Executive Summary. District/State Taluka Village Khasara No. Area (Hectare) Katni (MP) Murwara Tikariya Part of

Similar documents
FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

Hind Energy & Coal Beneficiation (India) Ltd.

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

Hind Energy & Coal Beneficiation (India) Ltd.

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

Executive Summary for Dang Sarkar Metal Stone Quarry (42.63 Ha) EXECUTIVE SUMMARY

ToR Letter No. SEIAA/AP/ANT/ Dated Monitoring Period : October 2016 to December Applicant

THE RAMCO CEMENTS LIMITED

MCDR INSPECTION REPORT

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office

PREFEASIBILITY REPORT OF PROPOSED BUILDING LIMESTONE PROJECT OF

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

PRE-FEASIBILITY REPORT. 5.0 Hectare sand mine under bhu-jal

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Please purchase PDFcamp Printer on to remove this watermark.

Health and safety norms of CPWD should be followed during construction.

PROPOSED TERM OF REFERENCE

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

ENVIRONMENT MANAGEMENT PLAN

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

PRESENTATION ON MANGANESE ORE DEPOSITS OF SMIORE FOR THE WORK SHOP ON REVISION OF THRESHOLD VALUES OF MINERALS AT GOA

EXECUTIVE SUMMARY. FOR CHORMARI - DEGARHAT LIMESTONE DEPOSIT AT VILLAGES CHORMARI AND DEGARHAT DISTRICT SATNA, MADHYA PRADESH (EXTENT: 102.

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

Environmental Impact Assessment

Mangalam Cement Ltd. (Unit-II) Stack No.

STANDARD TEMPLATE & FORM-1 FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE PROJECT COST: - 17.

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

1.0 EXECUTIVE SUMMARY

Max. building height (m)

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Base Metal and Iron Ore Mining

Geological & Mining Consultants. SCHEME OF MINING OF JINDAL CHROMITE MINE OVER AN AREA OF HECTARES IN JAJPUR DISTRICT, ORISSA.

CMPDI. 4.6 Mine Closure Plan

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

PRE FEASIBILITY REPORT (PFR)

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

Environmental Clearance Compliance Half Yearly Report

EXECUTIVE SUMMARY INTRODUCTION : Jayaswal Neco Industries Limited

GUIDELINES to the MINING ACT

THE SINGARENI COLLIERIES COMPANY LIMITED

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017

Mangalam Cement Ltd.(Unit I)

Appendix 0 Air Dispersion Modelling Study Black Point Quarry Project Guysborough County, NS SLR Project No.:

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

Environmental Management Plan (EMP)

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India

EXECUTIVE SUMMARY. Executive Summary for 12.77ha Gosalpur Manganese, Iron, Blue dust & ETC Minerals

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

ENVIRONMENTAL EFFECTS OF THE OPEN CAST MINING OPERATIONS AT SAMMAD URBAN AREAS NEAR TO LIMESTONE QUARRIES AMMAN 2010

SCHEDULE OF RATES DAM AND ALLIED WORKS REFERENCE DATA NOTES ON BASIC RATES DATA FOR SCHEDULE OF RATES

Sand Mining and Transport: Potential Health Effects. Thomas M. Peters, PhD, CIH Associate Professor University of Iowa Iowa City, IA

Annex F Scoping Checklist

RECLAMATION OF COAL MINE VOID

CHAPTER-1 INTRODUCTION

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ppt on Ash Management By :J.N. Dave (G.M.-Power) & D.S.Makwana (I/c. G.M.-PP)

10.0 AIR QUALITY AND CLIMATIC FACTORS

LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT

The mine is opened on The reasons for delay for starting mining operations are:

The assessment is based upon the design ore production of 95 million tonnes / annum.

