VIE-7865 Secondary Cities Development Project

Similar documents
Ex-ante Project Evaluation

CONSULTATION AND PARTICIPATION PLAN

TERMS OF REFERNCE FOR CONSULTANTS

Report and Recommendation of the President to the Board of Directors. Proposed Grant Nepal: Water Resources Project Preparatory Facility

Mongolia: Reforms in Technical and Vocational Education and Training in Mongolia (Preparing the Skills for Employment Project)

Japanese ODA Loan. Ex-Ante Evaluation

INFORMATION ON PFR2 SUB-PROJECTS:

The 9th Disaster Risk Management Seminar

Ex-ante Evaluation - 1 -

FRAMEWORK FOR ECOSYSTEM-BASED ADAPTATION(EBA) AT SUBNATIONAL LEVEL FOR THE GMS- IMPLEMENTATION AND MAINSTREAMING RAJI DHITAL

PROGRAM PREPARATORY TECHNICAL ASSISTANCE. 1. The program preparatory technical assistance (TA) is required to:

SUMMARY OF PROJECT PERFORMANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Title Action Plan toward Effective Flood Hazard Mapping in My Country

Republic of Uzbekistan: Tashkent Province Water Supply Development Project

Greater Mekong Subregion: Flood and Drought Risk Management and Mitigation Project Royal Government of Cambodia

VIE: Proposed Ha Noi Metro Rail Extension Project (Line No.3: Ha Noi Railway Station Hoang Mai Section)

FinnOC FINNISH OVERSEAS CONSULTANTS LTD. SUSTAINABLE DEVELOPMENT SOLUTIONS

Forest Carbon Partnership Facility

Lessons Learned: NAMA development in Vietnam

Jakarta, Indonesia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle)

Hydra, Tunisia. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

SECTOR ASSESSMENT (SUMMARY): TRANSPORT, AGRICULTURE, NATURAL RESOURCES AND RURAL DEVELOPMENT. 1. Sector Performance, Problems, and Opportunities 1

VIETNAM GOVERNMENT State Bank of Vietnam

Executive Summary Sri Lanka Strategic Cities Development Project (SCDP)

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Ex-Ante Evaluation (for Japanese ODA Loan)

CAM: Urban Water Supply Project Siem Reap Subproject

UZB: Second Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program

Monitoring and Evaluating Social Protection Programs Efforts to Respond to Natural Disasters and Climate Change-Related Shocks

Initial Environmental Examination (Final Review) MFF 0054-VIE: Water Sector Investment Program Tranche 2

San Paolo Albanese, Italy

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT AND INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT PAPER ON A PROPOSED ADDITIONAL LOAN

Technical Assistance Report

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles

Linking Subnationals to Finance - Investing in Asia s Urban Future

SECTOR ASSESSMENT (SUMMARY): ENERGY

SEA and Green Growth The African Development Bank Experience

IGF Geneva 2016 MPF-SDG Comparative Analysis. Perrine Toledano CCSI, Head: Extractive Industries

Nepal: Earthquake Emergency Assistance Project

TECHNICAL ASSISTANCE RAJASTHAN RENEWABLE ENERGY CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Report and Recommendation of the President to the Board of Directors

VIET NAM LOSSES CAUSED BY TYPICAL DISASTERS FROM 1978 TO 2005 TYPICAL DISASTERS IN VIET NAM ECONOMIC LOSS RECORDED FROM

To: AGRICULTURAL PROJECTS MANAGEMENT BOARD LOW CARBON AGRICULTURAL SUPPORT PROJECT. SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness

Technical Assistance Consultant s Report

Development of Gender Analysis and Gender Action Plan for the MRCS. Duration: A maximum of 30 working days tentatively during April-May 2017

ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5416 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4819 Project Name. Adolescent Girls Initiative - Afghanistan Region

Environmental and Social Monitoring Report. Viet Nam: Central Regions Rural Water Supply and Sanitation Sector Project

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

ADB in Vietnam. ADB s Climate Change Related Interventions in Vietnam. ADB in Vietnam. Outline

ANNEX 6 PUBLIC CONSULTATION

SECTOR ASSESSMENT (SUMMARY): URBAN DEVELOPMENT AND WATER SECTOR 1

Policy Brief. Building Resilience Adaptive strategies for coastal livelihoods most at risk to climate change impacts in Central Viet Nam

DURATION : 30 working days over the period 20 September November 2016

Nauru Solar Power Development Project under the Pacific Islands Renewable Energy Investment Program. Asian Development Bank Nauru

Report and Recommendation of the President to the Board of Directors

Environmental and Social Considerations in Detailed Planning Survey. (Technical Cooperation for Development Planning)

