SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

Similar documents
SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): POWER Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT: BIHAR POWER SECTOR

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN])

Developing a Regional Roadmap on Energy Connectivity. China Electric Power Planning & Engineering Institute Bangkok

Solar Plus: Diversified Low-Carbon Systems to Improve Energy Supply and Climate Resilience. Islamic Republic of Afghanistan Asian Development Bank

WEST KALIMANTAN POWER GRID STRENGTHENING PROJECT Reducing Indonesia s Oil Dependency While Fostering Regional Cooperation

CASE STUDY How Uzbekistan is Becoming a Solar Energy Powerhouse

10. HOW CAN SOUTH ASIA PROMOTE ENERGY TRADE 6

South Asia Energy Security : Challenges And Opportunities

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities

Energy Policy in Lao PDR

ASSESSMENT OF PUBLIC SECTOR MANAGEMENT

Energy sector in Mongolia. Contents Brief of energy sector Energy sector policy Future trend

Content Sri Lanka At a Glance Energy reserves Current Energy Policy and Measures Past Energy Demand and Supply Outlook of energy Demand and Supply Ene

SECTOR ASSESSMENT (SUMMARY): RAJASTHAN POWER SECTOR. 1. Sector Performance, Problems, and Opportunities

Brief Overview of Renewable Energy Regulation in Tanzania

Renewable energy: Investing in Africa

THEME Country profile Current state of energy sector Outlook of energy demand and supply The energy policy Documents and its implementation. Short ter

Successful Implementation of Hairatan to Mazar-e-Sharif Railway Project in Afghanistan

Afghanistan Resource Corridor Development: Power Sector Analysis

AFGHANISTAN FROM TRANSITION TO TRANSFORMATION II

Preliminary Findings of the Gap Analysis for Central Asia

Doing Business in Afghanistan 2017

Dr. Jyoti Parikh Executive Director Integrated Research and Action for Development (IRADe)

Content Introduction Institutional Arrangement Energy Policy Documents Energy Statistics Legal and Policy Efforts for Hydropower Development Problems

ERAV Electricity Regulatory Authority of Vietnam

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Team Leader (TTL) 8. Brief Description of Project/Program (including objectives and expected outcomes) 2

Customs Reforms and Trade Facilitation

Taiwan Power Market Outlook to 2030 Market Trends, Regulations and Competitive Landscape. GDPE0646ICR / Published April 2013

POLICY BRIEF #25 BUILDING GLOBAL ENERGY INTERCONNECTION (GEI) TO PROMOTE 2030 AGENDA FOR SUSTAINABLE ENERGY DEVELOPMENT.

Proposed Multitranche Financing Facility Islamic Republic of Afghanistan: Arghandab Integrated Water Resources Development Investment Program

Energy Efficiency in Central Asia: regional aspects and gaps

DEVELOPMENT OF ELECTRICITY TRADE IN CENTRAL ASIA SOUTH ASIA REGION 1

DATA, BENCHMARKING AND RATIONALE BC Hydro Service Plan 2018/19 to 2020/21

Current Status of Energy in Viet Nam: Tran Thuc

Member State Perspectives

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982. Project Name. Region. Country

Hydro & Small Hydro Outlook in India 2017

General Information Energy Reserves Current Energy Policy and measures Past Energy Demand and Supply Energy outlook Energy Related Investment Major Di

Indonesia's Energy Transit: Struggle to Realize Renewable Potential

CONTENTS 2. PROJECT DESCRIPTION NEED FOR THE PROJECT ABOUT THE PROPONENT SITE SELECTION OVERVIEW OF THE PROJECT 2 5

GHG Accounting for Electricity Transmission and Distribution Projects

Western Power Company Ltd. Ngonye Falls Hydroelectric Project October 2014

2.ENERGY AND OIL #INVESTINGUATEMALA. Industry in Guatemala

Nuclear energy development in the Republic of Armenia. IAEA, Amsterdam June

2017 PARTNERSHIPS CONFERENCE Light Up and Power Africa. Astrid Manroth Director Transformative Energy Partnerships

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

Terms of Reference. Conflict Management and Mitigation for Energy Projects in Nepal

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name. Indonesia Power Transmission Development Project Region