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer


INDIAN BUREAU OF MINES MINES CONTROL AND CONSERVATION OF MINERAL DIVISION MCDR INSPECTION REPORT Dehradun regional office

(A) Cases recommended by SEAC for Prior Environmental Clearance

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

Best Practices for Building High-Performance Resource Roads. Road Drainage. Developed by: The Roads and Infrastructure Group

PRE- FEASIBILITY REPORT

PRE FEASIBILITY REPORT FOR. Mining of Riverbed Sand. From Darakeswar River. Area : 8.09 Ha ( 20 Acres )

SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE LETTER NO.: J-11011/981/2008-IA-II (I) dated: February 27, 2010

SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

Geotechnical Investigation Reports and Foundation Recommendations -Present status in India -Examples

Arcow Quarry, North Yorkshire

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

Project Proponent: Shri Kuldeep Pratap Singh Bhati Page - 11

An Estimation of Air Quality Index of a Coastal Station

FORM-1, PRE FEASIBILITY REPORT ENVIRONMENT MANAGEMENT PLAN FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE

LOW LYING AREA FILLING

Factors affecting health of Ash Dyke and Preventive Measures. Kukreti RC Chowdhury Ujjwal Naresh D N

Rapid Environmental Impact Assessment Study for the Proposed Cement Plant at Majhgawan, District Sidhi, Madhya Pradesh

M/s Crystal Consultants. ENVIRONMENTAL MANAGEMENT PLAN FOR JINGI & JONJRO SAND MINING Lease Area Ha. Capacity 146 Tonne / Day

MINING REGULATIONS IN FOREST AND ECO-FRAGILE AREAS A PRESENTATION BY RAJEEVA, IFS, ADDITIONAL PRINCIPAL CHIEF CONSERVATOR OF FORESTS.

Transcription:

Executive Summary 1.0 Introduction Tikariya Laterite, Bauxite and Fireclay Mining Project is located near village Tikariya Tehsil Murwara, District Katni (M.P.) The total lease area is being 27.35 Hectare. The lease is sectioned by Govt. of Madhya Pradesh to Shri Ganesh Vishwakarma. The lease is having vast experience in field of mining and mineral trading. The lessee has his office at village Jalpa Devi wards Katni M.P. The proposed capacity of the mining is 1, 15,000 MTPA for minerals Laterite bauxite and Fireclay on the sectioned lease area of 27.35 Ha. Govt. of M. P. has sectioned mining lease to Ganesh Vishwakarma on an area of 27.35 hectare at village Tikariya Tehsil Murwara, district Katni (m. P.) The lease period is from 31-05-2002 to 30-05-2022 (20 years). At the beginning minerals like letarite & fire clay is in the original lease agreement, later on mineral Bauxite is included in the original lease agreement. 1.1 Location of the Project District/State Taluka Village Khasara No. Area (Hectare) Katni (MP) Murwara Tikariya Part of 39 27.35 Total 27.35 The lease area is approachable from Katni to Niwar turning point (located on Jablapur katni N.H.-7) at 13 kms. From Niwar turning point to Niwar is distance 8 km, from Niwar to Lease area at village Tikariya is 4 kms from village road. The nearest Rly Station is Niwar is 4 km from lease area. Topography of the area is slopping area. Highest elevation of the area is 440 m is located in North- West part of the area whereas lowest elevation of the area is 420 m in South Eastern part of the area. Elevation difference between highest and lowest elevation is about 20 m. In 2 km radius of the lease area three more mining is proposed to be operated.

