W205 BIM Best Practices December 9, 2008 Kurt D. Maldovan

Similar documents
AIA 2009 BIM AWARDS. Category B: Design/Delivery Process Innovation Using BIM

EcoDomus, Inc

Click to edit Master title style

BIM Design & Construction Requirements. Follow-up Seminar. September 10,

INTEGRATED LIFECYCLE MANAGEMENT BIM/VDC REQUIREMENTS IMPLEMENTATION PLAN

BIM V.1 Tables A1

The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM

Anaheim Regional Transportation Intermodal Center (ARTIC) 2014 AIA TAP / BIM Awards

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at

developing open information exchange standards

FIVE WAYS YOUR MOVE TO A BIM WORKFLOW PAYS OFF

General Contractor Regulatory Agency. [Info] Construction budget is defined as all hard costs including overhead and profit

BIM for Contractors: Kickin It Off the Right Way

Strategies using Autodesk Navisworks. Doing it right the first time!

CIVIL ENGINEERING BENEFITS OF BIM. Helping Civil Engineers do more with BIM

Autodesk and the UK BIM Level 2 Mandate

Strategic Revit MEP Object Organization From BIM to Asset Management

The UK BIM Revolution

BIM Checklist. Introduction

Back to Where We Once Belonged FM Global s road to SlimBIM

BIM EXECUTION PLAN PROJECT INFORMATION PROJECT NUMBER

O10 BIM for specialist sub-contractors and trades BIM IN PRACTICE

Sylvia Kendra Associate Director Facilities Knowledge Management. January 11, 2017

BIM for infrastructure, Paul King Bentley Systems 2016 Bentley Systems, Incorporated

GIS + BIM = Integrated Project Penn State

Trends & Developments. Trends & Developments

Benjamin D. Hall Interdisciplinary Research Building

Teaming with BIM Do the rewards outweigh the risks?

Building Information Modeling to Facilities Information Management and Beyond

2008 Building Information Modeling AEC Statewide BIM Adoption Survey

AB A Dissection of the U.S. Army Corps of

DESIGN-BIM-BUILD-OPERATE HOW OWNER REQUIREMENTS ARE INFLUENCING CONSTRUCTION FIRM STAFFING AND ACADEMIC EMPHASIS

Collaborative Design and Scoping. CH2M s practice of Target Value Design

BIM Competency Delivers Competitive Advantages

Digicon / IBC National BIM Survey Survey Results

Sustainable Design Services

Office of Physical Plant Case Study

HYBRID COLLABORATIVE DELIVERY TEAM/ INTEGRATED PROJECT DELIVERY DOCUMENTS SUBMITTAL PROCESS

IV.E.8 - BIM Standards

BIM 2016 and the NEC. Simon Rawlinson, 20 April 2015

Lessons Learned for Better LEED Submissions

4D Modeling: Applications and Benefits

Project Management Information System

Digital Project Administration for. Office 2 Office, LLC

PLAN SUBMITTAL GUIDELINES FOR THE HYBRID COLLABORATIVE DELIVERY TEAM

The Issue of Conversation & Communication

State of Tennessee Office of the State Architect {TN OSA) Building Information Modeling {BIM) Requirements. Version 1.0

BIM s value proposition for building owners

Getting Started on your Structural Project

Facilities Management

The BIM Toolkit. Sarah Delany February 2015 v2.0

Physical or Virtual? : Effectiveness of virtual mockups of building envelope systems

Synchronous Building Information Model-Based Collaboration in the Cloud: a Proposed Low Cost IT Platform and a Case Study

The ProjectWise Advantage

Airport Owners Guide to Project Delivery Systems White Paper Update

Building Information Modeling (BIM) for Surveyors February 8 th, 2013

PSA TEC 2016: Stakeholder Management - Strategies for Project Success

Best practice PDM Anders Bank Petersen

BUILDING INFORMATION MODELLING BOUYGUES UK THE USE OF BIM TO IMPROVE PROJECT PERFORMANCE

Improve Asset Management through Asset-Centric Information Management

COMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS ASHRAE STANDARD 202

Performance Information Procurement System. Developed By: Performance Based Studies Research Group