REPUBLIC OF UZBEKISTAN

Energy Trust of Oregon Strategic Plan

Balkan Energy Overview

Cost of Service and Public Policy. Ted Kury Director of Energy Studies, PURC

OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA: CASE OF RENEWABLE ENERGY

Democratic Socialist Republic of Sri Lanka Commercial Capital: Colombo Administrative Capital: Sri Jayawardenapura Kotte

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5136 Project Name

THE RENEWABLE ENERGY IN LIBYA: PRESENT DIFFICULTIES AND REMEDIES

Electricity Data Collection

Ing. Andrew T Barfour, FGhIE,FID Director/Project Coordinator GEDAP Ministry of Energy & Petroleum GHANA

Renewable Projects Portal for CLP Group

THE ELECTRIC POWER INDUSTRY: Power Capacity Mix

DECADES Tool to Make Comparative Assessment of Electricity Generation in Indonesia 1

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3692 Project Name. CM PRG for Kribi Gas to Power Project (FY09) Region

Enabling PV Afghanistan

WATER AND WIND QUÉBEC S CLEAN, RENEWABLE ENERGY RESOURCES

Improving Coordination Among Government Ministries in Afghanistan

Japanese ODA Loan. Ex-Ante evaluation

USAID/NARUC/ EKT- East Africa Regional Regulatory. 1 st Partnership Exchange: ETHIOPIA POWER SECTOR OVERVIEW

Flexibility in Indian Power System

Ministry of Regional Development and Infrastructure of Georgia United Water Supply Company of Georgia

ADB Support for Solar Power In India

Cooperation in the Energy Sector

Canada as a Global Energy Leader

TECHNICAL ASSISTANCE RAJASTHAN RENEWABLE ENERGY CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

RAJASTHAN CONCENTRATING SOLAR POWER A Multi-stakeholder Partnership That Maximizes Solar Power to Fuel India s Economy

World Bank s Engagement on Renewable Energy in Central Asia. Mits Motohashi Senior Energy Specialist World Bank Group Energy & Extractives

Renewable Energy Policies Case Study For Jordan

BUSINESS AND INVESTMENT OPPORTUNITIES IN ENERGY SECTOR OF AZERBAIJAN. Subsectors: Oil and Gas Electricity

Ex-Ante Evaluation (for Japanese ODA Loan)

ENERGY POLICY OF MONTENEGRO UNTIL 2030

Global Infrastructure Facility

Georgia: Development of Public Private Partnerships

Energy Sustainability Challenges in Asia-Pacific Opportunities for Regional Cooperation. Sergey Tulinov December 2013

Completion Report. People s Republic of China: Hebei Zhanghewan Pumped Storage Project. Project Number: Loan Number: 1922 August 2014

The development and use new and renewable source of energy in Mongolia

ADB in Vietnam. ADB s Climate Change Related Interventions in Vietnam. ADB in Vietnam. Outline

General Overview Area km2 Population-3,5 mln Situated south-east of Europe Density of population 121.9/km2 Economy- based on sevices 75% agricul

Implementation of UNFCCC in Armenia: ongoing activities in the context of climate change mitigation measures

SB 838: Oregon Renewable Energy Act Establishing an Oregon Renewable Energy Standard

Grid Integration in Sri Lanka

Country Presentation Bangladesh

UN Economic Commission for Europe. Policy Reforms to Promote Energy Efficiency and Renewable Energy Investments in Bosnia and Herzegovina

CHINA 2050 HIGH RENEWABLE ENERGY PENETRATION SCENARIO AND ROADMAP STUDY. Energy Research Institute National Development and Reform Commission

Rural Electrification by Renewable Energy in Cambodia

PPIAF Assistance in Montenegro

Transcription:

