Fixed & Tilt-Over Cabinet Base TC & TCTO Range

Similar documents
comprehensive product guide

When quality, delivery, and installation are paramount... WEC are the largest manufacturer of Motorway CCTV columns for the UK highway infrastructure

SPECIFICATION FOR TUBULAR STEEL LIGHTING COLUMN. Reference is made in this Specification to the following:

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

Stainless steel. 1.6 Stainless steel IP 69 K. Premium Panel, protection category IP 69K

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.

Steelwork and Security Kiosks

Roof Accessories. Division Roof Hatches Roof Safety Rails Safety Posts. Division Smoke Vents

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION ORNAMENTAL ALUMINUM FENCING

Steelwork and Security Kiosks

Electric Service Standards

Daytona Beach Pier Building Renovation Jun 2010

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

BoSS Climalite Camera and lighting tower

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

OVERSHOT GATE TECHNICAL DATA SHEET

Delivering Reliability. Electrical Vaults. Power & Energy-Underground Structures

TS 805 POLES TTS CONSTRUCTION SPECIFICATION FOR POLE INSTALLATION TTS MATERIAL SPECIFICATION FOR STEEL POLES BASE MOUNTED

City of Winnipeg BASES, HANGERS AND SUPPORTS Section NEWPCC - Pump Well Isolation Page 1 of 6 Tender No June 2003

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SPECIFICATION FOR REINFORCED SOIL WALL

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

TELECOMMUNICATION TOWERS & CAMOUFLAGE SOLUTIONS CATALOGUE

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION VIBRATION ISOLATION

660 Volts 630 & 800AMP

Attachment A-Flagpole(s) Specifications

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets

Safety Ladders: Made of Aluminium

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

WALL MOUNTED ARTICULATING JIB CRANE

C. Concrete Inertia Bases: Drawings showing required concrete steel reinforcing, construction details, and dimensions.

ROLLING RACK. Simple Security

THE COMPLETE RANGE OF BASE-HINGED & STANDARD COLUMNS LIGHTING COLUMNS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POLES

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

SECTION METAL FLOOR PLATE STAIRS

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

Air flue duct for use with ecotec boilers

801-MORD Mordred FIXING: Ground. ORDER No: CUSTOMER: Complied by Date AB 30/06/15 ISSUE ECN DATE SIGN /07/15 AB

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

The City of Winnipeg SECTION ST. VITAL LIBRARY RENOVATION PROJECT 6 FERMOR AVE. Page 1 of 5

.1 Underwriters' Laboratories of Canada (ULC)..1 CAN/ULC-S102-M88(R2000), Surface Burning Characteristics of Building Materials and Assemblies.

R-Group Finland Oy. REA Lifting Inserts Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved

SECTION CHAIN LINK FENCES AND GATES (PARK)

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available.

Light-Metal Roof Edge, Raised

B R OA DWAY RAC K. High Security

M21Si ISO and M21Vi ISO Reduced Bore Ball Valves DN15 to DN150 Flanged PN40

SECTION OUTLET, PULL, AND JUNCTION BOXES

RAISED ACCESS FLOOR SYSTEM TECHNICAL SPECIFICATION

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

Standard Parts. Ganter. Highlights Standard Parts in Hygienic Design

SECTION METAL FABRICATIONS

VPL-3200B Residential Vertical Platform Lift Technical Specifications

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

MASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.

SECTION CHAIN-LINK FENCES AND GATES 02821/1

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION DECORATIVE METAL FENCES AND GATES

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

General Symbols, Ducts and Cables

THE WORLD LOOKS UP TO COMPOSITE ELEVATED TANK

Conergy SolarFamulus II

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

Series PV. Compact Switchgear Cabinets. Construction subject to change without notice Dimensions in mm

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

MDS TL5 Minimum Deflection Systems

PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

HEKAPLAST. PE-HD twin wall cable ducts and cable protection pipes for underground installation. Corrugated and Twin Wall Pipes of Plastics

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

MERCHANTS METALS. A. ASTM F552 Standard Terminology Relating to Chain Link Fencing

IBC Compliant Seismic Rated Isolators

Installation plan. Tumble dryer. PT 8807 EL (Electrically heated) en - US Mat. NR / 02

Introduction. Disclaimer. Table of contents

A World of Solutions Visit Composite Elevated Tank. Elevated Water Storage

A. Coordinate concrete unit masonry (also termed CMU and block ) work with work before and after, especially:

HF Tower Collapse ! We re not the only ones. NSARC HF Operators 1 KFI KRBC-TV

Fire Rated Cable Support Systems

DOWNSPOUT Sc.ale: None

Design Standard Conduit for Electrical Systems

SPORTS AND STADIUM LIGHTING. Solutions for Amatuer and Professional Athletic Venues

ROOF MOUNT KIT OWNERS MANUAL

Smarter. Safer. Leaner.

