Los Coyotes Country Club Development Plan

Similar documents
CEQA BASICS. The California Environmental Quality Act. Prepared for: Orange County Department of Education. Prepared by:

County of El Dorado Notice of Preparation Tilden Park Project

2035 General Plan Update, Belmont Village Specific Plan, and Climate Action Plan

City of Palo Alto (ID # 7047) City Council Staff Report

An Overview of the California Environmental Quality Act

Neighborhood Advisory Committee. EIR Process Overview. Chapman University April 20, 2016

RESOLUTION NO.15- The Planning Commission of the City of La Habra does hereby resolve as follows:

Draft Environmental Impact Report Serramonte Views Condominiums and Hotel Project

CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION

Commerce Park. Draft Environmental Impact Report. CITY OF FONTANA Citrus Commerce Park SCH SEPTEMBER 2014 VOLUME 1. Project Applicant:

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

CEQA and its Role in Historic Preservation. Darcy Kremin, AICP Bay Area Environmental Practice Leader Michael Baker International, Oakland, CA

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4

Inglewood Oil Field Specific Plan Project Environmental Impact Report Public Information Meetings

Table of Contents. City of Redlands - Redlands Crossing Center

Environmental Setting, Impacts, and Mitigation Measures

Purpose of the EIR. Chapter 1 Introduction

County of El Dorado. El Dorado Hills Apartments Project Draft Environmental Impact Report. SCH No Prepared For: Prepared by:

CITY OF CLOVIS Traffic Impact Study Guidelines

Environmental Setting, Impacts, Standard Conditions of Approval, and Mitigation Measures

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

CEQA Scoping Meeting. West Desert Hot Springs Master Drainage Plan Program Environmental Impact Report

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES

FIGURE N-1 LAND USE COMPATIBILITY FOR NEW DEVELOPMENT NEAR TRANSPORTATION NOISE SOURCES

Article 7. COMMERCIAL AND MIXED USE ZONES

TRANSPORTATION IMPACT ANALYSIS GUIDELINES

Additional Planning Commission Recommended Findings

Planning Commission 101: The Nuts and Bolts of Planning

DRAFT ENVIRONMENTAL IMPACT REPORT SOLEDAD VILLAGE SCH NO Lead Agency:

CEQA AIR QUALITY HANDBOOK. Guidelines for the Implementation of the. California Environmental Quality Act of 1970, as amended

ADDENDUM TO THE NEWARK GENERAL PLAN TUNE UP PROGRAM ENVIRONMENTAL IMPACT REPORT (SCH ) FOR THE NEWPARK PLACE SPECIFIC PLAN.

Downtown Estes Loop Project Frequently Asked Questions

The Resort at Los Coyotes

FINDINGS CALIFORNIA DEPARTMENT OF TRANSPORTATION FINDINGS FOR THE INTERSTATE 10 CORRIDOR PROJECT SAN BERNARDINO AND LOS ANGELES COUNTIES, CALIFORNIA

TRAFFIC STUDY GUIDELINES

Venice Pumping Plant Dual Force Main Project Draft EIR 1.0 I NTRODUCTION

CHAPTER COMMERCIAL ZONES

Subsequent or Supplemental Impact Report; Conditions.

Energy and Climate Action Plan. County Planning Commission Hearing September 3, 2014 County of Santa Barbara

California Environmental Quality Act Part 1: CEQA Basics

City of Los Angeles. Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations

3.0 CUMULATIVE IMPACT ANALYSIS METHODOLOGY

2.1 Project Definition/Classification/Initial Study Project Definition

City of La Palma Agenda Item No. 2

Appendix Y-3. Environmental Impact Comparison Social Sciences Interdisciplinary Building

3.0 COMMENTS AND RESPONSES

CITY OF LOS ANGELES SAN PEDRO COMMUNITY PLAN

Draft Noise Abatement Guidelines

Piner High School Field Lighting Project

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.3 STAFF REPORT February 18, 2014

... Noes: Supervisors:-N_o_n&...

