PRE - FEASIBILITY REPORT

Similar documents
PRE-FEASIBILITY REPORT

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

PRE FEASIBILITY REPORT

PRE- FEASIBILITY REPORT

Environmental Clearance Compliance Half Yearly Report

The Ramco Cements Limited RR Nagar. P.M.RAMASUBRAMANIAN GM Process & QC Sr. Manager - Process S.V.Veeraraghavan Asst.

PROJECT FEASIBILITY REPORT

Performance Analysis of Cement manufacturing Industry

PRE-FEASIBILITY REPORT. for

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

Hind Energy & Coal Beneficiation (India) Ltd.

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

ACC Limited CHAIBASA CEMENT WORKS

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

PRE FEASIBILITY REPORT

SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

Mangalam Cement Ltd.(Unit I)

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A

Mangalam Cement Ltd.

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

PRE-FEASIBILITY REPORT

IMS (Integrated Milling System)

Mangalam Cement Ltd. (Unit-II) Stack No.

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

- 1 S. NO. PARTICULARS DETAILS

INDUSTRIAL ACCESSORIES COMPANY

Capacity Enhancement and Energy Conservation in Cement Plant

CEMENT MANUFACTURING PROCESS

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

SANGHI INDUSTRIES LIMITED

Rapid Environmental Impact Assessment Study for the Proposed Cement Plant at Majhgawan, District Sidhi, Madhya Pradesh

Environmental Clearance Compliance Half Yearly Report

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

Hind Energy & Coal Beneficiation (India) Ltd.

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

PRE-FEASIBILITY REPORT

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE FEASIBILITY REPORT JOJOBERA CEMENT PLANT

Rajasthan State Pollution Control Board

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

Orient Cement Ltd. 2

Executive Summary in English

Environmental Impact Assessment

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

INNOVATION IN ENERGY CONSUMPTION

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

Pre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh

New 790-Megawatt Unit. Council Bluffs Energy Center

MM Despro Engineering Pvt. Ltd.

PRE FEASIBILITY REPORT

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.

RAW MATERIALS

Energy Saving Measures in. Cement Industry

For. Coal Washery. Promoter. : Budbud & Kerajharia. Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012

Executive summary. EIA STUDY for 1320MW Coal Based Super-critical Thermal Power Plant at Deosar, District Singrauli, Madhya Pradesh 13-13

PRE-FEASIBILITY REPORT. M/s. NUVOCO VISTAS CORPORATION LTD. ( Formerly Lafarge India Limited) At-Jojobera, Jamshedpur, Dist East Singhbhum Jharkhand

Industrial Process & Pilot Plant

To Study of Maximum Efficiency Of Power Generation in Thermal Power Plant

PRE-FEASIBILITY REPORT

Improvements in Material Handling: A Case Study of Cement Manufacturing Plant

Rajasthan State Pollution Control Board

Presentation on Excellence in Energy Management-2017

Bhushan Steel Limited 1. Name & Address of the owner/occupier of the industry, operation or process

Dalmia Cement (Bharat) Limited, Kadapa 1 st Workshop on Energy Efficiency in Cement Sector 23 rd June 2015

Cement industry Industrial emissions IPPC

Anil Agarwal Environment Training Institute. Cleaner Fly Ash Brick Production

PRE FEASIBILITY REPORT. For EXPANSION OF CEMENT PLANT

Module: 5 Lecture: 24

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

after water, concrete is the most consumed material on earth cement is the glue that holds it together

2. TECHNICAL DESCRIPTION OF THE PROJECT

Cement Manufacturing Page 1 10/12/2005 WP0003

ATTACHMENT No. E EMISSIONS TABLE OF CONTENTS

Solutions for Wear Protection in Power Plants

ENERGY EFFICIENCY BENCHMARKING FOR CEMENT INDUSTRY- IMPROVEMENT OPPORTUNITIES

KALYANI STEELS LIMITED

(Part 2: Cement Industry Sector) Stanley Santos

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS

Spillage and Material Handling Systems. By Hugros Inc.

