Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

Similar documents
Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Water Pollution Control for Work in Sensitive Areas

Erosion & Sedimentation Control Policy

Town of Fortville Utility Street Standards

Design Specifications & Requirements Manual

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

SACHSE EROSION CONTROL GUIDELINES

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

SECTION EROSION AND SEDIMENTATION CONTROLS

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

SECTION TRENCHING & BACKFILLING

CITY OF BUENA PARK EDISON ROW PARKING LOT IMPROVEMENT PROJECT FY PROJECT NO. GP-1775

Diversion Dikes. Fe=0.95

Installation and Maintenance of Erosion Control BMPs

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

CHAPTER 9 EROSION AND SEDIMENT CONTROL DESIGN

PART 1 GENERAL REQUIREMENTS

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria

APPENDIX C DURING CONSTRUCTION BMP TABLES

Appendix K. Standard Construction Techniques and Mitigation Measures

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

SECTION 903 EROSION CONTROL

Outline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

SITE DESIGN ENGINEER'S STATEMENT:

The Good, The Bad, and The Ugly

Best Management Practice (BMP) Guidance Manual

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

CITY UTILITIES DESIGN STANDARDS MANUAL

Storm Drain Inlet Protection

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

C. Foundation stabilization for pipe and utility structures.

GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES

JEFFERSON COUNTY STORM WATER MANAGEMENT

Constructability Guidelines

4.8. Subsurface Infiltration

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

Elements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP)

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

E. STORMWATER MANAGEMENT

Concrete Waste Management

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

General Permit No.: OHR Page 53 of 146

Planning & Building Department. Requirements for Erosion and Sediment Control

EROSION AND SEDIMENT CONTROL PLAN (ESCP) FOR PROJECT TITLE

Richland County Department of Public Works Engineering (Land Development) Division

Module 4 Regulatory requirements for Land Disturbing Activities

TABLE OF CONTENTS SECTION 700 STORM DRAINAGE STANDARDS...

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

Temporary Watercourse Crossing: Culverts

Review of State and Federal Stormwater Regulations November 2007

U.S. ARMY CORPS OF ENGINEERS. Little Rock District

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

Soil Erosion and Sedimentation Control. Authorized Public Agency Procedures Manual

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

Small Site Stormwater Quality Permit Application

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

Factor Potential Effects Mitigation Measures

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN

4.8. Subsurface Infiltration

Design Specifications & Requirements Manual

Alberta Transportation. Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects

Storm Drain Inlet Protection for Construction Sites (1060)

STORMWATER MANAGEMENT PROGRAM. Table of Contents

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.

ACTION PLAN FOR RETROFITTING STRUCTURAL BEST MANAGEMENT PRACTICES Storm Water Management Plan

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

Appendix G: Source Control Mitigation Measures Intentionally Left Blank

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

[Rev - 1] 06/

SECTION FACILITY SANITARY SEWERS

PART II - CODE OF ORDINANCES Chapter 16 - CONSTRUCTION, REHABILITATION AND PROPERTY MAINTENANCE REGULATIONS ARTICLE VIII. PROPERTY MAINTENANCE

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas

Chapter 21 Stormwater Management Bylaw

Forsyth County Procurement

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

City of Aliso Viejo Stormwater Program 2017 ANNUAL WATER QUALITY MANAGEMENT PLAN FOR HOMEOWNER ASSOCIATIONS AND PROPERTY MANAGEMENT COMPANIES

Special Provision - Turbidity

Division 02 - Site Work Section

Erosion Control State Standards Sampling of Material Innovations

Construction Site Erosion Control and Phase II of the Stormwater Permit Program

Stormwater Pollution Prevention Plan (SWPPP) for Construction Activity for Small Construction Sites

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

BIOPOD TM BIOFILTER WITH STORMMIX BIOFILTRATION MEDIA. Inspection and Maintenance Guide

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Block or Log forms of PAM and PAM blends are manufactured for specific use in drainage waterways to remove suspended particulates from runoff.

