GRUNDFOS WHITE PAPER. Although a baseplate is designed to be a. FOUNDATIONS by Greg Towsley DESIGN RECOMMENDATIONS

Similar documents
Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations

SECTION VIBRATION ISOLATION

Electronic Machinery Grouting Manual

SECTION ALUMINUM GATES

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

C. Concrete Inertia Bases: Drawings showing required concrete steel reinforcing, construction details, and dimensions.

3-speed technology. The power of flexibility. GRUNDFOS Superbrute. Features

SUGGESTED SPECIFICATIONS Pump Frames through 64132

SPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION METAL FLOOR PLATE STAIRS

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

CHOCKFAST INSTALLATION PROCEDURE

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

SECTION VIBRATION AND SEISMIC CONTROL FOR PLUMBING

SECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT

IBC Compliant Seismic Rated Isolators

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing

FIVE STAR PRODUCTS, INC. (800)

CONCRETE FORMWORK CHECKLIST AT SITE

DARTMOUTH COLLEGE DESIGN September 15, 2004 &CONSTRUCTION GUIDELINES

3-speed technology The power of flexibility

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

B BASF MasterFlow MasterFlow MasterFlow MasterFlow C CGM Grout...8

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

FIVE STAR PRODUCTS, INC. (800)

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

Series Sump and Sewage Systems

SECTION GROUT. A. American Society for Testing and Materials (ASTM):

SPECIFICATIONS - DETAILED PROVISIONS Section Horizontal Centrifugal Water Pumps C O N T E N T S

COMPRESSORS CB /07

Design recommendations

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

RAISED ACCESS FLOOR SYSTEM TECHNICAL SPECIFICATION

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

Diffused Aeration Piping Equipment

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

METAL HANDRAILS AND RAILINGS. A. Properly identified manufacturer's literature, including shop and erection drawings before starting work.

B R OA DWAY RAC K. High Security

Standard Installation Fire Damper Models: 119, 119(F), 119(SS), D19

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

Aluminum Component Pipe Railings

1. Cast-in-place concrete is specified in Section

ROLLING RACK. Simple Security

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

Operating Instructions

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.

CP-24CC Potassium Silicate Concrete

1 PVC or ABS drain with strainer

SECTION ROLLER GATES

Single Post Anchor Part Number Spectrum Lane ~ Missoula MT ~

Pump Company. Simsite Structural Composite Pumps. The only Pump that is Impervious to Salt Water Corrosion. Since 1919 VERTICAL PIT

Stainless Steel Aeration Equipment Specification

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

PS 3000 Installation Manual Step-By-Step Procedures C.9. DOOR AND WINDOW OPENINGS C.9.1 PREPARE IN ADVANCE. C.9.2 VBUCK CONSTRUCTION.

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

By CTS Cement Manufacturing Corp.

SPECIFICATION: CAST IRON SLUICE GATES

ZS880 Linear Shower Drain Installation Instructions

Freedom Barrier Free Shower Pan Installation Instructions

WALL MOUNTED ARTICULATING JIB CRANE

SECTION DECORATIVE METAL AND GLASS RAILING

PIPE AND TUBE RAILINGS

A M E R I C A N A R C H I T E C T U R A L M A N U F A C T U R E R S A S S O C I A T I O N

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

7. Allowable Fittings.

SPECIFICATION FOR TUBULAR STEEL LIGHTING COLUMN. Reference is made in this Specification to the following:

Tnemec 394 Proprietary Long Form Coatings Schedule

SPECIFICATION FOR REINFORCED SOIL WALL

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

SECTION PACKAGE BOOSTER PUMP STATIONS

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

THIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE.

Freedom One-Piece Barrier Free Showers Installation Instructions

FIVE STAR PRODUCTS, INC. (800)

Modal Analysis as a Tool to Resolve Pump Vibration Issues

BioPrism Solid Surface

Printing Presses come in various types but can be divided into 2 basic types;

WORK REPORT FOUNDATION REPAIR AND REGROUT NUOVO-PIGNONE 6HE COMPRESSOR ENAGÁS BARCELONA PORT. REPORT NO: V-011 DATE: 6 August 2001 PAGE NO: 1

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

2. Water Pressure Booster Systems. 3. Duplex Pedestal Type Sump Pumps.

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION PIPE AND TUBE RAILINGS PART 1- GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY 1.3 PERFORMANCE REQUIREMENTS

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work.

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.