Refuse-to-Energy Facility

Sustainable Solutions In Energy & Environment

WESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management

Bin Level Indication Applications in Cement Production and Concrete Batching Plants

BEST PRACTICES ON ENERGY EFFICIENCY

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

Presentation on VRPM An Energy Efficient Grinding System for Cement Plants. Case Study of M/s Mangalam Cement Kota, Rajasthan

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

PRE FEASIBILITY REPORT INCREASE IN THE PRODUCTION OF PENTAERYTHRITOL FROM 560 MTM TO 730 MTM & SODIUM FORMATE FROM 336 MTM TO 480 MTM

BUREAU OF INDIAN STANDARDS. (Southern Regional Office) Our Ref: 60/CM

U-II : 3.5 MTPA Cement Commissioned : Jan U-I : 3 MTPA Cement Commissioned : 1997

Transcription:

PRE - FEASIBILITY REPORT FOR PROPOSED EXPANSION OF CEMENT PLANT FROM 1.0 MTPA TO 1.15 MTPA OF M/S KALYANPUR CEMENTS LTD. & INSTALLTION OF 15 MW CAPTIVE THERMAL POWER PLANT OF M/S SONE OJAS LTD. (A WHOLLY OWNED SUBSIDIARY OF KALYANPUR CEMENTS LTD.) REGD. OFFICE : MAURYA CENTRE 1, FRAZER ROAD PATNA 800 001 BIHAR

INDEX Chapter No. Contents Page No. 1 Executive Summary 01 2 Introduction of the Project / Background Information 05 3 Project Description 08 4 Site Analysis 13 5 Planning Brief 14 6 Proposed Infrastructure 16 7 Rehabilitation & Resettlement 18 8 Project Schedule & Cost Estimates 19 9 Analysis of Proposal 21

Chapter 1 EXECUTIVE SUMMARY 1.1 General Details: Kalyanpur Cements Ltd. (KCL), a Public Limited Company originally incorporated as Kalyanpur Lime & Cement Works Ltd. in Aug. 1937 and subsequently renamed in 1988 as Kalyanpur Cements Ltd. Kalyanpur Cements Ltd. (KCL) has been manufacturing cement at its Rohtas District plant in Bihar since 1946 and has been investing in expansion and technical enhancement repeatedly. The current production line was ordered and erected in 1991. Now KCL intends to expand its cement production capacity from 1 MTPA to 1.15 MTPA. KCL proposed to debottleneck its existing production process to increase its annual production upto 1.15 MTPA. There is no qualitative production process change envisioned. The machinery has enough spare capacity to deliver the extra production. KCL is the only running large industrial unit in this backward area of Bihar that is also naxal influenced, leading to significant job and value creation in the region. The expanded capacity would sustain KCL s economic viability for the near future. Presently power demand for the cement plant is being met from BSEB Grid. Due to depressing power scenario & high power tariff of utility grid, KCL made an Special Purpose Venture ( SPV ) in the name of Sone-Ojas Ltd. for setting up of 15 MW Captive Power Plant in vicinity of existing cement plant. SOL will generate 15 MW Power partially by Recovery of Waste Heat of Cement Plant, through Waste Heat recovery Boilers and by coal. Proposed Captive Power Plant will fulfill the entire power requirement of cement plant, limestone mines and other cluster companies. Balance power will be for free access sale on the transmission network of utility grid. 1.2 Location: 1