Public Hearing January 13, Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith

THE SUPERIOR COURT OF CALIFORNIA COUNTY OF SANTA CLARA DOWNTOWN SUPERIOR COURT

City of Gardena Western Avenue Specific Plan and TTM 74350

Mitigation Monitoring Program

III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR

Section 4.0 ALTERNATIVES

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

STAFF REPORT. City Planning Commission. Case File Number: PLN16053; ER July 6, 2016 SUMMARY

IRVINE UNIFIED SCHOOL DISTRICT MITIGATION MONITORING AND REPORTING PROGRAM FOR THE PLANNING AREA 6 NORTH ELEMENTARY SCHOOL

Christy Usher, AICP Associate Planner Phone Fax:

APPENDIX C COMMENTS AND RESPONSE TO COMMENTS RECEIVED ON DRAFT NEGATIVE DECLARATION

NOTICE OF PREPARATION

Draft Environmental Impact Report

B. ALL RESIDENTIAL ALTERNATIVE

5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN

Council Agenda Report

ANDORA AVENUE TTM PROJECT Subsequent Draft EIR

MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM

LARKSPUR SMART STATION AREA PLAN. Public Workshop December 3, 2013

Lorelei H. Oviatt, Director, AICP Kern County Planning and Community Development Department

1.0 INTRODUCTION 1.1 EIR REQUIREMENT

You Can t Build Without CEQA!

CEQA Categorical Exemption Determination

Letter No Impact Sciences, Inc Temporary use of the Rose Bowl by the NFL November 2012

HELPING YOU CREATE SUCCESSFUL EVENTS. THAT S OUR PROMISE TO YOU.

UC Davis Medical Center Education Building Project Phase 2 Telemedicine Resource Center and Rural PRIME Facility January CEQA Findings

NIGHTTIME ILLUMINATION

III. Corrections and Additions

MAY 4, Noise Barrier Presentation NE Quadrant Smith Avenue, Cherry Hill Circle NOISE BARRIER ABUTTER MEETING. Tech Environmental, Inc.

RAND CORPORATION HEADQUARTERS BUILDING. Final Environmental Impact Report

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

FINAL ENVIRONMENTAL IMPACT REPORT VERONICA MEADOWS SPECIFIC PLAN. January 2005

Appendix H Traffic Study

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

Addendum No.9 to the 2009 UC Merced Long Range Development Plan Environmental Impact Statement/ Environmental Impact Report

CEQA and Health Effects

DR-15-11/LLA Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment

ADDENDUM TO THE EIR. Specifically, Section of the CEQA Guidelines states:

Planning Commission Report

GLOBAL WARMING AND RESIDENTIAL REAL ESTATE DEVELOPMENT: THE CALIFORNIA EXPERIENCE

CEQA Categorical Exemption Determination

CONSENT ITEM LOCAL AGENCY FORMATION COMMISSION EXECUTIVE OFFICER'S REPORT FOR MEETING OF: SEPTEMBER 11, 2017

SECTION 3.322: NESKOWIN LOW DENSITY RESIDENTIAL ZONE (NeskR-1)

Overcoming Barriers to Mixed-Use Infill Development: Let s Get Trip Generation Right

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014

COMPARISON OF ALTERNATIVES

City of Palo Alto (ID # 6220) City Council Staff Report

Transcription:

Los Coyotes Country Club Development Plan Community Meeting October 13, 2014 Community Development Department

1. Welcome and Introductions Community Meeting October 13, 2014 Community Development Department

1. Welcome and Introductions City Staff Joel Rosen Community Development Director Jay Saltzberg Planning Division Manager Michael Ressler Senior Planner, Project Planner Monique Schwartz Assistant Planner Dennis Barnes Traffic and Transportation Manager Consultants Phil Martin Phil Martin and Associates Melissa Dugan - Stantec

2. Meeting Agenda Overview and Discussion Community Meeting October 13, 2014 Community Development Department

2. Meeting Agenda Overview and Discussion 1. Welcome and Introductions 2. Meeting Agenda - Overview and Discussion 3. Existing Conditions 4. Proposed Project and City Process 5. What is an EIR? 6. Los Coyotes Development Plan Draft EIR 7. How to Participate 8. Meeting Recap / Additional Q&A 9. Adjourn

3. Existing Conditions Community Meeting October 13, 2014 Community Development Department

3. Existing Conditions Rosecrans Avenue City of Fullerton 210 Acres

3. Existing Conditions Former Swimming Pool Vacant Offices Tennis Courts Club House Driving Range Guard House

3. Existing Conditions Guard House

3. Existing Conditions Tennis Courts

3. Existing Conditions Vacant Office Buildings

4. Proposed Project & City Process Community Meeting October 13, 2014 Community Development Department

4. Original Proposal The Resort at Los Coyotes 200 private residential condominiums 250-room resort and hospitality building 5,000 sq. ft. restaurant 6,000 sq. ft. of health spa, 10,000 sq. ft. addition to the club house Replacement of three tennis courts Practice area enhancements Landscape amenities at the Country Club entrance drive

