Distributed Gas Connections Guide September 2017

Similar documents
Biomethane Gas Monitoring Systems

Ireland s renewable gas potential

Potential of farm scale biogas to grid in Ireland

Hunter Ward June 20 METERING SOLUTIONS FOR RENEWABLES & ALTERNATIVE FUELS INDUSTRY

IGU Global Gas Award Competition. Opening up the Gas Market

Explaining the Renewable Heat Incentive in Ireland. Frank Groome Energy in Agriculture 22 August 2017

Renewable Heat Incentive Guidance Volume Two: Ongoing obligations, payments

in relation to Anaerobic Digestion

Modelling of Biogas Supply Chains Ida Græsted Jensen. Department of Management Engineering, Systems Analysis

Canadian Biogas Metrics Study: Quantifying the Economic, Environmental and Social Benefits of Biogas Energy in Canada

Canadian Biogas Study: Quantifying the Energy, Environmental and Economic Benefits of Biogas in Canada

What will be the new scenario in Italy with the approval of the regulation on biomethane? Davide Valenzano - Federica Ceccaroni

RE: Renewable Gas Forum Ireland Opening Statement & Executive Summary

(c) Tertiary Further treatment may be used to remove more organic matter and/or disinfect the water.

A GUIDE TO THE GB RENEWABLE HEAT INCENTIVE SCHEME.

Renewable Heat Incentive Guidance Volume One: Eligibility and how to apply

Long Term Development Statement 2017

Agri-Gas-Grid The Opportunity for Ireland s Agri Sector

Brent Gloy, April

Methane and California s Livestock Operations. Rachel Tornek, Policy Director California Methane Symposium, Los Angeles March 12, 2015

Low-carbon heating of homes and businesses and the Renewable Heat Incentive

Piggery Digester Systems

Consultation on an EU strategy for liquefied natural gas and gas storage

Small Scale Digester Case Study: Peters/USEMCO Anaerobic Digester

Renewable Heat Incentive Schemes. Neil Witney Renewable Heat Premium Payment

Manure Management Program

A tognum Group Brand COMBINED HEAT AND POWER FROM BIOGAS

Impact of support incentives on biogas market - Experiences from Germany

CENTRAL DATA SERVICES PROVIDER ANNUAL CHARGING STATEMENT. For the period 1 st APRIL st MARCH 2019

Supplementary evidence to the Scottish Parliamentary Committee on Economy, Jobs and Fair Work: CCS and heat

Introduction of service pipe alterations and disconnections by Authorised Utility Infrastructure Providers (UIPs) (UIP/GT Briefing Note 5)

Focus on Energy s Biogas Feasibility Study Grants for Anaerobic Pretreatment and Anaerobic Digester Facilities

Inveraray to Crossaig Overhead Line Reinforcement

Company specific addendum

INNOVATING GAS SOLUTIONS FOR FOCUSED ACCURACY

Why consider AD? Definitions: What can be digested? 8/8/2016

ETI progress in gasification Targeting new & cleaner uses for wastes & biomass using gasification

GCE Environmental Technology. Energy from Biomass. For first teaching from September 2013 For first award in Summer 2014

Anaerobic Digestion Of MSW Organics 2011 ASTSWMO Solid Waste Managers Conference Kansas City, Missouri Nora Goldstein, BioCycle

National Transmission System Gas Connection Application Guide

Non Registered Embedded Generation Information Pack

Global Challenges in Energy: Comparison between UK and India

Biogrid; an affordable alternative for a sustainable future

RENEWABLE GAS. Driving Emissions Reductions for California s Clean Energy Future. Innovation

DECC CONSULTATION RESPONSE: RO Grace periods consultation

Sustainable Family Farming through Innovation

Gasification Power / Heat & Power Pure Heat. Pure power generation only up to 40% efficient.

