Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0

Similar documents
Environmental Information Worksheet

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

Appendix D - Evaluation of Interim Solutions

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

POLLUTION PREVENTION AFTER CONSTRUCTION

Boise City Public Works General Drainage Plan Review Requirements Checklist

STORMWATER MANAGEMENT PROGRAM. Table of Contents

Good morning, Chairman Yaw, Chairman Yudichak, Chairman Vulakovich, Chairman Costa,

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE

Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria

LOCATION AND DESIGN DIVISION

I. General Information. A. Project Team & Contacts: Role Company Name Phone City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department

Division of Surface Water Environmental Mitigation & Special Permitting Section

THE CORPS REGULATORY AUTHORITY

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator

Chapter 102 Construction Stormwater Program Updates VUSP Pennsylvania Stormwater Management Symposium

RULES OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION CHAPTER EROSION AND SEDIMENTATION CONTROL TABLE OF CONTENTS

City of Clarksville. Storm Water Management Manual

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1

City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017

INVASIVE SPECIES CONTROL PLAN FOR CONSTRUCTION ACTIVITIES AND POST CONSTRUCTION MONITORING

S.O.P. No. HMD

SOLID WASTE DISPOSAL FACILITY CONSTRUCTION/DEMOLITION LANDFILL PERMIT APPLICATION PACKAGE. ADEM Form

Erosion & Sedimentation Control Policy

Department of the Army Permit Application

Navigating the U.S. Army Corps of Engineers Regulatory Process

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

PRESENTERS. Contact Information: RW Armstrong Union Station, 300 S. Meridian St. Indianapolis, IN

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

Chapter 2 ADMINISTRATIVE PROCEDURES

Instructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN):

Public Notice ISSUED: March 14, 2018 EXPIRES: April 13, 2018

Project Planning area. King County Department of Transportation Road Services Division

SITE DESIGN ENGINEER'S STATEMENT:

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

1.0 Introduction. The USACE Fort Worth District s goals for the REIS are to:

City of Watertown, South Dakota Storm Water Management Program. Minimum Control Measure 1: Public Education and Outreach on Storm Water Impacts.

Public Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number:

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

CITY OF SPRING HILL Water Quality Buffer Zone Policy (Adopted April 22, 2008)

Chapter 21 Stormwater Management Bylaw

State of Georgia Department of Natural Resources Environmental Protection Division NOTICE OF INTENT. NOI - Version 2012

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-3

ACT 537 SPECIAL STUDY WASTEWATER CONVEYANCE SYSTEM CAPACITY ANALYSIS WASHINGTON TOWNSHIP MUNICIPAL AUTHORITY

Trails Permitting Process

Nevada Department of Transportation (NDOT)

EXHIBIT A SCOPE OF SERVICES Districtwide Storm Sewer Inspection

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

SECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING

Suffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation

State of Georgia Department of Natural Resources Environmental Protection Division

Chapter 3 DESIGN. C. Project Scope: The Designer may proceed only with the authorized scope of work. Scope changes must be approved by the OFD-PM.

Ordinance No Lot Surface Drainage

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

What is a stormwater utility fee?

PUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303)

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

Venice Pumping Plant Dual Force Main Project Draft EIR 1.0 I NTRODUCTION

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

Poly Met Mining, Inc. Antidegradation Review - Preliminary Determination for 401 Certification

Module 4 Regulatory requirements for Land Disturbing Activities

Chapter 9 Wetlands Park Study Team

The Village of Wellington NPDES Guidance/Reference Document

ILLICIT DISCHARGE, STORM WATER INFLOW TO THE POTW, AND ILLEGAL CONNECTION CONTROL.

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

ANCHORAGE STORMWATER MANUAL

STORMWATER AND EROSION CONTROL PERMIT

ESTIMATE OF QUANTITIES

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.

