PRE-QUALIFICATION NOTICE FOR INCINERATOR PROJECT

Similar documents
MultiZon incinerator for batch operation

Incinerator Options. Surefire TS Fixed Hearth Incinerators. todaysurematthews.com +44 (0) Application. Throughput Capacities

to a medium range machine. Our Mini Plus machine is capable of a burn rate of up to 50kg per hour cleanly We also manufacture high capacity burn rate

SUGGESTED SPECIFICATIONS Pump Frames through 64132

MP-400. The most thermally efficient, robust and reliable medical incinerators on the market. Simply Built Better!

Callidus Oxidizer Systems. Thermal and Catalytic Oxidizer Systems

RL SERIES. Two Stage Light Oil Burners FIRING RATES LIGHT OIL

Combustion Laboratory Unit C492

MP-300. The most thermally efficient, robust and reliable medical incinerators on the market. Simply Built Better!

Citations from CRF as required in WV DEP's 45CSR24

INDUSTRIAL BOILER. Moving step grate Under feed firing HPKI-R HPKI-K

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

Evaporative Gas Cooling and Emissions Control Solutions

Manufacturer since 1930 s ATI ENVIRONNEMENT. Presentation. Dr. KIM Moody. Oct. 15, 2014

Date: March 10, Dear Sir/Madam,

ADVANCED PUMP TECHNOLOGY.

S THERMAL OXIDIZER SOLUTIONS TO MEET TOMORROW S CHALLENGES

REQUEST FOR QUALIFICATIONS. Design/Build Project Number CP Power Plant - Boiler 10 Gas Burner Replacement

SECTION SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES

TUV SUD BABT PRODUCTION QUALITY CERTIFICATION SCHEME

Design, Fabrication, Supply, Installation & Commissioning of Scissor Lift for ITMT Building at. CREST, Hosakote. Indian Institute of Astrophysics

OIL-INJECTED ROTARY SCREW COMPRESSORS. G ( kw / hp) / G VSD ( kw / hp)

The choice for innovative flue gas treatment. Sorbacal SPS, the most effective calcium sorbent on the market

DESIGN OF GRAIN DRYER

Preparatory study for Steam Boilers Ecodesign

EUROPASS DIPLOMA SUPPLEMENT

Your partner for the right solution

Technical Specification Industrial Series - IS2 to IS48 Systems. CapDI Benefits. Feed Water Quality. Design and Scope of Supply.

Flygt N-Pumps 3085, 3102 & For reliable and efficient wastewater handling

Texas Industries of the Future November 20, 2013

NCE Energy saving circulating pumps

Biomass Gasification

Flygt C-pumps Submersible waste and raw water pumps

// XPLORER-NS. Total Nitrogen and Sulfur Analyzer

Worldwide Pollution Control Association. August 3-4, 2010

INNOVATION BEYOND TECHNOLOGY

Commercial and Industrial Solid Waste Incinerator (CISWI) Rules Final Reconsidered Rules Requirements Summary

NOTIFICATION OF COMPLIANCE (NOC) WITH THE REQUIREMENTS OF 40 CFR 63 SUBPART EEE FOR THE FIXED BOX INCINERATOR #2

Industrial Process & Pilot Plant

PPC specializes in maximum efficiency air pollution control equipment using a variety of different

Microgeneration Certification Scheme: MCS 008

European Machinery Directive 2006/42/EC & Related Directives

Model M120 Mini Temperature/Humidity Meter

Powder Dosing Solutions

Biomass Boiler Emission Abatement Technologies. Simon Wakefield

Bio-medical Wastes Disposal Incinerator Systems - Understanding, Criteria and Analysis For Comparative Selection, By Homi R. Mullan.

Request for Quotation (RFQ) for the provision of mechanical design and construction services to the CSIR CSIR RFQ:

Technical Description Package Micro Auto Gasification System (MAGS )

Hamm MW Pyrolysis Plant. Integrated Pyrolysis into Power Plant Plant capacity 100,000 t/a Pre-processed Waste Materials

Company Introduction

TÜV SÜD BABT Production Quality Certification Scheme

METHODOLOGY FOR ENERGY AUDITS IN POWER PLANTS REGARDING ANALYSIS OF ELECTRICAL ENERGY CONSUMPTION

Flygt 3171, 50Hz. Technical Specification

GENERAL PROVISIONS: Furnish and install one steel deck platform motor truck scale and associated electronic controls.

Final Report. Toxic Reduction Plan. Conestoga-Rovers & Associates 651 Colby Drive Waterloo, Ontario N2V 1C2.