1. How can Ofgem ensure that sharper Cash Out incentives from the Significant Code Review:

New Ways to Energy. Energy Production of Renewable Resources and Bio-Waste in Biogas Plants. Hese Biogas GmbH Hese Biogas GmbH

Renewable Energy - A technology overview and the new Feed in Tariffs. Jos Mister Energy Saving Trust

Renewable Heat Incentive Scheme. FAQs. Index. General aspects about the RHI...Page 2. Eligible technologies tariff Table:...Page 3

Covered Anaerobic Ponds for Anaerobic Digestion and Biogas Capture: Piggeries

RENEWABLE NATURAL GAS

What is Bioenergy? William Robinson B9 Solutions Limited

Key performance indicators to underpin Scottish climate change policy

City of Sydney Gasification Project

Gas Network Innovation Strategy at a glance. March 2018

Renewable Gas Forum Ireland

Welcome To Our Exhibition

Biowaste in the Circular Economy. Henrik Lystad, Chair European Compost Network ECN e.v.

RENEWABLES IN SEVERN TRENT WM Public Sector Sustainability & Energy Network

Cadent process changes for introduction of the Gas Industry Registration Scheme (GIRS) and IGE/TD/101 (UIP/GT Briefing Note 2)

Joint Office of Gas Transporters 0212: Revision of the Rough Storage Connection Agreement

DCC Business Case for DCC activities during the Transitional Phase of the Switching Programme

Biogas Conference Kolding, DK, 04 April 2017 BINDER. Biogas Monitoring Why and How? Jan Talkenberger, Manager International Sales, Binder GmbH

Overview of Biogas Technology

ANAEROBIC DIGESTION A TOOL FOR RECYCLING ORGANICS

THE ITALIAN BIOMETHANE

COMMISSION STAFF WORKING PAPER

Biogas Upgrading Plants.

Bioenergy New Zealand

GUIDEBOOK RENEWABLES PORTFOLIO STANDARD ELIGIBILITY SECOND EDITION CALIFORNIA ENERGY COMMISSION MARCH 2007 CEC CMF

BIOGAS TECHNOLOGY FOR POVERTY REDUCTION AND SUSTAINABLE DEVELOPMENT B P NEMA. Principal Scientist. Central Institute of Agricultural Engineering

7624 Riverview Road Cleveland, Ohio

PETRONAS GAS BERHAD NETWORK CODE FOR PENINSULAR GAS UTILISATION TRANSMISSION SYSTEM

German Roadmap for Biomethane.

STATEMENT OF CHARGES FOR CONNECTION TO NORTHERN IRELAND ELECTRICITY NETWORKS DISTRIBUTION SYSTEM. Effective from 1 st October 2017 Version 1.

Biogas Upgrading & Bottling Experience in Warna Sugar Mills

STRATEGIC INTEGRATION OF BIOMETHANE IN THE GAS GRID. Andreas Kunz Leiter Realisierung Erneuerbare Energien

RENEWABLE ENERGY & BIOFUELS CAPABILITY STATEMENT

Kompogas dry anaerobic digestion Energy from organic waste

Optimising biofuels/biomass use in the energy mix for various end use purposes EU examples

AGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM

Guaranteed Standards of Performance

Urban Renewable Biogas

A Biogas Decision Support System Tool

DISTRICT HEATING & HEAT NETWORKS PRESENTATION

Integrating Anaerobic Digestion and Aerobic Composting. Tom Kraemer and Scott Gamble SWANA Northwest Symposium April 29, 2015

Kompogas Dry Anaerobic Digestion Energy from Organic Waste

Affinity Water Limited New Supplies

(SIDE EVENT) Toward the Establishment the Bilateral Offset Credit Mechanism (BOCM) Utilisation to Support the NAMA Implementation

Ultrasonic Technology for Accurate Flow Measurement of Biogas

Recycling Qualifications

Quality Protocol Biomethane from waste

MULTI-WASTE TREATMENT AND VALORISATION BY THERMOCHEMICAL PROCESSES. Francisco Corona Encinas M Sc.

Renewable Heat Incentive Consultation on the proposed RHI financial support scheme

Natural Energy Solutions

Innovations in the Gas Value Chain. Raphael Schoentgen CTO ENGIE & President Hydrogen Europe

DEVELOPING DECENTRALISED ENERGY SYSTEMS FOR URBAN REAL ESTATE SCHEMES

Ashbridges Bay Treatment Plant Biogas Cogeneration Proposal from Toronto Hydro Energy Services

Transcription:

Distributed Guide September 2017

Foreward 3 About SGN 3 The existing gas network 4 Who is involved in the gas market? 4 Foreward This guide is intended to help you, as the owner or developer of distributed gas, to connect your production facility to our network. The types of gas that connect to the network include coal bed methane, shale gas and biomethane. The process for connecting these gases is exactly the same however this guide primarily focuses on biomethane. Greening the gas 5 How it works 5 Legal requirements 7 How to get connected 7 Initial Enquiry 8 Capacity Study 8 Feasibility Study or Adopted Entry Facility 8 s 9 9 Network Entry 9 Useful references and contacts 10 SGN 10 Government bodies 10 Other references 10 Appendix 1 Process Flow Diagram 11 About SGN We manage the network that distributes natural and green gas to 5.9 million homes and businesses across Scotland and the south of England. Whoever your supplier is, our pipes deliver gas safely, reliably and efficiently to every one of our customers. It s your gas, in our network. We believe that the gas distribution networks will continue to play a crucial role in the domestic heating market and will provide the most cost-effective path for low-carbon transition with significant social benefits in terms of energy security and fuel poverty. SGN Distributed Guide 3

The existing gas network The UK benefits from one of the most extensive gas networks in the world which transports the energy to heat almost 85% of UK homes and the vast majority of industrial buildings. consumption greatly exceeds electricity consumption in UK homes, particularly during colder months. Natural gas is safe, reliable and convenient for rapid space and water heating. It can also assist those living in fuel poverty as a result of the low relative costs of gas compared to alternative heating systems. Who is involved in the gas market? The process of connecting any distributed gas to the network involves a number of parties, where commercial and contractual arrangements are required to be in place. The diagram illustrates this: Producers are responsible for producing the gas. The gas produced must meet the quality requirements set out in the Safety (Management) Regulations 1996. The producers must secure sales of their gas with a shipper before it can be injected into the grid. shippers convey gas in the pipeline network by contracting with gas transporters, such as SGN. shippers must have a Shippers Licence before taking part in any gas shipping actions. Distributed gas producer purchase contract Network Entry... Connection transporters own and operate the gas distribution network, using the infrastructure to transport the gas from producer to end consumer. Transporters may take responsibility for quality testing and gas metering. shipper Uniform Network Code transporter Suppliers are responsible for customer interaction and provide an interface for consumers to purchase their gas. Suppliers must have a Retailer Licence before engaging in any consumer contract. supplier customer Customers purchase gas for residential, commercial or individual use. They contract directly with gas suppliers to secure their gas. Greening the gas We refer to any source of sustainable and low-carbon gas as green gas. This can include substitute gas and hydrogen however currently most of the focus and growth is around biomethane. Biomethane is derived from biogas which is produced by anaerobic digestion. During this process, organic material is broken down in the absence of oxygen to produce biogas and digestate, a nutrient-rich fertiliser. Feed Slurry or manure Energy crops Fertiliser Collection pit Biowaste Digestion residue storage storage The most efficient use for this biogas is to clean it up and inject it into the gas network. Biomethane is regarded as a low-cost and scalable form of renewable and low carbon heat, which can help towards the country s energy goals. There are a number of independent studies which have shown the gas networks can be a major component of a low carbon energy system. We also know from our own research people are generally happy using gas for heating and so if Digester Biomethane fuelling station The gas to grid process using anaerobic digestion with farm feedstocks Biogas treatment plant To natural gas network we can decarbonise the gas flowing to people s homes, this then saves households from switching to other more expensive forms of low carbon heat in the future while allowing carbon targets to be met. Biomethane injection projects are currently supported by the government s Renewable Heat Incentive (RHI) which offers incentives to develop renewable heat technologies. The RHI is absolutely vital for green gas projects. How it works Biomethane for injection into the gas network is produced by cleaning and upgrading biogas that has been created through either an anaerobic digestion or gasification process. The biomethane may need propane to be added by the biogas producer to ensure it has the required energy content, prior to injecting into the network. To ensure the biomethane meets the requirements for the gas grid, it passes from the producer s plant through a Network Entry Facility where it is checked for both gas quality and energy content, before being metered and odorised to give it the characteristic smell. Before being injected into the gas network the biomethane must be sold to a gas shipper. Ofgem can provide details of licensed shippers. The Network Entry Facility can either be installed by us or the biomethane producer under the guidance of our Functional Design Specification (SGN/SP/BIO/2). If installed by the producer we will adopt as a minimum the Remotely Operated Valve (ROV), the Remote Telemetry Unit (RTU) and the connecting pipeline to the network. The diagram overleaf illustrates the equipment and potential ownership in a Network Entry Facility. It does not reflect the actual layout of the equipment on-site. 4 SGN Distributed Guide SGN Distributed Guide 5

