BRIDGES WITH PROGRESSIVELY ERECTED DECKS

Similar documents
Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey

Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE

STRESS RIBBON BRIDGE

Progressive Erection Applied to Box Girder with Strutted Wing Slab

Sabah Shawkat Cabinet of Structural Engineering 2017

Finite Element Simulation of Cantilever Construction Structure

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

New Troja Bridge in Prague Structural Solution of Steel Parts

MIDAS Training Series

Precast segmental design and construction in China

xiii Preface to the Fifth Edition Preface to the Second Edition Factors for Conversion to SI Units of

Appendix D.2. Redundancy Analysis of Prestressed Box Girder Superstructures under Vertical Loads

Design studies of the Castle Bridge over Wislok River in Rzeszow with application of CAD System

THE EUROPE BRIDGE, IN PORTUGAL: THE CONCEPT AND STRUCTURAL DESIGN

ST7008 PRESTRESSED CONCRETE

Bridging Your Innovations to Realities

Structural assessment of the integrated steel fly-overs widening the historic multiple-arch concrete viaduct over the Pede valley

CONSTRUCTION OF BALANCE CANTILEVER APPROACH SURAMADU BRIDGE

The Europe Bridge in Portugal: concept and structural design

The bridge over the Georges River at Alfords Point has been duplicated with a new incrementally launched bridge.

Experimental Research of Bridges with Encased Beams

The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure

SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE

Table of Contents. ACKNOWLEDGEMENTS...ii LIST OF FIGURES...xii LIST OF TABLES...xv LIST OF SYMBOLS...xvi CHAPTER 1:ABOUT THIS STUDY...

Design of Steel-Concrete Composite Bridges

Bridge articulation No. 1.04

CONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG

Hyperstatic (Secondary) Actions In Prestressing and Their Computation

Mechanical Performance of Composite Truss Bridge with Double Decks

Bijan Khaleghi, Ph, D. P.E., S.E.

CONSTRUCTION STAGE ANALYSIS OF SEGMENTAL CANTILEVER BRIDGE

BrD Superstructure Tutorial

Construction of Bridges

SUMMARY BIOGRAPHY LEAN-ON CROSS- FRAME BRACING FOR STEEL GIRDERS WITH SKEWED SUPPORTS

UHPC Connection of Precast Bridge Deck

Prestressed Concrete Girder Continuity Connection

Contents. Tables. Notation xii Latin upper case letters Latin lower case letters Greek upper case letters Greek lower case letters. Foreword.

Introduction to Structural Analysis TYPES OF STRUCTURES LOADS AND

THE FORENSIC MEDICAL CENTER

APPENDIX C CALIBRATION OF LRFD DESIGN SPECIFICATIONS FOR STEEL CURVED GIRDER BRIDGES

Modelling of RC moment resisting frames with precast-prestressed flooring system

The Bridge over Danube at Beska

Bonner Bridge Replacement Update:

5.4 Analysis for Torsion

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

Development of New PSC Box Girder Bridge with Concrete-filled FRP Struts

Strength Design of Reinforced Concrete Structures

NETWORK ARCHES FOR RAILWAY BRIDGES

French bridges experiences from prefabricated deck elements. Stockholm, march 4th, 2009

Composite Steel-Concrete Bridges with Double Composite Action

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1

This final draft of the fib MC2010 has not been published; it is intended only for the purpose of voting by the General Assembly.

I-94/I-69 Interchange Bridge Construction

Executive Summary. Champlain Bridge Approach Spans Edge Girder Condition Assessment and Rehabilitation Requirements.

The Pennsylvania State University. The Graduate School. College of Engineering EVALUATION OF BRACING SYSTEMS IN HORIZONTALLY CURVED STEEL I-

mortarless Design Manual Part 1 (AS 3600:2009) Section 1 Page 1 AS 3600:2009 PLAIN AND REINFORCED CONCRETE - CODE OF PRACTICE

SLENDER STEEL ARCHES WITH PARTICULAR HANGER ARRANGEMENT FOR MODERNISING CONCRETE BRIDGES (ARCH 04)

The new Reno bridge on the A1 Milan-Naples Motorway

Hybrid prestressed concrete bridges with steel truss webs-sarutagawa bridge and Tomoegawa bridge