Transcription:

TC & TCTO Range Technical Specification All dimensions in mm unless otherwise stated Standards Applicable - Structural Steelwork: BS EN 10210-1:1994, BS EN 10210-2:1997 - General Steelwork: BS1449:1991, BS1387:1985, BS EN 10025:1993 - Hot Dipped Galvanized: BS EN ISO 1461:2009 - Fasteners: Grade 8.8 BS3692:2001 BS4190:2001, DIN931, DIN934 - Welding Procedures: Comply with BS EN 1011-2:2001 - Design Wind Loading: In accordance with CP3 chapter V Pt 2 & BS 6399 Pt 2:1997 - Paint Finishes: BS4800 and RAL colour range 4 holes - for standard PTZ camera fixings equi-spaced on 101.6 PCD 312 2 off - M25 conduit thread Pole convection venting prevents condensation Decorative banding fitted as an option Lockable access door on integral sealed cabinet WUA removable winch Clear area before lowering pole 1730 400 Sq. cabinet 746 c/w equipment wooden mounting backboard Earthing points within pole & door TCTO TC Pocket type root available as an option Options & Accessories Enlarged cabinet (500 Sq.) All pan/tilt, dome, fixed camera mount bracketry Transferable winch for tilt-over columns Double door access (partitioned cabinet) Camera wash equipment (static columns only) Ornate camera mounting brackets Product Ref & Ordering Information Town Centre 400 Sq. Cabinet Based Column Tilt-Over Column Column Height in Metres Heavy Duty Column when minimum deflection is required i.e. high zoom lens camera TC TO 6 HD 41

TC & TCTO Range Base and Windload Specification Concrete Foundation Table X x Y x Z A minimum soil bearing pressure of 75 KN/m2 is assumed 300-330 60-70 TC 4 bolt root 50 All studs must be level and square 450 550 Installation Method 1. From the map, select location of installation 2. Excavate as per recommended area and depth 3. Assemble root base as shown in fig. 1 4. Insert root base into the hole ensuring that it is level and that the four studs protrude 60-70mm above the concrete foundation 5. Fit the cable duct if routing via the interior of the column. A plastic pipe of approximately 100mm outside diameter is recommended for this. Ensure this protrudes through the template by 50mm minimum. 6. Pour concrete ensuring that it is a mix of C35 to table 6 BS 8110 and then tamp down well 7. Fit the setting template over the four protruding studs, double-checking that they are level and that clear access can be gained to the cable duct if it is being used 8. Leave the concrete to cure for a minumum of 72 hours prior to attempting to erect the column 9. When fitting the column, ensure that the concrete base is in complete contact with the underside of the column and grout accordingly 10. When the column has been fitted, protect the studs with a suitable protective coating. Denzo tape or similar is recommend for this fig. 1 Template TC Root Assembly (4 bolt assembly shown) studs TC 8 bolt root 550 crs. 575 crs. 645 Sq. Anchor plate Secure template to studs using nut top & bottom 42

