APPLICATION AND CERTIFICATE FOR PAYMENT

Similar documents
Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

Montgomery County Public Schools Facilities Guide DIVISION 0 - CONDITIONS OF THE CONTRACT

Concrete. Conveying Systems. Doors, Windows & Interiors

THE UNIVERSITY OF ALABAMA AT BIRMINGHAM (UAB) BIRMINGHAM, ALABAMA

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50

CSI MASTER FORMAT 2012 SAMPLE COST CODES

C P A. Presented By Jason G. Smith, CCM, LEED AP. Founder and Principal of Construction Analysis and Planning, LLC

Schedule of Values Cruise Terminal 2 Expansion

Schedule T5. Tender Documents. This tender is for: Tender Documents: The documents issued for this tender include the following: Tender Schedules

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

Residential Building Inspections

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

Davis Frame Co., Inc. Construction Budget Considerations

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

UNC Charlotte Residence Hall Phase X. Bid Results February 16, Alternate #7A Pinehall Brick Pavers. Alternate #6A Tile Student Bath

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample

MCCARTY ARCHITECTS, P.A. POST OFFICE BOX 440 / 533 WEST MAIN STREET TUPELO, MS / FOR ANSWERS TO QUESTIONS CONTACT: JUSTIN HARRINGTON

City of High Point Airport Overlay District Noise Level Reduction Design Standards

BILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST

Building Systems and Design Elements included in SliDeRulE

Company s Formal/Legal Name: US Mail Address: 9 Digit US Mail City: US Mail State: US Mail Zip: -

Additions and Renovations to Saint Robert Bellarmine Parish Center and Narthex 9/16/14 Outline Design Development Specification

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

M-DCPS MASTER SPECIFICATION GUIDELINES TABLE OF CONTENTS (TOC) Division 2 SITEWORK Last Revised

Construction Summary

M-DCPS MASTER SPECIFICATION GUIDELINES TABLE OF CONTENTS (TOC) Division 2 SITEWORK Last Revised

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

M-DCPS DESIGN CRITERIA Table of Contents

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

DEPARTMENT OF VETERANS AFFAIRS VHA MASTER SPECIFICATIONS. TABLE OF CONTENTS Section

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

PROFESSIONAL DESIGN MANUAL INDEX

CIRCLE K SUB-CONTRACTOR BID FORM

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #139 Douthit Hills Student Community, Clemson University Project Tony Greene

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

CAREERS. in the Construction TRADES

CONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

Budget Estimate Basic Tenant Improvement

Each proposed project will be reviewed for compliance with the following codes as applicable.

BuildingAdvisor.com Estimating Checklist

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

1 AND 2 FAMILY DWELLING REQUIREMENTS

SUBSTANTIAL IMPROVEMENT

THE CONSTRUCTION SUPERVISOR

RPR CONSTRUCTION COMPANY, INC.

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Exhibit D Construction Budget Template

CATAMARAN TOWER - 1 Seef Area Plot 19, 20

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #154 Douthit Hills Student Community, Clemson University Project Tony Greene

Project Information Session / Meet and Greet # 3

BUILDING PERMIT APPLICATION

BUILDING CODES & DESIGN CRITERIA

F.C.L. INTERIOR FINISHES CHECK LIST 2010 PRODUCT SELECTION - FLOORING GENERAL ITEMS PRODUCT SELECTION GENERAL ITEMS

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

PERMIT APPLICATION REQUIREMENTS INTERIOR RENOVATIONS/BUILD OUTS CODES USED: ADOPTED FLORIDA BUILDING CODE & NEC

The Homeowner s Building Application Checklist for Constructing a Residential Addition

Appendix 3G Wood First Matrix

RSMeans Contractor s Pricing Guide Residential Repair & Remodeling Costs 2015

GC s Subcontractor QA/QC Plan Sample

CODE COMPLIANCE PLAN REVIEW PROCEDURES

STRUCTURAL ABBREVIATIONS S-001 GENERAL NOTES CONCRETE MASONRY NOTES DESIGN NOTES SOF NSWG-10 UAS SUPPORT FACILITY FY 2016 MILCON P-225

Inspection Report. 1 of 8

HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT

Construction Cost Estimate - DRAFT

Inspection of New One- and Two- Family Dwellings

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #160 Douthit Hills Student Community, Clemson University Project Tony Greene

CONSTRUCTION CODE PERMIT INFORMATION

Capital Projects Update

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

Residential Inspector s Guide: Building and Energy based on the 2009 International Residential Code Chapters 1-11

Residential Inspector s Guide: Building and Energy based on the 2009 International Residential Code Chapters 1-11

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

UMC El Paso Far East Clinic and Neighborhood Healthcare Center West Issue for Construction Page Project No and April 13, 2015

