1. Outline of the Project Country:Ethiopia. Project title:the Capacity Development Issue/Sector:Transport. Project on Bridge Management (R/D):

Summary of Evaluation Results

The Capacity Development Project for Non Revenue Water Reduction in Jordan Summary Sheet for Result of Evaluation Study after the Project

Summary of Terminal Evaluation. 1.Outline of the Project. Management for the Municipality of Panama in the Republic of Panama

Informal Apprenticeship Training in Ghana

Summary Sheet for Terminal Evaluation

Summary of Terminal Evaluation

Summary of the Mid-term Review

I. Project Outline. Background. Objectives of the Project. Activities of the project

Malaysia Needs of Industries in Malaysia. I. Project Outline

Technical and Vocational Education & Training (TVET) Reform Project. Phase 1 Workplan (Dec 2007 Dec 2009)

Summary of Terminal Evaluation

Enhancing Entrepreneurship Skills in TVET Colleges and Polytechnics in Rwanda

CHRISTIAN HEALTH ASSOCIATION OF GHANA. Organisation and Management Arrangements Executive Secretariat

SKILL NEEDS ANTICIPATION AND MATCHING IN THE SOUTH EASTERN EUROPEAN COUNTRIES

Japan-Vietnam Joint Committee for Preventing Japanese ODArelated. (Anti-ODA-related Corruption Measures)

TECHNICAL ASSISTANCE

A Review of Constraints to Using Data for Decision Making. Recommendations to Inform the Design of Interventions

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Jun ,000,000.00

Foreign Economic Relations Department Ministry of Planning and Finance Government of the Republic of the Union of Myanmar

23 24 April 2012, La Canelle Rouge Domaine Les Pailles, Mauritius

Hitachi Research Institute Report Work Style Innovation Improving Added Value Hisato Kessoku, Associate Senior Researcher, 2nd Research Department


Human Resources Development and Training

MONITORING AND EVALUATION Appeal no /2003

Current Status of Economic Statistics in Cambodia

UNITED NATIONS DEVELOPMENT PROGRAMME Junior Professional Officer (JPO) JOB DESCRIPTION

The Evaluation Study on the Japan Overseas Cooperation Volunteers (JOCV) Program. Final Report (Summary)

REPUBLIC OF RWANDA MINISTRY OF EDUCATION

JICA Technical Cooperation on Low Carbon Development and Challenges of JCM in Indonesia

Gervacio G. Selda, Jr. Statistical Research and Training Center, Philippines

An Overview of ODA Evaluation. 1.1 Development of ODA Evaluation in Japan Japan s Measures on ODA Evaluation... 4

Ex-Ante Evaluation (for Japanese ODA Loan)

TVET Policy and Strategi on Harmonization and Internationalization of Vocational Secondary School Indonesia

National R2P Focal Points Recommendations

JICA s Cooperation for Rule of Law Promotion in Myanmar

Ref: SADC/2/3/3 Vacancy No 2 of 2017 SOUTHERN AFRICAN DEVELOPMENT COMMUNITY VACANCY ANNOUNCEMENT

THE SEOUL DECLARATION ON PARTICIPATORY AND TRANSPARENT GOVERNANCE 27 May 2005, Seoul, Republic of Korea

Functional Dimension 1. Functional Dimension 1

Investing in African Youth: The North African Experience. Macroeconomic Outlook: Challenges and Opportunities

Sebastien Tshibungu, National Expert in Aid Management and Coordination, UNDP DR Congo

Innovative Practices in TVET towards Education for Sustainable Development. County Paper. Maldives

Financial Management (FM) Harmonization Report and Guidance Note: Executive Summary. December 2012

Cattle Improvement Project Fields: Agricultural/Rural development- Agricultural Development

Towards a sustainable health workforce in the WHO European Region: framework for action

Directorate General of Economic statistics and the Directorate General of Social Statistics

Agenda 2030 Mainstreaming and Monitoring - Mauritius

Evidence-Based HR in Action

Europe s Universities in the European Research Area [1]

Summary of Terminal Evaluation

Effective Recovery after a Catastrophic Earthquake: Community, Financial and Environmental Collaboration

