MANAGEMENT SYSTEM FOR STREAMLINING THE INNOVATION PROCESS OF RESEARCH AND DEVELOPMENT WORKPLACE

Similar documents
SMART LOGISTICS COMPANY SYSTEM STRUCTURE

CHANGE OF THE CORPORATE CULTURE IN TRANSFORMING OF ISO 9001: 2015 AND ISO 14001: 2014

Conception Of Innovated System For Waste Disposal

OECD GUIDANCE ON SAFETY PERFORMANCE INDICATORS

RESEARCH PAPERS FACULTY OF MATERIALS SCIENCE AND TECHNOLOGY IN TRNAVA SLOVAK UNIVERSITY OF TECHNOLOGY IN BRATISLAVA

Industrial marketing as review of opinion and realization problems

Business Studies - Management Notes. Business Studies Study Notes

Visionary Leadership. Systems Perspective. Student-Centered Excellence

OUTSOURCING AND CONTROLLING IN LOGISTICS OF AIRPORTS

Partnership Self-Assessment. Toolkit. A Practical Guide to Creating and Maintaining Successful Partnerships

6.2 What are the benefits of information management? Generally speaking, there are four kinds of benefits from managing information strategically:

McKinsey 7s Model for Organization s Effectiveness

Management, Motivation, and Leadership: Bringing Business to Life

Liberalization, Investment, and Regulation: The Key Factors for the Development of the Electronic Communications Market

Managing Complex Organizations: A Simplified Approach

For over two decades, the successful teachings and practices of Edward

ISO whitepaper, January Inspiring Business Confidence.

Organizational Design

STAGES OF A STRATEGIC MANAGEMENT MODEL

Challenges in Assessing Parameters of a Socio-Technical System

Effective Negotiating

MARKETING AND SUPPLY CHAIN MANAGEMENT

Core Values and Concepts

Empowerment The best way to become a World Class Organization By Diane Prange

Sustainability Policy of the Eletrobras Companies

Transactional Leadership

INTRODUCTION TO ISO 14001

Sponsor/CRO Partnership Optimization

Will You Fail Your Channels? Are You Helping Your Channels Succeed in the Changing Channel and Technology Landscape?

Some insights about Insights

Performance Excellence Program (PEP)

T AP INTO THE POWER OF FOUR KEY F ACTORS TO DELIVER SUCCESS. IF YOUR COMPANY HAS SUCCESSFULLY IMPLE- MENTED A STRATEGIC PLAN, then you re definitely

TALENT ECONOMY LEADING IN A CRISIS

Nogdawindamin Family and Community Services. Values and Competencies Dictionary

Test Bank Business Intelligence and Analytics Systems for Decision Support 10th Edition Sharda

Planning and design for smarter cities

Unit-V. Internal commerce is the application of electronic commerce to processes or operations.

LESSON 2: INTRODUCTION TO STRATEGIC MANAGEMENT

Actionable enterprise architecture management

0 Introduction Test strategy A Test Strategy for single high-level test B Combined testing strategy for high-level tests...

ISO 9000, TQM AND CENTRAL EUROPE

Case on Manufacturing Cell Formation Using Production Flow Analysis

Q1) Discuss in some details what is meant by Performance measurement, explaining the factors included as performance measures.

MAINTENANCE COST CONTROL IS YOUR SYSTEM ACTIVE OR PASSIVE?

Thomson Reuters Regulatory Change Management

MODELING OF TRANSPORT DEMAND IN RELATION TO COMPETITION ON TRANSPORT MARKET

Chapter 7. Management, Leadership, and the Internal Organization

2015 THROUGH RESULTS INTEGRATED THINKING THE BENEFITS OF INTEGRATED REPORTING <IR>

The Basics of ITIL Help Desk for SMB s

B B. Why do a strategic plan?