1/4/2014. Alternative Project Delivery Methods 1. Agenda

BUILDING INFORMATION MODELLING: A FASTTRACK APPROACH OF CONSTRUCTION MANAGEMENT

Construction Simulation An Introduction

National Institute of Building Sciences

Stepping into Variable Height Retaining Walls

BIM Pilot Getting Started Guide. next

AGI Software for Space Mission Design, Analysis and Engineering

Indiana University. Vice President for Capital Planning and Facilities

IBM Integrated Product Development (IPD)

131 - Extending the Value of Solid Edge in an Engineer-to-Order World

BIM TECHNOLOGY THE IMPACT ON THE PLANNING AND UTILIZATION PHASE HDR TMK, all rights reserved.

Virtual Design & Construction Andy Kayhanfar Vice President of Visual Solutions InEight

BIM International/ Collaboration/

Welcome! BIM in the DoD-MHS (an overview) HBC.4 Progression of the MHS BIM Implementation. March 15, 2012

Building information modeling and intelligent green buildings

VIRTUAL DESIGN AND CONSTRUCTION SERVICES

IMPLEMENTING BIM ON LARGE INFRASTRUCTURE PROJECTS

Figure i-1: The BIM Project Execution Planning Procedure. Building Information Modeling Project Execution Planning Guide

ConsensusDocs. Catalog. Updated Docs Inside

Pandya Paragkumar U Civil Engineering Graduate Student Lamar University

Building Information Modeling (BIM) Execution Plan

Achieving Results Through

ALM120 Application Lifecycle Management 12.x Essentials

UK BIM programme Munich Nick Tune Director BuildingSMARTUK & International

COMOS Making data work.

A Design Dress Rehearsal Before Building

From Digital to Reality Using BIM in key German Rail (Deutsche Bahn) Projects Presentation on

MIT Design Standards. BIM Execution Plan v6.0

QUALIFICATION MATRIX ADDENDUM:

Global Building Information Modeling (BIM) Market: Size, Trends & Forecasts ( ) May 2016

AUGUST 1, 2017 VA BIM STANDARD BIM MANUAL V2.2

S.A.M.E. Infrastructure Forum

DESIGN + BUILD CONSTRUCTION

9/11/2009. Return on Investment. Building Information Modeling & Virtual Design and Construction

Back to Basics: Understanding Business Development Lifecycle

Application of Building Information Modeling Tool for Building Project

ALTERNATE TECHNICAL CONCEPTS Missouri Department of Transportation

Transcending the BIM Hype HOW TO MAKE DOLLARS AND "SENSE" FROM BUILDING INFORMATION MODELING (BIM)

Transcription:

W205 BIM Best Practices December 9, 2008 Kurt D. Maldovan kurt.maldovan@jacobs.com

BIM in Planning: Early Design Tool Links to Cost Model/ Program BIM in Design: 35 Active Full BIM Designs All Disciplines, All Phases Coordinated Designs BIM in Construction: 7 Full BIM Designs in Construction 12 VDC Projects

2000-2005 Pockets on BIM/4D Innovation and Usage November 2005 Internal BIM and 4D Discussions January 2006 Commissioned A BIM Task Force March 2006 Best BIM Path Forward Do a Full Project April 2006 First Full BIM Project (All Disciplines/ Phases) July 2006 Committed to doing All Projects in BIM May 2007 First three BIM Projects Into Construction August 2007 Developed Integrated VDC Scope and Approach Began VDC Dialog with Clients October 2007 Began aggressively proposing Integrated VDC Delivery 12 Active Projects with varying levels of VDC Application November 2007 22 BIM Projects/ Today 35 Projects

Typical Scope Of BIM On 1 st Projects All Disciplines Involved in BIM BIM Used In All Phases Of Project Majority Of Drawings Will Come From The Model Use Interference Detection/Management Model Will Be Used To Develop Quantities Use 4D Scheduling to Evaluate Constructability Design Reviews Done In The Model Design Model Used In Construction

