R E CYC L E RAC K. Green By Design

Similar documents
ROLLING RACK. Simple Security

B R OA DWAY RAC K. High Security

US Pool Lift Model #114 (Independence) Installation Guide

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

BioPrism Solid Surface

Installation Instructions

Single Post Anchor Part Number Spectrum Lane ~ Missoula MT ~

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Model # 158-P4. 12/12/2013 Page 1 of 11

Console Table Legs & Console Table Top

SECTION ORNAMENTAL ALUMINUM FENCING

Model # 238HS-P8. 4/27/2011 Page 1 of 11

Zurn Z874. Trench Drain System. Installation Instructions

Zurn Z886. 6" Perma-Trench. Installation Instructions

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

Installation Instructions

FIVE STAR PRODUCTS, INC. (800)

SPECIFICATIONS: Architectural Aluminum Railings

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

Model # 358-R48. 7/7/2011 Page 1 of 11

Aegis Heavy Capacity 20K Floor Scale. MODEL: 6200 Series. Installation Manual

Underground Exhaust System

Blue-Tip SCREW-BOLT. Ratchet teeth locks head against fixture. Reverse parabolic threads privide high load capacity

ROOF MOUNT KIT OWNERS MANUAL

Underground fire hydrants

CHEMICAL /4" 3/8" to 5/8" /8" 3/4" to 1-1/4" 1 10

Model #369SM-RDP. 8/23/2016 Page 1 of 10

Model # 362S-RDP. 9/17/2012 Page 1 of 12

Model # 358H-PR. 4/8/2011 Page 1 of 12

Smarter. Safer. Leaner.

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

University of Delaware

Model # BT238-U6. 9/30/2014 Page 1 of 12

TRANSPORT II " 10.5" MOUNTING POSTS FENCE LINE POST. Classic gate shown GATE OPENING CANTILEVER GATE SAFETY WARNING

ZS880 Linear Shower Drain Installation Instructions

FEATURES APPLICATIONS. Technical data sheet SSW - STEEL STRONG-WALL FOR TIMBER FRAME RACKING RESISTANCE.

SECTION METAL FLOOR PLATE STAIRS

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

Model # BARK-358-RDP

Installation Instructions

Model # 238-U6. 5/24/2013 Page 1 of 11

Protective Capony RTC-16

Linear Drainage ZF806 ZF812

CITY OF FARGO SPECIFICATIONS SIGNING

Foundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing

A. Section Includes: SpectraPour Poured-in-Place Playground Surfacing System

GroundTrac. Installation Manual

1 PVC or ABS drain with strainer

Model # 338S-OP. 9/30/2011 Page 1 of 13

Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations

SPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S

GGI-750. Gravity Grease Interceptor Technical Data. Submittal Special Precautions Specifications Installation

INSTALLATION INSTRUCTIONS FOR ELECTRICAL CONTRACTORS

Freedom Barrier Free Shower Pan Installation Instructions

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

SECTION HANGERS AND SUPPORTS FOR PLUMBING

INDUSTRIAL GUARDRAIL SYSTEMS

SECTION METAL MATERIALS, METHODS AND FASTENING

March 3, Addendum No. 1

Tactile Pad Installation Guide. All Surfaces.

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

MASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.

FallZone Poured-in-Place Specification

hors Anc Eaton's B-Line series fasteners 183

FORMING THE RETAINING WALL FOUNDATION OUTER WALL

SECTION PANEL SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

CIA-GEL 7000 EPOXY. One Product For All Applications ADHESIVE ANCHORING SYSTEMS FOR CONCRETE AND MASONRY

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

SECTION 716 SIGN MATERIALS SCOPE

H 12 Heavy Duty Modern Tripod 8 Seat Swing Heavy Duty Hangers

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

Ultra Aluminum Fence, Rail & Gate Specifications

DIY Decking Guide Planning your Project Easy Step by Step Guide Simple Illustrations Maintainence

Model # 338S-RDP. 7/31/2012 Page 1 of 13

Freedom One-Piece Barrier Free Showers Installation Instructions

CONCRETE PLANTERS. Max Protection with Greening

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

SEM EXPANSION JOINTS.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

ANCHORS Mechanical & Chemical Anchoring

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available.

