ABDUL KHALIQ MALIK (QA/QC Supervisor Mechanical&Welding) Mobile No 0092-337-761 5783 Email: khaliqqci@hotmailcom Nationality Age Marital Status Education Discipline Experience : Pakistani : 40 Years : Married : Associate Mechanical Engineering : QA/QC Engineer : 19 years OBJECTIVE: To seek and strive for a distinguished position in inspection of mechanical construction and painting by employing the best of my potentials, skills and attitudes earned in profession that will keep me abreast of the latest trends and practices followed in engineering and technology QUALIFICATION: CERTIFICATION: Associate Engineering Mechanical Certified Welding Inspector (CSWIP 31) from TWI, United Kingdom IRCA Registered Lead Auditor Course for ISO 9001: 2008 Saudi Aramco Approved QA/QC Supervisor Saudi Aramco Approved Mechanical & Welding Inspector Coating Inspection Training (Hemple Paints) Saudi Aramco Approved Painting / RTR Inspector Radiographic Testing (ASNT Level-II) Dye Penetrate Testing (ASNT Level-II) Magnetic Testing Particle (ASNT Level-II) Quality Awareness Training Program ISO 9001:2000 Certification of Handling and Assembling of Fiberglass Reinforced Reinforced Thermoset Resin (RTR) Pipe system from Bond strand LTD, KSA SAFETY TRAINING: 1 Safety Awareness Training Program for SSSP Project, Jeddah, KSA 2 Safety Awareness Training Program from Marubini Corporation PARCO Project 1 P a g e
COMPUTER SKILLS: Microsoft Windows and its relevant office program, Excel, Word PROFILE: Over 19 years experience in Plant construction, Pipe line,welhead piping,flow line, Fabrication, Installation & Commissioning of Pressure vessel,,plant Piping, Boilers, Heat Exchangers, Storage tanks, Columns/Tower, Heavy Steel Structure & Maintenance Inspection of Plants/Facilities in Oil & Gas and Petrochemical Industry Well experience in QA/QC, Internal Auditing, Welding, Painting/Coating & Insulation, Welding Procedure Qualification, Welding Procedure Specifications (WPS), Welder Performance/Qualification Testing, Welding Inspection, Heat treatment (PWHT), Destructive & Non Destructive testing Well versed with interpretation of Engineering drawings, P&ID's, Piping Isometrics, Plot plans, Equipment drawings, detailed fabrication drawings & cutting/layout plans, Experience with the use of international standards and codes of practices, such as API, ASME, ASTM, BS, ANSI, PIP, and Saudi Aramco Standards Preparation of repair & post shutdown/turnaround reports, daily progress reports, Weekly Highlight, Monthly Report & documenting the major issue related project/plant quality Experience 19 Years in QA/QC WORK HISTORY: DURATION : From Aug 2012 to April 2014 : SAUDI ARAMCO (SRACO) : QC Supervisor : Sadara-Dow Chemical Project DURATION : From Oct 2010 to August 2012 (PMT-PID) : SAUDI ARAMCO (SRACO) : SrProject Inspector Mechanical /welding : Saudi Aramco Total Refining & Petrochemical Co (SATORP) DURATION : From Sept 2005 to Mar 2010 (PMT-PID) : SAUDI ARAMCO (SAUD CONSULT) : SrProject Inspector Mechanical /welding S : HARAD GOSP-3,(Pipe Line) ABQAIQ INSPECTION UNIT (Pipe Line, Welhead, and Flow line) Qurraya Power Plant DURATION : From Feb 2004 to June 2005 2 P a g e
: AL-SUWAIKET (SNAMPROGETTI, GAMA) : SAUDI ARAMCO : QA/QC Supervisor : BERRI GAS PLANT DURATION : From Feb 2003 to Feb 2004 : Moody International Limited, Pakistan : BRITISH PETROLEUM : Gas Plant, Badin, Pakistan (Pipe Line, Welhead, Flow line) DURATION : From 1999 to Jan 2003 : Tamimi Co Construction Division Dammam, KSA : SAUDI ARAMCO (Pipe line, Wellhead, Flow line) S COMPLETED: Berri Gas Plant (Jubail), KSA Hawiyah Gas Plant Inlets & Auxiliary Facilities Project, KSA Kuff Gas Manifold Expansion & Transmission Pipelines to Uthmaniyah Gas Plant, KSA UA Pipeline Upgrading System, KSA 10km 48 Crude P/L and 15km 36 Crude P/L ) UA-6 Pipeline Replacement and Rehabilitation Works, KSA From 1997 To 1999 : ABV Rock Group Limited : Saudi Strategic Storage Project Tanks, Jeddah, KSA : SSSP From 1995 To 1997 : 4 x 323 MW Power Plant Hubco, Pakistan : IHI Japan From 1994 To 1995 : Qadirpur Gas Field Development Project Pakistan : Fillpo-fochi, Italy 3 P a g e
