Customer Responsibilities

Similar documents
Author to add specific customer activities or additional help, information, or guidance for the customer to follow prior to installation.

Markes International Thermal Desorption G8125A, G8126A, G8127A, G8128A, G8131A, G8132A, G8136A, G8133A, MKI-MicroC Site Preparation Checklist

MNL, SEL DIMENSIONS, SITE AW PLANNING GUIDE ARTWORK SIZE A SHEET 1 OF 1

Pre-installation Manual CONCEPT 301 D/401 D/501 D

Model FDL 115 Safety drying chambers for limited quantities of solvent

KEPAS Sampling & Analyzing Station

Low Voltage Switchgear Construction Checklist (under 500 kva)

RapID Raw Materials Verification System

Model BF 260 Incubators Avantgarde.Line with forced convection

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment.

ENCORE 2G MEDIUM LABORATORY STERILIZER SPECIFICATION/DATA SHEET

Choosing Rack Type, Size, and Power Distribution Unit

Installation Instructions

This Specification Data Sheet brought to you by: Trinity Blvd. Fort Worth, Texas /

SYSTEM 1E LIQUID CHEMICAL STERILANT PROCESSING SYSTEM

Unit Substation Transformer Construction Checklist (under 500 kva)

Contents. SuperPlate. Tubes Technology. Through Holes Technology. Milled Channels Technology. Thermal Analysis. SuperPlate

ELVORON LU/LA ELEVATOR

Model FD 115 Drying and heating chambers Avantgarde.Line with forced convection

Site Preparation Guide. Stratasys J750 3D Printing System. DOC Rev. D1

Model BF 720 Incubators Avantgarde.Line with forced convection

Engineering Specifications for the CXI Room of the FEH LUSI Document # ESD SP

Technical Specification Industrial Series - IS2 to IS48 Systems. CapDI Benefits. Feed Water Quality. Design and Scope of Supply.

Gerber M Series Site Requirements

CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH

INdoor MGM 200 Natural Gas - emissions NOx < 500 5%O2. Type Specifications Co-generation Unit with MAN Gas Engine

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.

Pioneering ALD experience since The ALD Powerhouse PRODUCT CATALOGUE FOR SUNALE P-SERIES ALD SYSTEMS

Atlas Copco. High-pressure oil-free air piston compressors P 37 - P 160 / 25 to 40 bar / 37 to 160 kw

Use this tough enclosure to keep components safe and out of the way.

Tank Scale Service Checklist

Laboklav. Type 55 to 195 Liter. Technical Datasheet. Dampfsterilisatoren Steam sterilizers

MEDIZINTECHNIK FÜR TIERÄRZTE

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

PoDFA The complete solution for inclusion measurement Inclusion identification and quantification analysis

Rosemount 1152 Alphaline Nuclear Pressure Transmitter

MHWW-09-H-1 Chilled/Hot Water Hi-Wall Fan Coil. Heat / Cool Fan Coil 9,000 BTUH. Rev. 1.3

Zoned Comfort Control

Advanced Lean Beverage Innovation

UPS Electrical Design and. Installation. critica POWER SUPPLIES

Modular Coldroom Installation Manual

RS kw. Motor size: kw. All compressors available with frequency control! RENNER screw compressors

Thermoelectric Coolers. All Models INSTRUCTION MANUAL. Rev. G 2016 Pentair Equipment Protection P/N

Generator set data sheet. 410 Prime Emissions level: EPA Nonroad Tier 1. Fuel consumption. Engine Standby rating Prime rating Continuous rating

Rosemount 1154 Alphaline Nuclear Pressure Transmitter

Thermoelectric Cooler

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms

INSTALLATION MANUAL MULTI DECK HOT MERCHANDISERS MD Versions. Solid back 3 level Pass through 3 level

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

ALTERNATOR. LSA 36 - single-phase to 11.5 kva

Online data sheet SMC209 C CEMS SOLUTIONS

Technical System Catalogue Modular PDU (PSM)