JFK Airport Light Rail Transit System

FINITE ELEMENT ANALYSIS AND PARAMETRIC STUDY OF CURVED CONCRETE BOX GIRDER USING ABAQUS SOFTWARE

Title Page: Modeling & Load Rating of Two Bridges Designed with AASHTO and Florida I-Beam Girders

RESEARCH FOR THE MECHANICAL BEHAVIOR OF SIMPLE-SUPPORTED IRREGULAR REINFORCED CONCRETE SLAB BRIDGE

Inventory Inspection and Load Rating of a Complex Segmental Concrete Bridge. Presented by Matthew J. Lengyel, PE, SE

POST-TENSIONED SEGMENTAL BRIDGES

Design of Short Span Steel Bridges

Analysis of a Severely Skewed Prestressed Concrete Beam Bridge

16. Design of Pipeline Structures.

Analysis and design of balanced cantilever prestressed box girder bridge considering constructions stages and creep redistribution

Design, fabrication and construction of Railway Bridge over Södertälje canal

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 1, No 3, 2010

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

Bridge Design. II. Bridge Types. Praveen Chompreda. Substructure. Superstructure. which support the roadway. Pier (Column) Abutment.

Project Reference Catalogue

Construction of the Superstructure of Major Sea Crossings

Appendix D.1. Redundancy Analysis of Composite Spread Box Girder Superstructures under Vertical Loads

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 1, 2012

fifteen design for lateral loads Lateral Load Resistance Load Direction Lateral Load Resistance

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

THEORETICAL AND EXPERIMENTAL STUDY OF UNBOUNDED POST-TENSIONED CONTINUOUS SLAB DECKS CONSISTING OF HIGH STRENGTH SCC

Innovative Design of Precast/Prestressed Girder Bridge Superstructures using Ultra High Performance Concrete

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

Ironton Russell Bridge Project

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

REVIEW ON SHEAR SLIP OF SHEAR KEYS IN BRIDGES

NCHRP. Project Number 12-71

Design and Rating of Steel Bridges

Tolerances for Concrete Construction. Tolerances for Concrete Construction. Tolerance 6/16/2015

Behavior of a multiple spans cable-stayed bridge

Flexure Design Sequence

HARRY H. EDWARDS INDUSTRY ADVANCEMENT AWARD. The Chesapeake and Delaware Canal Bridge Design-Construction Highlights

Ironton Russell Bridge Project

SPECIFICATIONS FOR THE CONSTRUCTION OF NEW PASSENGER EQUIPMENT CARS PREFACE

SECTION PLATE CONNECTED WOOD TRUSSES

Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts...

Interaction between ductile RC perimeter frames and floor slabs containing precast units

THE NEW AASHTO MANUAL FOR BRIDGE EVALUATION 2008

IZODOM 2000 POLSKA Zduńska Wola, ul. Ceramiczna 2. tel , , tel./fax

JAPANESE CONCRETE BRIDGES. Alan Burden 1

Transcription:

Istanbul Bridge Conference August 11-13, 2014 Istanbul, Turkey BRIDGES WITH PROGRESSIVELY ERECTED DECKS P. Novotny 1, P. Svoboda 2 and J. Strasky 3 ABSTRACT Two types of bridges with progressively erected decks are described in terms of the architectural and structural solution and technology of their erection. The first type is formed by a concrete spine box girder that is additionally widened by precast struts and cast-in-place overhangs. The decks are cast in formworks that were suspended on overhang movable scaffolding with so-called organic prestressing. The deck is post-tensioned both by internal and external tendons. The bridges have spans from 42 to 69 m; their width is from 25 to 31 m. The second type is formed by a steel trough that is composite with a concrete deck slab supported by steel struts. The deck slab is cast in a formwork formed by precast members. The steel sections are incrementally assembled beyond the abutments and consequently launched into their design position. After that the deck slab is progressively erected. The bridges have spans from 45 to 66 m; their width is from 25 m. The arrangement of the bridges was developed on the basis of detailed static and dynamic analyses. During the construction the strain gauges were placed in critical sections and the structures were carefully monitored both during the erection and service. 1 Project Engineer, Strasky, Husty and partners, Bohunicka 50, 61900, Brno, Czech Republic 2 Production Director, Strasky, Husty and partners, Bohunicka 50, 61900, Brno, Czech Republic 3 Technical Director, Strasky, Husty and partners, Bohunicka 50, 61900, Brno & Professor, Brno University of Technology, Veveri 95, 66237 Brno, Czech Republic