Contractors, Property Owners, Plans Examiners & BSD Managers

Yardmen Arena Expansion & Renovation Project Update

Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100


CSI Codes - Specialty Detail

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire

MODULAR BUILDING SPECIFICATIONS

HOW TO OBTAIN A BUILDING PERMIT

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Transcription:

AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in connection with the Contract. Continuation Sheet is attached 1. ORIGINAL CONTRACT SUM CONTRACT DATE: COMPLETION DATE: Change Order Days Added = 0 NEW CONTRACT COMPLETION DATE: 1/0/1900 $895,000.00 The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. 2.Net Change by Change Orders $25,080.00 CONTRACTOR: 3. CONTRACT SUM TO DATE $920,080.00 Overall % Complete 49.32% By: Date: WORK TO DATE : $453,750.00 $260.00 4. TOTAL & TO DATE $454,010.00 State of: County of: 5. RETAINAGE Subscribed and sworn to before a. 5 % of completed work $22,687.50 me this day of b. 5 % of stored material $13.00 Total Retainage $22,700.50 Notary Public: 6.TOTAL EARNED LESS RETAINAGE $431,309.50 My Commission expires: ARCHITECT'S CERTIFICATE FOR PAYMENT 7.LESS PREVIOUS PAYMENTS 8. CURRENT PAYMENT DUE $431,309.50 9., INCLUDING RETAINAGE $488,770.50 In accordance with the Contract Documents, based on on-site observations and the data comprising this application, the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. Distribution : AMOUNT CERTIFIED $ OWNER ( Attach explanation if amount certified differs from the amount applied for. Initial all figures on this Application and on ARCHITECT Copies the Continuation Sheet that are changed to conform to the amount certified. ) ARCHITECT: PROJECT MANAGER By: Date: ACCOUNTING This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. Page 1 of 1

TOTAL D Division 1 - GENERAL CONDITIONS 895,000.00 447,500.00 260.00 447,760.00 50% 447,240.00 Engineering & Design Support - - - - 0% - Submittal & Approval Activities - - - - 0% - Job Site Safety - - - - 0% - Alternates & Options - - - - 0% - Project Coordination & Administration - - - - 0% - Permits, Inspections & Compliance - - - - 0% - Quality Control & Testing - - - - 0% - Temporary Facilities - - - - 0% - Misc Tools & Equipment - - - - 0% - Project Closeout - - - - 0% - Division 2 - SITE WORK - - - - 0% - Site Clearing, Demolition & Removals - - - - 0% - Allowances for Unknown Conditions - - - - 0% - Termite Control - - - - 0% - Concrete Paving, Curbs, Etc. - - - - 0% - Water and Gas Distribution System - - - - 0% - Sanitary Sewer System - - - - 0% - Storm Drainage System - - - - 0% - Finish Grading & Grassing - - - - 0% - Division 3 - CONCRETE - - - - 0% - Concrete Formwork - - - - 0% - Concrete Reinforcement - - - - 0% - Cast-in-place Concrete - - - - 0% - Special Concrete Work - - - - 0% - Division 4 - MASONRY - - - - 0% - Mortar - - - - 0% - Masonry Accessories & Bonding - - - - 0% - CMU Units - - - - 0% - Brick Units - - - - 0% - Masonry Pointing and Cleaning - - - - 0% - Brick Pointing and Cleaning - - - - 0% - Cast Stone - - - - 0% - Division 5 - METALS - - - - 0% - Structural Metal - - - - 0% - Open Web Steel Joists - - - - 0% - Metal Roof Deck - - - - 0% - Light Gauge Partition Framing (Welded) - - - - 0% - Pre-Engineered Steel Truss - - - - 0% - Page 1 of 4

TOTAL D Miscellaneous Metals - - - - 0% - Metal Stairs & Handrails - - - - 0% - Pipe Bollards - - - - 0% - Division 6 - WOODS & PLASTICS - - - - 0% - Rough Carpentry - - - - 0% - Finish Carpentry - - - - 0% - Millwork - - - - 0% - Cabinetry - - - - 0% - Countertops - - - - 0% - Exterior Wall Sheathing - - - - 0% - FRP Columns & Trim - - - - 0% - Division 7 - BUILDING PROTECTION - - - - 0% - Damp proofing & Waterproofing - - - - 0% - Metal Roof Systems - - - - 0% - Shingle Roof Systems - - - - 0% - Cavity Damp proofing System - - - - 0% - Water Repellant Coating - - - - 0% - Under slab Vapor Barrier - - - - 0% - Building Insulation - - - - 0% - Exterior Insulation & Finish - - - - 0% - Firestopping - - - - 0% - Flashing & Sheet Metal - - - - 0% - Thru-wall Flashing - - - - 0% - Sealants & Caulking - - - - 0% - Division 8 - DOORS & WINDOWS - - - - 0% - Hollow Metal Doors - - - - 0% - Wood Doors - - - - 0% - Special Doors - - - - 0% - Entrances & Storefronts - - - - 0% - Wood Windows - - - - 0% - Aluminum Windows - - - - 0% - Door, Finish & Exit Hardware - - - - 0% - Glass & Glazing - - - - 0% - Skylights - - - - 0% - Division 9 - ES - - - - 0% - Gypsum Walls - - - - 0% - Other Wall Systems - - - - 0% - Hard Tile Work - - - - 0% - Acoustical Ceilings & Surfaces - - - - 0% - Resilient Flooring - - - - 0% - Page 2 of 4

