SECTION SANDSTONE RESTORATION

Similar documents
SECTION BRICK MASONRY ASSEMBLIES

1. Repairing brick masonry, including replacing damaged units as indicated on drawings. 2. Repointing mortar joints.

B. Samples: Submit, for verification purposes, samples of the following:

Maintenance of Unit Masonry

SECTION INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING

Section COATING RESTORATION

MANUFACTURER S (SHORT FORM) SPECIFICATION / SECTION

CSI SECTION MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials

FIVE STAR PRODUCTS, INC. (800)

ARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment

DURRELL DESIGN GROUP, PLLC ROOF REPLACEMENT BARR ELEMENTARY SCHOOL JACKSON PUBLIC SCHOOL DISTRICT JACKSON, MISSISSIPPI.

Bid Opportunity Section CKP File No M May 2009 Page 1 of 9

Custom Polishing Systems

MDC MicroTex Eggshell Micro-Textured Ceramic Coating for Walls

PRODUCT GUIDE SPECIFICATION

SECTION EPOXY TERRAZZO

Jewel Stone. Decorative Concrete Overlay System. Part 1 GENERAL MANUFACTURER S SPECIFICATION

SECTION RESINOUS FLOORING or SECTION QUARTZ FLOORING

PERM-FLEX ASSEMBLY DIRECT APPLICATION TO CEMENTITIOUS SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960

DIVISION 04 MASONRY CAST STONE. A. Design Considerations. 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone.

SECTION SIMULATED STONE MASONRY

SECTION CONCRETE AND MASONRY COATINGS

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

A. This Section includes resinous flooring systems with epoxy body coat(s).

1.1 Related Work Specified in Other Sections (Delete if Not Applicable):

ELASTOFLEX ELASTOMERIC TEXTURED ACRYLIC WALL COATING SPECIFICATION

RENEW ELASTOMERIC ACRYLIC COATING (PAINT GRADE) MANUFACTURERS SPECIFICATION / SECTION

FIVE STAR PRODUCTS, INC.

SIDER-POOL. Product Data. Features and Uses

By CTS Cement Manufacturing Corp.

TEX COTE 600 TEXTURED COATING MASONRY PROTECTIVE COATING

SECTION CONCRETE PAVING SLABS SET IN MORTAR

FIVE STAR PRODUCTS, INC. (800)

KOSTER AMERICAN CORPORATION

ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

A. ASTM C 150 Standard Specification for Portland Cement. B. ASTM C 595 Standard Specification for Blended Hydraulic Cements.

B. All work of the section shall comply with the conditions of the contract, the drawings and any special conditions forming a part of the contract.

SECTION SITE CONCRETE

ZYCOSIL WATER REPELLENT

DIVISION 3 - CONCRETE Section Concrete Rehabilitation

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)

Rust-Oleum Industrial Brands Specification

Application Instructions for Keystone Kool Deck on Existing Concrete

DIVISION 04 MASONRY. Section Title Number MASONRY Maintenance of Masonry Masonry Mortaring Masonry Accessories

SECTION MOISTURE RESISTANT/WATER-PROOF FLOORING ADHESIVE FOR CONCRETE SLABS

SKATE ON LAYKOLD Specification

Sample Specification

SAMPLE SPECIFICATION

ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX Products

SECTION COMMON WORK RESULTS FOR CONCRETE SSPECIALTY COATINGS

EDGEWATER, FLORIDA JUNE 14, 2010

SECTION MANUFACTURED STONE VENEER. A. Section Includes: 1. Manufactured stone veneer masonry, accessories, and related materials.

MASONRY MORTARING

1.3 Work shall include all reinforcement and accessories necessary to complete installation.

DIVISION 3 HEAVY DUTY CONCRETE FLOOR TOPPING SECTION 03340

CRUSHED AGGREGATE BLENDED WITH GRANITECRETE ADMIXTURE SURFACING

POLYURETHANE FOAM SAMPLE DESIGN GUIDELINES URETHANE

Florock Seamless Flooring Systems

YEARS WATER PROOFING AND PERFORMANCE WARRANTY*

A. Section includes hydraulic-cement-based, polymer-modified, self-leveling underlayment for application below interior floor coverings.