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

P.O. BOX 24 CALEDON 7230 TEL:

Biotec 1-4 Package Sewage Treatment Plants

Technical and Economic Evaluation of a 70 MWe Biomass IGCC Using Emery Energy s Gasification Technology

Environmental Management Procedure (EMP)

Kawasaki Gas Turbines-Americas Gas Turbines Power Generation Technology & Applications

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

Manual Rotary Heat Sealers. Type: F108TX. List of content : Introduction 2. General description 3. Application 4. Safety precautions 5

/ /

RIELLO 40 N SERIES. One Stage Heavy Oil Burners FIRING RATES HEAVY OIL. N kw N kw

AP-25 Plasma System AP-25 PLASMA THERMAL SPRAY SYSTEM

STATE OF NEW JERSEY Honorable Jon S. Corzine, Governor

NOTICE INVITING TENDER

Comparison of Dry Sorbent Injection of Sodium Bicarbonate, Lime, and Carbon and Their Control of Dioxins/Furans, Mercury, Chlorides and Sulfur Dioxide

APPROVAL FOR HAZARDOUS (BIOMEDICAL) WASTE INCINERATION PLANT FOR HOSPITALS

SECTION DUCTILE IRON PILES

REQUEST FOR PROPOSALS

EPA EMISSION RULES - BOILERS

UPS Electrical Design and. Installation. critica POWER SUPPLIES

SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S

Course 0101 Combined Cycle Power Plant Fundamentals

2. How can the University have an expansion of the Cogeneration Facility without an increase in the amount of coal used?

// XPLORER-NS. Full range Total Nitrogen, Total Sulfur instrument for the modern Laboratory.

Waste to Energy WTERT, N.Y., October 2008

Islamic Republic of Iran Ministry of Petroleum Vendor Evaluation Questionnaire

AUTOMATIC BALING PRESS MODEL: HRB-CENTURION 200HP; 13/9

Information Pack BG25 / BG50

WHAT S INSIDE 11 TECHNICAL INFORMATION 18 HYDRAULIC PRINCIPLE DRAWINGS 20 BUFFER VESSELS 23 TECHNICAL SUPPORT 23 DECLARATION OF COMPLIANCE

Utilities Used in Production 129

Biomass Boilers & Stoves

tec.nicum Services relating to machine safety and industrial safety

Flygt 3057, 50Hz. Technical Specification

Product catalogue. Compliant with EN norm

Best Practices Learned from Greenhouse Gas Reporting

ENGINEERING CONSULTANCY SERVICES

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard.

THE DESIGN PROCESS HEALTHCARE DESIGN RESOURCE INDUS HOSPITAL, KARACHI PAKISTAN AUGUST 2010 AUG. 02, 2010

Benefits of variable speed drives in sugar production

FOR SALE Nov USED METAL WORKING EQUIPMENT. HORIZONTAL CONTINOUS CASTING LINE FOR COPPER BILLETS Consisting of INDUGA 2.2 IR

Steam Power Station (Thermal Station)

Uniform Environment, Safety, and Health (ESH) Specification for Equipment Procurement (v.1.3)

QUALITY AGREEMENT. This Quality Agreement is made between. (Customer Legal Entity Name Hereinafter called CUSTOMER ) And

DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY

United Induction Heating Machine Limited of China. Product Catalog

NUCLEAR POWER CORPORATION OF INDIA LTD. (A GOVT. OF INDIA ENTERPRISE) SPECIFICATION NO.PB-E-542/REV. No.0

Transcription:

PRE-QUALIFICATION NOTICE FOR INCINERATOR PROJECT Page 1 of 9

BACKGROUND: Aga Khan Hospital & Medical College Foundation (AKHMCF) is a Joint Commission International accredited tertiary care hospital. It is a philanthropic, not-for-profit private institution committed to provide exemplary high quality health care. AKHMCF has its own incinerator that is used to incinerate all medical waste produced in the hospital. This is in compliance to Environmental Protection Agency (EPA) - Pakistan Standards, where a dedicated medical waste incinerator is required to incinerate medical waste through a controlled burning process. As the health care facilities at the hospital grow, it is necessary to increase the incinerator capacity. It is therefore imperative that a new incinerator is added to the existing incinerator at the hospital premises. REQUIREMENT: Pre-Qualification Notice for the Incinerator Project at the Stadium Road campus in Karachi, Pakistan is issued for pre-qualification. Contractors / bidders should be familiar with latest trends in technology in areas of Incineration of Medical Wastes. Details of the requirement are attached herewith; marked as Annexure A for specification & as Annexure B for Drawings. Documents to be furnished in the Proposal for Pre-Qualification The bidders seeking pre-qualification for aforementioned project are requested to submit the following documents and details as a minimum for evaluation: 1. Complete administrative and financial details of the company with audited annual financial statements for the last 3 years. 2. Details of the company: established year, total number of employees and local agent details in Pakistan. 3. Written confirmation that the Company is in good standing with all tax, Government and Regulatory bodies. 4. Full disclosure of all legal dispute and claims. 5. Organizational chart and experience and qualification of key personnel. 6. List of similar contracts executed over the past 10 years with past performance / testimonials from clients. 7. Brief on Health, Safety, Environment, Quality Assurance, ISO Certification and Control systems followed. 8. Compliance certificate with all the requirements, as stated in AFD s website. 9. Any other document in support of pre-qualification. Interested bidders are requested to submit their details within 21 days of publication of this advertisement along with above details in two hard copies, two CDs and also send all information through email to procurement@aku.edu Page 2 of 9