4. Current Proposal The Los Coyotes Country Club Development Plan 125 private residential condominiums 10,000 sq. ft. addition to the club house Replacement of two tennis courts Practice area enhancements Landscape improvements at the Country Club entrance drive and parking lot

4. The Los Coyotes Country Club Development Plan A - Residential 7.9Acres C - Clubhouse Improvements 6.8Acres B Entrance Landscape Amenities 1.2 Acres D - Practice Area Enhancements 5.9Acres

4. The Los Coyotes Country Club Development Plan A - Residential

4. The Los Coyotes Country Club Development Plan A - Residential

4. Planning Documents General Plan and Zoning General Plan long range 25-30 year horizon contains goals and policies Zoning day to day implementation of General Plan specific rules

4. General Plan

4. General Plan

4. General Plan

4. Current General Plan General Plan Designation: Open Space General Plan Policy OSR-4.7 Allow for additional uses at the Los Coyotes Country Club including hospitality hotel, spa, golf course-oriented residential dwelling units, and other golf-related amenities. No changes to General Plan

4. Zoning Map

4. Zoning Map

4. Current Zoning Designation OR Recreational Open Space To provide for recreational activities located in or using substantial open space.

4. Allowed or Conditionally Allowed Uses in the OR Zoning Designation Golf Course Public Park Indoor and Open Air Theaters Dance Hall, Entertainment Restaurant Race Track, Rodeo Theme Recreational Park

4. The Los Coyotes Country Club Development Plan Applications and Requests Request City initiate a Text Amendment Development Agreement Application - Architectural Design Guidelines Tentative Tract Map Application All being processed together

4. The Los Coyotes Country Club Development Plan Zoning Text Amendments Can be Initiated by: 1. Community Development Director 2. Planning Commission or 3. City Council

4. Proposed Zoning Text Amendment Initiated February 11, 2014 by City Council If approved -Amend Zoning Code Table 19.612.010 Proposed text to be added to use table: Luxury Golf Course-Oriented Dwelling Units

5. Environmental Impact Report Community Meeting October 13, 2014 Community Development Department

5. CEQA California Environmental Quality Act Inform public and decision-makers about the potential significant environmental impacts Identify ways to avoid or reduce significant impact(s) Minimize impacts by using feasible alternatives and mitigation Disclose the reasons a project is approved even if it will have some impacts

5. CEQA Preliminary Evaluation Is the action a discretionary project? Is the project exempt? Is there a possibility that the project may have a significant impact? What is the appropriate document?

5. CEQA Levels of Environmental Review Exempt Negative Declaration (ND) Mitigated Negative Declaration (MND) Environmental Impact Report (EIR)

5. How do you determine which level of CEQA document? Conduct Initial Study (IS) - a checklist of items to determine level of environmental review (strongly recommended but not required) OR Jump right to highest level Environmental Impact report (skip the initial study)

5. Environmental Impact Reports 2 main types 1. Program EIR For projects with only conceptual or schematic plans 2. Project EIR For projects with more detailed specific plans

5. Environmental Impact Report Process Notice of Preparation (NOP) Scoping sessions Preparation of the Draft EIR (DEIR) Public Notice of Completion of DEIR Public comment period of DEIR Public hearings Final EIR (FEIR) FEIR Certification//Project Approval Notice of Determination (NOD)

5. Environmental Impact Report Executive summary Project description General Contents Environmental setting baseline Project s significant adverse environmental effects and mitigation measures Analysis of reasonable range of alternatives Analysis of project s growth inducing impacts and cumulative impacts

5. Environmental Impact Report Typical Impact Analysis Issues Aesthetics Agriculture Air quality Biology Cultural Resources Energy Geology Greenhouse Gas Emissions Hazards & Hazardous Materials Hydrology/Water Quality Land Use & Planning Mineral Resources Noise Population & Housing Public Services & Utilities Recreation Transportation/Traffic

5. Environmental Impact Report Determine significance criteria Evaluate impacts Impact Analysis Identify and recommend feasible mitigation measures for each impact