Bridges with Progressively Erected Decks P. Novotny 1, P. Svoboda 2 and J. Strasky 3 ABSTRACT Two types of bridges with progressively erected decks are described in terms of the architectural and structural solution and technology of their erection. The first type is formed by a concrete spine box girder that is additionally widened by precast struts and cast-in-place overhangs. The decks are cast in formworks that were suspended on overhang movable scaffolding with so-called organic prestressing. The deck is post-tensioned both by internal and external tendons. The bridges have spans from 42 to 69 m; their width is from 25 to 31 m. The second type is formed by a steel trough that is composite with a concrete deck slab supported by steel struts. The deck slab is cast in a formwork formed by precast members. The steel sections are incrementally assembled beyond the abutments and consequently launched into their design position. After that the deck slab is progressively erected. The bridges have spans from 45 to 66 m; their width is from 25 m. The arrangement of the bridges was developed on the basis of detailed static and dynamic analyses. During the construction the strain gauges were placed in critical sections and the structures were carefully monitored both during the erection and service. Introduction Bridge structures formed by concrete or steel box girders with large overhangs supported by struts represent an optimum solution for crossings of deep valleys. These bridges are esthetically pleasing and structurally very efficient. Their economy can be enhanced by a progressive erection of their decks. This is illustrated on construction of several viaducts built in the Slovak and Czech Republic. Concrete Viaducts Thirty year ago a cable stayed bridge across the River Elbe near a city of Podebrady was erected. Its 31.80 m wide deck is formed by a spine girder with large overhangs supported by not mutually connected precast slab struts. The one cell box girder assembled from precast segments was constructed first, then the struts were erected and the overhangs were cast in simple formwork that was supported by these struts. After that similar arrangement was used in a construction of the Vrsovice cable stayed bridge built in Prague and in several bridges designed by others. Recently similar approach has been used in construction of several long viaducts that have been built in Slovakia - see Fig. 1. These bridges have span lengths up to 69 m see Fig. 2, their widths are up to 28.70 m see Figs. 3 and 4. The spine girder is cast span - 1 Project Engineer, Strasky, Husty and partners, Bohunicka 50, 61900, Brno, Czech Republic 2 Production Director, Strasky, Husty and partners, Bohunicka 50, 61900, Brno, Czech Republic 3 Technical Director, Strasky, Husty and partners, Bohunicka 50, 61900, Brno & Professor, Brno University of Technology, Veveri 95, 66237 Brno, Czech Republic

Figure 1. Viaduct across the Hostovsky Creek: Completed bridge and its erection. by-span in a formwork suspended on a special overhead gantry with organic prestressing system (OPS) that eliminates deflection of the gantry. To reduce the self weight of the spine girder as much as possible, the girder is very narrow. Therefore the transverse projection of the overhangs is up to 11.00 m. It is evident that this solution requires not only a careful analysis and detailing, but also an experience contractor. Also the construction and service of these bridges have to be carefully checked and monitored. Figure 2. Concrete viaducts: elevations.

Figure 3. Bridge structure. Recent Structures The first structure of this kind is a 975 m long viaduct across the Hostovsky Creek built on the Expressway R1 near a city of Nitra see Figs. 1 and 2 - R1 205. The bridge of the width of 25.66 m has 17 spans of lengths of 33.0 + 42.0 + 45.0 + 48.0 + 9 69.0 + 48.0 + 45.0 + 42.0 + 33.0 m. The depth of the girder varies from 4.00 to 2.60 m. The bridge was opened to traffic in September 2011. Two bridges of similar arrangement are being built on a motorway D1 section Fricovce Svinia near a city of Presov - see Fig. 2 - D1 202 and 203. These bridges built across the Lazny and Stefanovsky Creek have total lengths of 269 m and 182 m; typical span at mid-span at support Figure 4. Cross section of the bridge D1 216.