Table 1.0 Details of Mining Lease Area Sl No.. Particulars Details 1. Type of mine Open cast 2. Total lease area 273500 sqm 3 Area covered by old pit 86326 sqm 4 Area covered by existing waste 1375 sqm dumps 5. Area covered by existing mine road 1220 sqm 8. Area covered by proposed mine waste 2016 sqm dumps 9. Area covered by cart tracking 3550 sqm 10. Method of mining Manual 11 Area to be excavated in lease period 609 sqm 12. Area covered by proposed plantation 450 sqm 2.1 Geology and Reserve The applied area is part of younger succession of rocks overlaying the vindhyan super group of rocks. This sequence has been found to occur around the katni and unconfirmably over alying the sediments of semri and kymore group and comprise of laterite capping and compact clays, with thinly bedded ferruginous fine to coarse grained send stone. Lithostratigraphic suggestion of the sedimentary succession overlying the vindhyan of the area as follows: Formation Lithounit Age Katni formation Alluviun Laterite and Subrecent to recent ferruginous soil with Kaolinitic clay conglomerate Semri and kymore vindhyan group of rocks 2.1.1 Regional Geology Local geology of the applied area is a part of regional geology.hill part of the applied area is covered by the out crops of laterite in the form of boulders (compact), where as southern and eastern part of the area is covered by the loose (friable) laterite. Eleven exploratory pits exit in the area, which exploratory proves the existence of laterite and white clay. Existence of fire clay ia seen in the (Pit A ) pit lacated in south western part of the area, accordingly area is divided in two blocks, named as block A and block B.the capping of laterite, followed by the fireclay, covers area of pit A. Laterite of the area is brown in colour, soft in nature, having bulk density 2.7 tonnes per cubic m. Recovery percentage of laterite is 100% and recovery percentage of clay is 90% and remaining 10% is waste in the form of murrum with gravels. Recovery percentage is considered by volume Fire clay of the applied area os grayish white in colour, semi plastic in nature, having bulk density 2.1 tonnes per cubic m and PCE Orton Cone.

2.2 Reserves 2.2.1 Summary of Reserves Average cross sectional area X distance between two cross section lines Total volume is a sum total of successive cross section Total volume X Bulk Density Summary of Reserves is as below Reserves of laterite and fireclay Block A Category Area m 2 Volume in (m 3 ) Proved (laterite) Probable (Fireclay) Waste Laterite 20% m 3 60% (m 3 ) Bauxite 20 Laterite % m 3 Tonnage m.t. Bauxite Tonnage m.t. 143020 858120 171624 514872 171624 1390154 360410 143020 429060 85812 257436 85812 695077 180205 Category Ore depleted in Left out in UNFC Code tones tonnes Proved 7128 365796 111 (laterite) Probable (Fireclay) - 145026 121 Reserves of laterite and Bauxite Block B Category Area m 2 Proved (laterite) Probable (Fireclay) Volume in (m 3 ) Waste 20% (m 3 ) Laterite 60%(m 3 ) Bauxite 20% in m 3 Laterite in tones Bauxite in Tones 143020 858120 171624 514872 171624 1390154 360410 143020 429060 85812 257436 85812 695077 180205 Ore depleted Ore depleted Laterite m.t. Bauxite m.t. Laterite m.t. Bauxite m.t. 1971 Nil 511 Nil 1388183 695077 359899 180205 Total 2083260 540104 Total reserves of laterite and bauxite 2623364 m.t. The life of the mine is worked out on the basis of the production projected; presently this will change depending upon the market conditions as well as the increase in reserves after proposed exploration. 3.0 Mining The opencast mining method is proposed using explosive. Thus present mining operations being carried out manually by open cast mining method. Though the use of