Energy Supply Improvement Investment Program (RRP AFG 47282-001) SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Sector overview. Afghanistan is among the lowest in electricity usage globally about 100 kilowatt hours (kwh) per year per capita consumption with only 30% of its population connected to the grid. Peak demand in 2014 was 750 megawatts (MW), although the unsuppressed demand is estimated at 2,500 MW. In 2014, almost 80% of power was supplied by imported power, and demand in major cities increased by 25%. Although the reliability of the grid has improved significantly since 2002, load shedding is still common and private generators fill the gap. To meet this demand growth, Afghanistan aims to develop a combination of domestic fossil fuel, hydropower, and renewable energy generation projects, through public and private sector participation, complemented by diversified import solutions. 2. Significant renewable energy and fossil fuel resources need to be developed through public and private investments. In 2014, nearly 97% of the country s oil needs were imported. Lack of investments in gas production and transmission infrastructure restricts development of identified gas reserves of 75 billion cubic meters to only 150 square kilometers (km) area. The key challenges are (i) lack of generation capacity, (ii) increasing constraints in transmission and distribution systems, (iii) weak financial management and sustainability of sector entities caused by lack of cost-reflective tariff frameworks, and (iv) inadequate sector regulation. 3. Inadequate generation capacity. The total installed generation capacity in Afghanistan is only about 520 MW, including 254 MW (49%) from hydropower resources; 200 MW (39%) from thermal sources (furnace oil, diesel, and gas); and 65 MW (12%) from distributed generators. Imports constitute nearly 80% of the total power balance, and the import bill of energy has increased 14 times from $16 million in 2007 to nearly $224 million to 2015. The absence of a water treaty with neighboring countries (five out of six rivers have transboundary issues) and international mining investors reneging on their contractual obligations impede the development of indigenous hydropower and thermal (gas and coal) power projects. 4. Missing renewable energy and off-grid development. Less than 9% of the rural population has access to electricity, while more than 75% of Afghans live in rural areas and 67% of the gross domestic product comes from rural areas. Afghanistan has an estimated 23,000 MW of hydropower resource potential, 67,000 MW of wind potential, and 222,000 MW of solar potential. However, development of such resources to date has been minimal. Harnessing these will improve the country s energy mix and energy security. 5. Isolated asynchronous power grids. Afghanistan needs a unified national electricity grid. It has 10 isolated grids or islands supplied by different power systems through 220-kilovolt (kv) and 110-kV links. Different parts of Afghanistan s networks are supplied as passive islands by power fed from Iran, Tajikistan, Turkmenistan, and Uzbekistan. However, because of asynchronous grid operations in these countries, the current network configuration is highly inflexible. Asynchronous networks inhibit efficient power interconnections and trade, so power produced on one network cannot be connected to any of the country s other systems without the installation of back-to-back convertor systems to align power frequency. This impedes efficient 1 This summary is sourced from publications by the Government of Afghanistan and its development partners, posted on the Interministerial Commission for Energy (ICE) website. https://sites.google.com/site/iceafghanistan/

2 load dispatch and results in a higher probability of blackouts because of lack of reserves and high dependency on feeds from importing countries. Afghanistan s generation is not utilized at full capacity because of constraints in rearranging the loads to build islands. Therefore, bulk export of energy is not possible and the country cannot serve as a transit system for transmitting electricity from Central Asian countries to South Asia. 6. Low coverage of distribution network. Low grid connectivity makes a vast difference between rural and urban access. While over 75% of the population in large urban areas like Kabul, Kandahar, Herat, and Mazar-e-Sharif have electricity, less than 10% of the rural population has access to grid-connected power. Nearly 1.2 million customers are connected to the grid, comprising nearly 30% of the country s population. The government, with assistance from development partners, is funding major distribution expansion programs across major load centers of the country. Nearly 200,000 new distribution connections are under implementation and another 100,000 connections are in the planning phase. 7. High energy losses and low energy efficiency. The current level of losses is estimated to be about 24%, down from 54% in 2008. Assuming 10% is an acceptable level of technical and commercial losses, the balance of 13.5% is estimated to be worth $71.2 million a year at $0.12 per kwh. A reduction in technical and commercial losses is important both in terms of the financial sustainability of Afghanistan Power Utility (DABS) and supplying more power to consumers. DABS is rolling out its annual asset maintenance plan, bulk metering plan, and computerized maintenance management system to arrest system losses. 8. Uneconomic electricity pricing and high cost. The average electricity tariff is $0.8 $0.12 per kwh, far below what is needed to cover power import generation costs of about $0.06 $0.10 per kwh on average, and power transmission and distribution costs for the network of about $0.07 $0.10 per kwh. Based on the current energy mix, to be cost-reflective, the tariff is estimated to be around $0.15 0.18 per kwh. 2 The cost of operation, maintenance, and new investments is high because of broad security concerns. 9. Weak legal framework and no market-based policy. More is required to strengthen capacity and accountability, to ensure clearer explanation of responsibilities and better collaboration across government agencies. The sector s legal framework is weak, and the lack of sector-specific laws and regulations is leading to poor governance and lack of market-based pricing that allows for full cost recovery. These shortcomings must be addressed if the sector is to attract much-needed foreign investment. Sector corporatization is strengthening through the formation of DABS in 2009 and the Afghan Gas Enterprise in 2011. The Electricity Services Act, 2015 defines the roles and responsibilities of sector entities. 10. Missing development plan for gas. According to recent studies conducted by the United States Geological Survey and the Afghan Ministry of Mines and Petroleum (MOMP), the total estimated undiscovered technically recoverable natural gas reserves in Afghanistan are 444 billion cubic meters (m 3 ), in addition to already identified reserves of 75 billion m 3. The absence of a gas development plan and an investment framework is an obstacle to the funding of projects by the government and development partners because it makes it difficult to identify, harmonize, and sequence expansion programs effectively. Technical assistance (TA) to help Afghanistan develop a gas development master plan funded by ADB is on-going. 3 2 The cost of diesel generation is $0.30 $0.50 per kwh, depending on the size of the equipment. 3 ADB. 2013. Technical Assistance to the Islamic Republic of Afghanistan for the Gas Development Master Plan. Manila (TA 8401, $700,000, approved on 11 July).

