MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation

Similar documents
The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

Overland Flow Time of Concentration on Very Flat Terrains

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan

Chapter 4 "Hydrology"

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

iswm TM Technical Manual Hydrology:

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Module 3. Lecture 4: Introduction to unit hydrograph

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

Table of Contents. Overview... 1

Section 600 Runoff Table of Contents

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

Chapter 6 Hydrology TABLE OF CONTENTS CHAPTER 6 - HYDROLOGY

STORMWATER MANAGEMENT: Emerging Planning Approaches and Control Technologies

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

Engineering Hydrology. Class 16: Direct Runoff (DRO) and Unit Hydrographs

HYDROLOGIC & HYDRAULIC ASPECTS of the Walnut Street Bridge over the Schuylkill River Philadelphia, PA

Engineering Hydrology Class 3

Peak discharge computation

IBS Site Drainage: Senior Design Project

Runoff Hydrographs. The Unit Hydrograph Approach

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY

Activity Calculating Property Drainage

Chapter H. Introduction to Surface Water Hydrology and Drainage for Engineering Purposes

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF

CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview

DIVISION 5 STORM DRAINAGE CRITERIA

1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952).

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg

4.1 General Methodology and Data Base Development

Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity

WMS Tools For Computing Hydrologic Modeling Parameters

Flood hazard assessment in the Raval District of Barcelona using a 1D/2D coupled model

La Riereta Catchment Sant Boi de Llobregat

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance

Culvert Sizing procedures for the 100-Year Peak Flow

Urban Drainage Introduction. A.Ramachandra Rao. C.B. Burke. T.T. Burke, Jr.

Chapter 3 Calculating the WQCV and Volume Reduction

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE

Sunset Circle Vegetated Swale and Infiltration Basin System Monitoring Report: Rainy Seasons and

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021

SEWAGE TREATMENT AND DISPOSAL

1 n. Flow direction Raster DEM. Spatial analyst slope DEM (%) slope DEM / 100 (actual slope) Flow accumulation

Hydrologic Study Report for Single Lot Detention Basin Analysis

Green Infrastructure Flood Reduction Computations

Preliminary Drainage Analysis

Project Drainage Report

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

CEE3430 Engineering Hydrology

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Sizing Criteria Worksheets and Examples

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

Journal of Geography and Earth Science 1(1); June 2013 pp Idowu, Edan & Damuya

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH

TECHNICAL MEMORANDUM. SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design

Analysis of Runoff Reduction and Hydrologic Cycle Utilizing LID Concepts

APPENDIX A: STORMWATER HYDROLOGY

Risk management of urban rain events in a coastal city. The case of Marseille

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

2

Simple Method for Estimating Phosphorus Export

Stream Reaches and Hydrologic Units

Rainfall - runoff: Unit Hydrograph. Manuel Gómez Valentín E.T.S. Ing. Caminos, Canales y Puertos de Barcelona

RAIN WATER HARVESTING FOR URBAN FLOOD PEAK REDUCTION

HYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA (310) FOR THE PROJECT:

Runoff Processes. Daene C. McKinney

Index. Page numbers followed by f indicate figures.

Effect of Land Surface on Runoff Generation

PRELIMINARY HYDROLOGY STUDY

Appendix I OFFICE OF THE MORGAN COUNTY SURVEYOR STORMWATER DESIGN MANUAL 7/1/2008

Hydrology is the study of the movement

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

Software Applications for Runoff Hydrological Assessment

CONSISTENCY BETWEEN CUHP AND RATIONAL METHODS James C.Y. Guo, PhD, P.E., and Ben Urbonas, P.E., D.WRD 08/04/2008

Sizing Calculations and Design Considerations for LID Treatment Measures

Appendix G Preliminary Hydrology Study

STORM WATER MANAGEMENT REPORT

DRAINAGE DESIGN AND RUTTING PERFORMANACE GUIDELINES FOR PERMEABLE PAVEMENT

APPENDIX G HYDRAULIC GRADE LINE

Gwinnett County Stormwater System Assessment Program

EFFECT OF RAINGAGE DENSITY ON RUNOFF SIMULATION MODELING by ABSTRACT

Uncertainty in Hydrologic Modelling for PMF Estimation

HYDROLOGICAL INVESTIGATIONS IN SEMI-ARID AREAS CASE STUDY: RAILWAY CULVERT DESIGN IN LIBYA

Runoff Volume: The Importance of Land Cover

Section 2: Watershed Characteristics and Runoff

Chapter 2 - Hydrologic Analysis

Stormwater Drainage Criteria Manual. City Of Clearwater Engineering Department Effective July 1, 2015

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

visual otthymo version 2.0

City of Oakland. Public Works Agency Standards STORM DRAINAGE DESIGN GUIDELINES. Engineering Design & ROW Management Division

Transcription:

Watershed MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1 A watershed is an area of land thaaptures rainfall and other precipitation and funnels it to a lake or stream or wetland. The area within the watershed where the rainfall event occurs is called the catchment area. In engineering applications, these terms are used interchangeably. The catchment is also called a drainage basin or a drainage area. The surface runoff from a rainfall event in a watershed is captured an outlealled catchment outlet or pour point. Precipitation Rainfall data is collected by National Weather Service (NWS) manually using a standard 8inch rain gage or an automaticrecording rain gages such as the tipping bucket rain gage. Rain gage measurements are point measurements and can be representative of a small area of 25 km 2 (10 mi 2 ). NWS uses next-generation radar (NEXRAD) to obtain areal measurement of rainfall. These weather stations are capable of measuring weather activity within 230 km radius. In engineering design, we use historical or statistical measurement of rainfall represented in the form of Intensity-Duration-Frequency (IDF) curves. These curves express the relationship between the average intensity of a rainstorm during an average time for a probability of occurrence. An example IDF curve is shown in the Figure above. These curves are developed by using the average maximum rainfall data using statistical methods. Things to note from a IDF curve: The rainfall intensity increases as the duration decreases The rainfall intensity increases as the return period increases. The probability of a rainfall event with high intensity is low. In United States, the frequency of local rainfall distributions was published by Hershfield in 1961, this is commonly referred to as TP-40 (Technical Paper 40 published in NWS). These frequency distributions were derived from data from 4000 stations assuming a Gumbel distribution. When IDF curves are not available, we use a methodology proposed by Chen. Chen (1983) uses the three rainfall depths derived from TP-40 (R "# ", R "# "## %&, R " ) and proposed a relationship between average intensity, i (in/hr) for a rainfall of duration, t (min), by i = a t + b "." (1) 1

where a, b 1, c 1 are empirical functions of the three depths derived from TP-40. A typical runoff hydrograph is shown below Rainfall excess is defined as the total rainfall minus the abstractions such as infiltration. Overland runoff occurs when the rainfall rate exceeds the infiltration capacity of the soil. Runoff models are classified as either Distributed parameter models small areas such as roof, lawn streets etc Lumped parameter models used for large catchments where the processes are lumped into one parameter We generally use hydrographs to understand the catchment response to a rainfall. Hydrographs show the temporal variation of rainfall at the catchment outlet (D shown in the Figure). It is possible to understand the characteristics of a catchment such as the slope, type of terrain etc by looking at the hydrograph. Hydrographs are extensively used in flood routing and storage calculations in stormwater management systems. 2

Time of concentration Longest travel time that it takes for surface runoff to reach the discharge point of a catchment. This is a function of effective rainfall intensity (i e ), catchment length scale (L), average catchment slope, S 0, the type of catchment surface (C) Different empirical methods are used to compute the time of concentration ( ) (a) NRCS method = 5.5 P 24 nl S o where is the time of concentration in minutes, P 24 is the 2-year 24-hour rainfall in mm, L is the length of the catchment in m, n is the Manning s roughness coefficient for overland flow; and S o is the ground slope (b) Kirpich equation 4/5 (2) = 0.019 L0.77 S 0 0.385 (3) where tc is the time of concentration in minutes, L is the flow length in m, So is the average slope along the flow path. This was primary developed in wooded agricultural catchments in Tennessee. Rossmiller suggested that for concrete or asphalt, the calculated should be multiplied by 0.4. (c) Izzard equation = 530KL1/3 i e 2/3 where i e L<3.9 m 2 /h (4) where L is the overland-flow distance in m, ie is the effective rainfall intensity (mm/h) and K is a constant given by K= 2.8 10 6 i e + c r S 0 1/3 (5) c r is the retardance coefficient that is determined by the catchment surface as given in the Table 10.4 of the textbook. (d) Kerby Equation = 1.44 Lr S 0 0.467 where L is the length of flow in m, r is the retardance roughness coefficient given in Table 10.5 of the textbook and So is the slope of the catchment. (6) 3

(e) Kinematic wave equation = 6.99 i e 2/5 nl S o 3/5 where is time in minutes, i e in mm/h, L is the length of the catchment in m, n is the Manning s roughness coefficient for overland flow; and S o is the ground slope (7) Problem 1 An urban catchment with an asphalt surface has an average slope of 0.5%, and the distance from the catchment boundary to the outlet is 90 m. At the catchment location, the 2-year 24-hour rainfall is estimated as 50 mm. For a 20-min storm with an effective rainfall rate of 75 mm/h, estimate the time of concentration using all the empirical equations 4

The Rational Method The rational method is a widely used peak-runoff model in urban hydrology. This is used to calculate the peak runoff (Q p ) for a given rainfall intensity (i) as follow where C is the runoff coefficient, and A is the area of the catchment Assumptions: Q p = CiA 1. Entire catchment area is contributing the runoff (duration of the rainfall is equal to the time of concentration) 2. Rainfall is distributed uniformly over the catchment 3. All catchment losses are incorporated into the runoff coefficient, C 5

Problem 2 A new 1.2 ha suburban residential development is to be drained by a storm sewer thaonnects to the municipal drainage system. The development is characterized by an average runoff coefficient of 0.4, a Manning s n for overland-flow of 0.2, an average overland-flow length of 70m and an average slope of 0.7%. The time of concentration can be estimated by the kinematic wave equation. Local drainage regulations require that the storm-sewer pipe be sized to accommodate the peak runoff rate resulting from a 10-year rainfall event. The 10-year IDF curve is given by 315.5 i = t 0.81 + 6.19 where i is the rainfall intensity in cm/h and t is the duration in minutes. Location regulations further require a minimum time of concentration of 5 mins. Determine the peak runoff rate to be handled by the storm sewer. 6

Problem 3 Consider the case where the residential development described in the above problem contains 0.4 ha of the impervious area that is directly connected to the storm sewer. If the runoff coefficient of the impervious area is 0.9, Manning s n for overland flow on the impervious surface is 0.03, the average flow length is 20 m and the average slope 0.1%, estimate the design runoff rate to be handled by the storm sewer. 7