SUPPLIER QUALITY MANUAL

Similar documents
Form Fit & Function Engineering, LLC 350 Seminole Drive Spartanburg, SC Supplementary Quality Assurance Clauses

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

INS QA Programme Requirements

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

Vendor Qualification Survey

SUPPLIER QUALITY REQUIREMENTS

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6

Supplier Quality Manual

Orbel Corporation Quality Assurance Provisions (QAP) for Suppliers

Quality Management System

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

TABLE 1 PCB IPC-A 600 PCB IPC- 6012, 6018

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS

Supplier Quality Agreement

Materion AMTS Supplier Quality Manual

Quality Clauses F Rev. I West Brooks Avenue North Las Vegas, NV Phone (702) Fax (702)

Orbital ATK Alliant Techsystems Defense Electronic Systems Special Mission Aircraft Fort Worth

2.2. The Seller shall be responsible for achieving and maintaining a quality performance level of either:

Appendix QI. Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items

QUALITY ASSURANCE REQUIREMENTS

SUPPLIER QUALITY CLAUSES

Supplier Quality Requirements Q Clauses

SUPPLIER QUALITY MANUAL

Self-Audit Checklist

Supplier Quality Manual

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

UPPLIER ANUAL. Issued: 01 Aug 13

SUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210

SHELTON INDUSTRIAL PATTERN INC.

Supplier Quality Manual (QQS )

TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME

Supplier Quality Terms & Conditions

AAMI Quality Systems White Paper: Comparison of 21 CFR Part 820 to ISO 13485:2016 1

General Purchase Order Requirements

Controlled By: QA Mgr. / Gen. Mgr. Effective Date: 3/31/2014 FORM-70

SUPPLIER GUIDELINES MANUAL

Altech Machining, Inc. Terms and Conditions

Supplier Quality Manual

MAGNETIC COMPONENT ENGINEERING, INC.

PMA Quality Assurance Manual Rev. 2 Date 12 Feb 2016

Supplier PO Quality Requirements

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

Quality Assurance Procurement Clauses and Flow Down Requirements

SUPPLIER QUALITY CODES

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Procurement Quality Assurance Requirements

PRODUCT HSE: Clauses HSE Technological purchase

Vendor Quality. Requirements Manual

... Supplier Manual . REV 1. P d --KICKHAEFER MANUFACTURING COMPANY SUPPLIER MANUAL (PRINTED COPIES ARE UNCONTROLLED)

QUALITY CLAUSE CODES

List of Documented Information (Document & Records)

TITLE: Quality Assurance Sub-Contract Quality Clauses DATE: 12/4/2017 OWNER: Operations Manager

Supplier Quality Assurance Requirements

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

RFC-SOP-0002 Skyworks RF Ceramics Supplier Quality Manual

BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL

External Providers Quality Requirements.

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES

APPD DESCRIPTION OF CHANGE DATE. BY A NA 8/23/12 Updated to new format, re-sequenced clauses, added

SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM)

Union Pacific Railroad. Supplier Excellence Manual. Contents

INSPECTION SYSTEM REQUIREMENTS

INTRODUCTION. New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry.

Supplier Requirements Retail Information Svcs LLC Fastener Division

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100)

SUPPLIER QUALITY PROGRAM Procurement Standard

Supplier Quality Requirements Manual

Supplier Quality Assurance Requirements

TÜV SÜD BABT Production Quality Certification Scheme

Rosen Aviation Supplier Quality Assurance Requirements

This document describes the minimum quality assurance requirements suppliers of RUAG Switzerland Ltd. have to comply with.

2. GENERAL REQUIREMENTS

Rev A. Vendor Compliance Manual

Quality Management System Manual

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS

QUALITY ASSURANCE MANUAL

Supplier Quality System Requirements Rev # 1 Aug 30, 2013

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

ISO 9001:2008 and AS9100 Rev. C. Supplier Quality Manual

SUPPLIER QUALITY ASSESSMENT

Definitions contained in the above mentioned document and industry regulations are applicable herein.

Definitions contained in the above mentioned Specifications and Industry Standards are applicable herein.

Title: PROCUREMENT QUALITY REQUIREMENTS CWCDS Dayton, OH

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

Bulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions

Product Order Quality Requirements Meggitt (Orange County), Inc.

