CONCEPTUAL BASELINE ALIGNMENT

Similar documents
Comparison of Bridge Rehabilitation versus Bridge Replacement Concepts

extent feasible. Per the and low constructability,

Lesner Bridge Replacement

SUNSHINE SKYWAY BRIDGE

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Ironton Russell Bridge Project

Use of Grade 80 Reinforcement in Oregon

Bridge Asset Management City of Battle Creek Planning and Projects

AASHTOWare BrD 6.8. BrR and BrD Tutorial. PS7-3 Stem PS Bridge Example

Ironton Russell Bridge Project

BrD Superstructure Tutorial

Prestressed Concrete Structure Tutorial

I-345 Feasibility Study Public Meeting

MIDAS Training Series

Bonner Bridge Replacement Update:

PENNDOT e-notification

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction

!"#$ % 1( =4+0(1*0)4 A)*.(.)44)4 8(: 4 0, 2(3*05. Page 1A of 10 11

Alder Drive / Blair Road Bridge Replacement Projects

Ironton Russell Bridge Project

Chapter 4 Bridge Program Drawings

Pattullo Bridge Replacement Project. Cost Report

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

Field application of FRP material in Kentucky

Boeing North Bridge in Washington State

US 278 East Bound and West Bound. MacKay Creek and Skull Creek. Cursory Above Water and Underwater Investigation Of. Over

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

CONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG

RETROFIT AND REPLACEMENT OF DUMBARTON RAILROAD BRIDGES

Bijan Khaleghi, Ph, D. P.E., S.E.

Table of Contents. ACKNOWLEDGEMENTS...ii LIST OF FIGURES...xii LIST OF TABLES...xv LIST OF SYMBOLS...xvi CHAPTER 1:ABOUT THIS STUDY...

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

I-74 over the Mississippi River

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Ironton Russell Bridge Project

Progressive Erection Applied to Box Girder with Strutted Wing Slab

Guidelines for Checking Final Design Bridge Plans

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.

Accelerated and Innovative Bridge Construction In Washington State

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

TRANSVERSE SECTION TABLE OF CONTENTS CHAPTER 9

Structural Analysis Models and Their Advancing Technologies

Bridge Engineering/Construction Ultra High Performance Concrete (UHPC)

Bridge PBEE Overview & Pilot Next Generation Bridge Studies

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY

Ontario Structure Inspection Manual Inspection Form Structure Number: 12

AASHTOWare BrR 6.8 Steel Tutorial Steel Plate Girder Using LRFR Engine

Design of Steel-Concrete Composite Bridges

Innovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge

John James Audubon Bridge

SELLWOOD BRIDGE REPLACEMENT PROJECT

Service life extension of existing precast concrete girders

REHABILITATION PACKAGE 4-a

Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts...

BMI Precast PRECAST & PRESTRESSED CONCRETE PRODUCTS

Implementing Asset Management: WSDOT s Experience

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

Bridge Economy and Life Cycle Costs of Steel & Concrete Bridges

LRFD Bridge Design Manual Changes

Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction

2016 ACEC/PA ANNUAL MEETING

Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager

Accelerated Bridge Construction (ABC) National Status

AASHTOWare BrD 6.8 Substructure Tutorial Solid Shaft Pier Example

NCHRP LRFD DESIGN SPECIFICATIONS FOR SHALLOW FOUNDATIONS. Final Report September 2009

BRIDGE GIRDERS TECHNICAL GUIDE

CHAPTER 12 MICHIGAN DESIGN MANUAL BRIDGE DESIGN REHABILITATION PROJECTS REHABILITATION PROJECTS SCOPE OF REHABILITATION PROJECTS

Folsom Lake Crossing by Hans Strandgaard, Alex Harrison, Jeff Aldrich, and Jeff Thomure, CH2M HILL

The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 55J11 TWP 197 (70 TH AVE NW) OVER A STREAM DISTRICT 6 OLMSTED COUNTY

BRIDGE CONSTRUCTION APPROACHES

Baseline Document Change Announcement

ACCELERATED BRIDGE CONSTRUCTION IN TEXAS. Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M.

Use of Externally Bonded FRP Systems for Rehabilitation of Bridges in Western Canada

3.6 Construction Methods

Title Page: Modeling & Load Rating of Two Bridges Designed with AASHTO and Florida I-Beam Girders

AASHTOWare BrDR 6.8 Steel Tutorial STL6 Two Span Plate Girder Example

Dan Carrier Parsons Brinckerhoff Project Manager Cooper River Bridge Charleston, South Carolina

Get In, Get Out, Stay Out!

