POLICY FOR CONSTRUCTION OF NOISE BARRIERS IN RESIDENTIAL AREAS

Similar documents
MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM

Draft Dulles Toll Road Highway Noise Policy

Draft Noise Abatement Guidelines

Why does MnDOT build noise barriers? What is a Type I project? What is an impacted location?

Why does MnDOT build noise barriers? What is a Type I project?

dministrator Wyoming Department of Transportation Federal ighway Administration Wyoming Division

Traffic Noise Introduction to Traffic Noise Analysis and Abatement

Dulles Toll Road Highway Traffic Noise Policy. February 2, 2011

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

Traffic Noise Analysis

Virginia Department Of Transportation. Highway Traffic Noise Impact Analysis Guidance Manual

ARTICLE 38: AIR QUALITY ASSESSMENT AND VENTILATION REQUIREMENT FOR URBAN INFILL RESIDENTIAL DEVELOPMENTS

CITY OF AIRDRIE. Transportation Noise Policy

1. Introduction Noise Analysis Results Figures. List of Tables

Noise Analysis Study along I Tim Bjorneberg Project Development Program Manager SDDOT

NOISE STUDY REPORT. for the WEKIVA PARKWAY (SR 429)/SR 46 REALIGNMENT PD&E STUDY. Orange, Lake, and Seminole Counties, Florida

APPENDIX C NOISE STUDY TECHNICAL REPORT

CITY OF ASHLAND REDEVELOPMENT PLAN FOR THE ASHLAND INVESTMENT CO., LLC HOUSING DEVELOPMENT

TRAFFIC NOISE Noise and Policy. Date. Date. Footer Text

2.2. The intent of the Surface Transportation Noise Policy is to provide the following: The responsibility for providing noise attenuation.

LOCATION AND DESIGN DIVISION

DECISION REGARDING NEED FOR ENVIRONMENTAL IMPACT STATEMENT

MAY 4, Noise Barrier Presentation NE Quadrant Smith Avenue, Cherry Hill Circle NOISE BARRIER ABUTTER MEETING. Tech Environmental, Inc.

Traffic Study Guidelines

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

THE CORPORATION OF THE CITY OF PORT COQUITLAM BYLAW NO. 3876

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM

CHAPTER 26. REGIONAL MOBILITY AUTHORITIES SUBCHAPTER A. GENERAL PROVISIONS SUBCHAPTER B. CREATION OF A REGIONAL MOBILITY AUTHORITY

SOUND TRANSIT STAFF REPORT MOTION NO. M Link Noise Mitigation Policy

LOCATION AND DESIGN DIVISION

M E T R O P O L I T A N W A S H I N G T O N A I R P O R T S A U T H O R I T Y. Dulles Toll Road Highway Noise Wall Program

PUBLIC HEARING LOOP 9

Highway Traffic Noise: Analysis and Abatement Guidance

Title 15 BUILDINGS AND CONSTRUCTION

The Board of Finance of Baltimore City Department of Finance Bureau of Treasury Management

Northwest State Route 138 Corridor Improvement Project

PROGRAMMATIC AGREEMENT FOR APPROVAL OF CERTAIN CATEGORICAL EXCLUSIONS

COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA DEVELOPMENT POLICIES

5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN

NJTA Procedures Manual SECTION 1 POLICIES. Table of Contents Page No 1.1 GENERAL NEW JERSEY STATUTES...1

Chapter 21. Noise BACKGROUND

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

Qualitative Hot Spot Analysis for PM2.5 February 4, 2008

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION

MOUNTAIN VISTA SUBAREA PLAN FORT COLLINS, COLORADO TRAFFIC NOISE EVALUATION REPORT

APPENDIX A. NEPA Assessment Checklist

MAINTENANCE OF TRAFFIC NOTES

Texas Department of Transportation Page 1 of 9 Request for Information

Ohio Department of Transportation

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

City of Palo Alto (ID # 6096) City Council Staff Report

LOCATION AND DESIGN DIVISION

MnDOT Noise Policy. Type I Federal-aid Projects

APPENDIX C NOISE STUDY TECHNICAL REPORT

12-1 INTRODUCTION 12-2 REGULATORY REQUIREMENTS

Traffic Noise Presentation

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SANTA CRUZ LOCAL AGENCY FORMATION COMMISSION SPHERES OF INFLUENCE POLICIES AND GUIDELINES

NOISE CONTROL STUDY FOR PHOENIX HOMES 3654 & 3658 JOCKVALE ROAD APRIL 28, 2011 REV 1 TABLE OF CONTENTS 1.0 INTRODUCTION BACKGROUND...