TOTAL D Carpeting - - - - 0% - Painting - - - - 0% - Lettering & Room Identifications - - - - 0% - Sheet Wall Covering - - - - 0% - Division 10 - SPECIALTIES - - - - 0% - Building Specialties - - - - 0% - Toilet Partitions - - - - 0% - Louvers & Vents - - - - 0% - Identifying Devices - - - - 0% - Toilet & Bath Accessories - - - - 0% - Fireplaces - - - - 0% - Flagpoles - - - - 0% - Mailboxes, Chalkboards, etc. - - - - 0% - Division 11 - EQUIPMENT - - - - 0% - Appliances, Stoves, Dishwashers, Refrigerators, etc. - - - - 0% - Parking Control - - - - 0% - Library Equipment - - - - 0% - Vending - - - - 0% - Loading Dock Equipment - - - - 0% - Food Service Equipment - - - - 0% - Division 12 - FURNISHINGS & CASEWORK - - - - 0% - Furniture - - - - 0% - Laboratory Equipment - - - - 0% - Special Construction Casework - - - - 0% - Modular Casework, etc. - - - - 0% - Division 13 - SPECIAL CONSTRUCTION - - - - 0% - Swimming Pools - - - - 0% - Aquariums - - - - 0% - Pre-Engineered Stand-a-Lone Structures - - - - 0% - Lightning Protection - - - - 0% - Fire Suppression Systems - - - - 0% - Division 14 - CONVEYING SYSTEMS - - - - 0% - Elevators - - - - 0% - Escalators - - - - 0% - Dumbwaiters, Trash Collectors, Etc. - - - - 0% - Division 15 - MECHANICAL - - - - 0% - HVAC Systems - - - - 0% - Plumbing - - - - 0% - Page 3 of 4

TOTAL D Sprinkler & Fire Suppression Piping - - - - 0% - Ductwork & Venting - - - - 0% - Automatic Temperature and Humidity Controls - - - - 0% - Division 16 - ELECTRICAL - - - - 0% - Main Supply Lines - - - - 0% - Distribution Panels & Systems - - - - 0% - Communications - - - - 0% - Sound Systems - - - - 0% - Video Systems - - - - 0% - TOTAL CONTRACT SUMMARY: 895,000.00-447,500.00 260.00 447,760.00 50.03 447,240.00 CHANGE ORDER SUMMARY Change Order Item # C.O. Description Approved Amount Completed Work Status Days Added 1 Examples 25,000.00 6,250.00 In Progress 25% 2 Examples 10.00 0.00 0% 3 Examples 10.00 0.00 0% 4 Examples 10.00 0.00 0% 5 Examples 10.00 0.00 0% 6 Examples 10.00 0.00 0% 7 Examples 10.00 0.00 0% 8 Examples 10.00 0.00 0% 9 Examples 10.00 0.00 0% TOTAL CHANGE ORDERS: 25,080.00 6,250.00 0 Page 4 of 4

DETAILED INVENTORY OF CLIENT: MASTER TEMPLATE - SAVE P CONTRACTOR: MASTER - CONTRACTOR NAM A B C D E F DESCRIPTION PURCHASED TOTAL THIS COLUMNS USED LAST PERIOD PERIOD B + C EXAMPLES OF : - - - ALUMINUM WINDOWS 500.00 260.00 760.00 500.00 260.00 VENTED NAIL BASE INSULATION - - - - FIRE PROTECTION BOOSTER PUMP - - - - - STRUCTURAL STEEL - - - - - BAR JOIST & DECKING - - - - - PRE-ENGINEERED METAL BLDG. FRAMING - - - - - REINFORCING STEEL - - - - - HOLLOW METAL DOORS & FRAMES - - - - - HVAC CONTRACTOR - - - Sheetmetal Materials - - - - Grills, Louvers & Dampers - - - - - Equipment - - - - - Piping - - - - - TOTALS FOR THIS SHEET 500.00 260.00 760.00 500.00 260.00 To be used as document to support "Stored Materials as of date of accounting" Reported on AND CERTIFICATE FOR PAYMENT Page 1 of 1