Table of Contents. List of Drawings

Smarter. Safer. Leaner.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

LRV LLR. Single-Stage Horizontal. Single-Stage Vertical. Two-Stage Horizontal. Axially Split, General Industry Pumps.

High performance shrinkage compensated cementitious grout

Critical Structures Construction Issues

Model # 158-P4. 12/12/2013 Page 1 of 11

SECTION CAST-IN-PLACE CONCRETE

Electrical Metallic Tubing (EMT) Fittings

CSI SECTION MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials

Transcription:

GRUNDFOS WHITE PAPER FOUNDATIONS by Greg Towsley Although a baseplate is designed to be a rigid support for a pump and its driver, it will deflect. For this reason a foundation may be provided for additional support. One of the most significant factors for a reliable and trouble-free pump installation is a good foundation. Other factors of a good installation are the baseplate, its installation, and the alignment of the equipment. Other White Papers by Grundfos discuss these topics. This White Paper focuses on good industrial practices for pump foundations, but the installer should refer to the requirements of the manufacturer or owner. A good foundation will be stout enough to provide stability and give rigid support. It will be able to absorb the normal strains and shocks that may be transferred to it while operating in service. The foundation must also minimize vibration that the pump and driver create, or external sources, such as piping, building structures or other operating equipment. Figure 1 shows a multistage boiler feed pump with electric motor, mounted on a common Figure 1. Boiler Feed Pump Unit baseplate. This entire unit has been grouted to a foundation for a durable installation. Another key purpose of a good foundation is to help maintain alignment between the pump and driver. Alignment is also critical to the reliability of the equipment. Without a good foundation, distortion of the baseplate may occur due to the ground settling, thermal distortion of the baseplate, excessive piping forces, and pressure or vacuum forces that occur because of expansion joints. This may cause the pump and driver to become misaligned, and reduce the reliability of the rotating equipment. DESIGN RECOMMENDATIONS The foundation should begin with a firm footing. Fabricating a concrete foundation from the solid ground is the most acceptable. Concrete is the best material for construction of foundations because it is low in cost. The mass of the concrete foundation is great enough that it absorbs any of the dynamic and static forces previously described. The Hydraulic Institute recommends in its Standards 1 that the mass of the concrete foundation should be on the order of five (5) times that of the equipment it is supporting. If the pump unit is mounted on other than concrete foundation, such as a steel structure, the base should be supported on rigid steel beams along its length. It should also be mounted as near as possible to main structural members, other beams and the surrounding walls. Calculations should be made on the steel structure to insure that it has adequate rigidity to minimize baseplate distortion and vibration

FOUNDATIONS GRUNDFOS WHITE PAPER 2 during operation. The Hydraulic Institute also recommends in its Standards 2 that light-weight pump units may be fastened directly to an existing concrete floor if the floor meets the criteria of a foundation. If this is done, installation of threaded bolts into the foundation can be done as shown in Figure 2. This provides a rigid installation. The depth of the foundation should reach through the concrete flooring or elevation to solid ground or footings. The height of the foundation above the elevation is as required by the piping layout, but at least 20 times the diameter of the foundation bolts. General industry practice provides a foundation that is 3 to 6 inches (7.6 cm to 15.2 cm) longer and wider that the baseplate that will be installed. A practice of the petrochemical industry provides a design that insures the foundation is wide enough to provide a rigid support. This practice draws imaginary lines downward 30 on either side of the vertical of the pump, through the shaft centerline. These imaginary lines, as seen in Figure 3, should pass through the bottom of the foundation, not the sides. Figure 2. Threaded Anchor Bolt in Foundation Figure 3. Foundation Design

FOUNDATIONS GRUNDFOS WHITE PAPER 3 For elevated pump installations, similar to that shown in Figure 4, the overall size and mass of the foundation must be maximized to insure the best possible rigidity. If a new pump unit is being installed in place of an existing unit, the existing foundation should be removed in its entirety. The removal should be total and allow the new foundation to reach to the solid ground or footing. To properly hold the baseplate to the foundation, proper foundation bolts are required. The supplier of the pump unit normally recommends the diameter of the bolts. For proper holding of the base through the foundation, the bolt length should extend from in the foundation, through 0.75 inches to 1.5 inches (2 cm to 3.8 cm) of grout, the base height, and 0.25 inches to 0.50 (0.6 cm to 1.3 cm) inches above the nut. These foundation bolts are embedded in the concrete floor or foundation, and are located according to a drawing provided by the pump supplier. To assist in the proper location of the bolts and to maintain their position when pouring the foundation, a template can be formed. Pipe sleeves are used to allow final positioning of the bolt. These sleeves are a minimum of 3 times larger than the bolt, and have a length of at least 10 times the diameter. Figure 5 provides a view of the anchor bolt and pipe sleeve in which it is installed. It must be noted that pre-cast foundations, baseplates, and combination units are available. These pre-cast units are constructed of a polymer material that is inert to many chemicals. They may also reduce installation time for a new or replacement foundation. Some of the following installation and grouting recommendations still apply to the pre-cast system. The ANSI chemical pump shown in Figure 6 is installed on a flexibly mounted cast iron baseplate. This installation design does not provide much rigidity for a pump unit. Figure 4. Elevated Pump Unit Figure 5. Anchor Bolt and Pipe Sleeve Detail

