WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: WATER SUPPLY AND DISTRIBUTION INTRODUCTION

Similar documents
City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

Volume 1 Executive Summary

What is a stormwater utility fee?

City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012

CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN

The Metropolitan District. Stormwater & I/I Reduction Presentation March 16, 2017

City of Watertown, South Dakota Storm Water Management Program. Minimum Control Measure 1: Public Education and Outreach on Storm Water Impacts.

STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE

Storm Water Management Plan (SWMP)

Stormwater Management Plan (SWMP)

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

Storm Water and Sanitary Sewer

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY

Checklist for 2013 Draft NH Small MS4 General Permit Requirements

The Village of Wellington NPDES Guidance/Reference Document

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

Richard V. Busche, P.E., CFM

MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING PERIOD VILLAGE OF SKOKIE, ILLINOIS

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

Appendix J. Existing Efforts for Identifying Multi-Benefit Projects

GUIDELINES FOR STORMWATER BACTERIA REDUCTIONS THROUGH BMP IMPLEMENTATION NY/NJ HARBOR TMDL DEVELOPMENT

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

Storm Water Annual Report

III. INVENTORY OF EXISTING FACILITIES

CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT

STORMWATER MANAGEMENT PROGRAM. Pottawatomie County, Kansas Stormwater Management Program

Development in the City of Toronto

MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison

Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

Minnesota Pollution Control Agency

INFRASTRUCTURE ELEMENT STORMWATER SUB-ELEMENT GOALS, OBJECTIVES & POLICIES

National Pollutant Discharge Elimination System (NPDES) Phase II Permit

STORMWATER MANAGEMENT PROGRAM. Table of Contents

STORMWATER POLLUTION PREVENTION PLAN

Appendix C. BMPS, Measurable Goals, and Implementation Schedule

MS4 Permits. Understanding MS4 Permits (Municipal Separate Storm Sewer System) P508-17

Wastewater Master Facility Report. (Project Name) (Project Basin Location)

CHAPTER 9: SANITARY SEWER INTRODUCTION FORECASTS CHAPTER 9: SANITARY SEWER 9-1

City of Saint Paul s STORMWATER MANAGEMENT PROGRAM

MS4 Annual Facility Inspection Report

PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS

Municipal Separate Storm Sewer Systems (MS4) Implementation. Craig Carson Montgomery County Department of Environmental Protection

Warren County MS4 Stormwater Management Program Plan

Wastewater Treatment & Water Supply Alternatives Analysis

EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria

STORMWATER PROGRAM MANAGEMENT PLAN. For 5 Year Permit Period FOR. Town of Yarmouth, Maine

STORM WATER MANAGEMENT PROGRAM. City of Jacksonville, Alabama Phase II Small MS4 NPDES General Permit ALR040004

Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation

Illinois Environmental Protection Agency

Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

Section 1 Introduction and Background

Stormwater Control and Treatment

MEMO I N T E O F F I C E

Modified FY ,100, ,329,791

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA

Engineering Department

Illinois EPA update to DuPage County Watershed Management Section Bureau of Water

Watershed master planning, City of Griffin, Georgia, USA

Springfield Water and Sewer Commission. Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016

ALL ABOUT WATER IN HOT SPRINGS VILLAGE

S.O.P. No. HMD

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

Sewerage & Water Board of New Orleans

Sewer System Flood Reduction Measures in the Rockcliffe Area

Integrated Water Resources Management and Medway

Using GIS to Inventory and Map Rapid City, South Dakota s Major Drainage Elements

The Next Generation of Stormwater Management and Site Design. Melanie R. Grigsby, P.E. Stormwater Resource Manager, City of Fort Myers

UNDERSTANDING THE LAW. In Pennsylvania, both state and federal law govern water pollution caused by stormwater. We briefly examine both.