SECTION EXTERIOR INSULATION AND FINISH SYSTEM

Florock Seamless Flooring Systems

BTM BT2K 600. Areas of Use

SECTION CAST-IN-PLACE CONCRETE

A. Submittal Procedures: See Article 13 of the General Conditions.

FAST SETTING and FAST CURING MORTAR NATCEM 35

SECTION Vitrified Clay Wall Coping 2014

PRODUCT SPECIFICATIONS

SECTION Specification for Building Limes Specification For Building Sands from Natural Sources Methods of Tests for Paints.

RESILIENT CORK TILE 3 PART SPECIFICATION #Z 624

PORTER S ORIGINAL LIME WASH

SECTION CONCRETE PAVING FOR PEDESTRIAN AREAS. A. This Section includes exterior cement concrete pavement for the following:

GENERAL SHALE NATURAL THIN ROCK VENEER Installation Guide. GeneralShale.com

SECTION High Performance Coatings Field Applied Acrylic Urethanes (Solid Color, Pearl and Metallic Finishes)

BSS 200 Synthetic Track Surfacing System System Specifications

Guideline Specification ACRYMAX ARS-1-C Reinforced Composite Elastomeric Membrane System for Concrete Roofs Fluid-Applied Roofing

BSS 50 Synthetic Track Surfacing System Specifications

CELCORE CELLULAR INSULATING CONCRETE SPECIFICATION FOR RETROFIT PLACEMENT OVER EXISTING ROOF MEMBRANES

MANUFACTURER'S SPECIFICATIONS Section ST. ASTIER LIME PLASTER (NHL) PLASTER ON CONCRETE

SECTION MANUFACTURED MASONRY VENEER

PAYING ATTENTION TO DETAIL by Bob Cusumano

Kolorines Glass Mosaic Tiles Project Specification

Part 1 - General. Spec Component Sikadur 32 Hi-Mod. DIVISION 3 -CONCRETE Section Cast-in-Place Concrete Bonding Agents for Concrete

A. Drawings and general provisions of the Contract apply to this Section including all documentation provided in RFP#

1.02 DESCRIPTION A. This Section specifies furnishing and installing Surface Applied Detectable/Tactile Warning Surface Tiles where indicated.

CEMENTITIOUS CRYSTALLIZING WATERPROOFING PART 1 GENERAL

A. Section includes surface preparation and the application of high-performance coating systems on the following substrates:

SUPER-KRETE SPECIFICATION S-1 EXISTING CONCRETE SURFACE PREPARATION SECTIONS ; /19; ;

SECTION JOINT SEALANTS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION HYDRAULIC CEMENT UNDERLAYMENT

B. Related Sections: 1. Division 07 Section "Joint Sealants" for sealing of expansion, contraction, control, and isolation joints in tile surfaces.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

MANUFACTURER S SPECIFICATION

for Mortar-Set Concrete Tiling Installations

Narrow Modular Pavers (NMP) for Mortar-Set Concrete Tiling Installations

Engine Bay Floors Floor Resurfacing 4000

MS-2A LINER SPECIFICATIONS: for STRUCTURAL REPAIR and SEALING of MANHOLES

SECTION ARCHITECTURAL CAST STONE

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Transcription:

SECTION 04 01 40.91 - SANDSTONE RESTORATION Part 1 GENERAL 1.1 SUMMARY OF WORK A. For repairing and patching of sandstone. B. Related Sections 1. Section 01351 Special Procedures for Historic Treatment 2. Division 4 Specification Sections 1.2 SUBMITTALS A. Submit the following items in time to prevent delay of the work and to allow adequate time for review, do not order materials or start work before receiving written approval: 1. Product Data: For all specified materials to include the following: a. Material Safety Data Sheets (MSDS), as appropriate. b. Manufacturer s instructions for installation and application of products. 2. Material Samples: Before installation of sample to wall, submit the following: a. Each type of repair material showing proposed surface finish and color 3. Qualification Data: Submit certificates from the material supplier stating that field supervisors and masons installing the replacement material have successfully completed the training workshop for the installation of the stone repair material. 4. Restoration Plan: For each phase of repair work required provide detailed description of materials, methods, approach, tool selection, equipment, sequencing, and include the following: a. Measures for protection of surrounding materials on building and site. b. In-situ masonry preparation prior to repair. c. Removal of efflorescence (salt) from wall prior to repair. d. Measures to reduce existing excess moisture from masonry. e. Material curing methods after installation. 1.3 QUALITY ASSURANCE A. Contractor Qualifications: Engage an experienced masonry firm to perform the work of this Section. Contractor shall have completed work on projects of similar scope and materials specified and employing personnel skilled in the restoration process and operations indicated.

