California ISO Energy Imbalance Market Operations Overview. June 10, 2014 Webinar

Similar documents
Introduction to the Energy Imbalance Market (EIM Module 1)

Energy Imbalance Market Overview

Benefits for Participating in EIM February 1, 2016

Energy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Presentation on Draft SCED RFP

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Western Energy Imbalance Market

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

EIM Winter Reliability notes and processes for EIM entities. Craig Williams Training and Readiness

MOD-001-1a Available Transfer Capability Implementation Document

APPENDIX F FLEXIBLE RESERVE STUDY

Reduced Network Modeling of WECC as a Market Design Prototype

Standards for Imports of Regulation

California Independent System Operator Corporation Fifth Replacement Tariff

FERC Order 764 Settlements

2. Market Operations Overview

Utility Scale Integration of Wind and Solar Power

ISO Course Outline. Market Transactions Class

Business Practice Manual for Managing Full Network Model. Version 1011

Executive Summary MQRI-OPS 2

6.1.9 IFM Initial Conditions

155 FERC 61,111 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Business Practice Manual for Market Operations

Western EIM Benefits Report Second Quarter 2017

California ISO Preparing California for a Greener and Smarter Grid

3. Overview of Market Instruments

Dynamic Transfers Revised Draft Final Proposal

Day Ahead Market Enhancements: Issue Paper/Straw Proposal

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

2018 Draft Policy Initiatives Roadmap. Market and Infrastructure Policy December 7, 2017

Flexible Ramping Product Cost Allocation Straw Proposal

NERC Reliability Functional Model Technical Document Version 5

Spring 2014 Release Training

Business Practice Manual for Market Operations

Powerex Comments on CAISO October 31, 2013 Revised Draft Order No. 764 Tariff Changes. Submitted By Company Date Submitted Gifford Jung

Appendix 1 PRELIMINARY DELIVERABILITY BASELINE ANALYSIS STUDY REPORT

CAISO s Flexible Resource Adequacy and Must Offer Obligation Phase 2 Revised Straw Proposal Public Generating Pool and Public Power Council Comments

Northwest Power and Conservation Council NW Power Markets Symposium Products & Transactions

Policy Initiatives Catalog

Functional Entity Roles and Responsibilities

Northwest Power Pool Processes

SPP at a Glance. Located in Little Rock. Approximately 600 employees

System Impact Study and Facilities Study Process Manual For Cleco Power LLC

Briefing on 2018 Policy Initiatives Roadmap and Annual Plan

Mid-C Seminar July 16 th, 2014

Market Simulation Structured Scenarios

Operating Procedure PURPOSE... 1

April 28, Filing of CAISO Rate Schedule No. 90 Docket No. ER

Business Practice Manual for The Transmission Planning Process

Operating Procedure PURPOSE... 1

California ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring

Reliability Coordinator Data Request and Specifications for Data Provision

Hydroelectric Pumped Storage Potential and Renewable Energy Integration in the Northwest

ISO REVISED STAGING PLAN NO. 7

Operating Procedure PURPOSE... 1

Market Simulation Structured Scenarios. Energy Imbalance Market Implementation Powerex

The Western Energy Imbalance Market DOUG HOWE, CHAIR, WESTERN ENERGY IMBALANCE MARKET JANUARY 10, 2018

December 6, Docket No. ER Energy Imbalance Market Structural Market Power Informational Report

Market Performance Report February 2017

ANNUAL REPORT ON MARKET ISSUES & PERFORMANCE

the Real-Time Market will be based on the system marginal costs produced by the Real-Time

California Independent System Operator Corporation Fifth Replacement Electronic Tariff. Appendix A. Master Definition Supplement

Parameter Tuning for Uneconomic Adjustments. Lorenzo Kristov, Principal Market Architect

SUBMITTED VIA E-TARIFF FILING. August 4, 2017

Internal NYISO HVDC Controllable Line Scheduling. Concept of Operation. LECG Staff

Generation Desk Logging

BPM Change Management Meeting

1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Durgesh Manjure, MISO Energy September 6, 2017

Independent Transmission Organization. Stakeholder s Meeting December 2006

Business Practice Manual for Reliability Requirements. Version 34

Operating Procedure PURPOSE... 1

8/28/2017 Readiness Criteria PGE EIM Readiness

August 24, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C.

Annual Interregional Information Transmission Planning Process. Annual Interregional Coordination Meeting Folsom, CA February 22, 2018

CAISO TARIFF APPENDIX A Master Definitions Supplement

Mountain West Transmission Group Frequently Asked Questions Updated through September of 2017

Business Requirements Specification

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017

the most promising locations for new renewables in the Imperial CREZ.