Transcription:

SEDIMENT CONTROL NOTES 1.0 GENERAL 1.1 The Developer and Contractor shall comply with the requirements of all regulatory authorities, federal, provincial and municipal government departments including the Department of Fisheries and Oceans Canada and Ministry of Environment, in the protection of fish and wildlife during the construction of the works. Specifically, the Contractor shall ensure that all excavation and construction procedures are undertaken in such a manner as to prevent silt-laden runoff from the site of the work from entering the downstream drainage system, and shall follow procedures as recommended in the publication entitled Land Development Guidelines for the Protection of Aquatic Habitat, as issued by the Ministry of Environment. The sediment control measures shown on these drawings and contract documents are to be deemed minimum and not withstanding compliance, the Developer and Contractor, are ultimately responsible for sediment control for the duration of the project. Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below. 1.2 During construction the Contractor shall ensure that all disturbed areas are kept dewatered with concentrated surface runoff either directed around work areas with interceptor ditches or temporarily contained within closed conduits. The Contractor shall install a temporary cutoff and interceptor ditch system as necessary prior to and during grading and servicing construction to collect all surface runoff and protect disturbed and exposed soils from erosion. The ditching system is to be enclosed with temporary culverts at access crossings. 1.3 All exposed slopes and spoil stockpiles to be covered with 6mm polyethylene sheeting or erosion control matting, all well anchored to resist wind with weights or stapled in place. Erosion control matting to be combination straw/coconut fiber blanket type SC150 as manufactured by North American Green or approved equivalent. Blanket to be placed strictly in accordance with manufacturer s instructions. 1.4 Interceptor and cut-off ditches and boulevard swales to be as per typical section where grade exceeds 5.0% trench inverts to be rip-rap armoured on geofabric. Check weirs/filter berms to be installed at maximum 4.0m O.C. 1.5 All silt fencing shown to be constructed in accordance with silt fence detail. Contractor to install additional silt fence where site conditions dictate and down slope of all spoil piles and as directed by Engineer. 2016 August 31 1

1.6 All catch basins and lawn basins to have upstream sediment traps prior to and after paving as detailed on the drawings. 1.7 Earthworks, grading and services installation construction operations to be terminated during heavy rainfall when soil disturbance is subject to erosion and release of sediments to surface runoff. 1.8 No concrete truck washing is to be directed into the sediment control system or sewers recirculatory wash systems are to be used for washing the concrete trucks. All concrete trucks to be equipped with wash bucket flushing equipment. No concrete truck/flume to be discharged to the on-site drainage system or onto the street. 1.9 All temporary and permanent pipe work is to be fully gasketed. 1.10 All existing live city and private utilities to remain operational where a conflict between construction work and live City utilities occurs, the City shall be notified. 1.11 Where building construction interferes with cutoff trenches and swales, Contractor to arrange for diversion or enclosure of these drainage facilities to permanent storm sewer system. 1.12 All off-site works will be in accordance with MMCD (2009 Edition) and City of Burnaby Supplemental Specifications. 1.13 All on-site works will be in accordance with the current BC Building Code and BC Plumbing Code. 1.14 Pipe bedding and cover will be in accordance with City of Burnaby Standards (unless noted otherwise) with minimum 600mm cover. 1.15 Safety fencing to be 1.8m high chain link. Gate and corner posts to be 75mm, line posts to be 50mm 3.0m c/c. 1.16 The Contractor will provide and maintain efficient traffic management systems, signs, barricades, and flag persons to maintain access on municipal roads. All vehicular and pedestrian access on public rights-of-way to remain. 1.17 No excavation to be started until written approval of sediment control measures has been given by City s Environmental Services Department. 1.18 All right-of-way/covenant areas to be kept free of stockpiles and sediment control measures. 1.19 An adequate supply of materials will be maintained at strategic locations to enable a suitable emergency response to deal with containing downstream watercourse contamination. 2016 August 31 2