The factory of Kalyanpur Cements Ltd. (KCL) is located in village Kalyanpur, P.O. Banjari,Distt. Rohtas in Bihar. The area falls in survey of Topo sheet 63 P/14, Latitude : 24 o 40 10, Longitude :83 o 59 30. All seasonal road is available between Dehri On- Sone and the plant site. Banjari is 35 Kms by road South of Dehri One Sone Railway Station [Grand Chord Eastern Railway]. About 1 Km East of Plant, River sone takes its course downstream to North to Join River Ganges near Patna. Arjuna Hills, part of Kaimur Range of mountains proudly guard the area on other side of the plant. 1.3 RAW MATERIALS : Lime stone is main raw materials for cement. The company has own captive lime stone quarries which cater to the requirement of lime stone for Factory. Coal, as main fuel, is obtained from Central and Eastern coal field Gypsum, Slag, Pozzolana, Blue dust are other raw materials which are procured from different sources, lime stone is a sedimentary rock consisting of carbonates of calcium and magnesium with silicates. Coal for the captive power plant will be procured from CCL Meghalaya. 1.4 WATER REQUIREMENT: At present 425 KLD water is being utilized at the proposed project with existing capacity. After proposed expansion 250 KLD additional water will be required (for captive power plant only) and total water requirement will enhance upto 675 KLD. Domestic water requirement (220KLD) is being fulfilled by tubewells & plant water requirement will be fulfilled by Mines water discharge of KCL Captive Limestone Mines. 1.4 POWER REQUIREMENT: The power and energy demand of cement plant are 9 MW and 71.71 mio KWh per annum at present production level however plant capacity is proposed to be increased to 2200 TPD and power requirement shall increase to 11.5 MW. Due to very high power cost of BSEB power, Kalyanpur Cement Limited is contemplating to have an alternative sustainable and economic source for operation of the cement plant in place of the grid power and made Special 2

Purpose Venture (SPV) in the name of Sone-Ojas Ltd. (SOL) for establishment of 15 MW Captive Power Plant. Proposed Captive Power Plant will fulfill the entire power requirement of cement plant, own captive limestone mines and other cluster companies. Balance power will be for free access sale on the transmission network of utility grid. During outage of any unit power requirement shall be met from the utility grid. 1.6 Pollution Control Measures: 1.6.1 Air Pollution: KCL has installed various air pollution control equipment like ESPs in Raw Mill, Cooler and Cement Mill and bag filters in coal mill, Raw mill, grinding section following a strict monitoring and maintenance regime so that emission will be well below the permissible level mentioned by the regulatory agencies. For kiln, precalcinator and cooler KCL selected Electro Static Precipitator (ESP) with 99% efficiency. The total dust collected are fed back to the system and processed. Before entering hot gas in ESP it is drawn for drying raw materials, slag and coal, thus residual heat value is utilized and ESP dust loading is minimized. To improves the efficiency of ESP a Lechler s gas conditioning tower has been provided to bring down the temperature of the hot gasses from 320 to 150 0 C. KCL also installed Gas analyzer to ensure complete burning of coal and reducing CO at zero level. Presently we are monitoring CO, O 2, NOx and SO 2 with the help of FUJI Electric Gas Analyser. Total numbers of bag filters installed at KCL are 33. The bag filters are completed with casing hopper, supporting structure, maintenance platform, access ladder, filter bags, single / double flap valve, rotary air lock system, purging by solenoid operation. These are installed at discharge of belts, bucket elevator, roller press, packer machine, coal mill etc. The centrifugal fan are attached with bag filter for discharge of clean air. Maximum capacity of bag filter is 80,000 m 3 /hr and minimum 5500 m 3 /hr. at different installations. 3

For the proposed expansion ESP fan will be modified with the additional investment of Rs. 0.8 Crores. One of the ESP will be changed with Bag House with an investment of Rs. 4.5 Crores. In the proposed captive power plant emission level of dust in exhaust air will be limited to 50 mg/nm 3. For collecting the ground material from AFBC boiler and dedusting of vent air, a suitably sized ESP will be installed with emission level of 50 mg/nm 3. For controlling fugitive dust from silos and bunker, bag filter / spray system will be installed with emission level restricted to 50 mg/nm 3. 1.6.2 Water Pollution: In order to neutralize the domestic effluents & waste water it is proposed to lead these effluents to a neutralizing pit where acid or alkali shall be dozed depending upon the type and concentration of effluent. The treated effluent shall be used for development/maintenance of the green belt. An effluent disposal pump shall be used for this purpose. 1.7 PROJECT COST: Estimated cost of proposed expansion project is about Rs. 7.1 Crores & Installation of Captive Power Plant will be approx. Rs. 99.64 Crores. * * * * * 4

