Quarterly Report 30 June 2011

Similar documents
Grange Resources Australia s leading magnetite producer

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

Grange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO

A Tiger in the Congo. Charles Brown, COO, S.E.K SPRL, Katanga Province, D R Congo

For personal use only

For personal use only

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

For personal use only

EXCO S PROJECT PIPELINE

MINERAL RESOURCES LIMITED

Azure Minerals Ltd ASX Code:

EXCELLENT NICKEL LEACHING TESTWORK RESULTS

121 MINING INVESTMENT CONFERENCE HONG KONG

For personal use only. Minerals Explorer in South Korea

For personal use only

For personal use only

2014 MINERAL RESOURCES AND ORE RESERVES

Nullagine Gold Project Life of Mine Update

TERRAMIN AUSTRALIA LIMITED. Annual General Meeting

ASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT

QUARTERLY REPORT March 2011

For personal use only

For personal use only

Fresh drilling and metallurgical results advance plan to establish 100,000ozpa operation at Ashburton Project

For personal use only

Second drill rig to accelerate major drilling program at Productora

For personal use only

Windimurra Vanadium Plant Project Update. Investor Presentation August 2011

For personal use only

EXCO S PROJECT PIPELINE. Unlocking the Value

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

For personal use only

Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE

PILOT SOLAR EVAPORATION PONDS COMMISSIONED AT LAKE WELLS POTASH PROJECT, WA

For personal use only

Australia s New Nickel

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. November 2017 AGM Presentation

INDONESIAN BAUXITE PROJECTS

ASX ANNOUNCEMENT 12 MAY 2016

PATRICK SCOTT - DIRECTOR TIN CONFERENCE BEER & CO - SECOND ANNUAL WEDNESDAY, 5 NOVEMBER, 2014

For personal use only

Awak Mas DFS Optimisation - Metallurgical Breakthrough

For personal use only

Haoma Mining NL A.B.N

For personal use only

OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY

Sconi and Flemington: Two near-production cobalt-nickel-scandium deposits. ASX: AUZ October 2017

Activities Report Quarter Ended 31 st March 2015

5 th Asian Bauxite & Alumina Conference

Syerston Nickel & Cobalt Pre-Feasibility Study Completed. Scandium by-product credits provide potential for significant economic upside

For personal use only

For personal use only

Ore Reserves and Mineral Resources Statements 30 June 2013

AGM - Lorena Gold Project

For personal use only

For personal use only

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT

ABM Hits 3000 Ounce Target from Trial Mining

For personal use only

ASX Release ASX Code: YTC

For personal use only

ASX RELEASE BY METROCOAL LIMITED (ASX-MTE) $30 MILLION JOINT VENTURE SIGNED WITH CHINA COAL

COAL RESOURCES INCREASE TO 79Mt AT KATINGAN RIA, INDONESIA

For personal use only

The World s Next HIGH GRADE Vanadium Mine

Quality, Diverse Group of Mining Assets. February 2018

For personal use only

WPG TO ENTER THE IRON ORE INDUSTRY

OUTSTANDING RESULTS FROM ILMENITE UPGRADE TESTWORK

For personal use only. Cummins Range Rare Earths Project

CRITICAL RAW MATERIALS FOR THE BATTERY REVOLUTION INVESTOR PRESENTATION JANUARY 2018

Developing High Grade Projects in Mexico

BUILDING AN EMERGING RESOURCE COMPANY UPDATE ON ACQUISITION OF COAL AND MANGANESE ASSETS IN INDONESIA

For personal use only

For personal use only

Geology and mineral resources of the Kylylahti Mine

HILLGROVE ACQUIRES OPTIONS ON INDONESIAN BAUXITE PROJECTS

Sewa Bay Nickel Exploration Project, PNG

Investor Presentation Jogjakarta Iron Sands Project

For personal use only

Investor Presentation

Ste De Maisonneuve Blvd W Montréal, QC H3A 3L4 Tel: Fax:

JUNE QUARTERLY REPORT

For personal use only. Australia on the 'New Age Metal map: Dubbo Zirconia Project

For personal use only

Haoma Mining NL A.B.N

Macquarie Australia Conference 2018 Warrick Ranson Chief Financial Officer. M a y 2018

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources

AVINO SILVER & GOLD MINES LTD.