Project Size and Categorisation

Getting Started with Risk in ISO 9001:2015

ITServices Strategic Plan

6 Steps To Stakeholder Advocates

Asset management Overview, principles and terminology

Economic and Social Council

April 2017 Latest update. ISO/DIS Understanding the new international standard for occupational health & safety

CLIENT DISCOVERY TOOL

Version 1.0. The Contract Management Standard Final Edition. Version 1.0

5 Conversation Pillars for Employee Success

Monitoring of Public Policies - A Modern Tool of Good Governance

PSYCHOLOGICAL CONTRACT AT WORKPLACE: AN INVESTMENT

RISK MANAGEMENT IN THE INTERNATIONALIZATION PROCESS A CHALLENGE OF ENTREPRENEURSHIP IN ROMANIA

A Longitudinal Examination of Communication Networks and Organizational Life Cycle in an Entrepreneurial Venture

McKinsey BPR Approach

ISO Environmental management systems Requirements with guidance for use

An Oracle White Paper May A Strategy for Governing IT Projects, Programs and Portfolios Throughout the Enterprise

MAINTENANCE COST CONTROL IS YOUR SYSTEM ACTIVE OR PASSIVE?

Towards Human-Centered Design. Michael Bartl

Importance of Communication During Change: A Case of the Municipality of Vlora

14 Organizing for strategic knowledge creation

System Engineering. Instructor: Dr. Jerry Gao

Building for the Future: A Voluntary Regulation Code for Approved Housing Bodies in Ireland

Purchasing Strategy. ESCHA GmbH & Co. KG in Halver/Germany. Introduction

This charter defines the purpose, authority and responsibility of News Corporation s (the Company ) Corporate Audit Department.

Strategic Direction #7 Business Operations. Final Report

Ibrahim Sameer (MBA - Specialized in Finance, B.Com Specialized in Accounting & Marketing)

SciPhD Business Core Competencies

Available online at ScienceDirect. Procedia Engineering 96 (2014 )

Organizational Theory

Guidelines for Self-assessment Strategic Planning

PLACES MARKETING AS A TOOL OF TERRITORIAL DEVELOPMENT AND ITS APPLICATION IN THE LIPTOV REGION IN SLOVAK REPUBLIC

TQM Implementation for Effective Project Management

Finding the Logistics Organization that Fits Using Fuzzy Logic

Somalia. Risk Management For NGOs. Risk Management Unit United Nations Somalia

Deadly Sins of. Business Process Management. Smarter Solutions, Inc.

A White Paper by Exact Software ERP-II: Making ERP Deliver On Its Promise to the Enterprise. Business Unified

GUIDEBOOK CODE OF CONDUCT MANAGEMENT SYSTEMS

Align Projects with Strategic Objectives

High Performance Organization

Chapter Two. Project Management Growth: Concepts and Definitions. When to Use Project Management

EMPLOYEES EMPOWERMENT IN ORGANIZATION

Levers of Organizational Change

Knowledge structure maps based on Multiple Domain Matrices

Info 530: ERD & DFD Diagrams

PARTICIPATIVE MANAGEMENT A NEW DIMENSION IN MANAGING HUMAN RESOURCES ISSUES

Project Management Assessment. Apply an In-Depth Approach to Project Management to Achieve Systematic Success

COULD LOGISTICS CONTROLLING FULFIL ITS FUNCTION IN CASE OF COST APPRAISE OF LEAN SUPPLY CHAIN PROCESSES? David HOLMAN, Petr JIRSÁK

ANALYSIS OF THE FACTORS OF LOCALIZATION OF THE COMPANY DEVELOPMENT USING MCDM METHODS IN PRACTICE

adp.ca Outsourcing: Today s Approach to Doing More with Less Your guide to getting the most from your HR outsourcing experience

Transcription:

MANAGEMENT SYSTEM FOR STREAMLINING THE INNOVATION PROCESS OF RESEARCH AND DEVELOPMENT WORKPLACE Ing. Martina Husarova Doc. Ing. Jan Spisak, PhD Development and realization workplace of raw materials extracting and treatment, Faculty of mining, ecology, process control and Geotechnology, Technical university of Kosice, Slovak Republic Abstract Innovation is the application of new knowledge and its materialization. Thus it ensures the company's ability to cope with changes in the business environment and the ability to survive in the global competitive environment. As a result, innovation saves natural resources, provides safe and more efficient transport and production. Innovations change the style of work life, place emphasis on the importance of education, creativity, communication and collaboration. However, innovations are associated with a number of problems. They require high costs of the research and development and they face the risks during implementation. This paper describes specific experience with the application of principles and tools of logistics, project management and mainly the application of management system created for the streamlining not only the process of preparation and implementation of the specific innovation project, but also for the streamlining the operation of research and development workplace which implement innovative projects. Keywords: Process, project, management system, innovation Introduction: Any process, the process of planning and the process of innovative project implementation does not take place in isolation. But they depend on other factors which have an influence on efficiency of the processes implementation in the organization. Furthermore, the factors create an organization context of this process. Regardless of the method of project solving (top-down or bottom-up) it is possible to identify the main factors that most influence the success of implemented projects. The main factors 38

for the research and development workplace implementing innovative projects within entire innovation chain are following: infrastructure - talks about how the organization is structured and organized, system - the system which is used by organization in order to support the processes of innovation projects and processes to ensure the operation of organization, culture predominant culture in the organization, including communication, informal relationships towards inwardly and outwardly which significantly affect daily events in the organization. From the view of the process of preparation and management of the innovative projects, it is essential that the workplace promote an environment that will support innovation activities. In management of innovation project cycle, it is therefore necessary to minimize the risks arising from breach of national and European legislation, guidelines of management and supervisory bodies, or individual failure of the member of project team. To make management system design more efficient, it is essential to identify "bottleneck" in the process of planning, preparation, organization and control of the project. If we want the process of preparation and implementation of the innovative project to improve, we have to have it under control. Especially, the process must be clearly defined. Therefore, each process must be planned, described then implemented, monitored and finally continuously assessed. The process which is not continuously improved, its effect decreases. 1. Management system: In terms of the method of preparation and implementation, two types of projects are designed in the workplace: applied research projects, projects for practice. Applied research projects are characterized by forming the top-down solution, which is also typical for the projects of framework programme. In this case the strategy is determined as first and concrete solutions come up with the project implementation. In terms of risk prevention, it is important if workplace can arise from comprehensive database of experience in implementing analogous projects. Second fastest-growing group of the projects implemented in research workplaces, are projects for practice. These projects have the bottom-up planning form, i.e. a particular problem is being searched. Using this kind of planning form, the risks and disadvantages may not be immediately obvious and could happen that some of them are identified during the project. For both types of projects, the workplace has within established management system developed own unique 39

methods and techniques making more effective the entire process of the projects preparation and implementation. 2. The structure of the management system: For planning and management of all activities of the workplace, own management system was created. The system takes into account its specific position in the market and respects the legislative conditions in which it operates. The process model of the workplace was a model for formation of the system. Management system in visual form represented by four-side pyramid (Fig. 1) has a simple structure. Top of the pyramid consists of a vision of the workplace. Its fulfillment is divided into four sides of the pyramid into four fundamental areas of workplace specializations: research, development and innovation, transfer of the research, development, innovation (RDI) results into practice, transfer of the RDI results into education, VRP infrastructure. Fig. 1 The structure of our system is created by hierarchical process model In each area of the specialization are identified activities and processes and created algorithms for their planning, implementation and control with definite responsibility allocation. From the perspective of the pyramid, each pillar has three levels: strategic - which includes vision and strategic planning (on the Fig. 1 in the 3D model is displayed in purple colour), 40