3 11. Indigenous coal resources not utilized. The northwest Bamyan province has domestic coal resources. Coal, including the development of a plant to supply electricity to the Aynak copper mining project, could provide a significant source of power. However, implementation has been delayed significantly and the project may not provide the envisaged 200 MW of surplus power to the grid. Similarly, investment linked to the Hajigak iron ore deposit, which had foreseen the development of a power plant of up to 800 MW, remains uncertain. 12. Regional energy trade hub. Afghanistan seeks to become a significant energy resource corridor and energy transit hub. Expanding regional electricity trade between Turkmenistan Uzbekistan Tajikistan Afghanistan Pakistan (TUTAP), the Central Asia South Asia (CASA) power project, and gas imports from Turkmenistan into Afghanistan, Pakistan, and India (TAPI) would provide Afghanistan with transit revenues and energy security through energy offtake in Afghanistan. TUTAP will bring more than 1,500 MW of power to meet the country s demand, CASA will import 300 MW, while TAPI will supply up to 0.5 billion cubic meters of gas per year to Afghanistan. 13. Planning and financing. Nearly $5.0 billion in grant assistance and private sector investment is projected to be provided to the Afghanistan energy sector during 2013 2018. The Inter-Ministerial Commission for Energy (ICE), supported by ADB, has been an effective mechanism for brainstorming and reaching coherent agreements on an investment and governance agenda. 4 ICE supports collaboration among the government, development partners, and the private sector in (i) sector planning and harmonization to avoid overlapping, (ii) sequencing of investments, and (iii) analytical work related to Afghanistan s energy sector. The International Conferences on Afghanistan held in Tokyo (2012) and London (2014) pledged almost $16 billion for the country s reconstruction during 2013 2016, of which nearly $3 billion will be allocated (on-budget) to power sector investments. Out of this, to date, nearly $800 million has been invested in the energy sector. 2. Government s Sector Strategy 14. The government is implementing the energy sector strategy, road map, policy framework, and envisaged investment plan approved under its National Energy Supply Program (NESP) 2030. NESP integrates the power sector master plan 2012 2032, and gas development master plan 2015 2035, and builds on the Afghanistan National Development Strategy 2008 2013. The Electricity Services Act 2015 provides a legal and regulatory framework, and transparent structure for private sector participation. The NESP prioritizes the development of indigenous generation in parallel with power import infrastructure, completion of the transmission line ring, focus on renewable energy generation, expansion of power distribution networks, and development of gas fields for power and industrial anchors. By 2032, the NESP of nearly $10.1 billion funded through government and donor funds, public private partnerships, and private sector financing envisages (i) an increase in the electrification rate from 30% to 83% through an integrated transmission network; and (ii) an increase in domestic generation from 20% to 67%, and strengthening power exchange options with neighboring systems. 15. The power utility, DABS, is implementing a robust institutional development and commercialization strategy that includes (i) improved operation and maintenance (O&M) practices in the entire value chain, (ii) revenue protection initiatives, (iii) reforms in procurement and corporate governance, and (iv) business planning. ADB, the World Bank, and the United 4 ADB. 2013. Technical Assistance to Afghanistan for Supporting the Inter-Ministerial Commission for Energy. Manila (TA 8328-AFG, $1.5 million, approved on 22 February).