FOUNDATIONS GRUNDFOS WHITE PAPER 4 The lack of rigidity will affect alignment and mechanical seal reliability. This installation was replace with a pre-cast polymer baseplate/foundation shown in Figure 7. Figure 6. ANSI Chemical Pump on Flexible Base Figure 7. ANSI Chemical Pump on New Pre-Cast Baseplate/Foundation INSTALLATION RECOMMENDATIONS Installation of the foundation is critical to the life of the pump unit. Best practice recommends that all equipment be removed from the baseplate. This practice will vary from company to company, and will mostly be done with large equipment. The bolt locations should be double-checked with drawings and base. Once the foundation is ready to pour, the exposed threads of the anchor bolts should be covered with grease or wax and then the exposed threads should be wrapped. The foundation bolt sleeves may be packed with some type of non-binding material, such as rags or grease, to prevent concrete from entering the sleeve and prevent and final adjustment of the foundation bolts. Insure that enough concrete is available to complete the job all at once. The poured concrete foundation should then be allowed to cure for a minimum of 14 days. Hydraulic Institute 2 prefers 28 days. Waxed forms assist in the removal after the concrete has cured. Before installing the baseplate, the underside should be cleaned and coated with an epoxy primer. The foundation should have been poured with a rough surface or should be roughed after pouring, to provide a good surface to allow the grout to bond. In addition, the foundation should be inspected for dust, dirt, oil, or water, and all contaminants should be removed. Oil-free, high-pressure air can be used to blow the foundation clear. The baseplate should be leveled in accordance with the manufacturer s instructions, but there may be some additional considerations. When utilizing leveling wedges or shim sets, they should assemble together with minimal voids. This will assist in providing a homogenous mass.

FOUNDATIONS GRUNDFOS WHITE PAPER 5 Figure 8 provides a view of a typical baseplate that is grouted to a foundation. Note that the anchor bolts are not shown. It is also important that no sharp edges come in immediate contact with the grout. Sharp corners or edges may cause the grout to crack. Corners should be made round, such as those on the leveling wedges. In lieu of leveling wedges, the baseplate may be provided with 0.75 inches to 1.5 inches (1.9 cm to 3.8 cm) jackscrews. These should be coated with an anti-seize compound to assist in the removal after grouting. Final leveling should bring the pump and driver mounting pads back to the plane in which they were machined to co-planer flatness. GROUTING RECOMMENDATIONS Before any piping is installed on the pump, the entire pump unit needs to be grouted. Grouting of the baseplate to the foundation is done to provide a good, sturdy union between them. Grout is a concrete-type material that is used to fill between the baseplate and the foundation. The grout increases the mass of the baseplate to help in reducing vibration. In addition, the grout will fill any voids or imperfections in the foundation surface. When the grout solidifies, the baseplate and the foundation become one solid entity. Similar to pouring the concrete foundation, some site preparation must be completed. If any equipment was removed from the baseplate before installation, it should now be replaced. Preliminary alignment should be done on the equipment. The equipment should be tightened evenly, but not fully, as they will be final aligned later. Forms are then used to prepare the unit for grouting. The forms shall be of ample strength for the expansion of the grout, and secured to Figure 8. Typical Baseplate with Grouting