1. Contractor: Must have 5 years experience in construction and supervision of masonry restoration work on historic buildings of a similar age and scope of work to this project 2. Masons, Installers, and Field Supervisors: Must be certified by the material supplier to install the specified products. All personnel involved with the work of this Section shall provide individual certificates to the Architect documenting the successful completion of required training by the material manufacturer. Contact: U.S. Heritage Group, Inc., 3516 N. Kostner Ave., Chicago, IL 60641 Phone: 773-286-2100; Fax: 773-286-1852: for the training requirements for this project. If prior training has not been completed, job site training specific to this project will be required at the Masonry Contractor s expense. A contract for this training with U.S. Heritage Group, Inc., shall be submitted with bid documents. B. Mockups: Prepare in situ samples of each type of replacement material using masonry removed from the building where designated by the Architect. Apply replacement material to the wall, or unit to be repaired according to specifications and manufacturer s instructions. Prepare samples in an area where they will be exposed to the same conditions as will be present on the building during curing. Allow samples to cure at least seven days (or longer, if possible) before obtaining Architects approval for color match. Masonry materials will lighten in color as they cure. Samples should be viewed from a minimum distance of 15 feet. 1. Retain acceptable mockups in undisturbed condition as a standard for workmanship quality. Mockup to be used for judging completed work as the project progresses. Approval of work will be based upon: cleanliness, material color, texture, and finished profile. 1.4 DELIVERY, STORAGE, AND HANDLING A. Materials are to be delivered, stored, and handled to protect them from damage, extreme temperature, and moisture in accordance with Manufacturer s written instructions. B. Deliver and store material in Manufacturer s original, unopened containers with the production date shown on the container or packaging. C. Comply with the Manufacturer s written specifications and recommendations for mixing, application, and curing of mortars. 1.5 PROTECTION/SITE CONDITIONS A. Cold Weather Requirements: Work of this Section shall be completed when the temperature is 40 F and rising. Maintain substrate surface temperature above 40 F for 48 hours after installation of repair mortars. Heated enclosures to maintain specified temperatures are permitted with Architect approval.

B. Hot Weather Requirements: Protect repair mortar from direct sunlight and wind. Do not use or prepare mortar when ambient air temperature is above 95 F or surface temperature of substrate is in excess of 105 F. Part 2 PRODUCTS 2.1 MANUFACTURES A. Available Manufactures: 2.2 MATERIALS 1. U.S. Heritage Group, Inc., 3516 North Kostner Avenue, Chicago, IL 60641 Phone: 773-286-2100 Fax: 773-286-1852, www.usheritage.com A. Mineral Based Natural Repair Mortar for Sandstone: 1. Formulation: Pre-blended, mineral-based, single component repair product. 2. Color: Match to the existing in-situ masonry. 3. Texture: Match to existing in-situ masonry. 4. Product: HS60 Heritage Sandstone B. Admixtures: 1. No synthetic polymers or additives are permitted in the formulation. 2. No air-entraining admixtures are permitted. 3. No antifreeze compounds, chlorides or other additives are permitted. 4. Color pigments are permitted only with prior written approval from the material manufacturer. 2.3 FACTORY MIXING A. Pre-blend all replacement materials into single containers in a factory-controlled environment. B. Mixing of individual ingredients at the construction site shall not be permitted. C. Match color and texture of replacement material to the original material. D. Mark all containers to include manufacturing date and batch number. Maintain production sampling procedures for each batch and shipment for quality control tracking purposes. Part 3 EXECUTION 3.1 WORKMANSHIP A. Acrylic bonding agents, accelerators, or retardants: 1. Not permitted in material. 2. Not permitted on wall surface or individual masonry unit surface.

