EXPRESSION OF INTEREST

Similar documents
EXPRESSION OF INTEREST

EXPRESSION OF INTEREST

EXPRESSION OF INTEREST

White Rose Extension Project - Expression of Interest (EOI)/Prequalification Provision of Topsides Marine Transportation Reference No

EXPRESSION OF INTEREST

EXPRESSION OF INTEREST

NEW GC-16 IN WEST KUWAIT MATERIAL REQUISITION FOR LEVEL GAUGE TABLE OF CONTENTS

Newfoundland and Labrador Offshore Spill Preparedness and Response Initiatives

Company Profile. Atlas Offshore Co. No.8, Negar Ave. Vali e Asr St., Tehran, Iran

DESIGN BASIS FOR AIR CONDITIONING AND VENTILATION SYSTEM FOR SUBSTATION AND CONTROL BUILDING HINDUSTAN PETROLEUM CORPORATION LTD.

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

REGULATION OF THE MINISTER OF COMMUNITY, ABORIGINAL AND WOMEN S SERVICES. Safety Standards Act M 62

REQUEST FOR PROPOSAL Engineering Design for Culinary Water Tank and Secondary Water Tank Conversion

Deep Panuke. J. Nowlan / D. Green. D. Riffe R. MacQueen M. Weatherston Rev Date Reason for Issue Prepared Checked Approved Approved Title

Inland Technologies Inc

TECHNICAL EVALUATION

OIL INDIA LIMITED KG BASIN PROJECT KAKINADA GLOBAL EXPRESSION OF INTEREST NO. OIL/KGB/EOI-22

Green FSRU for the future

(6) Crawl boards and ladders used for roof work shall be securely fastened over the ridge of the roof or be otherwise effectively anchored.

OMNIPURE. Offshore Marine Sanitation Devices. Rugged, Dependable and Purpose-built for the demanding Offshore Industrial Sector

Oman LNG LLC. Pre-Qualification Questionnaire. QEN EPC to Construct Car Parking Sheds with Solar Photovoltaic Panels

REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320

Definition of Terms **Non-capitalized references to a state refer to a state other than the State of Michigan.

ARRANGEMENT AND WORKING OF MULTIPORT FLOW SELECTOR VALVE IN PRODUCTION MANIFOLD:

MAX300-BIO PRODUCT NOTE. Bioreactor/Fermentation Control Process Efficiency Product Quality Analysis. Bioreactor/Fermentation Mass Spectrometer

SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S

COMPANIES PREQUALIFICATION APPLICATION

ElectroChemTM Advanced EDR

b) General instructions and documents to be submitted by an interested company:

Design Concept and Features of the Mitsubishi LNG-FPSO (Floating Production, Storage and Offloading Unit)

REQUEST FOR QUALIFICATIONS (RFQ) For Engineering Services Institute for Marine Mammal Studies (IMMS)

Hawser Hooks for Tandem or Single Point Mooring

QUALIFICATIONS NEEDED TO DESIGN, CONSTRUCT AND MANUFACTURE NUCLEAR SYSTEMS AND EQUIPMENT. Cosmos M. Voutsinos, P.Eng.

REPLACEMENT FLOATING BRIDGE Statement of Requirements Rev A BCP/J/10384/00

NATIONAL ENERGY BOARD PIPELINE PERFORMANCE MEASURES REPORTING GUIDANCE

HMS-utfordringer i Nordområdene konferanse Captain Erik Almkvist. vikingsupply.com

CODE OF PRACTICE Transportation of Employees by Vessel to or from a Workplace in the Offshore Petroleum Industry - Newfoundland and Labrador

Contents. 1 Overview of Ship-Shaped Offshore Installations Front-End Engineering Preface Acknowledgments How to Use This Book.

Design, Fabrication, Supply, Installation & Commissioning of Scissor Lift for ITMT Building at. CREST, Hosakote. Indian Institute of Astrophysics

Infrastructure Code of Practice

Technical University of Moldova EMM Departament. plus. Author: Rachier Vasile. Scientific coordinator: prof. dr. ing. Sobor Ion

Energy East Pipeline. Project Overview. Kevin Maloney Manager, New Build Pipeline AB, NB, JV Irving and Cromer September, 2014

Atlantic Link: An Update. June 6, 2017

Pneumatic control and on/off valves for thermoelectric plants

OAKDALE CHILLED WATER PLANT CAPACITY UPGRADES UI PROJECT INSTALL CHILLERS SECTION COMMISSIONING

Storage Tank Explosion Frequencies on FPSOs

Remote Waste. (AOWMA) is the provincial, not-for profit, organization established to educate, train and certify industry professionals.