High-level Summary Report

RESULTS BASED MANAGEMENT POLICY

PARIS21-SADC WORKSHOP - STRATEGIC STATISTICAL PLANNING ACCRA, GHANA, JULY 27TH 28TH 2005 MEETING REPORT

JOB DESCRIPTION. Job title: Country Director Location: South Sudan. Department: Management Length of contract: 2 years. Role type: Global Grade: 12

Maldives: Employment Skills Training Project

Progressing and sharing experience in development evaluation Context

First Four Years National Artisan Development NAD: Next Six Years National-Provincial-Regional Artisan Development NPRAD:

Evaluation of the Feedback Mechanism of Japan s ODA March 2016 OPMAC Corporation

Sri Lanka: National Water Resources Authority

EMPLOYMENT OPPORTUNITY WITH EANNASO

Work plan for enhancing the management and administration of UNCTAD

Terms of Reference. Projects Outputs Evaluation

INDONESIA 1. Overview. Indonesia National Qualifications Framework. Quality assurance mechanisms Ministry of Manpower

National Skills Quality Assurance System

Distribution: Restricted EB 99/68/R November 1999 Original: English Agenda Item 9(c) English

CONSULTANT: Revision of Joint Programmes Guidelines

Small and Medium Enterprise Charter

Overview of Terminal Evaluation Study Results

Summary HEFCE operating plan for

AZERBAIJAN COUNTRY STRATEGY PAPER

Summary of the Joint Terminal Evaluation

1. Project Description

VACANCIES. In furtherance of UNFPA mandate in Ghana, the following personnel are needed to strengthen its operations:

Section 4. Efforts for Effective, Efficient, Open, and Transparent Procurement

Securing and Developing Human Resources for Nuclear Utilization: Initiatives and Prospects

Annex D. APEC Connectivity Blueprint for

N.B. Expected results below are for the period for more information see the FedNet Plan of Action (available on FedNet).

PortNet in Morocco: Creating a Strategic Alliance between Port and Foreign Trade Communities for a Competitive Economic Operator

Summary of Terminal Evaluation

Strengthening research capacities for the uptake of sustainable agriculture intensification

Public Private Partnership PPP & The Egyptian Experience

IFAD S PARTICIPATION IN THE HARMONIZATION INITIATIVE

Regional Development, Harmonisation and Internationalisation of TVET in the wake of AESEAN Economic Community (AEC)

Conference on "Skills and mobility for competitiveness" Brief summary

DETAILED PROJECT OUTLINE TECHNICAL ASSISTANCE PROJECT SUPPORTED BY THE UNITED NATIONS

TERMS OF REFERENCE FOR CONSULTING SERVICES

Programme Associate Gender Responsive Budgeting (GRB)* United Nations Entity for Gender Equality and the Empowerment of Women (UN WOMEN)

SDG Alliance 8.7. Joining forces globally to end forced labour, modern slavery, human trafficking and child labour

Standard for In-Company Trainers in ASEAN Countries. Effective In-Company Vocational Training in the Mekong Region

MODEC, Inc. Corporate Governance Guidelines

ENHANCED INTEGRATED FRAMEWORK. Concept Note. Sustainability of EIF Tier 1 projects to support National Implementation Arrangements (NIAs)

TIER II STANDARD FOR TECHNICAL COOPERATION ADMINISTRATORS INTRODUCTION

Mongolia: Reforms in Technical and Vocational Education and Training in Mongolia (Preparing the Skills for Employment Project)

Iraq Private Sector Development Center (PSDC)

Reform of the Ethiopian TVET System Towards a Suitably Skilled Work Force

Model Training Strategy for the Professionalization - Capacity Building of the Procurement Workforce

THE COMMONWEALTH SECREATARIAT SEEKS APPLICATIONS FOR REGIONAL TRADE ADVISOR (RTA) FOR AN ASSIGNMENT WITH PACIFIC ISLAND FORUM (PIF) SECRETARIAT

Third Party Evaluation Report 2011 Ministry of Foreign Affairs of Japan

Transcription:

Summary of Terminal Evaluation 1. Outline of the Project Country: The Republic of Ghana Issue/Sector: Technical and Vocational Education and Training Division in charge: JICA Ghana Office Period of Cooperation: From April 2007 to March 2011 Project title: Technical and Vocational Education and Training Support (TVETS) project Cooperation scheme: Project-type Technical Cooperation Total cost: 488 million JPY [approximately 5.9 million USD] Partner Country s Implementing Organization: Council for Technical and Vocational Education and Training (COTVET), three pilot institutions (ATTC, NVTI, A-Poly) Related Cooperation: -Development Study: The Study for Development of a Master Plan to Strengthen Technical Education in the Republic of Ghana 1-1. Background Since the JICA supported development of the master plan to strengthen technical education in the republic of Ghana 2001, the Technical and Vocational Education and Training (TVET) sub-sector has been under reform. The reforms have aimed to strengthen TVET delivery to be demand driven and practical through the adoption of the competency-based training (CBT) method. These efforts culminated in the establishment of the Council for Technical and Vocational Education and Training (COTVET); to co-ordinate and oversee technical and vocational education and training in the country and to provide for related matters COTVET Act 2006 (Act 718), assented by the president of the Republic of Ghana in August 2006. As part of efforts to reform, the Technical and Vocational Education and Training Support (TVETS) project was requested by the Ghana government. The project s aim being to strengthen the implementation capacity of the COTVET and its related institutions for introducing CBT in TVET delivery in Ghana; by strengthening the organizational capacity of TVET implementing institutions for formulating necessary operational guidelines on TVET through human resource development, and by piloting CBT on mechanical engineering at TVET training institutions, leading to the formation of a National TVET Qualifications Framework and Qualification Accreditation System under COTVET. For these project purpose and outputs, the Project selected three TVET institutions, namely, Accra Technical Training Center (ATTC), National Vocational Training Institute (NVTI) and Accra Polytechnic (A-Poly), to conduct pilot activities in order to reflect the lessons learned onto formulation of effective institutionalization. The Record of Discussions of the project was signed by both governments on 2nd April 2007 for a period of 4 years. Responding to the Discussions, the Project commenced in April 2007 and will be

terminated in March 2011. 1-2. Project Overview (1) Overall Goal: 1. Increased number of TVET Training Institutions with CBT. 2. Qualification Accreditation System is operational. (2) Project Purpose: To strengthen implementation capacity of COTVET and its related institutions for introducing CBT at TVET training institutions in and out of Accra, leading to forming a National TVET Qualifications Framework and Qualification Accreditation System under COTVET (3) Outputs: Output 1: COTVET is established and related structures acquire improved institutional and implementing capacity to deliver TVET under COTVET Output 2: Improved operational mechanism over TVET delivery through lessons learned from piloting CBT on mechanical engineering (4) Inputs (As of Terminal Evaluation) Japanese side: Ghanaian Side: a) Personnel a) Personnel Long-term Expert: 84.55 MM Counterpart: Technical officer: 143.4 MM Central level (COTVET Director, CBT b) Training in Japan: coordinator, Manager at Secretary s office) :10 (3 training courses) Pilot institutions (17 facilitators) : 3 (3 training courses as group training) b) Office space and expenses for daily activities Training in the third country: including electricity and water use, etc : 6 (South Africa and Botswana) c) Expenses for workshop (transportation costs c) Equipment: JPY 57,470 thousand for participants, copy of hand outs, etc) d) Local cost: JPY 100,050 thousand 2. Evaluation Team Members of Evaluation Team: 1 Mr. Koichi KITO (Leader of Mission), Senior Representative, JICA Ghana Office 2 Mr. Raimei NAKANO (Technical and Vocational Education and Training), Technical Advisor, Overseas Cooperation Section, Overseas Vocational Training Association(OVTA) 3 Mr. Jun TOTSUKAWA (Evaluation Analysis), Senior Consultant, Sano Planning Co., Ltd 4 Ms. Mama OWUSU (TVET Policy), Education Advisor, JICA Ghana Office 5 Mr. Ichiro FUKUHARA (Cooperation Planning), Representative, JICA Ghana Office 6 Mr. Kosuke NAGINO, (Evaluation support), Local Consultant (Monitoring & Evaluation) Period of Evaluation Study: November 18, 2010 December 10, 2010 Type of Evaluation:Terminal Evaluation 3. Results of Evaluation 3-1. Relevance