ACTION PLAN FOR RETROFITTING STRUCTURAL BEST MANAGEMENT PRACTICES Storm Water Management Plan

PROGRAM EFFECTIVENESS ASSESSMENT PLAN Storm Water Management Plan

FOR PHASE I PROPERTIES

WEST POINT CITY STORM WATER MANAGEMENT PROGRAM

Potable Water Supply, Wastewater & Reuse Element

3G. Hydrology and Water Quality

D. B. G R A Y E N G I N E E R I N G I N C.

Kane County Natural Hazards Mitigation Committee

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

History System Wide Coordination

ASHVILLE PARK STORMWATER UPDATE

ROUGE RIVER MONITORING FOR E. COLI TMDL IMPLEMENTATION FINAL REPORT GRANT#

Presented by: The Environmental Joint Insurance Fund (E-JIF) and PMK Group 65 Jackson Drive Cranford, NJ (800)

Site Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177

SECTION 3 NATURAL RESOURCES

Storm Water Pollution Prevention Program (SWPPP)

Inflow & Infiltration Reduction: A System-Wide Sewer Rehabilitation Program

Virginia Department of Transportation Pollutant Discharge Elimination System

GOALS, OBJECTIVES, & POLICIES

MS4 Permitting. Kyle Alexander& Christe Alwin Water Resources Division DEQ

Evaluation of Collection System Design Standards

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

STREAM RESTORATION PURPOSE, PRACTICE, AND METHODS. By Marcus Rubenstein, CPESC

Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility Plans

City of Richmond Municipal Separate Storm Sewer System Program Plan for the July 9, 2008 July 8, 2013 Permit Term

Transcription:

WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: Greenway Connections Protect and enhance drainage corridors Compact Development Continue efficient, economical development pattern Extend infrastructure in a cost-effective, staged plan Minot s high-service pump station to serve Minot and the Northwest Area Water Supply Project WATER SUPPLY AND DISTRIBUTION INTRODUCTION The trunk water system is shown on Figure 7.1. The water system includes the following: Water supply from ground water system consisting of two sources: Sundre Aquifer and Minot Aquifer. Wells located in the Valley along the Souris River, which draw water from aquifers to RAW water transmission lines, to the Water Treatment Plant. Water is treated at the City of Minot Water Plant and distributed through high service pumps to the Water Distribution System. The Water Distribution System includes trunk mains, booster stations, and water storage reservoirs, which provide the water supply and pressure to the system. The Minot water system is divided between three pressure zones: North, South, and Valley. The Northwest Area Water Supply (NAWS) will ultimately supply and distribute water to northwestern North Dakota, which includes Minot. The water supply is from Lake Sakakawea as part of the Missouri River. Pending lawsuits however, by Manitoba and the State of Missouri have delayed portions of the work. The main project objective is to finish construction of the protected water delivery system to Minot. When fully completed, NAWS is designed to provide 26 million gallons of Missouri River water per day to tens of thousands of citizens in northwest North Dakota. WATER RESOURCES 7-1

SUMMARY / RECOMMENDATIONS A water supply and distribution plan (WSDP) is recommended to serve the Future Land Use Plan included in the 2012 Comprehensive Plan. An overall plan will identify the following: Population and Water Demands: including existing and projected water usage, variation in water usage and fire demands. Existing and Proposed Facilities: including water supply, storage, distribution, hydraulic analysis, supply-storage consideration, treatment, phasing plan, conservation plans, and well head protection plans. Economic Analysis: including cost estimates, recommendations of improvements (Capital Improvement Program), water system charges, lateral benefit/trunk oversize charges, and implementation. North Hill Replacement Reservoir The future water supply to the City of Minot from ground water and/or the Missouri River (NAWS) is critical to align with the future land use plan. The potential for inadequate ground water supplies and limited capacity from NAWS is a concern and must be monitored by City officials as the City continues to grow. 7-2 WATER RESOURCES

US Highway 2 "/ #* #* #* %2 4TH AVE SE 27TH ST NE 16TH ST SW 8TH ST NW 27TH ST SE 46TH AVE NE 13TH ST SE 21ST AVE NW 2ND AVE SW 60TH ST NW 3RD ST SE 30TH AVE NW 16TH ST NW 6TH ST SW 3RD ST NE 20TH AVE SE 4TH AVE NW 16TH AVE SW 37TH AVE SW 20TH AVE SW 1TH AVE NW 2ND ST SE 16TH AVE SE 11TH AVE SW 1ST ST SW 11TH AVE SE 20TH ST NW 3RD AVE NW SUNSET BLVD UNIVERSITY AVE NW 42ND ST SE 10TH ST SW 8TH AVE SE 4TH AVE NE CENTRAL AVE 5TH AVE NE 57TH ST NW 11TH AVE NE 19TH AVE NW RR AVE NE 3RD AVE SE 31ST AVE SW 31ST ST SE 7TH ST NE 2ND AVE SE WESTERN AVE 19TH AVE NE 16TH ST SW 31ST AVE SW 11TH AVE SE 16TH ST NW 57TH ST NW 57TH ST NW 4TH AVE NE 37TH AVE SW 31ST AVE SW City of Minot 2011 Comprehensive Plan Municipal Watermain System µ 3,500 0 3,500 Feet October 8, 2010 K:\5459\5459100010\GIS\Projects\watermain.mxd "/ Water Treatment Plant ( Water Tower #* Booster Station %2 Afterbay Reservoir Water Well Fire Hydrant Gate Valve in Manhole Watermain City Boundary Open Water Wetlands Streams Railroad AIRPORT