B. Keep all replacement materials from smearing / staining adjacent surfaces. Adjust water content of material during placement to execute the cleanest work possible without compromising material performance. If needed, request assistance from the manufacturer to establish water content ratio to meet this requirement. C Maintaining clean masonry surfaces throughout the project is the responsibility of the contractor. 3.2 PREPARATION FOR REPAIRS A. Remove all loose mortar and masonry prior to installation of the repair mortar. Sound masonry with a hammer to verify its integrity. If necessary, cut away an additional 1/2 of the substrate to ensure the surface to be repaired is solid and stable. Remove any sealant residue. B. Where cramp anchors, threaded rod anchors, or dowels have been cut and pieces remain embedded in the substrate: Anchors that are free of rust, solidly embedded, and do not project beyond the surface of the masonry unit may remain. All others should be removed. C. Cut the edges of the repair area to provide a minimum depth of 1/4. The edges of the repair should be square cut. Do not allow any feathered edges in the repair area. D. Install mechanical anchors in all repair areas if specified on the Contract Drawing or as otherwise directed by the Specifier. E. Clean all dust from surface and pores of the substrate, using clean water and a scrub brush. F. For very dry or porous surfaces, pre-wet the substrate ahead of time to prevent the substrate from drawing moisture out of the repair too quickly. Re-wet the surface immediately before applying the repair material. 3.3 PREPARATION OF MORTAR A. It is recommended that a dust mask be worn during mixing. Do not mix more material than can be used within 30 minutes. Discard any mixed material that has been unused for 30 minutes or more. B. All repairs require a minimum two-coat application consisting of a skim coat and a build-out coat. Additional build-out coats may be applied to meet the required thickness. 1. Skim coat: For the initial skim coat, mix approximately 5 parts dry powder to approximately 1 part potable water. The prepared mixture should be the consistency of peanut butter. Temperature and humidity will affect the amount of water required. Mixing may be done by hand or using a low-speed drill (300 to 450 rpm) for 2 to 4 minutes. Do not over mix. 2. Build-out coat: The consistency of the mortar for the build-out coat should be similar to wet sand. For any additional build-out coats use slightly less water in the mix. Working time is approximately 60 minutes depending on temperature, humidity and wind conditions.

3.4 APPLICATION A. Cut away all loose and deteriorated material. Clean the area to be repaired with clean water and a bristle brush to remove any loose particles. Neutralize any salt deposits (efflorescence) with distilled water. Sound off and chisel out delaminated material. Dampen with clean water until glistening with no standing water. Square cut edges of repair area using hand tools or pneumatic carving tools. Repair area should not be less than 1/4 in depth. B. Skim coat: Follow manufactures required directions. Pre-wet the material surface, so that it is glistening wet, with no standing water. Remove loose material and wash down with additional water a second time. Ensure that the skim coat adheres to all surfaces of the repair area. Do not allow the surface of the skim coat to dry completely. C. Build-out coat: Follow manufactures required directions. For any additional build-out coats use slightly less water. Mortar may be built up to a thickness of 3 in one lift. Pre-soak the previously applied repair material with water if additional coats are necessary the following day. 3.5 FINISHING TECHNIQUES A. Tool, scrape, or carve to the required finish. Select tools and technique and timing to obtain the desired surface. Alter techniques in compliance to match existing surface as specified. Test finish techniques before applying to large areas. Craftsmen are required to understand the timing of the finishing techniques, and make adjustments for weather conditions. Pneumatic chisels can be used to create the desired finishes. 3.6 CURING PROCEDURE A. Keep the repair area, plus an additional 2 inches surrounding the repair area damp for a minimum of 36 hours. Spray the repair area with clean water, covering with plastic sheeting to keep the repair area damp. Adjust curing methods to prevent the repair from drying out too quickly. B. Curing methods will vary in different parts of the country and at different times of the year, calling for different amounts of water to be used in the first 36 hours after application. Adjustments to these curing procedures must take into account the remaining time prior to frost. C. Remove or replace patches with hairline cracks, those that show separation from stone, or those that do not match adjacent stone in color or texture. 3.7 CLEAN UP A. Remove mortar from tools and mixing equipment with water immediately after use.

END OF SECTION