Bio- production Clean-up and enrichment Pressure reduction Divert valve Pressure reduction Flare or recycle Flow meter Upstream controllers analysis and controllers (inc Supervisory PLC) Local Treatment (LGT) FWACV analyser Pressure reduction SGN control centre Remote Telemetry Unit (RTU) ROV controller (shutdown PLC) Remotely Operated Valve (ROV) PT Manual sample point Key flow sample line Control system Process/ROV function Divert valve function/process Requirements may vary Biomethane network entry facility Biomethane network entry facility SGN minimum adoption SGN network Legal requirements As part of our obligations as a gas transporter, we must offer conditions for gas entry points under section D12 of the Transporter Licence. Biomethane is considered a reliable source of energy, providing it meets all of the Safety (Management) Regulations (GS(M)R) 1996, which stipulate the quality of the gas that is acceptable. The amount of energy released when a volume of gas is burned is measured by the Calorific Value (CV) of the gas and must comply with The Calculation of Thermal Energy Regulations 1996 ( (COTE)R). Some gases have a lower CV than natural gas and in order not to disadvantage customers some enrichment may be required to be added to raise the CV. This will be site-specific, based on the feedstock and equipment being used. As with natural gas, the supply must be odorised so leakages can be detected. How to get connected In order for you to get connected to our network there are a number of steps that need to be followed: Initial Enquiry Form an indicative view on the potential for the distribution network to accept the entry capacity Capacity Study Undertake a detailed analysis of the distribution network to understand the drivers to deliver gas to the network Appendix 1 at the back of this guide provides an overview of the Distributed Process. There are a number of governmental bodies, who have responsibilities in the gas sector: The Department for Business, Energy & Industrial Strategy (BEIS) accountable for primary legislation of gas, such as the 1986 and 1995 Act, the Completion Act 1998, the Calculation of Thermal Energy Regulations 1996 and the GS(M)R 1996 mentioned above. The Office of and Electricity Markets (Ofgem) is responsible for the economic regulation of the gas market. The Health and Safety Executive (HSE) is responsible for the health and safety of the gas sector. The Uniform Network Code (UNC), a set of guidelines for all gas industry members that allows for market competitiveness, states that the biomethane producer must enter into a Network Entry (NEA) before gas may be injected into the grid. Adopted Entry Facility The delivery facility operator can design, procure and install the approved Entry equipment for the adoption of specific items by us or Feasibility Study Optional detailed technical study on the physical arrangements and estimated cost of making an entry connection by us For more information please see the useful references page at the back of this guide. s Formal agreement to undertake the work through a Network Connection (NCA) and Network Entry (NEA) 6 SGN Distributed Guide SGN Distributed Guide 7