Chapter 2 INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION 2.1 IDENTIFICATION OF PROJECT & PROJECT PROPONENT ; NAME OF THE PROJECT: Kalyanpur Cements Ltd. Expansion of Cement Production from 1.0 MTPA to 1.15 MTPA & Installation of 15 MW Captive Power Plant Village-Kalyanpur, P.O.: Banjari Dist- Rohtas, Bihar LOCATION OF THE PROJECT: The factory of Kalyanpur Cements Ltd. (KCL) is located in village Kalyanpur, P.O. Banjari,Distt. Rohtas in Bihar. The area falls in survey of Topo sheet 63 P/14, Latitude : 24 o 40 10, Longitude :83 o 59 30. All seasonal road is available between Dehri On- Sone and the plant site. Banjari is 35 Kms by road South of Dehri One Sone Railway Station [Grand Chord Eastern Railway]. About 1 Km East of Plant, River sone takes its course downstream to North to Join River Ganges near Patna. Arjuna Hills, part of Kaimur Range of mountains proudly guard the area on other side of the plant. IDENTIFICATION OF THE PROJECT: Kalyanpur Cements Ltd. (KCL) has been manufacturing cement at its Rohtas District plant in Bihar since 1946 and has been investing in expansion and technical enhancement repeatedly. The current production line was ordered and erected in 1991. Now KCL intends to expand its cement production capacity from 1 MTPA to 1.15 MTPA. 2.2 BRIEF DESCRIPTION OF NATURE OF PROJECT: 5

KCL proposed to debottleneck its existing production process to increase its annual production upto 1.15 MTPA. There is no qualitative production process change envisioned. The machinery has enough spare capacity to deliver the extra production. Due to depressing power scenario & high power tariff of utility grid, KCL made an Special Purpose Venture ( SPV ) in the name of Sone-Ojas Ltd. for setting up of 15 MW Captive Power Plant in vicinity of existing cement plant. SOL will generate 15 MW Power partially by Recovery of Waste Heat of Cement Plant, through Waste Heat recovery Boilers and by coal. 2.3 NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND OR REGION KCL is the only running large industrial unit in this backward area of Bihar that is also naxal influenced, leading to significant job and value creation in the region. The expanded capacity would sustain KCL s economic viability for the near future. 2.4 DEMAND SUPPLY GAP: KCL is the only large cement producer in the state of Bihar. KCL s rated capacity is 1 Million TPA whereas the total cement demand in the state is expected to be 8 Million TPA up to 2011-12. This extra demand is being met by shipping of cement from various states with an average distance of over 500 km. 2.5 IMPORTS VS INDIGENOUS CONSUMPTION : Bihar s cement market is not serviced through imported cement. 2.6 EXPORT POSSIBILITY: Cement from Bihar can be exported to Nepal keeping in mind commercial considerations. KCL used to export a portion of its produce to Nepal till 2002-03. 2.7 DOMESTIC/IMPORT MARKET: KCL sells approx. 80% of its production in Bihar and the balance is split between Eastern Uttar Pradesh and Northern Jharkhand. The incremental production is expected to be distributed in a similar manner. 2.8 EMPLOYMENT GENERATION (DIRECT & INDIRECT) 6

At present 1000 nos. of manpower is available with KCL. After proposed expansion & installation of captive power plant additional 39 nos. of manpower will be required. * * * * * 7