Hard copies to be submitted as per below mentioned details, envelope should mention Incinerator Project and addressed to: Senior Manager, Material Management Division Purchase Department Aga Khan Hospital & Medical College Foundation PO Box 3500, Stadium Road Karachi 74800 - Pakistan Annexure A Specification 1 Plant Overview A continuous loading incineration system with a capacity of 350 kg/hr. 24 hours [8.4 tons/day]. It includes a fully automatic feeding system and automatic de-ashing system to minimize user intervention. A pollution control ceramic filtration system captures all the gases, soot and entrained solids. Waste to move to the combustion chambers, namely primary chamber, secondary chamber and chimney. Process to be controlled by modulating combustion air injection and control of ignition burners. 2 General Make / Origin Spare parts list Consumable and incidental spare list Transportation / lifting / placement /assembling at AKHMCF site European / American One year free of cost One year free of cost [supplier needs to provide a comprehensive list] By supplier Page 3 of 9

Supervision / installation /startup /commissioning and training Operation/maintenance period Warranty Period: from the date of commissioning Necessary tools and gauges 30 days training of AKU staffs at site Pre-shipment machine testing at premises. Operating /maintenance manual /drawings in Auto-cad-format Site inspection Scale Fire protection system /control damper By supplier 18 months 24 months By supplier free of cost By supplier free of cost By supplier free of cost 4 sets in bounded hard copy inclusive electronic file CD. Local vendor representative will inspect the site. 1 No [ vendor will supply a scale at the entrance to provide accounting of the amount of amount of waste] AKHMCF provided at site Pollution control Vendor to include as per standard Final Ash Disposal Vendor needs to incorporate Combustion efficiency Vendor needs to incorporate Page 4 of 9

Shredder Vendor needs to incorporate 3 International Standard / CE Compliance : The whole Plant and associated equipment supplied as part of the overall installation will comply with the international standard. Design Emission Standard in compliance with EU standard 2000/76/EC Gas treatment standard in compliance with EE standard 2000/76/EC-4/12/2000 Industrial thermo processing part 2 BS E7N4 6-2: 1997 Low voltage directive 73/32/EEC Compatibility regulations 89/336/EEC, EMC Machinery Directive 89/392/EEC 4 Technical Specifications Plant Duty Incinerator type Pyrotec, Semi Pyrolytic Chamber Type of system : Stationary or equivalent Waste type : Medical Waste Waste CV range Waste CV design Waste density range Waste density design 8 Mj/kg to 20 Mj/kg 14 Mj/kg 70 kg/cu.m to 600 kg/cu.m 200 kg/cu.m Hourly Capacity of the system : 350 kg/hr. Page 5 of 9

Thermal capacity Destruction capacity Operating regime 1,400,000 kcal/hr. 8.4 ton / day Up to 20 to 24 hours/day Primary operating temperature : 1,000 C or equivalent Secondary operating temperature : 1,100 C or equivalent Fuel type : Natural Gas / Diesel Installation Area : Existing Infrastructure Layout is attached Maximum heat capacity : 1,225,000 Kcal/hr. 5 Treatment system Automatic loading system Automatic de-ashing system Heat exchanger Flue Gas treatment system Treatment of gases during combustion process Hydraulic Unit or equivalent upward direction Air-cooled type or equivalent By Dry / Wet Scrubber or equivalent By Ceramic filtration system or equivalent 6 Plant Utilities Power Supply Electric Motor 400 volt/ 3 phase / 50 Hz TEFC squirrel cage induction motor, class F insulation IP 54 Page 6 of 9

Capacity 45 Ampere Anticipated Usage 6 Kw / hr. Light fuel oil supply Class D, NCV 42.8 Mj/kg Capacity 70 litre/hr. Anticipated Usage 27 litre/hr. Raw water [ash quenching only] supply City water at 3 bar Capacity 1000 litre/hr. Anticipated Usage 10 litre/hr. Sorbent Powder or Sodium Bicarbonate supply Capacity Anticipated Usage Natural gas pressure Technical grade via 1 m 3 bags or equivalent 50 kg/hr. 14 kg/hr. 8 psi 7 Chimney Existing chimney length is 12 meter and width is 24 dia Not required [existing to be utilized] Page 7 of 9

Annexure B Drawings Page 8 of 9

Page 9 of 9