Bridge Development Update

Strain Gauge Balancing of the Lea Joyner

QEW Garden City Skyway Niagara Street to Glendale Avenue Risk and Value Engineering Support Major Infrastructure Decisions

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

HistoricBridges.org - National Bridge Inventory Data Sheet

Structural - Engineering Review Checklist

Seismic Performance of Precast Concrete Bents used for Accelerated Bridge Construction. Bijan Khaleghi 1

I 939. RMP I 515N-I 15S Over I 15 & US 95 01/26/2015. Report Contents. Signs and Utilities Inspection Report Maintenance Recommendation Report

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015

A STUDY ON RESTORABLE PRECAST PRESTRESSED HYBRID PIERS. Akio Kasuga 1 Shigeki Unjo 2 Yoshihiko Taira 1 Hiroshi Asai 1

Dan Eckenrode Executive Director

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation

AASHTOWare BrD 6.8 Substructure Tutorial Pier Drilled Shaft Example

Innovative Design of Precast/Prestressed Girder Bridge Superstructures using Ultra High Performance Concrete

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1

District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016

Transcription:

BRIDGE ABUTMENT CONCEPTUAL BASELINE ALIGNMENT EXISTING RIGHT OF WAY, TYP. BELLA BELLA DR 3RD AVE REGION NO. 10 PROPOSED FOX ISLAND BRIDGE STATE WASH. FEDERAL AID PROJECT NO. SHEET NO. EXH-01 TOTAL SHEETS BRIDGE ABUTMENT R BELL A VIS Option A BELLA BELLA DR FI B 3RD AVE TA D R FI PROPOSED FOX ISLAND BRIDGE W AR RE CT D R 3 REGION NO. 10 RE Option B N FOX ISLAND BRIDGE TYPE, SIZE, AND LOCATION STUDY Pierce County PROPOSED FOX ISLAND BRIDGE Public Works Tacoma Mall Office Building 4301 South Pine Street, Suite 628 Tacoma, Washington 98409 RIGHT OF WAY ACQUISITION An APWA Accredited Agency STATE WASH. FEDERAL AID PROJECT NO. SHEET NO. EXH-02 TOTAL SHEETS EXISTING RIGHT OF WAY (TYP.) R DR NW Know what's below. Call before you dig. GIG HARBOR APPROACH FOX ISLAND APPROACH TH NOR BELLA BELLA DR FI EXISTING FOX ISLAND BRIDGE FOX ISLAND BRIDGE TYPE, SIZE, AND LOCATION STUDY SHOR Pierce County Public Works D FI E BLV RIGHT OF WAY ACQUISITION LA BEL Tacoma Mall Office Building 4301 South Pine Street, Suite 628 Tacoma, Washington 98409 VIS TA An APWA Accredited Agency DR FI WA WORKING\SEA\D1748380\FOX_ISLAND - RAB.DWG Layout Tab: PLAN ND_DE.DWG / FOXISLAND_BA.DWG / FOXISLAND_DE-RAB.DWG 016 Time: 04:44:52 PM Plo ed by: CFRENCH 3R FI Drawing: C:\PWWORKING\SEA\D1748380\FOX_ISLAND - PP.DWG Layout Tab: PLAN Xrefs: FOXISLAND_DE.DWG / FOXISLAND_BA.DWG Date: 07/12/2016 Time: 04:46:29 PM Plo ed by: CFRENCH VE DA EXISTING RIGHT OF WAY (TYP.) EN DR NW FORD DR NW D 3R CT FI Pierce County DESIGNED BY: C. FRENCH SURVEYED BY: PIERCE CO. DRAWN BY: C. FRENCH DATE SURVEYED: CHECKED BY: R. RICHARDSON DATE PLOTTED: July 12, 2016 Public Works NO. DATE REVISION BY APPROVED Tacoma Mall Office Building 4301 South Pine Street, Suite 628 Tacoma, Washington 98409 CHECKED BY: Public Works CHECKED BY: REVIEWED BY: APPROVED BY: FOX ISLAND BRIDGE TYPE, SIZE, AND LOCATION STUDY An APWA Accredited Agency FOX ISLAND BRIDGE TYPE, SIZE, AND LOCATION STUDY APPROVED BY: REVIEWED BY: DATE BRIAN D. STACY, P.E. Pierce County SURVEYED BY: RR BOAT LAUNCH PROPOSED FOX ISLAND BRIDGE DESIGNED BY: NW EXISTING FOX ISLAND BRIDGE W AR DR FI FI PROPOSED FOX ISLAND BRIDGE AVE 3RD N EXISTING FOX ISLAND BRIDGE BOAT LAUNCH BRIDGE ABUTMENT Drawing: C:\PWWORKING\SEA\D1748380\FOX_ISLAND - RW.DWG Layout Tab: RW PLAN (NO_HATCH) Xrefs: FOXISLAND_DE.DWG / FOXISLAND_BA.DWG Date: 07/12/2016 Time: 04:48:25 PM Plo ed by: CFRENCH Call before you dig. DR NW EXISTING RIGHT OF WAY, TYP. Know what's below. WARREN Drawing: C:\PWWORKING\SEA\D1748380\FOX_ISLAND - RW.DWG Layout Tab: RW PLAN (NO_HATCH) Xrefs: FOXISLAND_DE.DWG / FOXISLAND_BA.DWG Date: 07/12/2016 Time: 04:48:25 PM Plo ed by: CFRENCH BRIDGE ABUTMENT PLAN AND PROFILE