Figure 5. Suspension of precast struts. length is 45 m. Both motorway directions are carried by one bridge of the total width of 29.5 m. The depth of the girder is 2.60 m. Since the bridge decks are frame connected with H shaped piers, the bridges form semi-integral structural systems. Another two bridges of similar arrangement are also being built on a motorway D1 section Janovce Jablonov near a city of Levoca - see Fig. 2 - D1 216 and 217. The bridges across the Lodina and Doliansky Creek Valley have total lengths of 367 m and 414 m; typical span length is 65 m. Both motorway directions are carried by one bridge of the total width of 28.70 m. The depth of the girder is from 4.00 to 2.60 m. Since the bridge decks are hinge connected with twin piers, the bridges form semi-integral structural systems. The spine girder of all bridges is progressively cast span by-span in a formwork suspended on the overhead gantries. The girders are cast with short overhanging cantilevers. The decks of all bridges are longitudinally prestressed by internal bonded tendons situated within the basic cross section and by external non-bonded tendons situated inside the central box. The bonded tendons are coupled in each construction joint. External cables are anchored at pier diaphragms and are deviated at pier and span deviators. In the transverse direction the deck slab is prestressed by tendon formed by 4 strands lead at flat ducts situated at distance of 1.50 m. During erection the struts are suspended on two prestressing bars anchored at outer cantilevers of the basic cross section. The struts of a nominal width of 3.00 or 2.50 m are supported by short bottom corbels of the box girder - see Fig. 5 and 7. The cast-in-place deck slab was cast in the formwork supported by already erected precast struts - see Fig. 6. After the transverse prestressing of the deck slab is applied, the longitudinal external cables are post-tensioned. erection service Figure 6. Formwork of the overhangs. Figure 7. Connection of the struts with the box girder.

Figure 8. Progressive erection of the deck. Static analysis The structural solution was developed on a basis of very detailed static and dynamic analyses. The structures were analyzed by a MIDAS program system. The bridges were modeled as 3D structures formed by beam elements and a 3D structure assembled of shell and solid elements. A detailed time dependent analysis of the progressively erected structure (see Fig. 8) was also performed. Also a strut and tie models were used for checking of important details. The design of the first structure the Viaduct across the Hostovsky Creek Valley - had been performed according to the Slovakia s standards (STN) valid at the time of the design. After that all other viaducts have been designed according to Eurocode. All aspects of the analysis are presented in [1]. The detailed analysis has confirmed that although the outer struts are not mutually connected (see Fig. 9), they contribute to resistance of the structure both in the bending and torsion. Since the function of the bridge depends on perfect connection of the struts with the box girders corbels that depends on perfect workmanship, following conservative approach was accepted. The spine girder was designed without contribution of the struts both for bending and torsion. On the other hand the precast struts were designed for the stresses that originate on condition of the perfect connection of the struts with box girders corbels. This approach guarantees that the struts will not be damaged during service of the bridge. Figure 9. Precast struts.

Figure 10. Long term measurement. Bridge monitoring during construction and service The first structure, the Viaduct across the Hostovsky Creek Valley (R1 205), has been carefully monitored during construction, in depth loading tests and during service. For monitoring of concrete stresses strain gauges were placed in four sections. Two sections were in span 6 and two sections were in span 7. Span 6 represents typical span supported by movable bearings on pier 6 and by concrete hinge on pier 7; span 7 is a special span hinge connected with pier 7 and frame connected with pier 8. In both spans one section is situated at midspan and one section situated at distance 0.5 from the pier table. Since longitudinal strains were measured, the gauges were placed longitudinally at the middle of the depth of top and bottom slab. The gauges were connected with Data Taker situated inside the bridge box. In selected periods the Data Taker saves frequencies of the individual strain gauges and their temperature. Also temperature and humidity inside the bridge box are monitored. After casting of the structural members in which strain gauges are placed, the measurement was performed. After that the measurement were done before and after post-tensioning of bonded tendons, striping of the formwork, erection of the struts, casting the overhangs, post-tensioning of the external cables, applying of the additional dead load, loading test and bridge opening. During service of the bridge the measurement is performed twice a year. Fig. 10 presents calculated and measured values from which a good agreement of results is evident. The strain measurement was also performed during the static loading tests for three loading stages. The spans 5 and 7 were loaded by 16 Trucks of average weight of 32.05 tons situated symmetrically to the bridge axis that created maximum positive bending moments. Span 6 was loaded by 8 trucks situated only on the left bridge side that created maximum torsion. The measured and calculated values were in a good agreement.