explosive is proposed but after removing capping of Sometime excavator with tipper combination is being used for excavation and loading of mineral in to truck dumper. Loading of mineral in to truck dumper is being done manually, some time using machinery (excavator with tipper combination) hand tools such as spades, hammer, crowbar, and chisels etc. are also being used for mining purpose. 3.1 Mining Method The activities involved in the mining are: 1) Ground preparation 2) Drilling 3) Blasting 4) Loading and unloading of mineral / overburden 5) Transportation Mining will be done by manually using hand tools like crowbars, spades, chisels and hammer adopted for sorting, sizing & loading. Drilling & blasting will be done only for removing the capping of Manganese Loading and un-loading is done manually. Loading O.M.S. = 10t Max load = 10m Max lift = 5m Sharping and tempering of tools clearing the area of loose boulders, maintaining the quarry road, plantation and watering the sapling for afforestation will be done by casual labour under mate /foreman supervision. Haulage of O.B. and rocks up to the stacking site will be done by head using cane baskets. Loading will be done manually by head load using cane baskets. 3.1.2 Storage of Explosive Pit head loading of ore is done on contract basis, after the material is shifted to surface store yard, manually. After ore is brought to the storage yard, proper, stack for sampling are prepared & subsequently ore is delivered. All these operation are manual (stacking by departmental workers & loading on contract basis) the ore is transport by trucks to the destination. 3.2.3 Blasting Parameters Storage, handling of explosive & blasting is strictly carried out as per the guidelines of Explosive Act and provision of MMR 1961 and special permissions obtained from DGMS which also ensure safety of workers and material along with control of noise and ground vibration. Every month the number of holes required to be drilled depends upon the production of Dolomite in that particular year. However, each hole the parameter as above should yield about 0.75m x 0.7m x 0.7m = 0.367 cum of Dolomite. 3.2.4 Disposal of Mine Waste Storage, handling of explosive & blasting is strictly carried out as per the guidelines of Explosive Act and provision of MMR 1961 and special permissions obtained from DGMS which also ensure safety of workers and material along with control of noise

and ground vibration. Single row blasting of maximum 10 holes of total charge of 3.5 Kg. Blasting is proposed for loosening purpose only. To achieve 6 m bench height drilling and blasting will be done in 4 stages. In view of flaky nature of lime stone, no regular holes are required to be given. Instead random holes will be given where hard rock will be encountered. 4.0 Use of Mineral The Laterite will be sold to nearby cement industries. The Fireclay will be sold to nearby refractory. Bauxite is sold to the mettle industry. 5.0 Reason for Environmental Impact Assessment (EIA) The impact of mine on the environment depends to a large extent on its location with respect to Human settlements, meteorological conditions, ambient air quality, water bodies, agricultural and forest land etc.most of the adverse impacts of mines are amenable to technological control by providing necessary preventive and control measures and finally through effective environmental management of the operating mines. Keeping in view the likely impacts of mines on environment, this Rapid Environment Impact Assessment Report has been prepared for submission to State Pollution Control Board and Ministry for Environment and Forests (MoEF) for clearance of the mining area in operation. 5.1 Resource Requirement The present proposal is of proposed mining activity at mining lease area of 17.33 ha at village Tikariya,Tehsil Murwara Dist Katni (M. P.). For efficient operation of the mines all necessary utilities will be made available, a brief description of the same is given below. a) Storage Facility It is proposed to provide adequate storage facilities for the excavated mineral, and waste, which is generated/ used during mining process. Proposed excavated minerals will be kept in the existing mining lease area and the waste will be utilized for reclamation purpose as mentioned above. b) Water Supply The total fresh water need is about 15 KL per day for domestic and mining purpose. This quantity of water will be taken from the ground water. The details of water balance of existing / proposed mining project are given below:

Process Table 2.2 Water Balance of Mining Project a) Mine site Total Dust Suppression Green Belt Drinking & Washing Total (A+B) b) Domestic 10.0 KL 2.5 KL 2.5 KL 15.0 KL e) Transport The lease area is located at a distance of 28 km south east of Katni. Approachable to lease area is from to Niwar turning point (located on Jabalpur-Katni N.H. 7) at 6 kms. From Niwar turning point to Niwar is distance 8 km. from Niwar to lease area at village Tikariya is 4km. from village road. The nearest Railway Station is Niwar is 8 km. from lease area. f) Employment Potential The mining establishment presents opportunities of employment to various posts under various cedars viz. management, supervisory, skilled workmen, semi skilled workmen and unskilled workmen beside casual workmen. 1. Permit Manager 1 2. Supervisor 2 3. Skilled Labour 10 4. Semi Skilled 30 5. Unskilled Labour 20 6.0 Environment Management Plan The mining development in the study area needs to be intertwined with judicious utilization of non renewable resource of the study area and within the limit of permissible assimilative capacity. The assimilative capacity of the study area is the maximum amount of pollution load that can be discharge into the environment without effecting the designated use and governed by dilution dispersion and removal due to the physio - chemical and biological process. The EMP list out all these measures for the mining activities. Many of the areas in environmental Management planning are of multidisciplinary dimension. Therefore the measures envisaged in the report are to be regarded as a guide and depending upon the continuing advice from various experts of relevant fields like forestry, soil chemistry, hydrology etc. The suggested scheme is to be detailed, if necessary modified. The EMP is prepared keeping in view all possible strategies oriented towards impact minimization. Solid Waste Disposal Air Pollution Control Land Use Plan pattern after mining activity