tactical - it includes an area of tactical planning, annual plans and their evaluation (in 3D models is displayed in 4 colours according to 4 professional areas: research, development and innovations blue colour, transfer into practice yellow colour, transfer into education red colour and infrastructure green colour), operational - this area is represented by the monthly and weekly work plans of the individual departments, which are subdivided into individual plans of specific workers. Based on the definition of a process map that says "map of the processes is a visual representation of the process boundaries and the main process steps", the pyramid is a process map of the workplace. 2.1 Internal structure Through a link with the surroundings and environment where the workplace operates, it is possible to describe its internal structure. The system which works here, is described by its structure and operating (management and planning). Description of the internal structure of is formed by process model of the workplace. In the traditional definition of the organization, the working methods, working activities and operations are conserved in individual function categorizations of the organization structure. In addition, their mutual relationships are in advance predetermined by inclusion in the hierarchy of the structure. Thus, organization processes are hidden somewhere within the organization structure. The parts of one process can be divided among several function positions within the organization structure. The whole context of the organization's processes is thus unclear and we can it just guess intuitively instead of exactly to determine. On the basis of such division of the processes, responsibility for the management of the particular process should bear the worker with the highest position in the organization, for instance senior manager, what does not always reflect reality. The reason why the workplace pays attention especially to processes is demand of dynamic in their operating. This dynamic is a key how to make the working methods possible to flexibly adapt to new opportunities offered by the research market (or to opportunities which are no offered by the market but workplace creates them by own active policy), and to cope with the administrative burden necessarily involving the implementation of large innovation projects. If the processes that run in the workplace should be sufficiently flexible to reflect the actual needs of the workplace (and its customers), the organizational structure as system support these processes must be flexible as well. On the workplace is introduced matrix organization structure, which is probably closest to process-oriented structure as on the one side there can be created the functional units and, on the other side ad- 41

hoc individual process groups according to the needs of the specific projects can arise. For the process groups or processes on the workplace is hold true that the processes are not divided into key processes i.e. important and supportive (subsidiary). If we want the workplace to operate as a whole, all processes have the same weight in terms of maintaining its functionality and dynamics. Serious administrative errors can have fatal consequences, for instance failure of factual project assignment. 3. Approaches to the use of values that offers an innovative project: In the context of the innovation process and understanding the importance of innovation project, it is important to mention the possibilities of using the value that is brought by the innovative project implementation not only from the perspective of the implementer of innovation but also from the workplace development point of view: short-term taking advantage of opportunity - misunderstanding of the innovation project value, long-term taking advantage of opportunities - understanding of the innovation project value. For short-term taking advantage of opportunity, an implementation of the innovation project is considered as the ultimate goal of achieving the project intent and thus its importance is ended. The aim of the project is fulfilled, but it was not outlined and managed so that the outputs obtained from the project would generate further innovative occasions, further occasions for development of the workplace, for instance acquisition of new partnerships, creation of new innovation occasions, etc. Therefore a potential innovation project is unused. Long-term opportunities use the innovation project only as a means (tool) in order to achieve higher - strategic objective of the organization. This approach enables to use the maximum potential of the project as used opportunity generates further opportunities for the organization (implementation of one project creates the conditions for the creation of further project). To take advantage of all offered opportunities and use up their potential, is the only way to maintain sustainable development of the workplace. 3.1 Management system of the innovation projects Management system of the innovation projects arises from workplace management system. In accordance with this system, the preparation and implementation of the innovation project is performed through described algorithms of the activities. For each project solved on the workplace are identified activities and processes and are created algorithms for their planning, implementation and control with responsibility allocation. 42