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

UNC Chapel Hill Informal Contracting Guidelines

CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL

HSE Challenges for Construction and Operation in the Sakhalin Offshore Climate

Request for Proposal Parking Lot Improvements

Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008

Dewatering solutions that work

SOMFY SPECIFICATION March 2012 SECTION... ROLLER WINDOW SHADES SOMFY LS 40 MOTOR RANGE. Disclaimer for advice given to architects and engineers

Barilla Cogeneration Power Plant main tips

5.2 MW Solar Mobile Power Unit

Summary of Improvements Materials: New materials Since 1980s e.g., composites, synthetics Higher Strength More reliable Lower cost

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents

Pratt & Whitney. Power Systems MOBILEPAC. Gas Turbine Package. It s in our power.

Deep Panuke. PL16 - Induction Bending of Onshore Line Pipe Prequalification Questionnaire

Deep Panuke. 01U Issued for Use T. MacAdam J. Gillis A. Alleyne K. Tonn Rev Date Reason for Issue Prepared Checked Approved Approved Title

Association of Energy Services Professionals (AESP) Request for Proposal Market Research Services

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

SECTION Coriolis Mass Flow Meters

SUPPLY PROCUREMENT NOTICE

Division II Contractors

LARGE STORAGE TANK PROJECT

Contractor Management and Purchasing

ELECTRICAL, INSTRUMENTATION & CONTROL SOLUTIONS FOR OIL & GAS INDUSTRY

Request for Proposal. Global Positioning System (GPS)

(Rev. 2000) STANDARD

Florida Department of Transportation 1109 South Marion Avenue Lake City, Florida

UniGas Hand-held combustion gas analyzer with 4 sensors

Polaris VCD. Efficient and Effective WFI Solutions WATER TECHNOLOGIES

Lifting Appliances of Ships and Offshore Installations

United Nations Development Programme (UNDP) FOR THE

CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS. Program Guide

RFP IP-Based Surveillance Camera System

The Corporation of The City of London

The following is required for a complete permit submittal for each unit.

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

Guideline for Bridge Safety Management February 2012

COMPLETE REVISION April Process Industry Practices Piping. PIP PNC00004 Piping Stress Analysis Criteria for ASME B31.

Flexible integrated transformer SOLUTION

Supplier Opportunities: Traveling Wave Reactor Program

CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS SINGLE-PHASE PADMOUNTED TRANSFORMERS

GLOBAL EXPRESSION OF INTEREST ( EOI ) For CONSULTANCY SERVICES TO PROVIDE BASIC ENGINEERING AND PROCESS FOR LUBE OIL BLENDING PLANT

The time and attendance system is separate from the payroll system therefore it interfaces with Sage ABRA to fully process various payrolls.

Platform Construction and Installation

Community Partnerships EDS and LMAPD

REQUEST FOR PROPOSALS LIBS PARK PLAYGROUND FOR CITY OF HASTINGS, NEBRASKA

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE

Dewatering solutions that work

SECTION ACTIVE VEHICLE BARRIERS

CTS Candidate Handbook Certified Technology Specialist

Request for Proposal For: 2018 American Bar Association Temporary Services

DANVEST POWER UNIT. with special Low Load Unit for wind-diesel power stations

.2 The scales and automated system for each of the three (3) scales shall be supplied from a single manufacturer.