SANITARY SEWER INTRODUCTION The sanitary sewer facilities serving the City of Minot include the following: Treatment Facility including aeration and treatment ponds located southeast of Minot. Valley Forcemains and Lift Stations constructed in the 1960 s along the north side of the Souris River serving the valley, and significant portion of North and South Hills. Puppy Dog Sewer System including pumping station and gravity sewers constructed in the 1970 s serving south and south west Minot not served by the Valley Forcemains. The sanitary sewer facilities existing and proposed are shown on Figure. The most recent sanitary sewer studies reviewing the existing and proposed facilities for each area are noted below. North Minot Sanitary Sewer Study, July 2011 Preliminary Engineering Report Puppy Dog Sewer System, January 2007 WASTEWATER TREATMENT FACILITY A Wastewater Treatment Facility Plan is underway as part of the North Minot Sanitary Sewer System, City Project No. 3490. The Wastewater Treatment Facility Plan, when completed will address the following: Assess wastewater treatment needs and impacts, review wastewater discharge during warm weather months, capacity during cold weather months, and discharge requirements. Review present and future growth strategies to satisfy present and future wastewater demands. Receive input from operations and engineer personnel to assess existing infrastructure to satisfy present and future wastewater demands. Work closely with City officials to understand financing capabilities and coordinate capital upgrade with an overall acceptable master plan. The Wastewater Treatment Facility Plan when completed will be the guide to allow development to occur in an orderly manner based on controlled growth and the financial resources of the city and development community. NORTH MINOT SANITARY SEWER STUDY, JULY 2011 The main components of the existing North Minot Sanitary Sewer include the following. Control and Master Lift Stations that pumps wastewater flows to the treatment facility, including aeration ponds/lagoons. Valley Forcemain consisting of 16 to 24 diameter forcemains constructed in the 1960 s along the north side of the Souris River. 17 lift stations discharging to the Valley Forcemain of which 9 are primary lift stations. Flow monitoring was completed as part of the study by installing temporary flow meters in conjunction with collecting rainfall data to measure wet and dry weather flows. The estimated wastewater flow for existing and future land use and the criteria to determine is noted below. Estimated Wastewater Flow = 950 gallons per acre per day Unit Rate = 2.5 units per acre Density = 2.27 persons per unit Rate = 150 gallons per person per day Additional Flow = 100 gallons per acre per day Improvements are identified at different locations to improve sewer capacity and serve future development. The biggest outcome from the study is the North Minot Sanitary Sewer System, which extends trunk sewers to serve east, north, and northwest Minot. The trunk sewers are intended to provide capacity to the 2-mile expansion boundary. Table 7.1 Proposed Trunk Sewer and Lift Station Cost Estimates Proposed Trunk Sewer and Lift Station Cost Estimates Trunk Sewer Cost($) Lift Station Cost * ($) Total Trunk Cost ($) 25,389,000 17,285,000 42,674,000 * Includes costs for improvements to existing lift stations along the valley forcemain system. WATER RESOURCES 7-5