Important: Before You Start

D-1 FIRE PROTECTION PRODUCTS TAPPING VALVE. MUELLER Tapping Valves. MUELLER Tapping Sleeves and Crosses. MUELLER Stainless Steel Tapping Sleeves

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper

1.02 DESCRIPTION A. This Section specifies furnishing and installing Surface Applied Detectable/Tactile Warning Surface Tiles where indicated.

B-500 / B-600 SERIES

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)

Raised Basement. Mechanical Installation Guide

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

PIPE AND TUBE RAILINGS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

Transcription:

R E CYC L E RAC K Green By Design Take green to the next level with the Recycle Racks. Combining basic materials with innovative design, Dero has created a completely unique bike rack. The Recycle Racks are made of 99% recycled content and are available in environmentally-friendly, powder coated finishes. The Recycle Racks Tree and Circles forms attract the eye and provide great support for bicycles.

99% Recycled Content FINISH OPTIONS Powder Coat White Black Light Gray RAL 7042 Deep Red RAL 3003 Yellow RAL 1023 CNH Bright Yellow Orange RAL 2004 Blue RAL 5005 Sky Blue RAL 5015 Hunter Green RAL 6005 Light Green RAL 6018 Green RAL 6016 Sepia Brown RAL 8014 Bronze Silver 9007 Dark Purple Flat Black Wine Red RAL 3005 Beige RAL 1001 Iron Gray 7011 Thermoplastic Black Green Red Blue Gray Brown

Submittal Sheet CAPACITY 2 Bikes MATERIALS #8 rebar, 99% recycled content 19 35 FINISHES MOUNT OPTIONS Powder Coat Our powder coat finish assures a high level of adhesion and durability by following these steps: 1. Sandblast 2. Epoxy primer electrostatically applied 3. Final thick TGIC polyester powder coat In-ground In ground mount is embedded into concrete base. Specify in ground mount for this option. Surface Tree Rack has one 5 circular foot with three anchors per foot. Circles Rack has one 8.5 x4.5 foot with four anchors per foot. 31 31 IN-GROUND MOUNT SURFACE MOUNT 12 12 36 36 18 24 10

Setbacks WALL 36" WALL 45" STREET 36" 59" STREET

Installation Instructions Surface Mount TOOLS NEEDED Tape Measure Marker or Pencil Masonry Drill Bit Drill (Hammer drill recommended) Hammer Wrench 9/16 Level RECOMMENDED BASE MATERIAL Solid concrete is the best base material for installation. To ensure the proper anchors are shipped with your rack, ask your Dero Rack representative which anchor is appropriate for your application. Be sure nothing is underneath the base material that could be damaged by drilling. 1 2 Place the rack in the desired location. Use a marker or pencil to outline the holes of the flange onto the base material. Drill 3/8 diameter holes 3 deep into surface. Make sure the holes are at least 3 away from any cracks in the base material. 3 4 Place rack (and washers to level rack if necessary) over holes. Thread nuts onto anchors, leaving approximately 1/4 of the anchor protruding, and tap into surface. Tighten nuts down to secure rack.

Installation Instructions In Ground Mount TOOLS NEEDED Level Cement mixing tub Shovel Trowel Drill with 1.5-2 diameter bit Access to water hose Materials to build brace (see Install Tip at bottom of page) INSTALLING INTO A NEW SIDEWALK 1 Final grade level 2 Poured concrete (4-7 deep) Sand pour bed Place corrosion resistant sleeve (min. 4 inside diameter) in sand pour bed in exact location where rack will be installed. Make sure top of sleeve is at same level as desired finished concrete surface. Fill sleeve with sand to keep it in place and prevent it from filling with concrete. Pour concrete and allow to cure. 3 INSTALL TIP After appropriate cure time, dig out sand from sleeves and insert racks, making sure they are level and at the appropriate height. Pour in Por- Rok or epoxy grout and allow to set. An easy way to brace the Recycle Rack while the grout sets is to bolt two 1x4 boards together at one end and clamp them onto the legs of the Recycle Rack like a clothes pin.

Installation Instructions In Ground Mount INSTALLING INTO EXISTING SIDEWALK 1 2 Drill holes no less than 1.5 diameter and no less than 6 deep into sidewalk. Fill hole with Super Por Rok or epoxy grout 1/2-2/3 full starting from the bottom to prevent air bubbles. 3 Place Recycle Rack into holes. Make sure the rack is level and held in place until the grout has set.