5. Environmental Impact Report Cumulative Impact The DEIR must analyze the project in the context of the big picture Cumulative impacts refer to 2 or more individual impacts that, when considered together, are considerable Can result from individually minor but collectively significant projects taking place over a period of time

5. Environmental Impact Report Effective ways to comment on Draft EIR Comments presented (preferably in writing) prior to the close of the final public review period. Should be clear and concise Should include factual information upon which comment is based Not based on speculation or unsubstantiated opinion

5. Environmental Impact Report Agency Requirements in Response to Comments and Final EIR List of commenters Written responses to comments received that address the adequacy of the Draft EIR Prepared Responses must include good-faith reasoned analysis Make Text revisions to Draft EIR No separate review period required Provide written response to commenting agencies 10 days prior to certification

5. Environmental Impact Report CEQA s Mandatory Findings - avoid or minimize environmental damage where feasible through mitigations and project alterations OR - Provide economic, social, technological or other considerations that override the identified impacts that can t be mitigated Prepare Statement of Overriding Considerations - Must be based on substantial evidence and must provide reasons

6. Los Coyotes Country Club Development Plan Draft Environmental Impact Report Community Meeting October 13, 2014 Community Development Department

6. The Los Coyotes Country Club Development Plan DEIR Released: October 30, 2014 Public Comment Period: November 28, 2014

6. The Los Coyotes Country Club Development Plan DEIR Impact Analysis Issues Aesthetics Agriculture Air quality Biology Cultural Resources Energy Geology Greenhouse Gas Emissions Hazards & Hazardous Materials Hydrology/Water Quality Land Use & Planning Mineral Resources Noise Population & Housing Public Services & Utilities Recreation Transportation/Traffic

6. The Los Coyotes Country Club Development Plan DEIR Impact Analysis Issues Aesthetics Agriculture Air quality Biology Cultural Resources Energy Geology Greenhouse Gas Emissions Hazards & Hazardous Materials Hydrology/Water Quality Land Use & Planning Mineral Resources Noise Population & Housing Public Services & Utilities Recreation Transportation/Traffic

6. The Los Coyotes Country Club Development Plan DEIR Areas Requiring Mitigation Air Quality / Greenhouse Gas Biological Resources Cultural Resources Hazards and Hazardous Materials Hydrology Noise

6. The Los Coyotes Country Club Development Plan DEIR Air Quality / Greenhouse Gas Mitigation Measure Restriction on type of paint Routine watering during grading activities

6. The Los Coyotes Country Club Development Plan DEIR Biological Resources Mitigation Measure Inspect trees for nesting birds prior to removal If nesting is detected, prepare a plan to preserve tree during nesting period

6. The Los Coyotes Country Club Development Plan DEIR Cultural Resources Mitigation Measure If human remains are encountered during grading, construction will cease and the Orange County Coroner will be contacted. If paleontological resources are encountered, all construction activity shall cease and a qualified paleontologist will prepare an immediate evaluation of the resource.

6. The Los Coyotes Country Club Development Plan DEIR Hazards and Hazardous Materials Mitigation Measure Appropriate removal of all identified leadbased paint. Appropriate removal of all identified asbestos. Appropriate removal of all identified Mercury.

6. The Los Coyotes Country Club Development Plan DEIR Hazards and Hazardous Materials Mitigation Measure The building plans shall be submitted to the Orange County Airport Land Use Commission to ensure height compliance.

6. The Los Coyotes Country Club Development Plan DEIR Hydrology Mitigation Measure Water Quality Management Plan shall be approved. SWPPP shall be approved. Submittal of a hydrology/hydraulics report All hazardous materials stored on the project site shall comply with all applicable local, state, and federal laws.

6. The Los Coyotes Country Club Development Plan DEIR Noise Mitigation Measure An acoustical report showing a temporary sound barrier to reduce noise levels at the west property line of the adjacent residents to a maximum of 70 CNEL. The sound barrier shall be installed prior to the start of construction and maintained during construction in Zone D.