TABLE OF CONTENTS F 600 SEWER CONSTRUCTION SECTION NO. SUBJECT DATE

SECTION TRENCHING & BACKFILLING

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

Chapter 11 Culverts and Bridges

Appendix I Endangered Species (Correspondence) DRAFT

Before we get to the E&SC

LANDFILL POST-CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES

I THOUGHT IT WAS JUST WET LAND: A GUIDE TO ENVIRONMENTAL PERMITTING FOR AIRPORTS ROAD SCHOOL 2018 SIMON DAVIES, SENIOR SCIENTIST MARCH 7, 2018

IN PROGRESS PARTNERS IN PROGRESS IN PROGRESS. your conduit for delivering confidence

FLORIDA DEPARTMENT OF TRANSPORTATION

EROSION, SEDIMENTATION, ETC

INSTRUCTIONS FOR USING THE GENERAL PERMIT...i A. GENERAL DESCRIPTION AND FEES

Starting Construction: Your Storm Water Permit

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

SECTION 11: REGULATORY FLOODWAYS

Public Notice ISSUED: August 11, 2015 EXPIRES: September 10, 2015

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan

DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services)

Task Order Authorization

Richland County Department of Public Works Engineering (Land Development) Division

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection

APPENDIX A. NEPA Assessment Checklist

E. STORMWATER MANAGEMENT

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR

Transcription:

Appendix J Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION Version 3.0 April 2015

Table of Contents Section 1 General Information... 1 Section 2 State of Tennessee Permits, Reviews, and Documents... 2 2.1 Tennessee Department of Environment and Conservation Permits... 2 2.1.1 Division of Water Pollution Control... 2 2.1.1.1 Basic Plans Review and Approval... 2 2.1.1.2 Notice of Coverage from NPDES Permit for Construction Stormwater... 2 2.1.1.3 Aquatic Resources Alteration Permit... 3 2.1.1.4 Section 401 Certification... 3 2.1.2 Division of Archaeology, Section 106 Permit... 3 2.1.3 Division of Natural Areas/Natural Heritage Review... 3 2.1.4 Division of Solid Waste Management Review... 3 2.1.5 Division of Air Pollution Control Review... 3 2.1.6 Division of Water Supply... 3 2.1.6.1 Sinkhole Identification and Alteration Coordination... 3 2.1.6.2 Class V Injection Well Permit... 4 2.2 Other State of Tennessee Permits... 4 2.2.1 Tennessee Department of Transportation, Utility Permit in Right-of-Way... 4 2.2.2 Tennessee Historical Commission, Section 106 Permit... 4 2.2.3 Tennessee Wildlife Resources Agency Review... 4 Section 3 Federal Permits, Reviews, and Documents... 5 3.1 U.S. Army Corps of Engineers... 5 3.1.1 Section 10 Permit... 5 3.1.2 Section 404 Permit... 5 3.2 U. S. Department of the Interior, Fish and Wildlife Service Review... 5 Section 4 Metro Permits, Reviews, and Documents... 6 4.1 Metro Grading Permit... 6 4.2 Metro Building Permit... 6 4.3 Metro Rights-of-Way... 6 Section 5 Other Permits, Reviews, and Documents... 7 5.1 Railroad Crossings... 7 5.2 Electric Utilities Crossings... 7 5.3 Gas Utilities Crossings... 7 i