(1) Policy priority The country s Education Strategic Plan (ESP) 2003-2015 and the recently revised ESP II (2010 2020) have TVET as one of the four focus areas in the education sector. They reiterate the importance of TVET through the capture of the TVET policy, which aims to improve the training quality and relevance. (2) Cooperation Priority The Japan s Country Assistance Program for Republic of Ghana sets two major pillars to support agendas, which are 1) Accelerating rural development; and 2) Promoting industrial development. The Project is matched with the strategic objective as the latter, human resource development needed for promoting industrial development from the TVET sector s approach. (3) Selection of Target Group Needs of COTVET Development of organizational as well as individual capacity of COTVET was the most prioritized issue to be tackled for the newly established organization COTVET. It is obvious that the Project has met with the needs of COTVET in the launching stage as the focal TVET coordinating organization. Needs of TVET in general The gap existing between industries expectation and graduates technical level led to difficulties for TVET graduates to find jobs. The TVET institutions, therefore, had recognized the necessity to improve the education system to fill the gap. Since the CBT approach can ensure to upgrade students technical level more than the traditional TVET approach, the Project has met with the needs of the TVET institutions. Appropriateness of the selection of pilot institutions The targeted three pilot institutions are evaluated as being of reasonable selection. The project developed the criteria to select the institutions such as physical environment to enable the conduct of the CBT approach. In addition, the trades targeted at the institutions were also selected from the viewpoints such as that the trades that Japan has the technical experience and knowledge, and can avoid duplication with other Development Partner s activities. (4) Advantage of Japanese technologies The technical instruction at the pilot institutions fully utilized Japanese technical advantage and experiences. The concepts such as 5Ss and Kaizen have been effectively introduced in their instruction. Although there is a difference in the name of training approach as the CBT between Japan and other countries, the Japanese training system has a lot of similarity with the CBT approach. Therefore, the Project did not receive any negative influences in the sense of advantage of Japanese technologies. 3-2. Effectiveness (1) Achievement status of Project Purpose and Outputs

Project Purpose The level of the achievement of the project purpose is evaluated as almost high. Considering the key word on which the project purpose focused; to strengthen capacity of COTVET and related institutions, it is evaluated that the project successfully strengthened the capacity of these newly established organizations. However, if these organizations had been established with the reasonable required number of staff as originally planned, the level of implementation capacity would have been higher. In this line, the evaluation of the achievement level is lower than high. Output 1 The achievement level of output 1 is evaluated as moderate. COTVET and the standing committees have developed their implementing capacity with institutional setting to deliver the CBT approach. Owing to the effort, the institutional setting with the necessary formats and documentation has significantly progressed. The forward steps taken for the past year is noteworthy, but again, due to the lack of manpower of COTVET, it has not been able to fully function as stakeholders expected. In this line, the achievement level is slightly lower. Output 2 The achievement level of Output 2 is evaluated as high. With intensive work at each pilot institution, the operational mechanism of the CBT approach was developed, enabling its application to other TVET institutions as a CBT model. (2) Contributing Factors of the Project implementation a) Devoted works by facilitators at pilot institutions Facilitators at the pilot institutions made sincere efforts to produce learning materials for the CBT approach, requiring them hard work in addition to their ordinary tasks. b) Performance of the project s staff Manpower inputs that have skills and knowledge on the CBT approach successfully contributed to establishing the Ghanaian CBT model. Some facilitators to the project as coordinators of the project from the pilot institutions also enhanced the smooth implementation of the project activities. c) Cooperation from industries Owing to the cooperation of the companies, workplace experience which is a core part of the CBT approach was successfully completed. (3) Constraining Factors The lingering delay in the organizational set-up of COTVET with reasonable number of staff until now has impacted on the level of achievement as well as on the sustainability of technical aspect because of insufficient time the project had for technical transfer. 3-3. Efficiency