FOUNDATIONS GRUNDFOS WHITE PAPER 6 Figure 9. Vertical Turbine Pumps Proper Installation prevent movement. The forms shall be taller than the lowest edge of the leveled baseplate. To assist with removal after the grout has cured, the forms should be coated with a paste wax. After the forms are in place, the joints should be sealed with a liquid-tight material to prevent the grout from seeping out of the forms. Figure 8 provides a view of the grout forms in place around a baseplate. In the case of vertical pumps, the discharge head, a curb ring, or a soleplate is grouted into position. As with a horizontal pump, a foundation is first fabricated for the unit. Figure 9 shows properly installed vertical turbine pump discharge heads and soleplates that are mounted on a foundation and grouted into place. Figure 10 provides a view of a damaged foundation of a vertical turbine pump. As it was not mounted properly to the foundation and grouted into place, the operation of the pump has caused damage to the foundation. In addition, the end user has attempted to minimize the vibration and stiffen the installation by adding shim under the soleplate. Proper grouting of an equipment baseplate requires many recommended practices, however, one should always follow the instructions and recommendations of the grout manufacturer. The instructions may differ between an expanding grout and a non-shrink grout. Typically, the grout should be poured when the ambient temperature is between 50 to 90 F (10 to 32 C). This will provide a good consistency in the grout. It should be mixed to a water-like consistency to allow it to flow evenly within the baseplate and for all air to be expelled from the vent holes in the baseplate compartments. If only one grout hole or other opening exists (see Figure 11), it should only be poured from this location. Figure 12 shows an ANSI pump mounted on a channel steel baseplate. For this installation, the grout was filled from an end, as detailed with the arrow. Figure 10. Vertical Turbine Pumps Improper Installation

FOUNDATIONS GRUNDFOS WHITE PAPER 7 Figure 11. Grout Hole Figure 12. ANSI Pump Channel Baseplate Figure 13. Baseplate with Leveling Screws

FOUNDATIONS GRUNDFOS WHITE PAPER 8 For baseplates with multiple grout holes, each of these should be used to ensure the underside compartments are completely filled and void of air pockets. The baseplate leveling pieces described previously are grouted into place. These will become part of the baseplate foundation. Figure 13 provides another view of baseplate leveling. Baseplates can be fabricated with leveling screws that provide ease of alignment. Baseplates manufactured to industry specifications, such as HI 1.4 1 or API-610 3, provide recommended specifications for this value-added feature. The grout should be filled until it starts to come up through all of the vent holes. To check for voids or air pockets, a hammer can be used on the baseplate to help in locating and eliminating the voids. During this process, prevent the grout from dropping below the level of the bottom edge of the baseplate. Figure 14 provides a view of a grouted baseplate with a void. Epoxy grout manufacturers provide instructions on how to fill these voids to provide for a solid installation. The grout should be allowed to cure for 48 hours, or as recommended by the manufacturer. The baseplate and grout should be protected from wet weather and temperatures outside of the limits recommended by the manufacturer. The foundation bolts can then be fully tightened after the grout is cured. Figure 14. Baseplate with Void

Being responsible is our foundation Thinking ahead makes it possible Innovation is the essence REFERENCES 1. Hydraulic Institute (2000). ANSI/HI 1.4 Centrifugal Operations. Hydraulic Institute, 9 Sylvan Way, Parsippany, NJ 07054. http://www.pumps.org. 2. Hydraulic Institute (2000). ANSI/HI 3.1-3.5 Rotary Pumps. Hydraulic Institute, 9 Sylvan Way, Parsippany, NJ 07054. http://www.pumps.org. 3. American Petroleum Institute (2004). API Standard 610, 10th Edition, Centrifugal Pumps for Petroleum, Petro Chemical, and Natural Gas Industries. American Petroleum Institute, 1220 L Street NW, Washington, DC, 2005. http://www.api.org. ACKNOWLEDGEMENTS Figures 1, 4, 9, 11, and 12: Diagnostic Solutions, LLC. USA GRUNDFOS Pumps Corporation 17100 West 118th Terrace Olathe, KS 66061 Phone: (913) 227-3400 Telefax: (913) 227-3500 USA PACO Pumps National Headquarters Grundfos CBS Inc. 902 Koomey Road Brookshire, TX 77423 Phone: (800) 955-5847 Telefax: (800) 945-4777 CANADA GRUNDFOS Canada Inc. 2941 Brighton Road Oakville, Ontario L6H 6C9 Phone: (905) 829-9533 Telefax: (905) 829-9512 MEXICO Bombas GRUNDFOS de Mexico S.A. de C.V. Boulevard TLC No. 15 Parque Industrial Stiva Aeropuerto C.P. 66600 Apodaca, N.L. Mexico Phone: 011-52-81-8144 4000 Telefax: 011-52-81-8144-4010 L-CBS-WP-05 Rev. 05/09 (US) http://cbs.grundfos.com