CB & CBTO Range Technical Specification All dimensions in mm unless otherwise stated Standards Applicable - Structural Steelwork: BS EN 10210-1:1994, BS EN 10210-2:1997 - General Steelwork: BS1449:1991, BS1387:1985, BS EN 10025:1993 - Hot Dipped Galvanized: BS EN ISO 1461:2009 - Welding Procedures: Comply with BS EN 1011-2:2001 - Fasteners: Grade 8.8 BS3692:2001 BS4190:2001, DIN931, DIN934 - Design Wind Loading: In accordance with CP3 chapter V Pt 2 & BS 6399 Pt 2:1997 - Paint Finishes: BS4800 and RAL colour range 4 holes - for standard PTZ camera fixings equi-spaced on 101.6 PCD 2 off - M25 conduit thread Pole convection venting prevents condensation Lockable access door on integral sealed cabinet c/w equipment wooden mounting backboard 1680 WUA removable winch Clear area before lowering pole 325 Sq. cabinet 746 312 550 x 550 High security door option Earthing points within pole & door TC325 baseplate (details overleaf) 300 x 300 Cable access CBTO CB Accessories & Adaptors Product Ref & Ordering Information CB(TO)/ACB Anti-Climb Bracket CB(TO)/CS150-300 Column Spacers 150mm-300mm CB(TO)/Paint Paint to BS4800 & RAL Colours CB(TO)/TBC Telemetry Clamp Bracket CB(TO)/SDA Swept Dome Adaptor CB(TO)/HSD-F High Security Door Option CB(TO)/SDA2 Swept Dome Adaptor Dual CB(TO)/LS Ladder Support CB(TO)/PT1-S2 1 Pan & Tilt c/w 2 Static Adaptors CB(TO)/TPTA Twin Pan & Tilt Adaptors CB(TO)/2SA Twin Static Adaptor CB(TO)/1SA Pan & Tilt - Single Fixed 325 Sq. Cabinet Based Column Tilt-Over Column Column Height in Metres CB TO 6 43

CB & CBTO Range Base and Windload Specification Concrete Foundation Table X x Y x Z A minimum soil bearing pressure of 75 KN/m2 is assumed 300-330 60-70 fig. 1 studs Anchor plate Template 50 550 Sq. 450 crs. TC325 Root TC325 Root Assembly All four studs must be level and square Secure template to studs using nut top & bottom Installation Method 1. From the map, select location of installation 2. Excavate as per recommended area and depth 3. Assemble root base as shown in fig. 1 4. Insert root base into the hole ensuring that it is level and that the four studs protrude 60-70mm above the concrete foundation 5. Fit the cable duct if routing via the interior of the column. A plastic pipe of approximately 100mm outside diameter is recommended for this. Ensure this protrudes through the template by 50mm minimum. 6. Pour concrete ensuring that it is a mix of C35 to table 6 BS 8110 and then tamp down well 7. Fit the setting template over the four protruding studs, double-checking that they are level and that clear access can be gained to the cable duct if it is being used 8. Leave the concrete to cure for a minumum of 72 hours prior to attempting to erect the column 9. When fitting the column, ensure that the concrete base is in complete contact with the underside of the column and grout accordingly. Torque the nuts to 230-270 Nm (175-200 fl. lb.) 10. When the column has been fitted, protect the studs with a suitable protective coating. Denzo tape or similar is recommend for this Foundation sizes are determined for three sets of wind speeds, which will cover most of the British Isles. Area A = 44m/s (98mph) Area B = 48m/s (107mph) Area C = 52m/s (116mph) Maximum gust speed is likely to be exceeded on average once every 50 years at 10m above the ground in open level country. 44

TC, CB, TCTO, CBTO Accessories Range of ornate arms available Conduit gland M25 threaded entry Tube to wiper spray nozzle Venting as standard Outline of customer CCTV camera Decorative banding Cabinet size options 325 / 400 / 500 Fan assisted cooling Double door access for partitioned cabinet (TC & CB only) Option Condensation drip tray with outlet pipe 400 Sq. cabinet Removable access door 3 options available - TCD - HSD - 4PL CCTV equipment mounted onto marine ply backboard Access door for wash bottle 5 litre wash bottle Tamperproof micro switch 342 746 x 312 Standard aperture Pocket type root available as an option 45

TC, CB, TCTO, CBTO Accessories Optional Extras Door Options Moderate risk area 2 point locking High risk area 3 point locking Very high risk area 4 point locking TCD Standard door One key required - Louvered door - Close fitting and flush door - Self grip rubber door seal - Secure compression locks - Earthing lugs Compression latches, locks door & pulls tight with one half turn HSD High security door Two keys required - Louvered door - Close fitting and flush door - Self grip rubber door seal - 2 secure compression locks and 1 high security lock - Earthing lugs - Protection shrouds for each lock High security lock c/w protection shroud 4PL Vault type door Three keys required Tamperproof escutcheon plate 4 off retractable locking bolts - Louvered door - Close fitting and flush door - 2 high security locks - Earthing lugs - Tamperproof escutcheons for each lock - Stainless steel locking mechanism 46