Chapter 3 PROJECT DESCRIPTION 3.1 TYPE OF PROJECT INCLUDING INTERLINKED AND INTER DEPENDENT PROJECT: KCL proposed to debottleneck its existing production process to increase its annual production upto 1.15 MTPA. There is no qualitative production process change envisioned. The machinery has enough spare capacity to deliver the extra production. As part of expansion plan a captive power plant and waste heat recovery units are also envisaged. 3.2 LOCATION: Village : Kalyanpur P.O. : Banjari District : Rohtas State : Bihar 3.3 DETAILS OF ALTERNATE SITES CONSIDERED AND THE BASIS OF SELECTING THE PROPOSED SITE, PARTICULARLY THE ENVIRONMENT CONSIDERATION GONE INTO SHOULD BE HIGHLIGHTED. No alternate site considered as it is the expansion project within existing premises. 3.4 SIZE OR MAGNITUDE OF OPERATION: KCL proposed to debottleneck its existing production process to increase its annual production upto 1.15 MTPA. There is no qualitative production process 8

change envisioned. The machinery has enough spare capacity to deliver the extra production. Due to depressing power scenario & high power tariff of utility grid, KCL made an Special Purpose Venture ( SPV ) in the name of Sone-Ojas Ltd. for setting up of 15 MW Captive Power Plant in vicinity of existing cement plant. SOL will generate 15 MW Power partially by Recovery of Waste Heat of Cement Plant, through Waste Heat recovery Boilers and by coal 3.5 PROJECT DESCRIPTION WITH PROCESS DETAILS: (A SCHEMATIC DIAGRAM/FLOWCHART LAYOUT, COMPONENTS OF THE PROJECT) KCL intends to expand its cement production capacity from 1 MTPA to 1.15 MTPA. KCL proposed to debottleneck its existing production process to increase its annual production upto 1.15 MTPA. There is no qualitative production process change envisioned. The machinery has enough spare capacity to deliver the extra production. MANUFACTURING PROCESS ; The manufacturing process for cement is combination of many activities at different points. The major portion of the process is continuous round the clock. CRUSHER Lime stone of maximum one cubic meter size is reduced to -90 mm pieces by crushing in impact crusher. RAW MILL Crushed lime stone [-90mm] is further reduced to fine powder by grinding in high pressure grinding roller. BLENDING SILO Fine powder from HPGR Raw mill is stored in large silo. Compressed air blowing is done to achieve suitable blending and homogeneity in silo. KILN 9

Raw meal from blending silo is pumped and fed to modern 5 stage preheater kiln. The kiln is a rotating long cylindrical tube in which fine powder coal is fired. Burning temperature at firing end is 1,400 to 1,450 0 C. Raw meal is calcined and burnt to form nodules called clinker. CLINKER YARD The clinker from kiln is stored in clinker yard. CLINKER GRINDING Clinker from kiln or from yard is fed to HPGR clinker grinding unit with gypsum. Fine grinding take place with assistance of roller and high efficiency separators. Ground material stored in ground clinker silo. HPGR GRINDING UNIT - FOR CLINKER/RAWMEAL GRINDING Stand by unit for clinker as well as Limestone grinding. Grinding take place with the assistance of roller and high efficiency separators. The fine powder stored in silo. CEMENT BLENDING PLANT Ground clinker & fly ash drawn from respective silos and mixed mechanically. CEMENT SILOS The out put of cement blending plant is stored in large vertical silos. PACKING PLANT Cement from silos is drawn by automatic packing machine for packing in bags after packing, each bag weight 50 Kg. These bags are loaded in trucks ready for dispatch to different destinations. BY-PRODUCTS There are no by-products in this factory. 10