Forestation and Land Use planning Water Pollution Control Noise Control Occupational Safety And Health Socio Economic Measures 6.1 EMP During Operational Phase Air Environment The major pollutant emitted from mining activity is suspended particulate matter and major sources of pollutants are excavation, blasting and vehicular movement as well as various materials loading points. As the open cast of mining is proposed, during the ambient air quality monitoring it is observed the baseline concentration of pollutants is well below the prescribed norms. And it can be concluded that mining activity will not cause any adverse effect of existing baseline status. As per the fugitive emission is concern the following measures is recommended: Use of water sprinkling system for the mine road for dust suppression. Green development along the road side and in the mining area. Over charging shall be avoided during the process of blasting. Proper maintenance of haulage roads which are being used for transportation of material. Adopt a wet drilling practice, which is used very rarely as the nature of the soil strata is soft. In addition to the above following additional measures are also being adopted. : 1. Dust mask are provided to all workers working in dusty atmosphere. 2. Spread of dust from blasting will some what checked by use of suitable explosive i.e. ANFO. Overcharging of blast holes should also be avoided. 3. To prevent spillage of materials by avoiding Overloading of trucks. 4. Plantation shall carry out at the periphery of mining lease. 5. Utmost care and regular inspection schedule shall be made to prevent any fugitive emission of dust during transportation of material from one place to another. 6.2 Air Quality Modelling and Predictions using Industrial Source Complex Short Term (ISCST) Model The air quality impact of a source or group of sources is evaluated by the use of mathematical models. The models simulate the relationships between air pollutant emissions and the resulting impact on air quality. The inputs to the model include data relating to emissions, meteorology and atmospheric details like ambient

temperature, wind speed and wind direction all of which are determined by formulating impact scenarios. Tikariya mine three line sources of 200m each were selected. The silt content of the mine area is taken as 8%, the velocity of the vehicle moving inside the line sources is taken as around 13-15 kmph, whereas the mass of the vehicle moving with the material is considered around 10 tonnes and number of trips for material transportation is taken as 3 Trips per day. The details of emissions expected from vehicular movement during mining activity The maximum SPM 3 at the receptor (5km,5 km) which is center of the (10 km X 10 km) grid and occurs at the mine activity itself. The different GLC of SPM concentration contours were plotted using SURFER package and Conceptual Plane shown in Figure 3.0. It is observed the predicted SPM concentration is located within the mine boundary lease of Tikariya mine and will not disperse to the surrounding region of the mine site. The observed ambient SPM levels during AAQ monitoring near the mine site is in the range of 116 to 192µg/m 3,during the winter season. The predicted GLC is 12 µg/m 3, thus the total incremental rise of SPM due to the proposed activity will be in the range of 128to 204µg/m 3,which is much less than the 500 µg/m 3 stipulated by CPCB guidelines of national ambient air quality standards for industrial areas. Given in Table No 4.0 and Table No. is 5.0.