4 States Agency for International Development are providing capacity support. In total, nearly $35 million of O&M capacity support programs are being implemented. 3. ADB Sector Experience and Assistance Program 16. ADB is the country s largest on-budget development partner in the energy sector, with cumulative assistance of nearly $937 million in grants and loans to date. ADB-assisted projects have commissioned more than 630 km of transmission lines, eight substations, 15,000 new power connections, and eight gas wells to generate 2 million m 3 of gas per day. Ongoing projects comprising 400 km of transmission lines, four substations, 110,000 new connections, and 4.5 MW of hydelectric generation projects are under implementation. Additional support has been provided to strengthen operations and maintenance, project preparation, analytical studies, and capacity development. ADB has led efforts to formulate the NESP and has acted as the development partner focal point in the energy sector. 17. ADB s investment projects include (i) the Afghanistan Uzbekistan Interconnection, completed in 2008 ($45.0 million); and (ii) the Afghanistan Tajikistan Interconnection, completed in 2011 ($47.0 million) 5. The ongoing portfolio comprises (i) the Power Transmission and Distribution Project ($50.0 million); 6 and (ii) the Energy Sector Development Investment Program tranche 1 ($164.0 million), tranche 2 ($81.5 million), tranche 3 ($75.4 million), tranche 4 ($200.0 million), and tranche 5 ($49 million). 7 Further, the North South Power Transmission Enhancement Project ($216.0 million), was approved in 2013. 8 18. ADB has provided TA in the sector, including projects to help Afghanistan (i) prepare the power master plan, 9 (ii) develop an interministerial commission for energy (footnote 4), (iii) develop a gas development master plan (footnote 3), and (iv) develop renewable energy. 10 Implementing energy projects in Afghanistan is difficult and entails additional security costs, capacity constraints, difficult terrain, rebidding, and availability of few international contractors and consultants willing to work in the country. Start-up delays are caused by lack of procurement and social safeguards capacity and difficulties. Implementation is challenging and takes longer because of the fragile post-conflict environment. Over the years, ADB has refined its implementation and project design from lessons learned in earlier projects to achieve results. 5 ADB. 2003. Report and Recommendation of the President to the Board of Directors: Proposed Loan to the Islamic Republic of Afghanistan for the Emergency Infrastructure Rehabilitation and Reconstruction Project. Manila (Loan 1997-AFG, $150 million, approved on 3 June); and ADB. 2006. Report and Recommendation of the President to the Board of Directors: Proposed Loans, Technical Assistance Grants and Administration of Loan by the OPEC Fund for International Development to the Islamic Republic of Afghanistan and Republic of Tajikistan for the Regional Power Transmission Interconnection Project. Manila (Loan 2304-AFG, $35 million and Grant 0230-AFG, $12 million, approved on 19 December). 6 ADB. 2005. Report and Recommendation of the President to the Board of Directors: Proposed Loan and Asian Development Fund Grant and Technical Assistance to the Islamic Republic of Afghanistan for the Power Transmission and Distribution Project. Manila (Grant 0004/Loan 2165/TA 4579-AFG, approved 14 April). 7 ADB. 2008. Report and Recommendation of the President of the President to the Board of Directors: Proposed Multitranche Financing Facility and Administration of Grant to the Islamic Republic of Afghanistan for the Energy Sector Development Investment Program. Manila (MFF 0026-AFG, approved on 2 December). 8 ADB. 2013. Report and Recommendation of the President to the Board of Directors: Proposed Asian Development Fund Grant for the North South Power Transmission Enhancement Project to the Islamic Republic of Afghanistan for the Energy Sector Development Investment Program. Manila (G-0374/0375-AFG, approved on 25 November). 9 ADB. 2010. Technical Assistance to Afghanistan for the Power Sector Master Plan. Manila (TA 7637-AFG, $1.5 million, approved on 6 November) and ADB. 2010. 10 ADB. 2014. Technical Assistance to the Islamic Republic of Afghanistan for Renewable Energy Development. Manila (TA 8808-AFG, $1.0 million, approved on 12 December).