PRELIMINARY ENGINEERING REPORT PUPPY DOG SEWER SYSTEM, JANUARY 2007 The Puppy Dog Sewer System includes the following: Puppy Dog Sanitary Pumping Station and Forcemain Puppy Dog Sanitary Sewer Interceptor Puppy Dog Sanitary Sewer Collection System The interceptor/pumping station was constructed in the 1970 s. The study done in January 2007 identified the existing and planning area as follows. Projected Area Population Existing Service Area 1,741 acres 5,200 Planning Service Area 6,380acres 36,207 * * Assumes year 2040 based on 2.5 households/acre, density 2.27 persons /household Estimated wastewater flow is the same as North Minot (950 gallons/acre/day). The preliminary engineering states the existing Puppy Dog Interceptor is currently at capacity and surcharges at times. Therefore if nothing is done to improve the facilities development would have to come to a halt. The preliminary engineering identified the following alternatives: The following improvements are identified in five (5) Phases beginning in 2007. The planning area is shown on Figure and does not extend to the 2-mile boundary. The engineer s opinion of estimated costs from the preliminary engineering report and noted below. Portions of these improvements have been constructed. Engineer s Opinion of Estimated Cost SUMMARY / RECOMMENDATIONS The previous sanitary sewer report and study in 2007 and 2011 provided analysis and recommendations for existing and proposed facilities. The Wastewater Treatment Facility Plan once completed will address wastewater needs for treatment. This Comprehensive Plan is intended to summarize the findings. Minot shall review the previous studies in 2007 and 2011 once the Wastewater Treatment Facility Plan is completed. It s recommended the City review the need to prepare a Comprehensive Sewer Plan for all of Minot reflecting on the goals of this Comprehensive Plan once the goals and objectives are accepted. Puppy Dog Forcemain improvements were identified from the pumping station to the wastewater treatment facility. Puppy Dog Pump Station needs to be sized for 20- year planning period. Puppy Dog Interceptor is at capacity. Therefore improvements were identified to direct flows from the existing Puppy Dog Interceptor to the new First Larson Coulee Interceptor ranging in size from 15 to 30. The proposed First Larson Coulee Interceptor extends west of 16th Street to serve southwest Minot. 7-6 WATER RESOURCES

Table 7.2 Engineer s Opinion of Estimated Cost Estimated Year Phase Improvement Total Project Cost 2007 I New 20 Forcemain to Aeration Basins $1,680,400 2007 I New Influent Control Structure at Aeration Basins $304,000 Phase I Total $1,984,400 2008 II First Larson Coulee Interceptor (MH 34 to Hwy 83) $3,765,400 2008 II South Hill Relief Pumping Station $1,177,300 2008 II Televise Puppy Dog Interceptor (MH 34 to Puppy Dog Pumping Station $119,100 2008 II Update WWTF Facility Plan $50,000 Phase II Total $5,111,800 2009 III New Puppy Dog Pumping Station $3,824,000 2009 III First Larson Coulee Interceptor (Hwy 83 to Crystal Springs) $1,087,900 2009 III Puppy Dog Interceptor Improvements (MH 34 to New Puppy Dog Pumping Station Option A) $4,265,600 2009 III Expand Emergency Storage Pond at Puppy Dog Pumping Station $345,000 Phase III Total $9,522,500 2010+ IV First Larson Coulee Interceptor (Crystal Springs to 30 th Street SW) $458,800 Phase IV Total $458,800? V New Parallel 20 Forcemain to Aeration Basins $1,559,900? V Expansion & Upgrade of Puppy Dog Pumping Station $962,500 Phase V Total $2,522,400? VI Expansion & Upgrade of Wastewater Treatment Facilities Undetermined Phase VI Total Undetermined Total Phases I V $19,599,900 The Comprehensive Sanitary Sewer Plan will summarize and include the following: Land Use Population Forecasts Sewer Design Criteria Sanitary Sewer Trunk System Wastewater Treatment Facility Cost Analysis -- Capital Costs (5 year Capital Improvement Program (CIP) -- Operation and Maintenance Revenue Capital Area Charges Sewer Rates Summary and Recommendations As Minot continues to grow and expand its boundaries and service areas, it s recommended the Comprehensive Sewer Plan be reviewed and updated every 5 years. Especially, if Minot continues to grow and expand as projected. WATER RESOURCES 7-7