Viggiano, Italy. Local progress report on the implementation of the 10 Essentials for Making Cities Resilient ( )

Community Based Rural Water Supply Schemes in Post Conflict Areas in Sri Lanka

Co-Benefit Approach in JICA

THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness PRIME MINISTER. No: 419/QĐ -TTg. Hanoi, 5 April 2017

World Bank Group Recruitment Drive (TOR for Future Vacancies)

Report and Recommendation of the President to the Board of Directors

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

Kingdom of Cambodia: Road Network Improvement Project

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Sasso di Castalda, Italy

ENHANCING IMPLEMENTATION OF THE 2030 AGENDA IN VIET NAM

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (First Cycle)

Kigali on 18/02/2014 N /400/14/EARP-DIR/NK/sm

STRATEGIC PROGRAM FOR CLIMATE RESILIENCE MOZAMBIQUE

VIETNAM GREEN GROWTH STRATEGY -a good opportunity to integrate ecoservices policy. Ministry of Planning and Investment

MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT (MARD) CENTRAL PROJECT OFFICE (CPO) VIETNAM MANAGING NATURAL HAZARDS PROJECT (VN-Haz Project)

Role of Climate Smart Agriculture in achieving Land Degradation Neutrality in Sri Lanka. Champika S Kariyawasam

Report and Recommendation of the President to the Board of Directors

Project Administration Manual. Project Number: Loan Number: November Kingdom of Cambodia: Provincial Roads Improvement Project

Tajikistan Asian Development Bank (ADB)

Viet Nam Rural Infrastructure Development and Living Standard Improve (I) (II)

GTP2 and the Agricultural Transformation Agenda

SECTOR ASSESSMENT (SUMMARY): POWER Sector Performance, Problems, and Opportunities

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit

Case Study: Converting waste to cooking fuel in Vietnamese coastal communities. Overview. Key lesson learned

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Nov ,493,000.00

Implementation Status & Results Vietnam Second Transmission and Distribution Project (P084871)

National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR

INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY. Environmental and Social Management System for ADB Line of Credit

IND: MFF - North Karnataka Urban Sector Investment Program - Tranche 2

Development plans of Viet Nam: Achievements, challenges and orientation to successful SDGs

The World Bank Pernambuco Rural Economic Inclusion (P120139)

WEST KALIMANTAN POWER GRID STRENGTHENING PROJECT Reducing Indonesia s Oil Dependency While Fostering Regional Cooperation

Adaptation in the Post-2012 Climate Regime: Some Perspectives from Asia

Sewerage and Water Board of New Orleans Strategic Plan

Job Opportunity: INTEGRATED RISK MANAGEMENT SPECIALIST. CDEMA Coordinating Unit

Terms of Reference. Application type: External vacancy Job Title: Category: Duty station:

Ref. Ares(2014) /11/2014. Resilience Marker. General Guidance (November 2014) Humanitarian Aid and Civil Protection

Transcription:

VIE-7865 Secondary Cities Development Project Tam Ky Buon Ma Thuot Ha Tinh Workshop on Enabling Inclusive Cities 28-29 October 2013 Sonia Chand Sandhu Sr. Environment Specialist SEUW

VIE: 7856 Secondary Cities Development Project Tam Ky Quang Nam Province Central coastal region Buon Ma Thuot Dak Lak Province Central highlands Ha Tinh Ha Tinh Province North central region Growing provincial capitals Limited urban infrastructure Degrading environment quality Vulnerability to storms, floods, and typhoons

Policy Pillars National Policy SEDS, SEDP National Green Growth Strategy Sector Orientation Plans City Master Plans ADB Policy Country Partnership Strategy (2012-2015) Urban Sector Assessment Urban Operational Plan. Safeguard Policy Statement 2009 Climate Adaptation & Environment Improvement National Climate Change Strategy Environment Protection Regulation Land Law Social Inclusion and safeguards Gender action plan SPRSS Environment management plans Resettlement plans Stakeholder communications strategy

THE PROJECT 11 subprojects to improve climate resilience and environment quality: integrated solid waste management; urban road upgrading for connectivity and evacuation during storms; flood dykes for increased protection of communities and land; drainage channels and regulating basins for flood protection and stormwater management Community awareness through information, education and communication Competencies in integrated urban development, environment planning, climate change adaptation and project management

PROJECT COST ADB $95.0 million ADF (Asian Development Fund) $26.71 million $6.47 million $10.45 million $9.79 million Government s counterpart fund from Tam Ky, from Ha Tinh, from Buon Ma Thuot $121.71 million Total project cost