2016 Fall Reliability Conference MRO

2017 Stakeholder Initiatives Catalog

ISO-NE FCM Capacity Market Design Scott M. Harvey. October 9, 2007

Methodology for Calculating Operating Limits for Generators

PJM PROMOD Overview. August 1, PJM

ConOp. Internal NYISO Controllable Lines. Concept of Operation. Scott Harvey, LECG. Document Locator:

3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the

Dispatching Variable Generation Resources

ISO New England Available Transfer Capability. Implementation Document. Version 1.0

Draft Whitepaper to Platte River Board of Directors

Imbalance Conformance Enhancements. Issue Paper & Straw Proposal

Stepped Constraint Parameters. Straw Proposal

LMP Implementation in New England

Overview of Control Area / Balancing Authority Functional Requirements Matt Wolf Manager Operations Support May 5, 2010

Tucson Electric Power 2017 Integrated Resource Plan. Southern Arizona Regional Solar Partnership Jeff Yockey, PE

Cluster Study Process

Supply Plan Template Jennie Sage Lead Compliance Analyst

Reliability Demand Response Product

Dual Pricing Constraint

Two Settlement PJM /06/2016

Transcription:

California ISO Energy Imbalance Market Operations Overview June 10, 2014 Webinar

Objectives 1. EIM Overview 2. CAISO s process in mitigating Unscheduled Flow (USF) 3. WebSAS tool: how dynamic and pseudo tie schedules are handled during active USF events. Page 2

Energy Imbalance Market Benefits Improved renewable integration Helps integrate renewable resources by capturing the benefits of geographic diversity Cost savings Benefits all by serving energy imbalance needs from the most economic resources in a larger pool. Increased reliability provides information that improves operational awareness and responsiveness to grid conditions across a large footprint Page 3

Scale of EIM in the West is growing PacifiCorp: Go-Live October 1, 2014 1.7 million customers 9,500 MW peak demand 10,600 MW generating capacity NV Energy: Go-Live October 1, 2015, subject to regulatory approvals 1.2 million customers 8,148 MW peak demand 5,815 MW generating capacity CAISO: existing market 11.4 million customers 50,280 MW peak demand 58,246 MW generating capacity CAISO is working with other interested parties Page 4

EIM preserves participants autonomy and current practices BAA 1 BAA 2 BAA 3 Balancing authorities balance and provide their own ancillary services Balancing authorities can trade bilaterally Participants retain all physical scheduling rights 5

Implementation Status Full Network Model representing CAISO, both PacifiCorp BAAs, BPA and other interconnected BAAs Modeling to 3 megawatt generator level Complete SCADA overlay Exporting 17,000 points via ICCP from PAC to CAISO CAISO state estimator currently running and solving Continuous tuning and translation improvements to state estimator solutions Page 6

Implementation Status Entity generation control upgrades to RTUs, DCSs, and AGC Digital communication of plant status, Pmax/Pmin, reserve capabilities in real-time Upgrades to revenue metering ~150 meters replaced ~100 meters reprogrammed ~10 new meters installed New meter data management system New situational awareness tools for operators that utilize the enhanced data now available Page 7

CAISO Responsibilities Under EIM, CAISO operates the real-time: Security constrained unit commitment and economic dispatch every 15 minute Security constrained economic dispatch every 5 minutes Publishes market results (for both PAC and CAISO, the EIM footprint) CAISO will manage their ACE, voltage, flows and all other BAA functions within their BAA Page 8

PacifiCorp Responsibilities Under EIM, PAC will manage the following in real-time: Area control error, System voltage, System flows, Outage submission and approvals, and All reliability responsibilities for their BAA. PAC will manage their reserves No impact to NWPP RSG Page 9

Responsibilities Redispatch under EIM has same reliability impacts as existing dispatch today, however: EIM is source of automated redispatch instruction PAC retains ultimate control of all Balancing Area functions Increased visibility and situational awareness Required to e-tag inter-baa transactions, as done today Page 10

Transmission Management EIM will operate to transmission system limits EIM will operate within transmission rights made available to it EIM will coordinate transmission usage with EIM participants Transmission Service Providers (e.g., BPA in PAC s case, as discussed in BPA s stakeholder meetings) EIM will not exacerbate transmission congestion Page 11