Figure 11. Bridge D1 202 construction. Figure 12. Bridge D1 217 construction. Composite Viaducts After successful completion of the bridge across the Lochkov Valley Creek on the Prague Ring Road, Czech Republic, which deck is formed by a by a steel trough that is composite with a cast-in-place deck slab, two other long composite viaduct are being built on the highway I/11 in the North Moravia, Czech Republic - see Fig. 13. However, to simplify their construction, their deck slab is cast in a formwork formed by precast members see Figs. 14 and 17. The first viaduct, the Bridge across the Hrabynka Creek Valley (Bridge 206) of the total length of 330.0 m, is formed a continuous girder of 6 spans of lengths from 39.0 to 66.0 m, the second one, the Bridge across the Kremlice Creek Valley (Bridge 207) of the total length of 528.0 m, is formed by a continuous girder of 11 spans of lengths from 33.0 to Figure 13. Construction of the Bridge across the Kremlica Creek Valley.

Figure 14. Bridge structure. 57.0 m - see Fig. 15. While the Bridge 206 has a straight axis, the Bridge 207 is in a plan curvature with radius of 900 m that transfers by a transition curve into the straight axis. Both directions of the highway are carried by a bridge decks formed by a steel girder and a 25.5 m wide composite deck slab see Fig. 16. The steel girders of the trough cross section assembled of top and bottom flanges and inclined webs are supplemented by central stringer and two edge stringers. While the central stringer has I cross section, the edge stringers have V shape with smooth surface that simplify the bridge maintenance. At distance of 3.0 m the stringers are supported by diagonal pipes attached to the girder s bottom corners. The shape of the structure is secured by top transverse ties anchored at the top flanges and at the edge and central stringers see Fig. 17. The deck slab is composite of precast slab members and additionally cast deck slab. Figure 15. Composite viaducts: elevations. Figure 16. Cross section of the Bridge across the Hrabynka Creek Valley.

Figure 17. Progressive assembly of the deck. The precast members of thickness of 100 mm are stiffened by steel trusses welded from reinforcing bars see Fig. 18. Their function both, for erection and service load, was verified by loading tests done at Brno University of Technology [2]. Both bridges are incrementally assembled beyond the abutments and consequently launched into a design position. The steel structure of the Bridge 206 is assembled of 20 segments of lengths from 13.0 to 21.3 m. The steel structure was incrementally launched with precast members; only a part of the structure of the length of 66 m beyond the launching nose was formed by the steel section. When launching was completed, remaining precast members were erected and the deck slab was progressively cast. The steel structure of the Bridge 207 is assembled of 25 segments of lengths from 13.0 to 29.0 m. Due to the complex bridge geometry the steel structure is assembled from two parts and it was launched from both abutments. The division is situated at the fifth span at the point of zero bending moment approximately in the place, where the strait bridge axis follows the transition curve. At first, the part of the steel structure close to the abutment 1 was incrementally assembled and launched, and then the part of the structure close to abutment 12 was assembled and launched. Due to the variable plan curvature the launched structure was Figure 18. Precast formwork. Figure 19. Buckling of the reinforcing bar.

Figure 20. Lunching of the Bridge 206. Figure 21. Lunching of the Bridge 207. temporarily supported by pier transverse steel girders that allowed a transverse movement of the deck. To reduce the weight of the launched structure, the steel structure was launched without precast members. After connection of both parts the precast members were progressively erected and the deck slab was cast. Conclusions The described structures were erected without any significant problems. They proved to be elastically pleasing and cost effective. Acknowledgments The bridges were designed by a design firm Strasky, Husty and partners, Brno, Czech Republic. The general contractors of the bridges in Slovakia are Eurovia SK, Kosice, and Strabag, Bratislava, Slovakia. The general contractors of the bridges in the Czech Republic are Eurovia CS, Prague and SKANSKA, Prague, Czech Republic. References 1. Novotny, P.- Juchelková, P.- Juris, M. Pawelczak, M.: Bridges with progressively erected cross section. Design of Concrete Structures Using Eurocodes. Third International Workshop Vienna, September 20-21, 2012. 2. Klusacek, L.- Necas, R.- Dvorak, T.- Strasky, J.: Zkoušky prefabrikovaných filigránových panelů mostovky před a po spřažení - most přes údolí potoka Hrabynka. 17. Betonarske dny, Hradec Kralove 2010.