Buon Ma Thuot, capital of Dak Lak Province Central highlands BMT4 - Capacity Building - Sub-project Implementation Support BMT2 - Construction and improvement of Tran Quy Cap Road (4.23 kms) Strategic location for connectivity in highlands Key contributor to coffee exports BMT3 - Construction and improvement of Mai Thi Luu Road (2.57 kms) Class I. Population - 311,965, growing at 3.17% per year BMT1- SWM and landfill development Ho Phu Engineered landfill and recycling facility; and restoration of Cu Er dumpsite Constrained by cross-city linkage and quality of urban services

Tam Ky, capital of Quang Nam Province Central coastal region TK2 - Dien Bien Phu road construction (6.37 kms) TK1 - Ban Thach River Dyke completion works (10.7 kms) Chu Lai Special Economic Zone Industrial growth from conventional to large consumer products Class III. Population 109,000 population growth 1.15% per annum High annual precipitation with avg. annual rainfall 3,448 mm 5 typhoons a year

Ha Tinh, capital of Ha Tinh Province - North-central region HT1 - Five Drainage Channels (9.5 kms) with access roads completion HT4 - Nguyen Trung Thien Road -Central upgrading (0.8 kms) HT6 - Hai Thuong Lan Ong Road upgrading (1.15 kms) Strategic connectivity - GMS, Economic Zones and ports HT2 - Thach Trung Regulation Basin for improved drainage capacity (9 ha) HT3 - Environmental Improvements to Bong Son Lake for upgrading degraded land, lighting, and sidewalks HT5 - Nguyen Trung Thien Road South upgrading (1.76 kms) Class III. Population 94,022 Expected population growth 8 % per annum Susceptible to Floods Limited drainage capacity

Lessons Learned & Special Features Optimizing Development Impact Limited procurement packages Sufficient funds for contingencies Advance actions Ha Tinh,Tam Ky Climate adaptation Enhanced resilience standards Increased protection of people, land and assets Ha Tinh Urban watershed based drainage Improved storm water management Area regeneration Buon Ma Thuot Community based 3 R SWM Complimenting green city vision

Project Benefits Enhancing Inclusiveness Dykes and drainage system will increase flood protection and livelihood, reduce asset loss, and health risks from floods Roads upgrading to improve mobility, evacuation during storms BMT - 3 R SWM will improve waste collection and disposal; Improved environment quality by closure of existing dumpsite and new engineered landfill

Due Diligence vis-à-vis Inclusiveness Economics Subprojects viable EIRR 13.5 to 18.3 % results range Finance Sufficient funds for O & M Tariff introduced for SWM Covenants and assurances provided Technical Technically feasible Optimum design solutions and standards for climate resilience adopted Complete, extend and upgrade flood protection dykes and drainage Safeguards Environment - Category B IR - Category A and IP - Category C EMPs and RPs in compliance Covenants and assurances provided Governance Consultations and Disclosure Grievance Redress Mechanism Poverty and Social Category - GI and EGM GAP enables women s participation in decision-making GAP & DMF targets and content of assurances aligned Employment opportunities with URENCO s in O&M

INVOLUNTARY RESETTLEMENT Sites are inclusively designed. Category A In compliance with ADB Disclosure and Consultation Requirements. Grievance redress mechanism developed Serviced Resettlement Sites available in all cities Affected Land = 118ha Affected Households = 2,437 (10,737APs) Mostly on Agric Land = 1,518 affected households. To be relocated = 116 households Total Base Cost = USD16,850,000 Income Restoration Program = USD2,600,000

ENVIRONMENT inclusiveness by improving resilience and preventive approaches Category B Initial Environmental Examinations (IEEs) - environment improvement and area regeneration from SWM, drainage & storm water management - temporary construction specific impacts Expected environment quality improvement and productivity of the surrounding areas Environmental Management Plans (EMPs) - mitigation measures for design, construction and operations. - EMPs will be updated and finalized at the detailed design stage. - EMPs costs integrated in the Project. In compliance with ADB Disclosure and Consultation Requirements. Grievance redress mechanism developed

IMPLEMENTATION STRUCTURE role of citizens? Is there room? Asian Development Bank (ADB) Government of Viet Nam (MPI-MOF-SBV) Dak Lak PPC Quang Nam PPC Ha Tinh PPC Executing Agencies (EAs) Buon Ma Thuot CPC Coordination Committee Quang Nam PCI QNa Lead Coordinator Ha Tinh CPC Implementing Agencies (IAs) Buon Ma Thuot City PMU DAKURENCO Quang Nam PCI QNa Ha Tinh PMU Project Implementing Units (PIUs) Project Implementation Consulting Services (International + National) Project Support, Capacity Building and Fiduciary Activities Buon Ma Thuot Subproject Mai Thi Luu Urban Road Buon Ma Thuot Subprojects Solid Waste Management Tran Quy Cap Urban Road Tam Ky All Subprojects Ha Thinh All Subprojects