Section 1 General Information The Designer is responsible for the following items: Providing a comprehensive assessment of the various building and environmental permits from Metropolitan Nashville and Davidson County, the State of Tennessee, federal agencies, and other regulators and entities required for a project, based on field observations and experience Compilation of required documentation needed for permit applications Preparation of the permit applications Submittal in PMIS of permit applications and supporting documentation via the Designer Submittal Business Process The Designer, in collaboration with the Project Manager or others as designated, contacts various state, federal, local, and other resource agencies and entities to verify the requirements particular to a given permit/permission. The type of impacts that a project may generate and the project location determine which federal, state, and/or local requirements apply. The Program Management Consultant (PMC) Permit Coordinator is available as a resource to the Designer. Permits and their requirements are subject to change as rules, regulations, and policies change. It is the Designer s responsibility to understand current compliance requirements of permit rules, regulations, and policies. Not all of the permits described in the following pages apply to all projects. Typical rehabilitation projects without any pipe replacement and within a limited area of disturbance may require no permits for project approval and bidding. Most of the facility, rehabilitation with extensive pipe replacement, and conveyance projects require, at a minimum, the following three permits/activities: Tennessee Department of Environment and Conservation s (TDEC) National Pollutant Discharge Elimination System s Permit for Construction Stormwater Metro Grading Permit TDEC s Wastewater Plans Review and Approval Facility-type projects in addition to the above three listed permits require a Metro Building Permit. The Designer generates the initial pre-construction application for the Building Permit and the Grading Permit and resolve issues so the contractor can obtain the final construction permit. Along with the Grading Permit application, all applicable state, federal, local, and other permits must be submitted to obtain Metro s Grading Permit. Examples of required applicable permits are the following - from the state of Tennessee (ARAP, Section 401, Tennessee Department of Transportation, etc.), the federal government (Section 10, Section 404, etc.), Metro (floodplain variance, Erosion Prevention and Sediment Control Plan, stormwater criteria, etc.), and other permits (railroad crossings, electrical and gas utilities permits, etc.). 1

Section 2 State of Tennessee Permits, Reviews, and Documents Various agencies and departments in the Tennessee require permits or reviews prior to initiating construction activities. These entities are listed below. 2.1 Tennessee Department of Environment and Conservation Permits The Tennessee Department of Environment and Conservation (TDEC) is responsible for protecting public health and the environment. Several divisions within the Department require reviews and/or permits prior to commencing any construction activities. Designers are directed to the TDEC 2013 Revised Design Criteria for trench water migration and the prevention of stream capture to review early discussions of alternatives, TDEC regulators requirements, and requirements/considerations for design. 2.1.1 Division of Water Resources, Water Quality Branch, Land-based Systems Additional information can be found at on the TDEC website. Activities or permits required by the Division of Water Resources, Water Quality Branch, Land-based Systems, may include: 2.1.1.1 Basic Plans Review and Approval With few exceptions such as rehabilitation with no extensive pipe replacement, TDEC reviews the final plans for construction and issues a plans approval letter. 2.1.1.2 Notice of Coverage from NPDES Permit for Construction Stormwater NPDES. Persons discharging pollutants directly from point sources into state surface waters must obtain a National Pollutant Discharge Elimination System discharge permit. A Notice of Coverage from the National Pollutant Discharge Elimination System Permit for Construction Stormwater must be obtained prior to initiating construction activities including mobilization. Obtaining this Notice of Coverage involves submitting an application along with the required Stormwater Pollution Prevention Plan and completing a Notice of Intent. Application. Operators of construction sites involving clearing, grading, excavation, utility lines, sewage treatment plants, roads, or borrow pits for fill material, etc., that result in an disturbed area with one or more acres must submit an application and obtain a permit. Stormwater Pollution Prevention Plan. A site-specific Stormwater Pollution Prevention Plan must be developed and submitted with the Notice of Intent. The Stormwater Pollution Prevention Plan must be developed, implemented, and updated according to Part 3 of the Construction General Permit. Notice of Intent. A completed and signed Notice of Intent for Construction Activity Stormwater Discharges (see link above). The Notice of Intent must include a map on 8½-inch by 7-inch paper with boundaries 1-2 miles outside the site property with the site and construction area outlined and the receiving water or receiving storm sewer highlighted and identified. It is preferable for this map to be the appropriate portion of a U.S. Geological Survey 2