US Highway 83 60TH ST NW 16TH ST NW 46TH AVE NE NW 27TH ST NE orce main and L ift Sta tio 3RD ST SE 6TH ST SW 1ST ST SW 2ND AVE SW US Hig hw ay 2 16TH ST SW 4TH AVE NW n 4TH AVE NE US Highway 2 8TH AVE SE 11TH AVE SE 10TH ST SW 2ND ST SE 4TH AVE SE 11TH AVE SE 16TH AVE SE 20TH AVE SW Aeration Ponds 13TH ST SE Valley F 7TH ST NE 1TH AVE NW 8TH ST NW 16T H ST 21ST AVE NW 20TH ST NW SUNSET BLVD 30TH AVE NW Treatment Ponds ep rc ar Wastewater Treatment Facility Plan City Project #3490 US Highway 83 52 F tl i rs ay hw son Coulee In te g Hi 37TH AVE SW US tor 31ST AVE SW Sanitary Sewer North Minot Existing Sanitary Sewer System City of Minot North Minot Sanitary Sewer City Project #3490 2012 Comprehensive Plan Puppy Dog Existing Sanitary Sewer System Puppy Dog Planned Sanitary Sewer Approximate Puppy Dog Existing Service Area 1,741 Acres Approximate North Minot Service Area City Project #3490 Approximate Existing Valley Forcemain Service Area µ 1 Approximate Puppy Dog Planning Service Area 6,380 Acres City of Minot Figure 7.2 May 11, 2012 Extended 2-Mile Boundary Open Water 0 1 Miles Wetlands V:\1938\active\193801073\GIS\Projects\sanitary services.mxd

STORM WATER MANAGEMENT Storm Guidelines The City of Minot has prepared a Storm Water Design Standards Manual (Manual) dated July 2002 to guide and assist entities needing to comply with its Storm Water Management Ordinance. The development of the Storm Water Management Ordinance and the Storm Water Design Standards Manual was a major step in solving existing and future drainage problems in the Minot area. The City s Storm Water Management Ordinance requires the development of Storm Water Management Plans and the acquisition of Storm Water Management Permits for most types of land disturbing activities within the City and its extraterritorial jurisdiction. The Storm Water Management Ordinance outlines application procedures, plan review procedures, approval standards, as well as permits, enforcement, and penalties. MS4 The Environmental Protection Agency (EPA) has issued stricter storm water discharge requirements through rules enforced in the Clean Water Act. The rules require the North Dakota Department of Health, as the delegated permitting authority, to issue permits for storm water discharges from small Municipal Separate Storm Sewer Systems (MS4s). The City of Minot due to its population of 10,000 or greater has been designated as a small MS4. The City must comply with this regulation and must develop, implement and enforce a Stormwater Management Program (SWMP). The City is required to reduce the discharge of pollutants to the maximum extent practicable (MEP) to protect water quality, and to satisfy the appropriate water quality requirements of the Clean Water Act. The SWMP will consist of a combination of Best Management Practices (BMPs), including education, maintenance, control techniques, system design and engineering methods, and such other provisions as determined to be appropriate, to meet the minimum requirements of this permit. 2. Public participation: Include citizens in solving stormwater pollution problems. This includes a required public annual meeting and an annual report. 3. A plan to detect and eliminate illicit discharges to the stormwater system (like chemical dumping and wastewater connections) 4. Construction-site runoff controls 5. Post-construction runoff controls 6. Pollution prevention and municipal good housekeeping measures, like covering salt piles and street-sweeping. Flood Control The City of Minot has several dams upstream on the Mouse (a.k.a. Souris) River that provides flood protection for the City. Lake Darling Dams (constructed in 1936) and upgraded in the 90s, and the Rafferty-Alameda Dams (developed over the 1988-95 periods) provide flood protection in the Souris River Valley including the City of Minot. The City has also constructed several levee embankments along the Souris River that also provide additional protection for the City. The summer of 2011 changed how the City of Minot perceives flood protection from the upstream dams. The City received record rate of flow (27,400 cubic feet per second) more than five times the rate that the existing channels and levees had been designed to handle and close to nine times the rate of any flood documented since The MS4 general permit requires the City of Minot to create a Stormwater Pollution Prevention Program with six important components: 1. Public education and outreach, which includes teaching citizens about better stormwater management WATER RESOURCES 7-11