Transcription:

EXPRESSION OF INTEREST White Rose Extension Project (WREP) EOI / Prequalification Potable / Utility Water Package EOI-101414-411 Rev. 01 Mustang Canada Inc. is seeking prequalification responses from interested companies for provision of the Potable / Utility Water Package for use on the Husky Energy White Rose Extension Project. Husky Energy is currently in the planning stages for this development which, subject to final company, partner and regulatory approvals, would include construction of a Wellhead Platform (WHP). Interested companies must be qualified to conduct the work scope as outlined in the prequalification questionnaire. Respondents are required to demonstrate their capabilities and experience via a formal response to this EOI/Prequalification advertisement. Respondents should provide a history of operations in the North Atlantic (or equivalent climate). Further details on Husky Energy and its Operating Environment are outlined below. Mustang Canada Inc. strongly supports providing opportunities to Canadian, in particular Newfoundland and Labrador companies and individuals, on a commercially competitive basis. Pre-qualified companies will be required to complete a Canada/Newfoundland and Labrador Benefits Questionnaire at the Bid stage. Mustang Canada Inc. also encourages the participation of members of designated groups (women; Aboriginal peoples; persons with disabilities; and members of visible minorities) and corporations or cooperatives owned by them, in the supply of goods and Services. Please provide one (1) original and one (1) copy of your formal response no later than Tuesday, November 5 th at 3:00pm, NST to the address as shown below: Wood Group Mustang Canada Inc. Attn: Ms. Jaime Howard 17 Duffy Place Email: ProcurementWREP@mustangeng.com St. John's, NL Canada Tel: +1 (709) 793-3161 A1B 4M7 Background Husky Energy has been active on Canada's East Coast for more than 20 years. Husky Energy is the operator of the White Rose field and has several exploration prospects in the central part of the Jeanne d Arc Basin. Discovered in 1984, the White Rose offshore oil field is located in 120 m of water, 350 km east of St. John's, Newfoundland and Labrador, Canada. The field consists of both oil and gas pools, including the South White Rose oil pool. The oil pool covers approximately 40 km 2 and contains an estimated 200-250 million barrels of recoverable oil. A new WHP will be situated approximately 7 km west of the existing SeaRose Floating, Production, Storage, Offloading (FPSO) vessel. Page 1 of 5

Operating Environment Husky Energy s lease holdings on the Grand Banks are situated in one of the harshest ocean environments in the world: During the winter season (December - March), winds can reach 90 to100 knots offshore. Fog from April to August can reduce visibility and impact crew changes by helicopter. Combined significant wave heights can reach 12.5 meters during the winter season. Surface water temperatures range from near 0 C to 22 C. Air temperatures range from -18.5 C to +25 C. Surface ocean currents up to 90 cm/sec have been measured. Mean surface currents range from 5 to 19 cm/sec. Sea ice, up to 100 centimeters thick, may reach the area from February to April, two to three years out of every ten. Icebergs pass through the area from March to July. General Requirements The selected company will be required to design, fabricate and test the equipment in compliance with Mustang Canada Inc. and Husky Energy requirements. Scope of Work The major scope of work items for the package is as follows: 1) Design, fabrication, inspection, testing and certification of the Potable and Utility Water Packages. Each package shall be complete with all auxiliary equipment necessary to make it safe, operable, and stand-alone units. The package shall be complete with, but not limited to the following equipment and requirements: Two (2) x 100% Fresh Water Generators, Vacuum Vapor compression, Salinity: <5ppm (for turbine washing), Rate: 70 m 3 /d One (1) Potable Water Hydrophore (Pressure Tank) Two (2) Potable Water (Centrifugal) Pumps (10 m 3 /h) Two (2) x 100% Silver-ion Water Sterilizer One (1) ph-adjustment / Re-hardening Filter One (1) Utility Water Hydrophore (Pressure Tank) Two (2) x 100% Utility Water (Centrifugal) Pumps (10 m 3 /h) Page 2 of 5