For personal use only

Building a Bauxite Company. Investor Presentation May 2018

The competent person in mine-site evaluation and responsibilities for study design, management and findings

INSG Environmental & Economics Session. Bruce Wedderburn. 27 th April 2010

Carbon Energy UCG Projects update. UCG Association London March 2011

For personal use only

Pit to Port Infrastructure in SA

Transcription:

Quarterly Report 30 June 2011 ASX Announcement: 13 July 2011 SIGNIFICANT EVENTS ASX CODE: MRE BOARD OF DIRECTORS Malcolm Macpherson Chairman Peter Johnston Managing Director and Chief Executive Officer John Morrison Non-executive Director Ivan Glasenberg Non-executive Director Marc Osckay Non-executive Director CONTACT Andrew Bantock Chief Financial Officer Minara Resources Limited + 61 8 9212 8400 or David Griffiths Gryphon Management Australia + 61 8 9382 8300 MINARA RESOURCES LIMITED Level 4, 30 The Esplanade PERTH WA 6000 PO Box Z5523 St Georges Terrace Perth WA 6831 Australia www.minara.com.au Production 7,157 tonnes of nickel packaged for the quarter. Murrin Murrin East ore processing commenced. Production impacted by failure of acid plant heat exchanger. Replacement heat exchanger installed. Operations recommenced. 2011 production guidance revised to 29,000 to 32,000 tonnes of nickel packaged (Minara 60%). Exploration Marshall Pool feasibility study commenced. Corporate $204 million cash at 30 June 2011. $19 million interim insurance payment received for 2010 autoclave pipeline failure (Minara 60%). 1

PRODUCTION Total production of 7,157 tonnes of packaged nickel and 457 tonnes of packaged cobalt was achieved at Murrin Murrin for the three months to 30 June 2011. The previous quarter saw 7,468 tonnes of packaged nickel and 488 tonnes of packaged cobalt produced. Minara s share is 60%. Unit Quarter ending 30 June 2011 Previous Quarter ending 31 March 2011 Material mined BCM 3,265,041 2,842,447 Autoclave feed Tonnes 633,895 697,689 Autoclave feed grade (Ni) % 1.28 1.27 Nickel production Tonnes 7,157 7,468 Cobalt production Tonnes 457 488 Direct cash costs US$/lb Ni 9.06 6.97 Autoclave feed for the quarter was 633,895 tonnes of ore grading 1.28% nickel. Quarterly production was adversely impacted by a number of issues. A planned mixed sulphide circuit train-swap occurred in April, however, this was followed by a number of unrelated maintenance issues. Gas supply issues arose in June resulting from maintenance works on the lateral gas supply pipeline by the pipeline operator. As previously announced, failure of an acid plant heat exchanger in late June saw nickel production continue at reduced rates before being shut down in early July. The acid plant was brought off-line following identification of the heat exchanger failure. Testing subsequently confirmed that the unit required replacement and an alternate heat exchanger unit was installed. Operations have now recommenced. The impact of the heat exchanger failure is currently estimated at approximately 2,000 tonnes of lost nickel production. 2011 production guidance is adjusted to 29,000 to 32,000 tonnes of packaged nickel (Minara s share 60%). INSURANCE CLAIM The Murrin Murrin Joint Venture maintains Material Damage and Business Interruption insurance. The insurance underwriters have been advised of a potential claim in relation to the heat exchanger failure and insurance loss adjustors have attended the Murrin Murrin plant for an initial assessment. During the quarter the joint venture received $17.8 million of an A$19 million interim insurance payment (Minara share $11.4 million) being part of an over $30 million claim, which has been submitted for the loss of production (and associated rectification costs) arising from the Train 1 HPAL autoclave pipeline failure at Murrin Murrin in May 2010. The final $1.2 million of this interim payment has since been received. The interim insurance payment is provisional and subject to final agreement of the total claim amount by the underwriters. However, the $19 million cash payment is seen by Minara to indicate a potential favourable outcome for this matter. The claim is expected to be finalised in the September quarter. 2

COSTS Direct cash costs (Brook Hunt C1) were US$9.06 per pound nickel (post by-product credits) for the quarter. This was higher than the first quarter, reflecting the relatively strong Australian dollar, higher than expected maintenance costs and the production losses discussed above. The Australian dollar averaged US$1.0618 for the quarter. This added approximately US$1.12 per pound nickel of C1 costs compared to the position if the 2010 average exchange rate of US$0.9208 had applied. The resumption of full production, including the benefit of a higher proportion of Murrin Murrin East ore processed, is expected to drive reported C1 costs lower in future periods, subject to the prevailing exchange rate. Minara continues to benefit from sulphur price protection arrangements. These arrangements with long-term suppliers, covering over 80% of Murrin Murrin s forecast 2011 sulphur requirements, will continue to protect the company from potential sulphur price increases over the balance of the year. A portion of these price protection arrangements extends to 2013. Negotiations commenced during the quarter for extension of the remainder to 2012 and beyond. DEVELOPMENT Relatively minor volumes of Murrin Murrin East (MME) ore were blended with other run-of-mine ores and processed during the quarter. MME processing volumes will ramp-up to full budgeted levels across the second half of 2011, contributing to an expected increase in autoclave feed grade to over 1.30% nickel for the remainder of the year. The Murrin Murrin East ore-body comprises approximately 20% of the Joint Venture s Proven and Probable in-situ Reserves. EXPLORATION Murrin Murrin Exploration (Murrin Murrin JV 100%) The near-mine exploration program continued during the quarter with drilling recommencing on high grade targets. This drilling program will continue for the remainder of the year with the aim of delineating zones of higher-grade ore within the existing mine environs and proving up additional resources with near term mining potential. Marshall Pool (Murrin Murrin JV 100%) The Marshall Pool deposit is a large low-grade nickel laterite deposit which is highly siliceous and amenable to upgrading by simple beneficiation. The project is located 70 km north of Leonora in Western Australia and is 140 km from Murrin Murrin by sealed road. During the quarter a pre-feasibility study into beneficiation of Marshall Pool ore commenced. The study is focussing on the potential to generate an intermediate beneficiated run of mine ore which can be transported to Murrin Murrin for further beneficiation and processing. Preliminary drill planning to provide core samples was completed, pulp re-samples were determined from existing pulps in storage and consultant selection advanced. The study is expected to take approximately 12 months to complete. 3