Hamilton Rapid Transit Preliminary Design and Feasibility Study

COMPONENTS OF THE NOISE ELEMENT

Noise Compliance Requirements for Distribution Transformers

Federal Aid Project #RPHP21L-0484(001) MERCED CAMPUS PARKWAY

ORDINANCE NO. _5063. The Board of Supervisors of the County of Santa Cruz ordains as follows: SECTION I

RS-2 District Schedule

Suncoast Parkway 2/SR Toll 589 FPID: & 3, -4

Staff Report. Staff believes that this second meeting provides that opportunity.

Installation of a noise wall on Provincial land on the east side of Deerfoot Trail SE south of Highway 22X.

Airborne Noise and The New NY Bridge Project

Zoning Permits 11-1 ZONING PERMITS

Douglas Woods Wind Farm

LEED for Homes Approved ID Request:

Department of Planning Services Division of Planning Phone: 302/ FAX: 302/

LANE CLOSURE GUIDELINES

BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

Categorical Exclusion (CE)

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:

NOISE STUDY REPORT DESIGN ADDENDUM

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES

Appendix M. Noise Assessment

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

ADMINISTRATIVE DESIGN REVIEW (ADR) An applicant s guide to the process

Chapter 21 Stormwater Management Bylaw

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS

Standard Performance Attributes for Transportation Projects

Appendix K. Environmental Noise Assessment

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation

Subpart C_Roadway Worker Protection

Appendix D Highway Traffic Noise Assessment

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

STATE PERSONNEL SYSTEM

1.0 Purpose. 2.0 Scope

CHAPTER 2 - TRAVEL DEMAND MODEL DEVELOPMENT

The requirements set forth in this Section shall govern the construction and/or installation of all Renewable Energy Systems:

FIGURE N-1 LAND USE COMPATIBILITY FOR NEW DEVELOPMENT NEAR TRANSPORTATION NOISE SOURCES

Draft Noise Study Report

PRACTITIONER S HANDBOOK

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program

Transcription:

POLICY FOR CONSTRUCTION OF NOISE BARRIERS IN RESIDENTIAL AREAS I. Introduction Effective Date: October 31, 2006 The New Jersey Turnpike Authority (the Authority ) has reviewed and reexamined its current Policy for Construction of Noise Barriers in Residential Areas (the Policy ) to consider appropriate modifications and updates that reflect current state-of-the-practice criteria and procedures. The Policy was developed to set forth the circumstances under which noise barriers should be considered for construction at Authority expense along residential areas in proximity to the Authority Roadway System. This Policy clarifies and updates the criteria to be used for determining eligibility for noise barrier consideration, as well as the criteria to be used to identify the appropriateness of actual noise barrier construction. Although the Authority is not bound by State or Federal law to construct noise barriers, the Authority s Board of Commissioners has determined that residential areas located in proximity to New Construction or Widening Projects that meet identified eligibility criteria set forth herein should appropriately be considered for the construction of noise barriers. This Policy supersedes any and all previous noise barrier policies adopted by the Authority. 1

II. Definitions A. Authority Roadway System. The Authority Roadway System includes the New Jersey Turnpike travel lanes, ramps, toll plazas and other Turnpike facilities used to carry traffic from milepost 0.0 south of Interchange 1, to and including the I-95 section of the Turnpike at milepost 122.0, including: 1) both the eastern and western alignments above Interchange 15E; 2) the Newark Bay Hudson County Extension; and 3) the Pearl Harbor Memorial Turnpike Extension. The Authority Roadway System also includes the Garden State Parkway travel lanes, ramps, toll plazas and other Parkway facilities used to carry traffic from milepost 0.0 to milepost 172.4. B. New Construction or Widening Project. A New Construction or Widening Project is any construction project that results in a new roadway or the widening of any portion of the Authority Roadway System. C. Roadway. Roadway consists of travel lanes, ramps, toll plazas or other Authority Roadway System facilities used to carry traffic, excluding parking areas, service areas, shoulders, and any other Authority facilities not used primarily to carry traffic. D. Home. A Home is any house, dwelling unit, structure or building used, and intended for use as a permanent residence or permanent place of habitation for one or more individuals or families, regardless of the form of ownership. E. Existing Homes. Existing Homes are those homes which either: (1) physically exist at the time of the Announcement of the New Construction or Widening Project by the Authority; or (2) have received a building permit or are part of a development that has received final subdivision or site plan approval prior to the Announcement of the project, and where that permit or approval is valid and in full force and effect at the time of the Announcement of the project. An Existing Home consists of the actual structure and does not include any attachments thereto. 2