Process Description of Captive Power Plant The steam generating system for the power plant will consist of one boiler (Coal + washery coal fired) of 60 TPH capacity with all the auxiliaries. The Cement industry is highly Energy Intensive wherein in addition to high Electrical energy requirement the heat energy requirements are also high. The waste heat energy available after utilization of the heat for cement process is available for waste heat recovery. Considering the potential heat values of the waste flue gases of cement plant process it is proposed to install the waste heat recovery Boiler. The heat values of pre-heater exhaust gases and clinker cooler exhaust gases shall be utilized in the waste heat recovery boilers to generate the steam. The generated superheated steam shall be introduced to the steam driven turbine generator set. The selected configuration for generation of power would consist of coal and washery coal based thermal power plant having one boiler with MCR 60 TPH and two waste heat recovery boiler (PH & AQC) connected to one turbo generators of 15 MW capacity. 3.6 RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY, LIKELY SOURCE, MARKETING AREA OF FINAL PRODUCTS, MODE OF TRANSPORT OF RAW MATERIAL & FINISHED PRODUCT. Lime stone is main raw materials for cement. The company has own captive lime stone quarries which cater to the requirement of lime stone for Factory. Coal, as main fuel, is obtained from Central and Eastern coal field Gypsum, Slag, Pozzolana, Blue dust are other raw materials which are procured from different sources, lime stone is a sedimentary rock consisting of carbonates of calcium and magnesium with silicates. Raw Material Requirement (TPA) Source Mode of Existing Proposed Transportation Limestone 90,00,00 10,25,000 Own Captive Mines and some bought (usually Satna) as required By Road Coal 98,000 1,16,000 CCL Meghalaya By Rail / Road Gypsum 25,000 29,000 Rajasthan, Bhutan By Rail / Road 11

Fly Ash 3,50,000 4,02,500 Blue Dust 30,000 35,000 Coal for Cogeneration Plant M.P., U.P. & Jharkhand Chaibasa, Jharkhand By Road By Road NA 80,300 CCL Meghalaya By Rail / Road 3.7 RESOURCES OPTIMIZATION/RECYCLING AND REUSE ENVISAGED IN THE PROJECT, IF ANY, SHOULD BE BRIEFLY OUTLINED. A waste heat recovery unit is planned along with the expanded capacity that will supply upto 20% of the cement plant s electrical power requirement. The cement process proposed is based on blended cement using fly ash, a waste material. 3.8 AVAILABILITY OF WATER ITS SOURCE, ENERGY / POWER REQUIREMENT AND SOURCE SHOULD BE GIVEN ; Water Requirement Existing Proposed Domestic Requirement 200 KLD 220 KLD Cement Plant Requirement 425 KLD 425 KLD (No additional water is required) Captive Power Plant Requirement Not Applicable 250 KLD TOTAL WATER REQUIREMENT 625 KLD 895 KLD 3.9 QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL Solid waste Generated from the proposed expansion project along with their management is described in table below ; Details of Solid Waste Generation Management Fly Ash from Captive Power Plant 1 35 TPD Recycle & Reutilize in cement Manufacturing Process within the existing premises. Cement Pant NIL No Solid Waste will be generated from the proposed project. * * * * * 12

Chapter 4 SITE ANALYSIS 4.1 CONNECTIVITY: The factory of Kalyanpur Cements Ltd. (KCL) is located in village Kalyanpur, P.O. Banjari,Distt. Rohtas in Bihar. The area falls in survey of Topo sheet 63 P/14, Latitude : 24 o 40 10, Longitude :83 o 59 30. All seasonal road is available between Dehri On- Sone and the plant site. Banjari is 35 Kms by road South of Dehri One Sone Railway Station [Grand Chord Eastern Railway]. 4.2 LAND FORM, LAND USE & LAND OWNERSHIP ; The proposed expansion project of KCL is being carried out inside the existing premises. Entire project area is under the ownership of KCL. 4.4 EXISTING LAND USE PATTERN (AGRICULTURAL NON AGRICULTURAL FOREST, WATER BODIES)ARE AWAY FROM THE MINIMUM DISTANCE FROM THE PERIPHERY OF THE PROJECT TO PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY, ECO-SENSETIVE AREAS WATER BODIES, CRZ ETC. ; Forest River/Nala/ Reservoir Village Road Kaimur Wildlife Sanctuary (1.5 km.) About 1 Km East of Plant, River Sone About 2.5 Km West of Plant, River Ausane Samhauta (1 km. S), Lebura ( 1.5 km. N), Banjari (3 km. NE), Kalyanpur (1 km. E) All seasonal road is available between Dehri On- Sone and the plant site. Banjari is 35 Kms by road South of Dehri One Sone Railway Station [Grand Chord Eastern Railway] Railway The nearest railhead is at Dehri-on-Sone at a distance of 35 Km from the project area. * * * * * 13