Fig. 3.0 Isopleths showing the Incremental GLCs of SPM during winter season 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 10.00 10.00 9.00 9.00 8.00 8.00 65.00 Distance in N Direction (km) 7.00 6.00 5.00 4.00 3.00 2.00 7.00 6.00 5.00 4.00 3.00 2.00 55.00 45.00 35.00 25.00 15.00 5.00 1.00 1.00 Scale 0.00 0.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 Distance in E Direction (km) Mine Location (X, Y: 5km, 5km)

Table-4.0 Ambient Air Quality Monitoring Stations S.No. Name of village Location Distance (km.) Direction from Area 1. Tikriya A-01 0.6 S.W. 2. Tharka A-02 3.5 N.E. 3. Newar Pahadi A-03 4.2 North 4. Barkheda A-04 5.6 S.W. 5. Shivrajpur A-05 4.8 S.W. 6. Kharhai A-06 2.6 South

Noise Environment In the open cast mining, there will no mechanical source of noise as its seen in the mining area, the ambient noise level are well within the standards of Occupational Safety and Health Administration (OSHA) and Central Pollution Control Board. Mining equipment will also generate significant noise, however, noise levels will be less than 90 dba and exposure to the workers for 8 hrs will also be les than stipulated standard of 90 dba. The major source of noise will be the vehicular movement, and it s a short time activity. Water Environment There are no surface or ground water bodies available in the lease area.there is no potential of acid mine drainage. Course exists in the area therefore there will be no effect of mining on the water regime. Water available in open well and bore-well in village Tharka near the area is potable and it is pure and clean. The question of treatment and disposal of water from mine does not arise as there are no chemical beneficiation processes involved. Surface rain water will be examined for its physic-chemical and bacteriological parameters in order to assess the effect of mining and related activities on ambient quality of water. Water will be analyses by as per procedures laid down in the standard method for examination water. The mine site will be well equipped with basic sanitary facilities like well designed latrine followed by septic tanks to avoid open defecation. Garland drain shall be provided to all overburden and topsoil dumps. Drain water will be passed to a settling tank thus heavy particles will settle before discharge of drain water, thus siltation of agriculture fields will be avoided up to some extent. 6.2.1 Overall Impact Evaluation The net environmental impact of the existing plant for biological category is beneficial. The beneficial value obtained is the result of increased natural vegetation and proper land use as envisaged in the EMP.The net impact under environmental pollution category is insignificant. The impacts are due to emissions of Particulate Matters from the vehicular movement and natural causes. Overall positive impacts are observed in both aquatic and land environmental components after implementation of measures suggested in EMP. The aesthetic category marks positive impacts due to better appearance of water, increased diversity of vegetation, marginal increase in visual quality and a favorable composite effect. The human interest parameters show encouraging positive impacts. The plant having a tremendous export potential will be economically of immense help to the local residents as well as to the nation itself. The total impact is, therefore, positive for the existing plant. Evaluation of impacts for 4 categories based on the above allocations is presented in EIA report.

6.2.2 Health and Safety The Health and Safety of the employees shall be given first priority durin the mining operation. Extensive publicity and propaganda related to safety Provision of rest shelters for mine workers with amenities like drinking water, fans etc. First aid facility shall be provided at mine site. Training programme organize for First aid. Periodical medical check up camps shall be organized for worker and staff. 6.2.3 Implementation of EMP and Monitoring A large part of the sampling and measurement activities will be concerned with long term monitoring aimed at providing an early warning of any undesirable changes or trends in the natural environment that could be associated with mining and associated activities. This is essential to determine whether the changes are a response to a cycle of climatic conditions or are due to the mining and associated activities.to meet the above objective an Environment Management Cell shall be formed under supervision of consultant and involve Pollution Control Board for their valuable suggestion and guidance. The following items will be considered under the monitoring schedule: Re- Vegetation & Green Belt development Drainage Blasting effects Air Quality Monitoring Water Quality Monitoring Occupational Health Socio-Economic Development 7.0 Conclusion The Mining project of Bauxite Laterite and fireclay Mine at Village Tikariya, Tehsil Murwara, District. Katni, (M. P.) will be environmental compatible to the surrounding due to the high standards of pollution control measures to be adopted during the operation activity. Considering the size and operating method of mining, it can be safely stated that the mining activity will not have any adverse effect on the surroundings, if the proper environmental management plan is adopted.