Two (2 x 100%) Safety Shower (Centrifugal) Pumps (5 m 3 /h) One (1) heater (55 kw) for heating safety shower water supply Associated piping, controls, insulation and heat tracing Heat tracing, controls cabling, and power supplies to be run to junction boxes located at edge of package. The equipment will be installed in a non-hazardous area and certified to CSA requirements. The equipment will be installed outdoors and exposed to the environment. Facility voltages are 600 VAC, three phase, 60 Hz and 208/120 VAC, single phase, 60 Hz. 2) Compliance with all Mustang Canada Inc. and Husky Energy project specifications and requirements, except for mutually agreed deviations. Also, responsible for ensuring that Sub-vendors are capable of meeting all requirements and that they are supplied with the correct technical documentation and all relevant sections of the Purchase Order and all subsequent approved revisions of the relevant sections of the Requisition document. 3) Compliance with supplier / packager / manufacturer blueprints, drawings and specifications for all components that comprise the Potable/Utility Water Package, thus ensuring that form, fit and function for interchangeable components, systems and sub-systems are not adversely affected. 4) Submission of a comprehensive monthly progress report and critical path schedules detailing all items in the critical path and their progress for each month. As well as participation in a monthly status conference call. 5) Participation in at least one clarification meeting prior to award at the Client s facility, a kickoff meeting after award at the packager s facility, a HAZOP meeting at the Client s facility, a design finalization meeting prior to design freeze at the Client s facility, a pre-inspection meeting at the packager s facility, a pre-fat meeting at the packager s facility, a control system PCS compatibility test at the packager s facility prior to FAT, and a post-fat punch list meeting at the packager s facility with followup via e-mail. Also participation in a pre-commissioning meeting, as well as assistance in installation, pre-commissioning, commissioning, start-up and site acceptance tests. 6) Submission of all general arrangement drawings, process & instrumentation drawings, electrical drawings, cable schedules, PCS (and F&G) modbus interface lists, cause & effect diagrams, inspection and test plans, weld procedures, torsional analyses, ISA instrument data sheets and other documents required to fully define Page 3 of 5

and characterize the equipment being supplied and to enable Mustang Canada Inc. and Husky Energy to design the facility as well as install, inspect and maintain the equipment. 7) After drawings that have received final design approval for fabrication, the supplier shall then provide an as-shipped set of drawings to characterize the actual configuration of each package as it left the factory, an as-installed set of drawings to characterize the actual configuration of each package as it was installed and precommissioned in the topsides fabrication yard, and an as-built set of drawings to depict the actual configuration of each package after offshore commissioning. 8) Dual language (English / French) instructions for all equipment associated with fire suppression systems and for any submitted MSDS documents. 9) The supply of all electric motors, generators, instrumentation, electrical components, electrical systems and wiring with a CSA label and in accordance with all CSA requirements. 10) Compliance with Canadian and CNLOPB Regulatory requirements. 11) The supply of all special tools, capital spares, and start-up and commissioning spares as defined in the purchase order. Commissioning spares shall include spare cards and PLCs for any control systems. The supplier shall advise the Client when spares must be ordered so they can be manufactured with the main equipment. 12) Weighing of all equipment exceeding 9000 kg with load cells having and accuracy of +/-1% of the measured value. The plan center of gravity shall also be verified using this equipment. Skids & systems shall not be disassembled to avoid the weighing of equipment in this fashion. A weight data sheet shall be supplied for all equipment provided. The supplier shall quantify the weight of all skids and major components as early as possible in the proposal and design phases and shall offer weight reduction alternatives for consideration by the Client. 13) The application of all necessary resources to meet agreed equipment delivery dates, especially after schedule slippages, parts scrapping and other unanticipated schedule impacts. 14) Export boxing and long-term preservation for all equipment. 15) Operator training Submission and Registration Requirements: Mustang Canada Inc. is committed to providing a safe, healthy and environmentally sound workplace for its employees, contractor and subcontractors. Interested companies must meet, at a minimum, all requirements of Mustang Canada Inc., as well as Husky Energy s commitments related to Canada-Newfoundland and Labrador benefits and other appropriate regulatory processes. In addition, interested Companies are required to complete the Wood Group Mustang Canada Inc. Supplier Pre-Qualification Questionnaire that must be submitted with their Expression of Interest. The questionnaire is available by contacting: Page 4 of 5

1. White Rose Extension Project Website Tel: +1(709) 793-3113 E-Mail: ProcurementWREP@mustangeng.com Website: http://sites.mustangeng.com/sites/bidpub/whiterose2 2. BIDS Newfoundland Tel: +1(709) 738-6500 or 1-800-397-0393 Website: www.bids.ca 3. NOIA Tel: +1(709) 758-6610 Website: www.noia.ca Schedule: It is anticipated that the Request for Proposal (RFP) will be issued within 4-6 weeks, with a planned award date 1 st Quarter 2014. The Required on Site (ROS) delivery for the Potable/Utility Water Package is 3 rd Quarter 2015. Page 5 of 5