(1) Input (Japanese manpower input) The Project drastically changed the manpower inputs from the assignment of two experts to an expert team composed of nine experts in response to the recommendations of the mid-term review mission, and the change successfully contributed to the progress of the project s achievement. Experts at each technical field also enhanced the quality of CBT approach from the aspect of trainers training. (2) Input (Ghanaian manpower input) Insufficient number of COTVET staffs has lead to multiple workloads for the respective staffs, resulted in the counterparts facing serious challenges in sharing their time with the project activities. It led to fewer chances to provide technical transfer to COTVET, creating another feature of the project as a consultancy service in parallel with the basic concept of technical cooperation project. The pilot institutions, on the other hand, provided sufficient manpower to carry out the project. (3) Input (equipment) The variety of equipment provided to the three institutions is evaluated appropriate, but the arrival of some equipment was delayed and affected the training schedule in the pilot institutions. (4) Input (Budget) The budget amount and the timing to disburse did not cause any inefficiency to the Project implementation. (5) Input (training in Japan and the third countries) The Project provided training opportunities in Japan and third countries. Training trips to South Africa and Botswana gave the participants essential ideas possibly to apply to Ghana. Realization of the effect of the training is expected in the near future (the training was very recently carried out in October 2010). (6) Duplicated activities Owing to the harmonized process by the technical committee on the harmonization of CBT, the Project did not encounter serious duplication with other projects. 3-4. Impact (1) Prospects of Achievement of Overall Goal It is difficult to foresee the achievement of the overall goal as of now since the CBT approach requires an increase in budget allocation and human resource development; facilitators on the CBT approach. The increase in the budget has to depend on external funding sources. Since this possibility is affected significantly by external conditions, it is difficult to predict the achievement of the overall goal. As to the qualification accreditation system, it is still under discussion with stakeholders. It is also difficult to forecast the achievement possibility at this moment.

(2) Ripple effect Communication opportunities with the TVET sector and industries have increased through frequent meetings at the standing committees, forums, workshops, etc. It is expected that the TVET institutions would be able to find coupling of trainees and companies for the workplace experience. Judging from the companies evaluation of the trainees at workplace experience, it is highly possible for graduates to find jobs more than the national job-finding ratio. Recognition of the CBT approach was extended through various opportunities such as TVET forum and the workshops, which is expectedly leading to extension within not only in Ghana but also neighboring countries. There are no negative impacts. 3-5. Sustainability (1) Policy aspect Due to the adoption of the COTVET Act, followed by official establishment of COTVET, as well as the adoption of the CBT policy as a national policy by the draft TVET policy 2004 and the Education Reforms of 2007, it is highly likely that the policy framework will remain sustainable. (2) Organizational aspect (COTVET) COTVET would be able to strengthen the sustainability of its organizational aspect if the requested increase in staff is realized in accordance with the employment plan. In other words, the current situation indicates that the sustainability of the organizational aspect is lower, which is one of the most serious challenging issues for COTVET as long as the situation remains with limited number of staff. (Pilot institutions) Under the assumption that the pilot institutions continue the CBT approach at the same trades with the same grade of the pilot project; the three institutions would have enough sustainability in terms of the organization structure with the number of facilitators. However, if a consideration is given to extend the CBT approach to other trades and grades, then the sufficiency of facilitators will be raised as a challenging issue because the CBT approach requires more facilitators compared with the traditional. (3) Financial aspect (COTVET~ for extension to other institutions nationwide) The CBT approach requires much more budget compared with the traditional. Judging from the budget forecasts of the government, to secure sufficient budget for dissemination of the CBT approach is a seriously challenging issue. Positive signs exist from some internal/external funding sources. One of them is the SDF (Skills Development Fund), which is now about to go fully operation. It requires more time to measure its availability and possibility for TVET institutions to apply.