2.0 OPERATION, MAINTENANCE AND PERFORMANCE STANDARD 2.1 Contractor to maintain and repair or replace all sediment control works and measures in good working order and clean out the sediment control pond at maximum six month intervals or more frequently as required by consultant to ensure effective operation. Prior to contract completion, Contractor to clean out pond to consultant s written acceptance. 2.2 Construction and maintenance of the sediment control facilities to be the responsibility of the Contractor. Contractor to provide city with contact names and 24 hour emergency contact. 2.3 The Contractor shall mechanically sweep all municipal streets to prevent tracking of sediment, and provide dust suppression measures as required by the City of Burnaby. Flushing will not be permitted. 2.4 Contractor, as part of regular maintenance, shall vacuum accumulated silts out of storm mains feeding the sediment control pond and basin. Typical maintenance shall consist of, but is not limited to, the following items: Accumulated silts in pond bases and storm sewer system to be vacuum cleaned. Siltation fences shall be cleaned and repaired as required. Perimeter fencing to be repaired if needed. Sediment to be removed from sediment control trenches when thickness reaches 100mm. 2.5 The performance criteria for project sediment control shall be a requirement that total suspended solids (T.S.S.) in downstream storm runoff from the project site shall not exceed a maximum of 25mg/L above background levels for normal dry day and 75mg/L above background levels during rain or storm event. 2.6 The PH level of water discharging from the site shall be within the range of 6 to 8.5. Runoff outside this range must be neutralized prior to discharge. 2.7 Maximum depth of accumulated silt/sediment not to exceed 250mm. 2.8 The Developer s Contractor is responsible for maintenance of all sediment control facilities shown on this drawing until 95% of all landscaping is completed or until permission is granted in writing by the City of Burnaby Environmental Services Department. 3.0 MONITORING, SAMPLING AND TESTING 3.1 A Letter of Understanding will be required from the Developer to be submitted to the City of Burnaby Engineering Department prior to approval authorizing the independent environmental monitor to undertake construction monitoring of the 2016 August 31 3

proposed sediment control facilities and ensure that the discharge water quality remains in accordance with Burnaby Watercourse Bylaw No. 9044. 3.2 An independent environmental monitor is required to be retained by the Developer to undertake sampling and reporting and to ensure adherence to the sediment control requirements during construction. The Developer shall provide adequate ongoing maintenance and monitoring to ensure the effectiveness of the siltation control facilities such that the water discharging from the system does not have total suspended solids in excess of 25mg/L (Dry Event) or 75mg/L (Rain Event) above background levels of the receiving water specified by the City of Burnaby Environmental Services Department (2 times per week during the initial excavation with an additional sample taken during storm events). Email all results to City of Burnaby, SCSMonitoringReports@burnaby.ca. Developer s reporting responsibilities include weekly summaries of monitoring results, sampling shall also be conducted during or after every storm event with a rainfall amount of 12.5mm or greater. Notwithstanding the weather conditions, the sampling frequency shall be at the discretion of, and to the satisfaction of the Environmental Services Department. 3.3 The independent environmental monitor is responsible for noting all system deficiencies in the monitoring report. If a deficiency is noted, the monitor shall include a timeline for corrective actions in the report. A noted deficiency with a high potential for sediment release will be considered noncompliant. City of Burnaby shall be notified about a noncompliant site within 24hrs by submitting page 1 of the monitoring report to City of Burnaby Environmental Services Department by email, SCSMonitoringReports@burnaby.ca. 3.4 The Contractor shall inspect the sediment control facilities daily during normal operations. Failing systems are to be noted and repaired as necessary for proper operation. Daily inspection log to be completed and kept onsite. 3.5 The environmental monitor may choose to measure T.S.S. instead of turbidity. A T.S.S.-turbidity regression analysis is required with 15 to 20 concurrent T.S.S. and turbidity measurements taken over a range of high to low discharges. Data and results shall be forwarded for approval to the City of Burnaby. 4.0 SEDIMENT CONTROL DECOMMISSIONING 4.1 All sediment control facilities shall remain until 95% of construction work including landscaping is completed, or upon permission by the City of Burnaby Environmental Services Department. Upon completion of 95% of on-site development and approval of Engineer and Burnaby Environmental control services, the Contractor is to remove the siltation fences and all sediment to draw down to approved containment system in presence of Engineer. All temporary inlets/outlets are to be removed and manholes plugged and re-benched to the approval of the City Engineer. 4.2 Restore disturbed areas and apply finished landscape treatment as per landscape architects specifications. 2016 August 31 4

2016 August 31 5