Transmission Management Gen 1 20 MW No overloads No change in NSI BAA Gen 3 30 MW Gen 2 10 MW Load forecast = 100mw Gen schedules: Gen 1 = 30 Gen 2 = 25 Gen 3 = 45 Total = 100 After Redispatch due to change in system conditions: Gen 1 = 50 Gen 2 = 35 Gen 3 = 15 Total = 100 Page 12

External Paths Connecting the EIM BAAs (PACE, PACW, and CAISO) PACE-PACW e-tag RTM and RTPD will dispatch energy within the existing transmission rights (200 MW). PAC-CAISO COI e-tag RTM and RTPD will dispatch energy within PAC s COI rights, using a dynamic schedule. CAISO and PAC will coordinate COI usage with BPA in its role as Transmission Service Provider Page 13

External Paths Gen B Gen C Total load of 300mw Base schedules: Gen A = 100mw Gen B = 100mw Gen C = 100mw Total = 300 Real Time, wind increases over forecast in CAISO and PACE. After Redispatch: Gen A = 110 Gen B = 70 Gen C = 120 Total = 300 30 MW PACW Gen A 10 MW 10 MW CAISO Overlay 20 MW 20 MW PACE No internal overloads No external overloads Page 14

External Paths EIM enhances load/resource forecasts and state estimator modeling integration EIM improves transmission/generation outage management EIM is forward-looking, proactively dispatching generation to forecasted load within remaining transmission capacity, system operating limits, and transmission rights Page 15

External Paths EIM can dispatch multiple generators simultaneously to have a positive impact on transmission constraints EIM provides reduced area control error deviations (ACE) EIM broadens generation ramping and regulating capacity in conjunction with smaller ramps Page 16

Redispatch Page 17

RTM Timeline: Submission of hourly base schedules T - 75: Base schedules and energy bids due (Resources) T- 55: Updated base schedules are submitted if necessary (Resources) T- 40: Updated base schedules are submitted if necessary (Entity SC) T - 20: E-tagging deadline (Entity SC) T EIM Market Participants Market 1 Market 2 Market 3 Market 4 X:00 X:15 X:30 X:45 Y:00 T- 22.5: 15-minute scheduled awards published T- 37.5: Start of Market 1 optimization T- 45: Results of sufficiency test published T- 60: Results of sufficiency test published (Balanced? Feasible transmission? Sufficient flexible ramping?) Market Operator (T = start of the hour) Page 18

RTD Timeline: Dispatches issued every 5 minutes Page 19

Real-Time Market Concept - Summary The Fifteen Minute Market will commit and dispatch to meet forecasted load. Intertie bids (only in CAISO footprint) Fast start generation The 5 minute market will re-dispatch online generation to balance. Load forecast changes Renewable changes Generation and transmission outages Slide 20

CAISO USF Mitigation Procedure 3510 Provides guidelines for implementing the WECC Unscheduled Flow Mitigation Procedure (USFMP) and for determining Qualified Path Values for Unscheduled Flow To maintain consistency with USF mitigation, energy profile of dynamic e-tags for EIM Transfers will reflect the expected total transfer between BAAs, based on forward-looking advisory dispatches Specifies the requirements for monitoring, notifications and coordination of USF as Path Operator for Path 66 Specifies the required actions of Scheduling Coordinators (SCs) during active USF events Page 21

CAISO USF Mitigation Procedure 3510 Once CAISO meets the accommodation requirements of USF Step 4 or greater and Path 66 flow is >= 95% of the transfer limit, CAISO will notify the RC and: Page 22

CAISO USF Mitigation Procedure 3510 To issue a USF Step 4 or greater, the CAISO Interchange Scheduler obtains: Path Transfer Limit Path Actual Flow Path Total Schedule Page 23

CAISO USF Mitigation Procedure 3510 The values are then entered into websas via the Issue USF Procedure window Page 24

CAISO USF Mitigation Procedure 3510 The next screen is populated with the appropriate USF step and comments. CAISO will note if any additional mitigation is being done such as on-path curtailments, deploying TRMs, and circulation on the Pacific DC Page 25

CAISO USF Mitigation Procedure 3510 Once the RC approves the activation of the USF procedure, the curtailments are issued via websas. Curtailments issued via websas include dynamic and static schedules including EIM dynamic transfer. All parties on e-tag are notified of curtailment. All EIM Transfer e-tags affected by websas curtailments are communicated to MO to Dispatches will reflect these constraints. ECC Tool: The EIM design will be compatible with ECC implementation and all other future regional tools. Page 26

Page 27