From 1993 To 1994 : Combined Cycle Power Plant Project (WAPDA) at Gas Turbine Power Station Kot Addu (Unit 11, 12, 13, 14 & 15), Pakistan : Babcock Germany and Alsthom France DETAIL OF WORK PERFORMED / ACHIEVMENTS General General Code knowledge ASME (311, 313, 314, 318,), AWS D 11, API-1104, API-5L, API 650 Attending pre-inspection meetings Coordination with NDT group for carrying-out of non-destructive testing as required Conducting quality audits of vender/suppliers and sub-contractors Documentation review (QCP, ITP, Method statements as per project specs) Fabrication & installation of RTR piping WPS and PQR preparation and review Qualification and certification of welders as per ASME Sec IX, API 1104, AWS D11 Visual welding inspection according to code and standard Review of NDE reports (RT, PT, and MT) Interpretation of RT films Review the reports of PWHT and hardness test Co-ordination meeting with the client and sub-contractors Process Piping & Pipe Line, Welhead, and Flow line (as per ASME 313, ASME 314, ASME 318 & API 1104) Review of drawings Review and approve of WPS & PQR Inspection of incoming material Inspection of Material treacibality Inspection of piping fabrication, erection and welding at site and workshop Inspections of heat shrink sleeve installation Inspection of valve testing activities Review and approve welding inspection reports Check the welding parameters according to WPS Fit-up checking Inspection of temperature Tie-in joints Test Pack preparation and review Punch list preparation Witness of hydro testing Witness of pneumatic test Witness of leak test Internal cleaning by water flashing, air blowing, pigging, and drying Gas Line Materials (Line Pipe, Gas Regulators, Gas meters, and Forged Fitting during Manufacturing) Inspection of incoming materials (HR Coils, Aluminum ingots, M S iron bar) Check the dimensional and Physical condition Check the chemical composition through independent laboratory Check the physical properties 4 P a g e
Monitoring the process of manufacturing Visual Inspection of welding and NDE by Eddy Current of Line pipe Dimensional inspection (Length, Diameter, wall thickness, Ovality, Sequerness and bevel angle) Flatting test of line pipe Bend test of line pipe Hydro test of line pipe Leak test of forged fitting and gas regulators Tank Inspection of low pressure and high-pressure storage tanks Witness of welder qualification test Fit-up inspection of shell plates Fit-up inspection of vertical joints Inspection of peaking, bending and plumpness Visual welding inspection Vacuum box testing of bottom plates Steel Structure WPS & PQR preparation and review as per AWS D11 Witness of welder qualification test Fit-up inspection Visual welding inspection as per AWS D11 Dimensional inspection according to drawings Painting and sand blasting as per SSPC & SIS 05 59 00 Check relative humidity and dew point Check weather condition (Surface temp & ambient temp) Inspection of abrasive material (sand, grit, copper slag silica free, steel shot, garnet, aluminum oxide) by laboratory Check abrasive size Inspection of surface preparation as per SSPC, SIS 05 59 00 Inspection of surface profile Inspection of wet film thickness Inspection of dry film thickness Inspection of holiday test (Pin hole test) (Valid Saudi Arabia driving (license) 5 P a g e