(Pilot institutions) The three pilot institutions have financial challenges to constraints cover all the necessary cost for the CBT approach, even if including their income generation effort. (4) Technical aspect (COTVET) From the start up stage towards the full operations stage, the belated reinforcement of manpower at COTVET appear as the challenging issue with regards to technical sustainability because of the fewer chances to transfer skills and experiences from the project. (Pilot institutions) The facilitators in charge of the CBT approach have gained enough technical capacity to continue the activities. If the institutions seek extension to other grades and/or trades, training to un-experienced facilitators would be indispensable. (Others) One of the challenges for the technical aspect is to secure trainers who can train facilitators on the CBT approach. It is required to develop a system to supply trainers in a stable manner to correspond to requests from TVET institutions. (5) Social aspect As the industries which received trainees from the pilot institutions for workplace experience were pleased with trainees and their technical skills, the receptivity of industries on the CBT approach is evaluated high. In order to continue workplace experience after the project, an effective system needs to be established to promote matching trainees with industries through the use of trade associations, etc towards mutual benefits. 3-4. Conclusions The Project showed the significant progress particularly after the mid-term review was conducted, then it is concluded that the project purpose and outputs will be achieved at almost satisfied levels. The organizational capacity of COTVET has developed for the past one year in particular, although the pace is still in gradual manner along with reinforcing the number of staff. In addition to the COTVET secretariat, the standing committees are already functioning, and have determined the necessary procedures for the CBT approach with a series of necessary documentation. Several issues including coordination with other stakeholders and legal approval remain, but the institutionalization in general is evaluated to have progressed well. On the other hand, challenges remain in sustainability. A gap is still observed between the workload of COVTET and the number of staff at this moment, which would affect the sustainability of COTVET from an organizational viewpoint. In addition, financial

sustainability is also a serious challenge in order to disseminate CBT approach nationwide because the approach requires more budget than the traditional. The utilization of internal and external fund is a possible device to extend CBT approach, but it is difficult to ensure sustainability as long as the necessary budget has to rely on special funding sources. 3-5. Recommendations (1) Access to funds for TVET institutions The Skills Development Fund, SDF, can be one of the solutions for financial constraints that many of TVET institutions face, but the current framework of the SDF focuses more on private sector development than training students in TVET institutions. It is necessary to develop a mechanism for TVET institutions to access to the fund for the CBT program. (2) Staff allocation of COTVET The number of COTVET staff is not enough to accelerate the TVET reform. Therefore, the Ministry of Education and other related organizations should make necessary arrangements to realize the recruitment plan of COTVET without delay. (3) Institutionalization of CBT To maximize the utilization of the products made by the Project for the CBT approach, it is necessary to accelerate the legal approval for these in order to promote TVET delivery. In addition, building consensus with other stakeholders is also indispensable to make these products on institutionalized system/processes function smoothly. (4) Harmonization of CBT The Ghanaian side should continuously follow the harmonized CBT, whose mechanism has been agreed among stakeholders through the CBT Harmonization Report. (5) Workplace Experience It is needed to strengthen the mechanism for workplace experience with industries such as strong partnership with trade associations. Mutual benefits for both TVET institutions and industries should be concerned in developing the mechanism. (6) CBT Training Package Development Flowchart for Development It is necessary to develop flowcharts showing the progress and the procedures for the CBT system. It will be a useful guideline to organize the CBT for other training institutes, and to demonstrate the right direction to develop the system. Developing system of the Training Package The system to develop training package including arrangements for honorarium for the technical teams should be considered by initiative of the COTVET beforehand, if new training packages are to be developed.

(7) Maintenance for Equipments It is necessary to make maintenance plan for the equipment in order to ensure long running usage. In addition, the plan should include the aspect of running cost for the equipments. 3-6. Lessons Learned (1) Local manpower as effective inputs The Project successfully involved many local experts and staffs in the activities. The involvement significantly contributed to the Project s outputs as well as enhanced the technical sustainability from the macro-viewpoint. In addition, if projects aim at formulating unique models to targeted countries, local manpower becomes a suitable input for the purpose of making their own models. (2) Assurance of quality on detailed planning survey The Project has faced many inhibition factors for smooth implementation during the Project period. Although many of these were unpredictable, some were partly caused by insufficient and/or improper project s design at the detailed planning stage. In order to avoid inefficiency in project s activities, the quality of detailed planning survey has to be fully secured.