F. Design Year. The Design Year is the year identified and used as the basis of operational design for a New Construction or Widening Project. The Design Year is chosen on a project-specific basis. G. Benefit. A Benefit of noise barrier construction is considered to occur whenever the exterior of a home receives at least a three (3) db(a) Leq noise level reduction. Any home that meets either or both of the criteria defining a noise impact in Section III.A of this Policy and that will receive a 3 db(a) Leq noise level reduction, is considered to count as one full benefit credit. Any home that does not meet either of the criteria defining a noise impact in Section III.A of this Policy but that will receive a 3 db(a) Leq noise level reduction is considered to count as one-half benefit credit. H. Announcement. The Announcement of any New Construction or Widening Project shall consist of a written notice published in two (2) newspapers of general circulation within the area of the New Construction or Widening Project. The written notice shall contain the following information: (i) a clear indication of the Authority s intention to undertake the project; (ii) a brief description of the project; and (iii) the location of the project, including the municipality and county. An Announcement may take the form of: (i) a legal notice or (ii) a formal article/press release issued by the Authority satisfying the above requirements. The Announcement of any New Construction or Widening Project shall be issued at any time prior to or during the initiation of the design phase of the project. III. Criteria for Construction of Noise Barriers A. The Authority shall only consider construction of noise barriers as part of a New Construction or Widening Project. In order for noise barriers to be considered, either of the following conditions must be met: 3

1. Noise levels must be projected by the Authority to exceed 66 db(a) Leq in the Design Year during the peak noise hour at the exterior of Existing Homes located in proximity to the Authority Roadway System. 2. Noise levels must be projected by the Authority to increase by at least 10 db(a) Leq from the existing year-of-study condition (baseline) to the Design Year during the peak noise hour at the exterior of Existing Homes located in proximity to the Authority Roadway System. B. Should either of the above conditions be met, the Authority shall consider the construction of a noise barrier. Actual construction of a barrier shall be conditioned upon the proposed noise barrier meeting all of the following conditions: 1. A reduction of ten (10) db(a) Leq below noise levels projected to exist during the Design Year of the New Construction or Widening Project is the design goal to be considered for any proposed noise barrier when reasonable and cost-effective. However, a reduction of five (5) db(a) Leq below noise levels projected to exist during the Design Year of the New Construction or Widening Project is the minimum reduction to be achieved for any proposed noise barrier. This minimum reduction must be capable of being achieved at the exterior of the Existing Home(s) located adjacent to the New Construction or Widening Project. 2. The construction cost of the proposed noise barrier must not exceed $50,000 per dwelling unit to receive Benefit. 3. Construction of the proposed barrier must be feasible from an engineering perspective in the sole opinion of the Authority. 4

4. The height of the barrier shall not exceed eighteen (18) feet, unless the Authority s Executive Director determines that extraordinary circumstances justify a higher barrier in a particular case. 5. Any other factors or procedures deemed necessary or appropriate by the Authority s Executive Director. IV. Noise Analysis Procedure Although no Federal funds are anticipated for any noise barrier construction resulting from determinations made in accordance with Section III of this Policy above and, therefore, compliance with Federal Highway Administration (FHWA) noise abatement requirements and procedures are not specifically required, it is the Authority s intent to conduct noise analyses under this revised Policy in general accordance with FHWA s procedures established for residential areas in 23 CFR Part 772 and the document entitled Highway Traffic Noise Analysis and Abatement: Policy and Guidance (1995). V. Public Involvement A. A Public Hearing and comment period conducted pursuant to, and in accordance with the requirements of Executive Order No. 172 shall be conducted by the Authority for any New Construction or Widening Project prior to construction of same, including any noise barriers proposed to be included as a part thereof. B. The Authority shall request a formal resolution of the governing body of any municipality within which noise barriers have been deemed eligible pursuant to this Policy. The Authority shall not construct any noise barrier without the support of the local governing body, as evidenced through the adoption of a formal resolution. The Authority shall request a formal resolution of the governing body with the transmittal of engineering plans depicting the proposed location and height of the proposed noise 5

barrier(s). Engineering plans shall be transmitted by the Authority to the municipal clerk of the affected municipality. A formal resolution in support of the construction of any noise barrier must be provided to the Authority within four (4) months of the Authority s request for same. VI. Land Use Planning The Authority encourages the use of rational local land use planning within general proximity of the Authority Roadway System. The Authority s Executive Director has the discretion to encourage municipalities located along the Authority Roadway System to implement effective land use controls which consider noise levels generated by roadway traffic in its subdivision and site plan approvals process. 6