construction of upstream dams. The record breaking flow caused damage to the area in excessive of $900 million. Due to devastation that occurred throughout the Souris River Valley, local governments recognized the need to develop a plan for flood protection. The Souris River Joint Board issued a request to the North Dakota State Water Commission to develop a Mouse River Enhanced Flood Protection Project. The primary objective for the Mouse River Enhanced Flood Project is to develop a preliminary alignment, as well as engineering, environmental, and cost considerations for plan implementation. The total potential cost of this project to implement flood protection features in the City of Minot is over $500 Million. The City of Minot will need to move forward to make improvements to the City s flood protection and determine as to what extent funding can be provided from various government agencies. The Mouse River Enhanced Flood Protection Project will need to be used by the City as a guide to help reduce risk of damages from future river flows. Selected Urban Watershed Assessments Minot s Storm Water Management Plan (SWMP) dated August 2003 identified storm water facility improvements and storm water management within the City of Minot. The Plan provides a guideline or framework to decide how to best allocate resources for infrastructure improvements, manage storm water runoff associated with urban development; improvements needed within flood prone areas, and achieve environmental regulatory compliance. Selected urban watershed assessments were reviewed in detail and improvements/costs were developed. A City Ad Hoc Storm Water Committee was formed to prioritize projects. Two projects that are currently underway are the 6th St SW Underpass project and the 21st Ave NW project. The table below lists future projects that have been identified for improvements with priority rankings based on need. Table 7.3 Future Project Improvements??? Project Name 4th St SW - 33rd Ave to 37th Ave 1 18 th St SW- 33 rd Ave to 37 th Ave 2 10th St SW - S. of 31st Ave 3 16th St SW - 11th Ave to 16th Ave SW 4 11th Ave SW - To 6th St SW 5 Polaris Park 6 Main St - 35th Ave to 37th Ave SE 7 Southwest Knolls - Phase II at 13th St/12th Ave 8 4 th Ave NW- At 8 th St NW 9 Rank Summary / Recommendations The Storm Water Design Manual and Storm Water Management Plan provided the first step to establish storm water rules and regulations. Storm water improvements were identified in specific areas where storm water standards were not met. The next step is to address storm water needs based on future growth projected in this Comprehensive Plan. Natural water resource areas impacted by future growth must be defined. Storm water management and conveyance of storm water through these areas must be established based on goals and policies of the City that not only comply with all regulatory requirements but the goals of the City. The Area Watersheds included in the 2 mile boundary are on shown Figure. As developments are reviewed requirements to provide and contribute to the overall management of storm water in the 2 mile boundary is required. Existing storm water deficiencies must be implemented to comply with current standards and the goals of the City. An updated Storm Water Management Plan would address the following: Land Use Water Resource Inventory Goals and Policies Water Resource Mapping and Management System Assessment Implementation Plan Best Management Practices Education Operating and Maintenance Cost Financing Capital Improvement Program (CIP) Summary and Recommendations The updated SWMP would define the City s strategies to protect/enhance natural water resources areas and manage storm water conveyance. As growth continues the need to update the plan shall be reviewed by City officials to insure the City s goals and policies are being met in accordance with expectations. 7-12 WATER RESOURCES

Town of Ruthville Upper Hay Coulee US Highway 83 Livingston Lake-Livingston Creek 60TH ST NW 16TH ST NW 46TH AVE NE Middle Hay Coulee Livingston Creek 30TH AVE NW NW 1TH AVE NW 27TH ST NE 8TH ST NW 16T H ST 21ST AVE NW 20TH ST NW South Egg Creek 7TH ST NE 4TH AVE NW 2 10TH ST SW 20TH AVE SW 3RD ST SE 4TH AVE SE 090100050602 US Highway 2 8TH AVE SE 11TH AVE SE 2ND ST SE US Hig hway 1ST ST SW South Branch Coulee Gassman Coulee 6TH ST SW 2ND AVE SW 16TH ST SW City of Minot-Souris River 4TH AVE NE 11TH AVE SE 16TH AVE SE 13TH ST SE SUNSET BLVD City of Burlington Souris River Town of Genoa 31ST AVE SW US g Hi 37TH AVE SW ay hw 52 US Highway 83 First Larson Coulee-Souris River Second Larson Coulee Town of Logan-Souris River Lower Kemp Coulee Area Watersheds City of Minot 2012 Comprehensive Plan City of Minot Extended 2-Mile Boundary µ 1 Watershed Boundary Open Water Figure 7.3 May 11, 2012 Wetlands 0 1 Miles V:\1938\active\193801073\GIS\Projects\watersheds.mxd