5 Problem Tree for the Energy Sector Effects Fewer Economic Opportunities and Reduced Economic Growth Low Electrification Rate Reduced Energy Security Missed Opportunities for Energy Transit, Trade, and Regional Cooperation Core Problem Inadequate supply and network to meet demand Causes Technical Constraints Operational insufficient transmission and distribution supply capacity Minimal off-grid renewable energy development Financial Constraints High operation, maintenance, and new investment cost Inadequate income Institutional Constraints Poor utility financial and operational performance Inadequate investment Sub-causes On-grid distribution localized and restricted Multi-island network Limited off-grid sustainable development High commercial losses Below-cost tariffs Weak human resource capacity Weak sector planning and forecasting Separate transmission grids in north and southeast No grid in west Difficulties to synchronize with neighboring countries Summer-only hydro supply and expensive diesel-fueled thermal supply Poor billing and metering Low tariffs deter private sector investment Poor organizational structure Weak regulation Deteriorating security and law and order concerns = Addressed by multitranche financing facility = Addressed by other development partners in Afghanistan

6 Sector Results Framework (Energy, 2015 2017) Country Sector Outcomes Country Sector Outputs ADB Sector Operations Outcomes with ADB Contribution Indicators with Targets and Baselines Outputs with ADB Contribution Indicators with Incremental Targets Planned and Ongoing ADB Interventions Main Outputs Expected from ADB Interventions Sustainable and reliable gridconnected power supply in northern, eastern, and southern Afghanistan National power transmission system upgraded, well maintained, and linked with neighboring countries Power system capable of transmitting additional 300 MW by 2018. (baseline:300 MW 2011 level) $580 million in 2015 2017, 49.2% of total COBP financing, inclusive of $340 million cofinancing (AITF), of which: CAD 25%, GRO 100%, and RCI 60% 1. Electrification ratio increased from less than 10% in 2007 to 50% in 2017 2. NEPS capacity of supplying 150 MW in 2009 increased to 1,000 MW of connected load by 2017 3. System losses reduced from 50% in 2007 to 30% by 2017 4. Southern provinces of Ghazni and Kandahar are connected to the NEPS system through 220-kV and 500-kV lines 5. Natural gas extraction facilities and infrastructure in the northern provinces of Afghanistan are further developed Transmission lines and substations constructed Distribution networks expanded Gas wells rehabilitated Technical and commercial power losses reduced Sector master planning institutionalized 650 km of additional transmission lines built in 2018 (baseline: 500 km 2012 level) 150,000 new household connections added by 2017 (baseline: 900,000 connections 2012 level) 12 gas wells rehabilitated by 2017 (baseline: 0 in 2012) Technical and commercial losses reduced from 42% in 2012 to 24% in 2017 Offices of power and gas sector master planning established and institutionalized by 2017 Planned key activity areas Investments in power generation, transmission, and distribution systems. Investment in gas infrastructure, and systems planning and capacity support Pipeline projects with estimated amounts Energy MFF 2 ($750 million) Ongoing projects with approved amounts Energy MFF tranche 1 ($176 million) Energy MFF tranche 2 ($81 million) Energy MFF tranche 3 ($78 million) Energy MFF tranche 4 ($200 million) Energy MFF tranche 5 ($49 million) North South Power Enhancement ($216 million) Planned key activity areas Afghanistan power system strengthened to evacuate more power, reduce losses, and distribute additional power Pipeline projects 450 km of 500-kV and 220-kV transmission lines constructed Tariffs increased to match cost of supply and undertake operations and maintenance Ongoing projects 150,000 new household connections added by 2017, compared with 2012 2 gas wells rehabilitated by 2015, from 6 in 2013 Technical and commercial losses reduced from 42% in 2012 to 24% in 2017 ADB = Asian Development Bank, AITF = Afghanistan Infrastructure Trust Fund, CAD = capacity development, COBP = country operations business plan, DABS = Da Afghanistan Breshna Sherkat (Afghanistan s state-owned power utility), GRO = economic growth, km = kilometer, kv = kilovolt, MFF = multitranche financing facility, MW = megawatt, NEPS = North East Power System, RCI = regional cooperation and integration. Source: Asian Development Bank.