Applying the Toolkit with Hindsight to the SCDP in Buon Ma Thuot, Tam Ky, and Ha Tinh Dimensions of Urban Poverty Focus Assets Target Investment Themes Targeted Inclusive Investments Structural Income & Social Finance Climate Resilience Buon Ma Thuot, Tam Ky, Ha Tinh: Urban Road Upgrading for Connectivity and Evacuation during Storms Buon Ma Thuot: Integrated Solid Waste Management Education Social Capital Disaster-Risk Reduction Tam Ky: Flood Dykes for Increased Protection of Communities and Land Health Basic Urban Infrastructure Land Management Ha Tinh: Drainage Channels and Regulating Basins for Flood Protection and Stormwater Management Non-Structural Environment Shelter Urban Renewal Buon Ma Thuot, Tam Ky, Ha Tinh: Increased Competencies Buon Ma Thuot, Tam Ky, Ha Tinh: Increased Community Awareness

Critical Aspects of Inclusive Urban Development Sustainability Resilience Inclusiveness Affordability CITIES FOR PEOPLE.challenges Progression towards prevention versus do no harm and mitigation Stakeholder assessment and their roles in project implementation Key criteria for inclusive urban development within limited budgets. Optimizing development impacts through cross-sectoral benefits and integration Establishing synergies between investment projects (donor partners) for overall development impact

Thank You Improving lives for future generations in Viet Nam.

COSTS AND FINANCING KEY POINTS Key Points: ADB concessional funding will be USD95 million (78%) and Government s counterpart fund will be USD26.71 million (22%). Project total is therefore USD121.71 million Government s counterpart fund will comprise $6.47 million (17% of subproject costs) from Tam Ky, USD10.45 million (25% of subproject costs) from Ha Tinh and $9.79 million (24% of subproject costs) from Buon Ma Thuot. Government s counterpart funds will cover the costs for the land acquisition and resettlement, part of the taxes and duties and national consulting services for the detailed engineering design as part of advance actions.

Asian Development Bank (ADB) Ministry of Finance (MOF) Funds Flow Dak Lak PPC (EA) Quang Nam PPC (EA) Ha Tinh PPC (EA) Buon Ma Thuot CPC (PIA) Tam Ky CPC (Quang Nam PCI QNA) -(PIA) Ha Tinh CPC (PIA) PMU Imprest Account 1 PMU Imprest Account 2 PMU Imprest Account 3 DAKURENCO PIU Sub-Imprest Account Contractors, Suppliers, Consultants, other Service Providers and Beneficiaries = withdrawal application (W/A) consolidated by Quang Nam PPC and forwarded to MOF, = payment released to imprest accounts, = payments to contractors, EA = executing agency, PIA = project implementing agency, PIU = project implementation unit, PMU = project management unit = direct payments. Source: Asian Development Bank.

Management approval sought (i) to proceed further with grant and loan negotiations tentatively scheduled for the week of 19 August 2013; (ii) To finance taxes and duties of Tam Ky as it is within reasonable country thresholds and does not represent an excessive share of the project investment, and is relevant to the project s success (iii) For approval of advance action of consulting services; and (iv) For Board consideration under Summary Procedure

GENDER ACTION PLAN The Project is categorized as effective gender mainstreaming (EGM), and thus, a gender action plan (GAP) has been prepared. Strategies suggested in the GAP to ensure women participate and benefit equally from Project interventions include (a) women s participation in decision making (during Project design consultations, during construction supervision, resettlement process and Project implementation); (b) increased women s economic empowerment (through employment opportunities and resettlement plan that ensure equal compensations to male and female headed households affected), (c) enhancing women s participation in technical training and access to employment opportunities; (d) improved gender mainstreaming capacity of PPCs and CPCs in urban and environmental planning and management and (e) inclusion of sex-disaggregated data in the Project performance management system, monitoring and evaluation indicators and regular Project reporting.

PROJECT RISKS AND MITIGATION Risk Mitigating Measures Infrastructure built through the project are damaged by typhoons and flooding DED of the proposed flood control dikes, road networks, sanitary landfill, and other community facilities will follow climate-resilient design standards and specifications. Technical and administrative capacities of project staff are inadequate for project management and continued O&M. Qualified staff especially women are not available. A specific capacity building component is designed to strengthen competencies in integrated urban planning and project management skills. Implementation is delayed due to coordination challenges between the three cities. Roles and responsibilities are outlined in the project administration manual for efficient implementation. Lead executive agency will coordinate and liaise with national line agencies and ADB during project implementation.