Supplier Quality Manual

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

QUALITY AGREEMENT. This Quality Agreement is made between. (Customer Legal Entity Name Hereinafter called CUSTOMER ) And

SUPPLIER QUALITY SYSTEM SURVEY

SUPPLIER QUALITY PROCUREMENT REQUIREMENTS

Quality Assurance Policy and Procedures

SUPPLIER QUALITY AGREEMENT

PCX Aerostructures, LLC Quality Notes Supplier Quality Assurance Requirements - Quality Clauses Revision 29 - March 30, 2017

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

ECIA Distributor Counterfeit Product Mitigation Internal Audit Checklist

D. All distributors shall be reviewed and approved as per company procedure.

ROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual

EN39 TUBE ASSESSMENT REPORT. Assessment Summary

Transcription:

SUPPLIER QUALITY MANUAL Printed versions of this manual and other Kooltronic supplier documents shall be for reference only and shall be subject to change without notice. It is the responsibility of all suppliers to verify the hardcopy version against the electronic version on www.kooltronic.com. APPROVALS Purchasing Manager Director of Engineering, Sales and Quality Assurance Approval Date: 12/15/16 Current Revision Level: Rev. D KOOLTRONIC, INC. K1295 (12/16)

Contents Section Page 1. Introduction 3 2. References 3 3. Purchase Order 3 4. New Supplier Approval 3-4 5. Maintaining Approval 4-5 6. Corrective Action Request 5 7. Request for Deviation/Waiver 5 8. Certificate of Conformance 5 9. RoHS/WEEE/REACH 6 10. Performance Monitoring 6 11. Authority 6 12. Communication 6 13. Health and Safety 6-7 14. Stamps and Tags 7 15. Part Markings 7 16. Scrap, Rejects, Non-Conformances 7 17. Work Orders 7 18. Gauges 7 19. Kooltronic Supplier Materials 7 20. Housekeeping 7 21. Kooltronic Procurement Quality Clauses 7 2 of 7

KOOLTRONIC SUPPLIER QUALITY MANUAL 1. Introduction In a competitive environment, Kooltronic is a company that always seeks to minimize costs while delivering the best services and highest quality products to its customers. In order to meet the needs of its customers, Kooltronic demands high performance from its suppliers. In return, it is the goal of Kooltronic to establish long-term relationships with its suppliers. The purpose of this manual is to provide information the supplier will need to ensure Kooltronic receives products and services that meet or exceeds its standards, allowing Kooltronic s customers to continue to receive the level of quality they have come to expect. 2. References a. International Standards Organization (ISO) website (www.iso.org) b. National Institute of Standards and Technology (NIST) website (www.nist.gov) c. Kooltronic Quality Manual (7.4 Purchasing) d. QOP-74-01: Purchasing e. QOP-74-02: Supplier Evaluation f. QOP-74-03: Verification of Purchased Product g. QOP-85-02: Corrective and Preventive Action h. UL/CUL/CE i. RoHS/WEEE/REACH 3. Purchase Order The supplier is responsible for adhering to the Terms and Conditions of Kooltronic, the product specification, this Supplier Quality Manual, and any other instructions cited on the Purchase Order. The supplier shall assume total responsibility for all sub-contract activity to meet specified requirements. The supplier must carry out a review of the requirements related to the product and ensure that all information required to manufacture the part is obtained from Kooltronic or a specified source. 4. New Supplier Approval Suppliers must achieve an Approved status on Kooltronic s Approved Supplier List (ASL) in order to be made an authorized supplier to Kooltronic. Approved status is awarded to a supplier demonstrating their quality system meets Kooltronic standards. Kooltronic will approve new suppliers through any of the 3 of 7

following means: a. Registered, but not limited to, ISO 9001:2008 or later, or other industry standards as applicable. Suppliers will be required to provide evidence of compliance with this certification. Fig 1. Industry Standards Industry Standard Scope ISO 9001 The international reference for quality management requirements in business-to-business dealings. ISO 17025 UL/CSA CE The general requirements for the competence of testing and calibration laboratories. Certifications for the industry-managed program related to the safety of equipment operation. The CE marking (also known as CE mark) is a mandatory conformity mark on many products in the European Economic Area (EEA). The CE marking certifies that a product has met EU consumer safety, health or environmental requirements. b. If the supplier is currently contracted to Kooltronic and considered APPROVED the supplier may carry out work on other Kooltronic Purchase Orders. c. Kooltronic will request that the supplier complete Kooltronic Form K933, Supplier Quality System Survey regardless of industry standard certification. 5. Maintaining Approval Suppliers are continuously monitored for quality, quantity and delivery performance. The supplier must maintain a performance score that Kooltronic considers to be appropriate in order to remain on the Approved Supplier s Listing. Failure to comply with the following stipulations may result in loss of approved status as a Kooltronic supplier. a. Corrective Action Requests may be issued to suppliers for various reasons. The supplier shall respond to Corrective Action Requests within 20 business days. b. The supplier shall notify Kooltronic of customer exposure within 48 hours of non-conformance identification. c. The supplier must notify Kooltronic of loss of ISO certification, or other applicable industry certification immediately upon decertification. 4 of 7