Chapter 5 PLANNING BRIEF 5.1 PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, TRANSPORTATION ETC) TOWN AND COUNTRY PLANNING/DEVELOPMENT AUTHORITY CLASSIFICATION. It is an Cement Production unit. It is already under operation for more than five decades to produce Cement. Cement is the basic raw material for construction & infrastructure development. KCL is the only large cement producer in the state of Bihar. KCL s rated capacity is 1 Million TPA whereas the total cement demand in the state is expected to be 8 Million TPA up to 2011-12. This extra demand is being met by shipping of cement from various states with an average distance of over 500 km. KCL sells approx. 80% of its production in Bihar and the balance is split between Eastern Uttar Pradesh and Northern Jharkhand. The incremental production is expected to be distributed in a similar manner. Dehri-on-Sone township is the nearby town to the proposed project area. Though Kalyanpur is a very backward village, the project authorities intends to develop the area equipped with all the facilities like water supply, electric supply, dish antenna, mobile communication tower, medical dispensary etc. 5.2 POPULATION PROJECTION : Higher indirect employment engagement is expected to be generated in areas of transport and mines contractor. 5.3 LAND USE PLANNING (BREAK UP ALONG WITH GREEN BELT ETC.) : 14

Total Land (Existing) Plant Area (Existing + Proposed) Green Belt Area (Existing + Proposed) 100.75 Acres 35.75 Acres 65.0 Acres 5.4 ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & SOCIAL) : Road & Electrical Supply condition of the study area is very poor. Good Roads & Regular Electric Supply is major infrastructure demand of the study area. 5.5 AMENITIES/FACILITIES : As it is an operative industry, all the amenities/facilities arrangement are already present. At present it is only necessary to enhance the arrangement as per the proposed target production. * * * * * 15

Chapter 6 PROPOSED INFRASTRUCTURE 6.1 INDUSTRIAL AREA (PROCESSING AREA): Kalyanpur Cements Ltd. (KCL) has been manufacturing cement at its Rohtas District plant in Bihar since 1946 and has been investing in expansion and technical enhancement repeatedly. The current production line was ordered and erected in 1991. Now KCL intends to expand its cement production capacity from 1 MTPA to 1.15 MTPA. KCL proposed to debottleneck its existing production process to increase its annual production upto 1.15 MTPA. There is no qualitative production process change envisioned. The machinery has enough spare capacity to deliver the extra production. 6.2 RESIDENTIAL AREA (NON PROCESSING AREA) : No Residential Area envisaged 6.3 GREEN BELT Existing green belt of 65.0 acres of will be developed and maintained in more precise way.. 6.4 SOCIAL INFRASTRUCTURE: Road:- All seasonal road is available between Dehri On- Sone and the plant site. Banjari is 35 Kms by road South of Dehri One Sone Railway Station [Grand Chord Eastern Railway] 16

Sports Activity:- Distribution of indoor and outdoor sports material like Ring rubber, skipping rope, Ludo, Football, Football Jersy, Volley ball, sports shoe etc are regularly supplied for the sports activity of Kalyanpur village. Medical: - Dehri-on-Sone hospital is the nearby hospital to the project area. 6.5 DRINKING WATER:- The project authorities will make arrangement of drinking water for the villagers of nearby villages also. 6.6 SEWERAGE SYSTEM: Waste water will be treated through Sewage Treatment Plant. Sewage sludge will be generated, which will be vermin-composted and used as manure for greenbelt development 6.7 INDUSTRIAL WASTE MANAGEMENT: All the generated industrial waste will be disposed off through authorized vendors. 6.8 SOLID WASTE MANAGEMENT: Solid waste Generated from the proposed expansion project along with their management is described in table below ; Details of Solid Waste Generation Management Fly Ash from Captive Power Plant 1 35 TPD Recycle & Reutilize in cement Manufacturing Process within the existing premises. Cement Pant NIL No Solid Waste will be generated from the proposed project. 6.9 POWER REQUIREMENT & SUPPLY/SOURCE: At present power requirement of KCL is 13 MW which is being supplied by BSEB Sub Station Samhuta. KCL proposes to install a cogeneration power plant to fulfill the power requirement alongwith proposed expansion. * * * * * 17