Version 3.0 Appendix J Permit Information 7.5-minute quadrangle map. Completed Notices of Intent must be sent to the appropriate Environmental Field Office. 2.1.1.3 Aquatic Resources Alteration Permit If any construction activities divert, obstruct, or change the natural flow or bed of any waters of the state (debris removal, bank stabilization, or culverting), involve construction within navigable waters, and/or dredge or place fill into waters of the state and/or wetlands, an Aquatic Resources Alteration Permit is required. 2.1.1.4 Section 401 Certification A Section 401 Certification from the Division of Water Resources, Water Quality Branch, Land-based Systems, may be required as an Individual Permit or as pre-cursor to obtaining a U.S. Army Corps of Engineers Section 404 Permit. A determination is made by the Division. 2.1.2 Division of Archaeology, Section 106 Permit A Section 106 Permit may be required if doing significant work affecting federally-controlled properties (work in which federal funds are used, work requiring federally issued permits such as U.S. Army Corps of Engineers Section 10 and Section 404 permits, or TVA Section 26a permits). The determination regarding applicability is made by the Division of Archaeology in conjunction with the Tennessee Historical Commission. 2.1.3 Division of Natural Areas/Natural Heritage Review The Division reviews the project locations for state-listed threatened or endangered flora species and assigns requirements, if appropriate. 2.1.4 Division of Solid Waste Management Review A review may be requested especially if solid waste disposal is anticipated. 2.1.5 Division of Air Pollution Control Review A review may be requested especially if the project involves constructing a new or modifying an existing air pollution source. For larger construction projects, the volume and type of anticipated air pollutants may need to be determined as required by the Division. 2.1.6 Division of Water Resources, Water Quality Branch, Drinking Water Program Activities or permits required by the Drinking Water Program may include: 2.1.6.1 Plans Approval and Notification of Construction Start The Drinking Water Program requires approval of the construction drawings prior to the commencement of construction. In addition, the Drinking Water Program s Construction Start Notification form must be submitted to the Drinking Water Program prior to the commencement of construction. 2.1.6.2 Sinkhole Identification and Alteration Coordination The Drinking Water Program must assess the proposed construction area to determine if any sinkholes are present. Sinkhole alterations must be coordinated with the Drinking Water Program if encountered in the design or in the field once construction has commenced. The Drinking Water Program and the Tennessee Department of Transportation provide Best Management Practices Guidelines if sinkholes are encountered. 3

Version 3.0 Appendix J Permit Information 2.1.6.3 Class V Injection Well Permit Anyone who discharges industrial/commercial wastes into a subsurface system other than city sewers or who modifies karst features is required to submit an underground injection control application to the Tennessee Drinking Water Program, Ground Water Management. For many sewer-related construction activities, a Class V (shallow, non-hazardous) Injection Well Permit is required. Additional information can be found at http://www.tn.gov/environment/permits/injetwel.shtml. Class V applicants must submit the following items before commencing construction or modifying an injection well: Authorization Application for Class V Underground Injection Well, which has three parts. - Part A requires general information concerning the facility s name and location, the activities conducted that require a permit, the nature of the business, the contact person, and other required environmental permits. - Part B requires information regarding the injection well, injection zone, the injected fluid, operation status, and parameters. - Part C requires information concerning the area lying within and below a 1-mile radius of the injection well pump site or facility. This includes surface geographic features, subsurface geology, and demographic and cultural features. The following attachments may also be required - Topographic and geologic quadrangle maps - Schematic diagrams showing construction details and well materials - Chemical analysis data for the injection fluid - Process descriptions - Operation and maintenance procedures - Geologic/geographic information collected during construction - Facility blueprints - Erosion and sediment control construction diagrams 2.2 Other State of Tennessee Permits 2.2.1 Tennessee Department of Transportation, Utility Permit in Right-of-Way For construction and/or improvement/encroachment activities within Tennessee Department of Transportation rights-of-way, a permit for utility construction must be obtained from the Department. 2.2.2 Tennessee Historical Commission, Section 106 Permit The Tennessee Historical Commission reviews the project areas for National Historic Preservation Act-Section 106 compliance and issue requirements as appropriate. 2.2.3 Tennessee Wildlife Resources Agency Review The Tennessee Wildlife Resources Agency reviews the project areas for state-listed threatened or endangered animal and aquatic life and issue requirements as appropriate. 4

