) Product Descriptions (Covering the products within the scope of the plan (for the Project Plan this will include the project s product; for the Stage Plan this will be the stage products; and for a Team Plan this should be a reference to the Work Package assigned). Quality tolerances will be defined in each Product Description) page 5 of 6

Schedule This may include or reference graphical representations of the following: Gantt or bar chart Activity Network Product breakdown structure Table of resource requirements by resource type (e.g. four engineers, one test manager, one business analyst) Product flow diagram Table of requested/assigned specific resources by name (e.g. Nikki, Jay, Francesca) The Schedule may also be in the form of a Product Checklist as shown below Product Identifier Product Title Product Description approved Draft Ready Final Quality Check completed Approved Handed Over (if applicable) Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual page 6 of 6