EuroFID Total Hydrocarbon Analyzer

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

Endoscope Reprocessor Specification Installation Instructions

Non-Structural Isolation QUAKEBASE - PLATFORMS - 3D ISOLATION - FLOORS - MODULAR SYSTEMS

Shrinking Data Center Size, Complexity, and Cost through Directed-Flow Liquid Immersion Cooling

Telecommunication Spaces

BoSS Climalite Camera and lighting tower

Lubricated Rotary Screw Air Compressors kw 5 50 hp

High Temperature Vacuum Tube Furnace GSL Operational Manual

Practibox ELEGANT & PRACTICAL 18 MODULES/ROW FLUSH-MOUNTING DISTRIBUTION CABINETS CATALOGUE PAGES INSIDE

Member Organization of the National Association of Pharmacy Regulatory Authorities (NAPRA) Cold Chain Policy

Building Program Example. Eric Anderson

SUPERSTEAM USG LINE UNFIRED STEAM GENERATOR. Humidification. Sterilization. Pharmaceutical

A-Series Aluminum Gantry Crane

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SCP Series Modular Reverse Osmosis System. January 2012 Version

PLCC Sockets Through Hole - M43 Series

Combustion Laboratory Unit C492

Installation plan. Washer-extractor PW 6107 EL. en - GB M.-Nr / 01

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

medixx Series Installation Guidelines medixx 50 medixx 60 medixx 70 Suitable for the following Siemens MRI Systems, or similar models:

Request for Quotation (RFQ) for the provision of mechanical design and construction services to the CSIR CSIR RFQ:

Applied Biosystems QuantStudio 12K Flex Real-Time PCR System

AUTOMATIC BALING PRESS MODEL: HRB-CENTURION 200HP; 13/9

REAL-TIME DUST MONITOR TEOM 1405-F

3M Intelligent Return Plus and Sorter System SL. Architect/Contractor's Package

nual k Excella E-1 Open Air Shaker N) manual New Brunswick Excella E-1 Open Air Shaker Operating manual

Quick-Start Operating Guide Document No Process Gas Cooler Copyright 2010 Terra Universal Inc. All rights reserved. Revised October 2010

Powerware 9390 Integrated Accessory Cabinet IAC-D Configuration Installation and Operation Manual. For use with kva and kva UPS Models

Isco EZ TOC. TOC and TC Analysis Made Easy. Continuous on-line TOC/TC measurement using low-temperature oxidation

B. System Design and Performance Requirements

Which Microstat is right for you?

Chloride/Sulfate Analyzer

FITOCLIMA WALK-IN STABILITY

Operational Manual. Spectrophotometer Model: SP-830 PLUS. Metertech Inc. Version 1.07

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

WHAT IS CANTILEVER RACK?

A. Submit the following in addition to the standard requirements.

SERIES DESCRIPTION MODEL PAGE

MD Power Supply -48Vdc +Bias Tee

MV Product Specifications

Mobile Nitrogen Vaporizer Skid

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets

OmniCenter/Color Touch

Flooded Type Water-Cooled Chillers. R134a

Installation. Smart-UPS VT in Parallel kva 380/400/415 V 208/220 V 200/208 V

Maintenance Bypass Breaker Cabinet Series Configuration 5. Installation and Operation Manual

SpeedExtractor E-916 / E-914 Technical data sheet

Pre-installation Manual LightCELL Advanced Laser Machining Center

Transcription:

Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation is the key first step in ensuring that your instruments and software systems operate reliably over an extended lifetime. This document is a checklist AND information guide prepared for you that outlines the supplies, consumables, space and utility requirements for your equipment for your site. Customer Responsibilities Make sure your site meets the following prior specifications before the installation date. For details, see specific sections within this checklist, including: Guidance When completing the relevant checkboxes in the checklist using a X or tick mark, please note that "X" stands for FAIL and for PASS. The site meets the requirements for Instrument space dimensions, floor loading and door access as describe in the Section 1 - Dimensions and Weights below. The Laboratory where the instrument will be located meets the environmental conditions for Temperature and water requirements as described in Section 2 Environmental Conditions The Power in the Laboratory meets the requirements for location, voltage/ current rating and number of socket outlets as described in Section 3 Power consumption Additional item to be made available by the customer at the time of installation including a suitable high vacuum pump, ideally 70 Litres/sec turbo molecular pump and water to the correct specification as described in Section4 - Additional requirements to be supplied by the customer. An Uncompensated Geiger Muller tube radiation monitor should be available to carry out a critical examination of the equipment. Please consult Other Requirements section below for other product-specific information. For more details, please consult the product-specific Site Preparation. If Agilent is delivering installation and familiarization services, users of the instrument should be present throughout these services; otherwise, they will miss important operational, maintenance and safety information. Issued: 03-Dec-2014, Revision: 2.0 Copyright 1 2014 Agilent Technologies Page 1 of 2

Important Customer Information 1. If you have questions or problems in providing anything described as a Customer Responsibilities above, please contact your local Agilent or partner support/service organization for assistance prior to delivery. In addition, Agilent and/or its partners reserve the right to reschedule the installation dependent upon the readiness of your laboratory. 2. Should your site not be ready for whatever reasons, please contact Agilent as soon as possible to re-arrange any services that have been purchased. 3. Other optional services such as additional training, operational qualification (OQ) and consultation for user-specific applications may also be provided at the time of installation when ordered with the system, but should be contracted separately. Important Customer Web Links and contact information How to get information on your product? - http://www.agilent.com/chem/xrd Need to know more? - customer Education http://www.agilent.com/chem/education Need help? - http://www.chem.agilent.com/en-us/technical-support/pages/default.aspx NOTE: Please use your local call centers when contacting us for any Sales & Service related questions quoting your system type and serial number. Site Preparation Completion Date completed Customer signature Issued: 03-Dec-2014, Revision: 2.0 Copyright 2 2014 Agilent Technologies Page 2 of 2

Section 1 - Diensions and Weight Identify the laboratory space before your system arrives based on the table below. Pay special attention to the total height and total weight requirements for all system components you have ordered. Also pay special attention to the total weight of the modules you have ordered to ensure your laboratory floor can support this weight. Fig.1 PXScanner Suggested Layout Issued: 03-Dec-2014, Revision: 2.0 Copyright 1 2014 Agilent Technologies Page 1 of 5

1. Able to bear the system weight of about 300kg over an area of 0.48m2. 2. Floor should be flat and horizontal within a tolerance of 3mm. 3. Ceiling should be minimum 2.2m high. 4. Adequate space is required around the system for servicing. The minimum clearance from the walls and a suggested system layout are shown in drawing below (Fig.1). 5. For the air cooled configuration Air Cooler unit, or for any additional third party chiller, an extra space of footprint 70 cm x 50 cm is required close to the system. 6. Unpacked, the largest subassembly will fit through a door aperture of 85 cm. Check the door aperture to ensure the system can be assembled in its designated area. 7. An engine hoist or several people should be available to help with assembly. Instrument Description Weight Height Depth Width Kg lbs cm in cm in cm in X-Ray generator 12 26 13 5 43 17 48 19 Extended Enclosure (option) 120 265 72 28 84 33 100 39 Electronics rack 140 309 104 41 77 30 60 24 KMW70 35 77 13 5 48 19 48 19 Air Cooler 25 55 93 37 32 13 70 30 Approximate Boxed Weights Weight Height Depth Width Kg lbs cm in cm in cm in PX Scanner head 180 397 129 51 94 37 84 33 Electronics rack 195 430 134 53 92 36 71 28 Accessories 200 441 94 37 122 48 80 31 Source, water cooler 130 287 90 35 96 38 61 24 Option devices Weight Height Depth Width Kg lbs cm in cm in cm in AirCooler 95 209 90 35 110 43 52 20 Issued: 03-Dec-2014, Revision: 2.0 Copyright 2 2014 Agilent Technologies Page 2 of 5