3.2 The structure of the project and responsibilities allocation From a technical point of view, each project is divided into certain stages. These stages are interconnected to form a system of processes and elements that are interacted. Therefore it is possible to identify a process approach whereas the outputs from one process present the inputs to another process. In general, the project can be divided into smaller sub-projects, which consists of several packages of working tasks. Decomposition of the project may be heterogeneous, but the sequence should be arranged hierarchically. Within established management system, there is evolved algorithm of solving which involves a sequence of steps from the project preparation to the impact period for each type of project solved on the workplace. Each type of project has own division. For projects of structural funds, decomposition of tasks and responsibilities is divided for the area of professional and administrative fulfillment (Fig. 2). Fig. 2 Decomposition of the tasks of structural funds In professional fulfillment, a correct understanding of the project s outputs presents a basic precondition for the project success. All these outputs are thus clearly and precisely defined. Therefore, a professional fulfillment of the project, which is represented by activities (A), is broken down into several areas of the activity (Fig. 3). Within each area of activity there is defined set of tasks (T). It is essential to fill up the set in order to meet the aim of the area. Fulfillment of the aims of the areas leads to the fulfillment of the aims of the activity. 43

Fig. 3 Structure of the professional fulfillment of the tasks for the structural funds Each of these tasks must be defined temporally and factually. Based on the definition of the project, an innovative project can be understood as an activity of one time interval, which can never be exactly repeated. Despite the fact that a good innovation project needs a new technology, methods and in addition it indicates the elements of uncertainty and risk, it is possible to minimize the level of risk by experience that brings knowledge of the area where the project is implemented. Conclusion: Properly designed management system must be a significant co-creator of the commercial success of the workplace and not its obstacle. Developed management system of the research and development workplace has a simple structure allocates working tasks, eliminates bureaucracy, is transparent and easily controlled, also is open, i.e. the system allows workers who need innovation to perform immediate innovation. The system has a wide range of support current documents, files, examples and experiences and therefore creates place for further improving productivity and quality of the performed work. Creation of the process model: Introducing a process approach on the workplace, the result of which the process model of the workplace was created, the following activities have been emerged: identification of the workplace processes, 44

accurate definition of the links between processes, assign the processes to the owners and thus to the clarifications of the responsibilities and competencies, formation of the comprehensive overview of the workplace s activities. Overview of the work organization: As a result of the process model introduction, the change within performed activities was noticed in the workplace. It leads to the following: disposal of duplication of the performed activities, unsecured activities covering, creation of substitutability, duplicate control providing, clear definition of job content, clarification of administrative work on the workplace. Maximize the effectiveness of activities: By attributing responsibilities and defined sequence of the steps resulting from interactive job content of all workers there have been emerged: shortening a period of the performed activities, shortening the communication and information channels, maximum use of workplace capacity. If the workplace want to ensure long-term competitiveness, it is not satisfactory to reduce costs and optimize the processes. It is essential that the competitiveness will be developed by combination of innovations and methods in order to rationalize the organization of work and to increase productivity. In the last decades, even innovation has allowed workplaces innovation to improve performance. Despite the fact that many of workplaces, in recent years, systematically worked on making their business processes more efficient, only few of them have an effectively well-functioning system of the continuous innovating. Although it is a long-lasting process, it will surely pay. Innovation of management principles and processes thus can create long-term advantage and bring advantageous shifts in competitive positions. 45

Acknowledgment: This contribution/publication is the result of the project implementation Advanced technology for the mining company of 21st century by the Research & Development Operational Programme funded by the ERDF. (ITMS: 26220220131) References: Kovac, M. (202) Innovation and technical creativity, Faculty of Mechanical Engineering, Technical university of Kosice, Publisher Michal Vaska, ISBN 8071653691. Kostruriak, J., Debnar, R. (2006) Principles lean" and innovations, Modern management, ISSN 0026-8720. Gozora, V. (2008) Project management, Vysoka skola ekonomie a manazmentu verejnej spravy, 216 p. - ISBN 978-80-89143-70-2. Vlcek, R. (2006) Value management of innovations, Modern management, ISSN 0026-8720. Kotler, P., De Bes F. T. (2005) Innovative marketing, Grada Publishing, a.s., Praha, ISBN 80-247-0921-X. 46