Approval is granted with the understanding that Kooltronic may discontinue approval at any time. 6. Corrective Action Request If Kooltronic finds a non-conformance in the supplier s product, Form K925, Corrective Action Request will be issued. Notification of containment for nonconformances is required within 48 hours from the supplier. Kooltronic requires the supplier to formally respond to the Corrective Action Request within 20 business days. Upon receiving the Corrective Action Request, the supplier will conduct an investigation to determine the root-cause of the non-conformance. Failure to respond to the Corrective Action Request could result in loss of approval status, suspension of all deliveries, and further evaluation of contract continuation. 7. Request for Deviation/Waiver No substitution of material specification, size or any other attribute will be allowed except by the amendment of the Purchase Order. If a deviation from the Purchase Order specification is necessary, a request for technical support must be submitted in writing. The request will then be assessed, and approved or not approved, allowing the deviation to be permitted or not. 8. Certificate of Conformance A Certificate of Conformance (C of C) must be sent with every shipment specified by Kooltronic s drawing. The C of C will be attached to the packing list. The C of C must contain the following information at a minimum: Fig 3. Information for Certificate of Compliance C of C Mandatory Information Kooltronic Part and revision number Quantity shipped Purchase Order Number Part description Supplier name and address Name of person completing form Title of person completing form Original and/or electronic signature Date of signature 5 of 7

9. RoHS/WEEE/REACH RoHS All parts supplied to Kooltronic must be compliant with the Directive on the restriction of the use of certain hazardous substances in electrical and electronic equipment. Kooltronic must be supplied with a certificate which identifies the parts supplied to Kooltronic and if they are in compliance with the RoHS directive. WEEE The Waste Electrical and Electronic Equipment Directive (WEEE Directive) is the European Community directive on waste electrical and electronic equipment. REACH A European Community Regulation on chemicals and their safe use. It deals with the Registration, Evaluation, Authorization and Restriction of Chemical substances. 10. Performance Monitoring Kooltronic expects its suppliers to continuously perform at a top level, providing Kooltronic with materials that are of the highest quality and delivered when needed. Supplier s performance will be monitored according to Kooltronic Work Instruction PR-74-01-02, Vendor Performance Reporting. 11. Authority Access is required for purposes of auditing and, if necessary, source inspection on the supplier s premises or their sub-contractor s site. The supplier will be informed in advance of audits and source inspection. 12. Communication Kooltronic Purchasing Department will be notified of all changes within the supplier s systems that affect quality. Kooltronic Purchasing Department has the sole authority to modify any aspect of a Purchase Order that affects cost, delivery schedule or quantity. 13. Health and Safety All potentially hazardous materials must be sent with a Safety Data Sheet (SDS). Domestic deliveries must abide by Occupational Safety & Health Administration (OSHA) regulations; European international materials must abide by European Union (EU) and/or other relevant regulations. All part and material deliveries must be marked, labeled and packaged abiding by United States Department of Transportation regulations. Safety Data Sheets must include the Volatile Organic Compound (VOC) 6 of 7

content. VOC content should preferably be in lbs/gallon. 14. Stamps and Tags All parts received must have positive traceability to inspection status. Tags and stamps must identify the individual inspector and be unique to the individual supplier. 15. Part Markings All materials must be identified with part markings or a Certificate of Conformance. 16. Scrap, Rejects, Non-Conformances In production, all scrap and rejected parts must be identified, documented and quarantined to prevent mixing with acceptable products. Quarantined area must be of limited access. 17. Work Orders All processes and manufacturing procedures must be accompanied with applicable work orders. Procedures must define specific requirements in order to complete each process. 18. Gauges Gauges and tools used during inspection and special processes must be calibrated and traceable to National Institute of Standards (NIST) Standards. (www.nist.gov) 19. Kooltronic Supplier Materials Kooltronic provided materials such as drawings, tools or models must be controlled and identified. 20. Housekeeping Supplier facilities are expected to be safe and clean work environments. Appropriate personal protective equipment is expected to be used as applicable. Controlled areas must have objective evidence of control. 21. Kooltronic Procurement Quality Clauses All suppliers are required to read and adhere to any and all Procurement Quality Clauses that are called out in the Kooltronic Purchase Order. 7 of 7