Initial Enquiry The Initial Enquiry will provide the customer with an indicative view on the suitability of our distribution network to accept the volume of distributed gas indicated in the customer s submission. This service is free of charge. The Initial Enquiry response will include: The location of the main(s) in relation to the site The pressure of the main(s) The diameter and material of the main(s) The suitability of the main(s) to accept the volume of distributed gas. We will aim to provide this information within 15 working days from receipt of the Enquiry. Capacity Study The Capacity Study report builds on the information provided under the earlier Initial Enquiry response and develops detailed network analysis on a specific site location to understand any potential constraints on the distribution network. The Capacity Study report is chargeable and we will provide a quotation to undertake this work. The Capacity Study report will include: Location of the site Network schematics Photographs and maps, where appropriate Detailed information on the available capacity Any other relevant information. We will aim to issue the study within 30 working days of the receipt of an acceptance. Feasibility Study or Adopted Entry Facility There are now two choices that can be taken at this stage: 1. You can design and install the facility following the guidance in our Functional Design Specification (FDS), at the end of which we will adopt specific items of equipment; or 2. We can provide you with a Feasibility Study to carry out the design, procurement and installation of the Entry Facility. If you decide to follow the adopted route for the entry facility we will provide you with an FDS (SGN/SP/BIO/2) which gives you the technical requirements we would expect the facility to adhere to. Once the facility has been constructed, validated and commissioned we will adopt, as a minimum, the following pieces of equipment: Remotely Operated Valve Remote Telemetry Unit Connecting pipeline to our network. We support the competitive provision of any connecting pipeline; information on independent connection providers who hold Industry Registration Scheme (GIRS) membership can be found at the following website: www.lloydsregister.co.uk/schemes/girs/providers-list.aspx Following a request for a Feasibility Study, we will provide a quotation and upon receipt of an acceptance, carry out a technical assessment to determine the physical arrangement of the entry compound and the connecting pipeline to our distribution network, if applicable. The Feasibility Study will also provide an indication of the costs involved in installing the entry facility equipment and the connection to the network where one has been requested. The estimated timescale for completion of the Feasibility Study is 10 weeks but is dependent on the project complexity. s As previously indicated two scenarios exist for the construction of an Entry Facility and they both need to have a and Network Entry in place with us before gas can flow into our network. The two scenarios are described in more detail below. SGN Constructed Entry Facility Where we have been asked to construct the facility and, subject to a satisfactory Feasibility Study, we will prepare and issue for signature a. The will form the contractual arrangements to proceed with the detailed design and build of the project. The sets out both parties obligations for the on-site works associated with the physical entry connection into the gas distribution network. The operates on a cost pass through basis, inclusive of overheads. The construction phase will proceed after completion of the unless the developer terminates the agreement in accordance with its terms. We will have provided an estimate for the construction stage based on the findings of the Feasibility Study and payment is usually in the form of stage payments (subject to credit status) which reflect the cash flow requirements of the works, with a final reconciliation to be made after completion. Other costs such as easement payments to land owners to secure the pipeline route, unforeseen costs (such as poor ground conditions), and costs due to the actions of third parties or a change to the agreed scope of work are added to the base cost. We will provide the relevant documents to support such costs and, where applicable, programme changes. Adopted Entry Facility In the case of the Adopted Entry Facility a will require to be signed between both parties to ensure the installation is fit for adoption and has been designed and constructed in accordance with the FDS. The installation will also require validation and commissioning. There will be a charge associated with this process, which will form part of the agreement. As with the SGN-constructed entry facility other costs such as easement payments to land owners to secure the pipeline route, unforeseen costs (such as poor ground conditions), and costs due to the actions of third parties or a change to the agreed scope of work are added to the base cost. We will provide the relevant documents to support such costs and, where applicable, programme changes. Network Entry A Network Entry (NEA) sets out the technical and operational conditions for the connection. The NEA is agreed between the Delivery Facility Operator (DFO) and us and is normally discussed with the future operator of the Entry Facility in parallel with the connection process. As part of the Network Entry a risk assessment of gas quality (SGN/PM/GQ8) must be undertaken to understand more fully the implications on the distribution network. The timescales to complete these elements of the project can vary depending on the project complexity. 8 SGN Distributed Guide SGN Distributed Guide 9

Useful references and contacts To enquire about a distributed gas connection: Initial enquiry received from customer Undertake initial analysis and issue response to customer (D+15) Customer requests Capacity Study Appendix 1 Process Flow Diagram Call us 0131 469 1809 @ Email us colin.thomson@sgn.co.uk Prepare Adopted and Issue Functional Design Specification (FDS) Signed Capacity Study acceptance Prepare Capacity Study report and (D+30) Alternatively please contact our Customer Service team with any questions you have: Call us 0800 912 1700 If you are deaf or hearing impaired and have a minicom or textphone please contact us on 0800 372 787 @ Email us customer@sgn.co.uk Write to us SGN 2nd Floor Inveralmond House 200 Dunkeld Road Perth PH1 3AQ Government bodies Department for Business, Energy & Industrial Strategy Ofgem Fax us 0845 026 0016 Signed Customer constructs entry facility to FDS SGN adopts relevant entry equipment Initiate detailed design and build package and construct entry facility Adopted entry facility Prepare Feasibility Study quotation and Signed Signed Feasibility Study acceptance Prepare and Does customer wish to proceed? Prepare Feasibility Study report and Customer requests agreement Health and Safety Executive Environment Agency www To find out more about our charges, visit sgn.co.uk Other References Joint Office of Transporters Prepare Network Entry and Signed NEA End 10 SGN Distributed Guide SGN Distributed Guide 11