Mt Lucky (Murrin Murrin JV 100%) The Mt Lucky deposit is a small low-grade manganese deposit which is to be used for process enhancement of nickel sulphide ore and nickel sulphide concentrate. During the quarter a program of works was approved for a drilling program to increase definition of the known mineralisation and to test deeper targets. HEALTH AND SAFETY The LTIFR 12 month rolling average is 3.66. The DIFR 12 month rolling average is 4.88. Safety continues to be a major focus for the company. ENVIRONMENT There was one reportable environmental incident for the quarter. Corrective action was taken and no fines or penalties issued. 4

CORPORATE/FINANCIAL Cash Cash on hand at 30 June 2011 was $204 million (31 March 2011 $199 million). Metals Markets Minara s nickel and cobalt revenue is priced in US dollars, with the majority of input costs denominated in Australian dollars (with the exception of sulphur and some maintenance parts). The London Metal Exchange (LME) nickel spot prices were relatively volatile during the quarter, trading in a range of approximately US$21,410 to US$27,420 per tonne nickel. The spot price opened the reporting period at US$25,555 per tonne nickel and closed the period on 30 June 2011 at US$23,125 per tonne nickel. LME nickel stock levels opened the reporting period at 123,948 tonnes and closed at 107,148 tonnes. The cobalt price traded in a range of approximately US$15.65 to US$18.00 per pound cobalt during the quarter. The price opened the quarter at US$16.40 per pound cobalt and closed the quarter at US$15.65 per pound cobalt. PROPOSED CARBON TAX Minara is closely monitoring the proposed carbon tax and its potential effects on the Company. Minara maintains that it operates in a trade-exposed industry as almost all of the Murrin Murrin Joint Venture s production is exported to international markets and therefore seeks protection from the impact of a carbon tax which would otherwise increase its cost base and reduce its international competitiveness. Murrin Murrin reports to the Federal Government under the National Greenhouse and Energy Reporting (NGER) Act 2007. In the NGER reporting year 2009-2010 Murrin Murrin reported emissions of 568,620t CO2-e. Minara s share would be 60% of this amount. Minara is considering the recent announcements made by the Federal Government and the potential impact on the Company. 5

Commodity Prices LME Nickel Cash Seller & Settlement Prices as at 30 June 2011 Average for quarter ending 30 June 2011 Average for quarter ending 31 March 2011 Average for quarter ending 30 June 2010 US$ per tonne 23,125 24,165 26,899 22,382 US$ per pound 10.49 10.96 12.20 10.15 A$ per tonne 21,534 22,759 26,773 25,368 Cobalt US$ per pound 15.65 16.57 17.86 18.46 Exchange rate A$:US$ 1.0739 1.0618 1.0047 0.8823 6

7

CEO S COMMENTS Murrin Murrin produced 14,625 tonnes of nickel in the first half of 2011, with the production profile set to improve in the second half, reflecting increased plant availability and increased processed ore-grade following the ramp-up to full production from the Murrin Murrin East ore-body. As previously announced, the acid plant was taken off-line following a heat exchanger failure in late June. Currently, we estimate this will cost approximately 2,000 tonnes of lost nickel production and have reduced our 2011 production guidance to 29,000 to 32,000 tonnes of nickel packaged. A replacement heat exchanger has been installed and operations have recommenced. We are focussed on improving production and reducing costs in the second half of the year. Peter Johnston Managing Director and CEO 13 July 2011 The information in this report that relates to Metallurgical Results is based on information compiled by Mr Bradley Adamson. The information in this report relating to Exploration Results is based on information compiled by Mr David Selfe. Both Mr Adamson and Mr Selfe are Members of the Australasian Institute of Mining and Metallurgy. Mr Adamson and Mr Selfe are full time employees of Minara Resources Limited. Mr Adamson and Mr Selfe have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which each is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Adamson and Mr Selfe consent to the inclusion in the report of the matters based on the information each has provided in the form and context in which it appears. 8