6. The Los Coyotes Country Club Development Plan DEIR Areas Not Requiring Mitigation Traffic Aesthetics Geology Land Use & Planning Public Services, Utilities, and Recreation

6. The Los Coyotes Country Club Development Plan DEIR Traffic Analysis

6. The Los Coyotes Country Club Development Plan DEIR How is a traffic study constructed? 1. Average Daily Trip Counts 2. Intersection Counts

6. The Los Coyotes Country Club Development Plan DEIR

Traffic ADT Count Dates June 3 June 8, 2012

6. The Los Coyotes Country Club Development Plan DEIR

6. The Los Coyotes Country Club Development Plan DEIR

6. The Los Coyotes Country Club Development Plan DEIR

Traffic Intersection Count Dates June 4, 2012 June 9, 2012 May 21, 2013

6. The Los Coyotes Country Club Development Plan DEIR

6. The Los Coyotes Country Club Development Plan DEIR Trip generation Summary Trip Generation ADT Low-Rise Condo/Townhouse 988 Office 6 Meeting Space 950 Total Average Daily Trips (24 hours) 1944

6. The Los Coyotes Country Club Weekday Trip Generation Development Plan DEIR AM PM Low-Rise Condo/Townhouse 84 97 Office 3 4 Meeting Space 65 59 Total Peak Hr 152 160

6. Roadway Performance Standards Run data through traffic models Traffic volumes projected over short and long range Vehicle carrying ability of a roadway or intersection Ratio between volume and capacity of intersections and roadways and delay determines levels of service (LOS)

Thresholds of Significance 1. Increases delay by more than 2 seconds per vehicle and the delay exceeds the performance standard 2. Increases the Intersection Capacity Utilization (ICU) by.02 or more and value exceeds the performance standard of the intersection

6. The Los Coyotes Country Club Development Plan DEIR Traffic Impact Study Conclusion The proposed project would have no significant impact on the circulation system under existing, short-range and long-range conditions.

6. The Los Coyotes Country Club Development Plan DEIR Conclusion The EIR concludes that all potentially significant environmental impacts can be reduced to a level of environmental insignificance. The final project design will be modified to include the mitigation measures.

6. The Los Coyotes Country Club Development Plan DEIR Notice of Preparation - March 27, 2013, Scoping session - April 4, 2013 Second Notice of Preparation - December 13, 2013 Preparation of the Draft EIR Notice of Completion September 30, 2014 Public notice - September 30, 2014 Public comment period - September 30, 2014 to November 28, 2014 Public hearings - Early 2015 Final EIR FEIR Certification Notice of Determination

7. How to Participate Community Meeting October 13, 2014 Community Development Department

7. The Los Coyotes Country Club Development Plan How to Participate? Comment on Draft EIR Attend Community Meeting Meet with City Staff Attend Public Hearings

8. Meeting Recap Q & A Community Meeting October 13, 2014 Community Development Department

Los Coyotes Country Club Development Plan Community Meeting October 13, 2014 Community Development Department

What is a traffic impact anaylsis? Community Meeting October 13, 2014 Community Development Department

Simple Trip Generation Example 10 = Daily Trip Generation Rate for a Single Family Home 10 = Homes being built (called Dwelling Units ) Homes are the Independent Variable How many daily trips do we project? 100

ITE Trip Generation Report Not a manual National data Florida, Arizona and California, played big role Suburban locations with little or no transit Some small sample sizes for new (though important) uses Discount clubs (861) Stand-alone drug stores (881) May not work downtown

What is a Trip End? Number of trips that come in or go out of a development (Volume at Driveways) one trip two trips A trip end is a single or one-direction vehicle movement with either the origin or destination (exiting or entering) inside the study site.

Journey/Trip/Trip Ends 2 TRIP ENDS 2 TRIP ENDS Start Stop 1 Journey (Home-Work-Shops-Home) 3 Trips (Home to Work) (Work to Shops) (Shops to Home) 6 Trip Ends (2 Per Trip) ONE TRIP 2 TRIP ENDS

How Are Trip Generation Rates Determined? Traffic is counted at each entrance of a certain land use. Traffic is then studied in relation to the size of certain independent variables. Tube laid 1,000 10,000 sq ft store 250 employees

Sample Page From ITE

Land Use (ITE Code) Time Period Independent Variable Trip Generation Rate 6.72

Apartment PM PEAK Adjacent Street Traffic

Acceptable 6. Levels of Service

6. The Los Coyotes Country Club Development Plan DEIR

6. The Los Coyotes Country Club Development Plan DEIR

6. The Los Coyotes Country Club Development Plan DEIR

6. The Los Coyotes Country Club Development Plan DEIR