Section 2 - Environmental Conditions Operating your instrument within the recommended temperature ranges insures optimum instrument performance and lifetime. 1. Performance can be affected by sources of heat & cold e.g. direct sunlight, heating/cooling from air conditioning outlets, drafts and/or vibrations. 2. The site s ambient temperature conditions must be stable for optimum performance. 3. PXScanner may be cooled using either ambient air or an external water supply. This decision must be made at the time of ordering to enable the system to be pre-configured before shipment. 4. Clean location, dust free environment > 2m from air conditioning or heating units. 5. Stability of ambient temperature during operation should be about ± 1 C. Instrument Description Operating temp range C (F) PXScanner (operational) 18-28 (64-82) Air Cooler 18-28 (64-82) Operating humidity range (%) Heat Dissipation (BTU) 4200 2050 Instrument Description Storage temp range C (F) PXScanner (storage) 10-40 (50-104) Air Cooler 10-40 (50-104) Operating humidity range (%) Heat Dissipation (BTU) None None Cooling water supply line If the PXScanner is to be used without the Air Cooler, cooling water supply line should be available: Min flow rate 1.8 l/min Supply Line Pressure 3-5 bar gauge Return Line Pressure Maximum of 1 bar Temperature stability Temperature range ± 5 C 10 20 C Composition Filtered, without deposits, chemically neutral and optically clear Issued: 03-Dec-2014, Revision: 2.0 Copyright 3 2014 Agilent Technologies Page 3 of 5

: 1. Take care to check Return Line Pressure on closed loop water systems 2. If the external cooling water for the PXScanner system is to be supplied by a third party chiller, this circuit should incorporate its own bypass valve system as the PXScanner Chiller will only take water as and when it is required. The third party chiller supply pressure must be set to 3 bars. Section 3 - Power Consumption 1. Outlets location should be on wall behind the system. 2. Common Earth should be supplied for all connections <0.5 Ohm. 3. Circuit breaker should be fitted to all outlets. 4. Fit a line voltage regulator if the power supply voltage fluctuates more than ±10 %. 5. In areas where the electrical power supply is unreliable an uninterruptible power supply (UPS) is recommended. The UPS should have minimum specifications of 2200VA with single phase output. 6. US Voltage ~120V is optional (to be requested at the time of ordering). Instrument Description Line Voltage (V) Frequency (Hz) Fuse Rating (A) PXScanner (computer, interface, water chiller etc.) PXScanner *US (computer, interface, water chiller etc.) 1 x single phase outlet 208-240 (± 10 %) 1 x single phase outlet 115-120 (± 10 %) 50 Hz ±5% 1 x 16 Amp 60 Hz ±5% 1 x 20 Amp Issued: 03-Dec-2014, Revision: 2.0 Copyright 4 2014 Agilent Technologies Page 4 of 5

Section 4 - Additional requirements to be supplied by the customer 1. For information on Agilent consumables, accessories and laboratory operating supplies, please visit http://www.chem.agilent.com/en-us/products/consumables/pages/default.aspx 2. The distance between the water supply and the chiller is not limited but the supply must deliver 3-5 bar gauge pressure with a minimum 1.8 liters/min flow or supply pressure regulator must be fitted and set to 3 bar. 3. The water supply should have a wall mounted shut off valve. 4. If the seismic resistant plate was purchased appropriate mounting should be present to allow attaching seismic plate to the floor. Required holes should be prepared in the floor prior the installation. Seismic resistant plate is shown on the picture below. Fig.2 Seismic resistant plate Issued: 03-Dec-2014, Revision: 2.0 Copyright 5 2014 Agilent Technologies Page 5 of 5