BRIDGE REHABILITATION GIRDERS AND DECK NORTH Bridge Plan ESTIMATED PROJECT COST $13M*

BRIDGE REHABILITATION WHAT DOES IT LOOK LIKE? EPOXY CRACK INJECTION MODIFIED CONCRETE OVERLAY FIBER REINFORCED POLYMER (FRP) STRENGTHENING Photo Courtesy of ChemCo Systems Photo Courtesy of MIddletown Times Herald - Record Photo Courtesy of GOMACO Photo Courtesy of STRUCTURE Magazine Photo Courtesy of Kriton Photo Courtesy of GOMACO Photo Courtesy of Equipment World - Better Roads Photo Courtesy of Advanced Waterproof Solutions Photo Courtesy of Meyers & Sons Construction

BRIDGE REHABILITATION & RETROFIT GIRDERS, DECK, FOUNDATIONS, COLUMNS, AND CROSSBEAMS NORTH Bridge Plan PARTIALLY ESTIMATED PROJECT COST $60M*

PIER RETROFIT PROCESS FOUNDATIONS, COLUMNS, AND CROSSBEAMS STAGE 1 BUILD NEW SHAFTS, COLUMNS AND CROSSBEAMS STAGE 2 REMOVE UPPER PORTION OF EXISTING PIER STAGE 3 COMPLETED PIER RETROFIT EXISTING BRIDGE EXISTING BRIDGE EXISTING BRIDGE NEW CROSSBEAM NEW CROSSBEAM NEW CROSSBEAM REMOVE INFILL WALL AND COLUMNS NEW COLUMN (TYP.) NEW COLUMN (TYP.) NEW COLUMN (TYP.) HIGH TIDE HIGH TIDE HIGH TIDE NEW SHAFT TYP. NEW SHAFT TYP. NEW SHAFT TYP. APPROX. EXISTING GROUND APPROX. EXISTING GROUND APPROX. EXISTING GROUND

ALTERNATIVE 1 PRECAST PRESTRESSED CONCRETE GIRDER See Detail PEDESTRIAN RAILING BRIDGE RAILING TYPE BP (TYP.) TRAFFIC BARRIER (TYP.) PIER 11 PIER 10 NAVIGATION CHANNEL 60-FT APPROX. VERTICAL CLEARANCE TRAFFIC BARRIER HIGH TIDE HIGH TIDE 188-FT Elevation Detail Typical Section at Piers ESTIMATED PROJECT COST $146M*

ALTERNATIVE 2 HAUNCHED PRECAST PRESTRESSED CONCRETE SPLICED GIRDER See Detail NAVIGATION CHANNEL TRAFFIC BARRIER 60-FT APPROX. VERTICAL CLEARANCE TRAFFIC BARRIER (TYP.) PIER 8 PIER 7 PEDESTRIAN RAILING BRIDGE RAILING TYPE BP (TYP.) HIGH TIDE HIGH TIDE 321-FT Elevation Detail Typical Section at Piers ESTIMATED PROJECT COST $127M*

ALTERNATIVE 3 PRECAST CONCRETE SEGMENTAL BOX GIRDER See Detail BRIDGE RAILING TYPE BP (TYP.) NAVIGATION CHANNEL TRAFFIC BARRIER 60-FT APPROX. VERTICAL CLEARANCE TRAFFIC BARRIER (TYP.) PIER 8 PIER 7 PEDESTRIAN RAILING HIGH TIDE HIGH TIDE 321-FT CL SHAFT Elevation Detail CL SHAFT Typical Section at Piers ESTIMATED PROJECT COST $168M*

ALTERNATIVE 4 COMPOSITE STEEL PLATE GIRDER See Detail NAVIGATION CHANNEL TRAFFIC BARRIER TRAFFIC BARRIER (TYP.) PIER 8 PIER 7 PEDESTRIAN RAILING BRIDGE RAILING TYPE BP (TYP.) New NY Bridge Approach Spans, Photo Credit: New York State Thruway Authority 60-FT APPROX. VERTICAL CLEARANCE HIGH TIDE HIGH TIDE 321-FT Elevation Detail Typical Section at Piers ESTIMATED PROJECT COST $155M* New NY Bridge Approach Spans, Photo Credit: New York State Thruway Authority

BENEFIT / COST COMPARISON JULY 2016 Rehabilitation Rehabilitation & Retrofit New Bridge (Alternative 2) Improved Sufficiency Rating Remove Load Posting Improved Seismic Resilience Improved Marine Vessel Clearance Reduced Maintenance Improved Sidewalk 1 Improved Shoulders 1 Improved Lane Width 1 Highest Benefit Moderate Benefit No Benefit Design Life (Years) 15 15/75 75 Estimated Initial Project Cost $13M $60M $127M Additional Project Cost at 15 Years 2 $229M 4 $112M 3 $0 Adjusted Estimated Project Cost $242M $172M $127M 1 If future improvements are made -- and at additional cost, included in Additional Project Cost at 15 Years 2 Assuming 4% annual inflation 3 Assuming $62M for Superstructure Replacement in 2016 dollars 4 Assuming $127M for New Bridge (Alternative 2) in 2016 dollars