Section 3 Federal Permits, Reviews, and Documents Various federal agencies/departments hold jurisdiction over federally controlled properties and conduct reviews and issue permits, as appropriate, for all project areas. 3.1 U.S. Army Corps of Engineers 3.1.1 Section 10 Permit A Section 10 permit is issued for stream crossings in the project area and a defined radius around the project. Projects may qualify for a Letter of Permission, a Nationwide Permit, or a Regional Permit depending upon the scope, location, and level of encroachment. If an individual Letter of Permission is required for a project, up to 700 days may be an appropriate timeframe. Nationwide or Regional permits can be issued in as few as 90 days. 3.1.2 Section 404 Permit A Section 404 permit is issued for projects affecting wetlands in the project area and a defined radius around the project. The Program s projects may qualify for a Nationwide Permit or a Regional Permit. There is a prerequisite. A 401 certification must be obtained from the Tennessee Department of Environment and Conservation, Division of Water Resources, Water Quality Branch, Land-based Systems, prior to issuing the Section 404 permit. 3.2 U. S. Department of the Interior, Fish and Wildlife Service Review The U. S. Department of the Interior s Fish and Wildlife Service reviews the project areas for federally listed threatened or endangered animal and aquatic life species and issue requirements as appropriate. 5

Section 4 Metro Permits, Reviews, and Documents 4.1 Metro Grading Permit The Metro Grading Permit can only be obtained by the Contractor after acquiring and submitting all forms, other state and federal permits, and utility permissions, etc. The Designer composes the initial application for this permit, resolves design issues, and obtains requisite clearances to be positioned for permit issuance to the contractor. MWS addresses the application fee payments. Grading Permit Application Checklist. This checklist must be submitted with the grading permit application. Post-construction Stormwater Management Plan. This plan must be submitted with the grading permit application. Erosion Prevention and Sediment Control Plan. This plan must be submitted with the grading permit application. In addition, inspections and reports are required during construction. Floodplain Variance. A Variance Plan must be submitted with the application for the grading permit. 4.2 Metro Building Permit This permit is required for construction activities involving the building structure construction. For building type projects, the Designer makes a preliminary project application via the Metro Buzzsaw electronic submittal process. The Designer resolves all design issues to position the permit application as approved for contractor attainment. MWS addresses the application fee payments. The awarded contractor pays for and obtains the actual permit. 4.3 Metro Rights-of-Way As much as feasible, Metro uses a one-stop-shop approach to permitting for construction involving Metro rights-of-way. Metro s Public Works Department must be contacted to obtain permission to disturb a Metro right-of-way. The Designer coordinates with the Public Works Department for pavement restoration and ADA restoration requirements on Metro streets. Other incorporated cities in Davidson County or outside of Davidson County may have other requirements, and the Designer should coordinate with that entity. It is imperative that the paving details be as close as possible to the Metro Public Works standards for consistency of construction and acceptance of roadway restoration work. 6

Section 5 Other Permits, Reviews, and Documents 5.1 Railroad Crossings Railroad companies must be contacted to ascertain any infringement into their rights-of-way. If construction involves their rights-of-way, the appropriate review, application process, and fees must be submitted, and a permit or contract must be obtained prior to commencing any construction activities including mobilization. 5.2 Electric Utilities Crossings The main electric utility in the Metro area is the Nashville Electric Service (NES). NES must be contacted to ascertain any infringement into their rights-of way. If construction involves their rightsof-way, the appropriate review, application process, and fees must be submitted, and a permit or contract must be obtained prior to commencing any construction activities including mobilization. 5.3 Gas Utilities Crossings Gas utilities must be contacted to ascertain any infringement into their rights-of-way. If construction involves their rights-of-way, the appropriate review, application process, and fees must be submitted, and a permit or contract must be obtained prior to commencing any construction activities. 7