Key Metrics For BIM/VDC: 1.) Schedule Compression and Utilization: Accomplish more work in shorter time-frame Focus more time on Design problem solving and project solutions 2.) Design Quality and Constructability: Eliminate design related change orders in construction Eliminate client review comments related to coordination 3.) Deliver Solutions for the Lifecycle: Apply 6D delivery across all projects linking 3D visualization with cost, schedule, commissioning, and O&M Exceed client expectations with an integrated practice model

What Works Well: Drawings From Models Coordination From Models Quantities From Models BIM as a Design/Engineering Tool The BIM-Based Work Process Team- Can Do Attitude Challenges: The tools are perfect until you start to use them Models need to be accurate and up-to-date Model File Sizes and Tool Performance The Details Standard Details in CAD, Model Detail required to create Drawing Details. Interoperability/ Multi Office/ Large Project Collab. Work Process Change is uncomfortable

Typical Scope Of BIM On 2 nd Projects Imbed Manufacturers Data Schedules Procurement O&M Baseline Design Automation Routing Layouts Connections BIM Integration with Analysis Structural Sustainability Lighting Power Code Analysis

What About My Drawings? Drawings Direction Cut Plane Design Model

1.) Started Day One With Design Planning and Integrated Decision Making 2.) As Design Modeling Commenced, Visual Coordination Took Place 3.) Daily, Automated Interference Detections Were Run/Reported 4.) Design Team Collaborated to Resolve the Interferences and Optimize The Design

Design Reviews in BIM Utilized Model Review Technologies to provide design team the ability to Collaborate within the model Walkinside Virtual Hardhat reviews Navisworks virtual Navigation and analysis environment Walkinside Navisworks

Structural Engineer Lead Electrical Engineer Mechanical Engineer Electrical Engineers

Quality Control of BIM 1.) Check- Model & Extracted Drawings 2.) Coordinate- Resolve System Interferences Prior to QC 3.) Develop QC-Specific Extractions to aide Review Teams 4.) Focus on Evaluating the Design Model s Constructability & Operational aspects of each System 3D PDF

BIM + Schedule Use Model to Establish Schedule (in Design) Iterative Process to Optimize Approach Simulate Site Logistics, Evaluate Safety (Safe-D) Develop Detailed Shortterm Look-ahead's Design for Construction

5D - BIM and Cost: BIM + Quantities/Cost Designers Continually Monitor Quantities Provide Fast, Accurate Quantities to Estimators Integrated Estimating Quantities From BIM From BIM

The objective of the Construction-Operations Building Information Exchange (COBIE) project is to create an openstandard through which information created during design and construction can be transferred directly to facility operators, maintainers, and managers in useable electronic format.

Lesson Learned: Transitioning Model to Construction Owner Should be Conduit to Share the Model Model Should be Shared with Bidders Review Model at Pre-bid Conference Provide Model to Awarded GC Metrics- RFIs/ Change Orders/ CCGs Raises Understanding and trust level Reduces Contractors level of perceived risk

Job Site Viz Lab

Bridging A/E BIM Design into Construction The Line Between BIM Design and BIM Construction BIM-Based Design Models have 80% Of the Data that the Contractor needs for construction. Contractors need to add the Remaining 20% of Data Primarily Comes From Sub-Contractors Sub-Contractor Models are Merged Into Design Models Design Model Data Changes Based on Specific Sub-Contractor and Manufactures Submittals Sub-Contractor Models Replace/Update Data In The Design Model Design/Construction Changes during actual assembly of building Contractor Updates Design/Construction Data Based on Assembly

The BIM Integrator- A New Business Line

BIM Integration - Approach

Keys to Success BIM Execution Plan Controlling BIM Model Performance Fully Coordinated CD s s in BIM Visualization

Resources www.bimwiki.com USACE BIM Roadmap NBIMS V2.0 WBDG Autodesk Communication Spec Consensus Docs AIA IPD Guide and Contract Language

Discussion Contact: Kurt Maldovan BIM Integrator 571-218-1439 kurt.maldovan@jacobs.com