Chapter 7 REHABILITATION & RESETTLEMENT (R & R) PLAN Kalyanpur Cements Ltd. (KCL) has been manufacturing cement at its Rohtas District plant in Bihar since 1946 and the entire project area is under the company ownership. No additional land is being acquired for the proposed expansion project, therefore, there is no need of any Rehabilitation and Resettlement (R&R) Plan. * * * * * 18

Chapter 8 PROJECT SCHEDULE & COST ESTIMATES 8.1 Likely date of start of construction and likely date of completion (Time Schedule for the project to be given) This project will be started after obtaining Environment Clearance from Ministry of Environment & Forests (MoEF). 8.2 Estimated Project cost along with analysis in terms of economic validity: 8.2.1 Cost for Cement Plant Expansion Modified Capacity of Preheater Fan 1.00 Crore Modified Capacity of ESP Fan Modified Capacity of Cooler Fan Change of ESP to Bag House TOTAL COST OF THE PROJECT 0.8 Crores 0.8 Crores 4.5 Crores 7.1 Crores 8.2.2 Cost for Installation of Captive Power Plant Land & Site Development Civil Constructions Plant & Machinery Technical Know How Fees Training Expenses 1.66 Crores 12.25 Crores 67.63 Crores 1.25 Crores 0.25 Crores 19

Miscellaneous Fixed Assets 2.10 Crores Preoperative Expenses 11.77 Crores Margin Money for Working Capital 0.24 Crores Contingency Provisions 2.49 Crores TOTAL COST OF THE PROJECT 99.64 Crores. * * * * * 20

Chapter 9 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION) 9.1 (FINANCIAL & SOCIAL BENEFITS WITH SPECIAL EMPHASIS ON THE BENEFIT TO THE LOCAL PEOPLE INCLUDING TRIBAL POPULATION, IF ANY, IN THE AREA.) ; In the proposed expansion project it is proposed to produce 1.15 Million TPA Cement. This will create some financial & social benefit, which is as follows: a) From target production of 1.15 Million TPA the Government will get more Royalty. b) Higher indirect employment engagement is expected to be generated in areas of transport and mines contractor. c) Setting up of 15 MW Captive Power Plant in vicinity of existing cement plan, will generate 15 MW Power partially by Recovery of Waste Heat of Cement Plant, through Waste Heat recovery Boilers and by coal. Proposed Captive Power Plant will fulfill the entire power requirement of cement plant, limestone mines and other cluster companies. Balance power will be for free access sale on the transmission network of utility grid. d) Moreover the Project Authorities (PA) will made the following arrangement for social welfare of the core zone as well as buffer zone ; i) Medical facilities : The PA will arrange medical camp in different village. Occupation health study will be done in core zone. For the purpose of malaria eradication proper steps will be taken by the PA, which include sprinkling of bleaching power, distribution of mosquito net etc. 21

ii) Drinking Water : The PA will make the arrangement of drinking water to the core zone as well as buffer zone. The arrangement of drinking water include drilling of bore wells fitted with submersible pumps, construction of over head water tanks then supply of water through pipe line. iii) Construction of culvert and bridges on the existing roads. Repairing of transport road. iv) Construction of school building & supply of reading materials to school children etc. v) Arrangement of sports material for local villagers, promotion of sports & tournament. vi) Arrangement of Environmental camp, distribution of saplings for fruit bearing trees, digging of rain water harvesting ponds, arrangement for roof top rain water harvesting etc. So in conclusion this project will be beneficial for the people of the area. * * * * * 22

Annexure I TOPOGRAPHY MAP OF STUDY AREA Source : Survey of India Toposheet No. 63 P/14 Scale : 1:50000 Project Location 23