COST MODELS
Introduction HC BiM QS 2016 And Beyond HC BiM QS is an unique Construction and Property Consultancy. We offer a versatile and comprehensive portfolio of services to both Clients and Contractors. We seek to understand our Clients needs. It is our aim to provide value for money and exceed our Clients expectations. Our service is of the highest quality and our values determine the relationship with our clients is always long term.
Our Expertise HC BiM QS 2016 And Beyond Quantity Surveying HC BiM QS provides QS procurement and commercial support services for the construction industry. Specialist capabilities include Building and Civil Engineering, Rail, M&E services Cost Modelling HC BiM QS provide an innovative process giving savings in time and cost Accurate measurement of quantities from 5D models Integrated bill of quantities' and estimates Visual 3D outputs
Introducing 5D A New Solution Cost Modelling Dynamic interactive BiM cost models from 2D drawings BiM models produced for all sectors of construction and engineering BiM process can be used at any stage of the project development Cost Plans, Estimates and Bills of Quantities are automatically populated Simple and quick change quantification
Process Explained 1. We construct a model from CAD drawings, specifications and other information available 2. We digitally measure geometric information to produce accurate quantities 3. We link the quantity information with project specific Bills of Quantities and Cost Plans 4. We create client specific reports.
Introducing Vico Vico Cost Planner
Process Overview Map Templates Project Specifications 2D CAD Drawings Stage Reports Libraries SMM7 Historic Costs CESMM BCIS Breakdown Structures Hutchins, SPONS, Etc. NRM1 BiM Model CESMM NRM2 of Bills of of Quants Estimate Cost Plan Cost Plans and Cost Estimates are dynamically linked to the 5D model to calculate quantities.
CASE STUDY Example: Station Shafts and Tunnels
Case Study Estimate for Shafts and Tunnels HC BiM QS were appointed to undertake the production of estimates for the new Crossrail station at Whitechapel along with the associated shafts and tunnels. Subsequently we were requested to value various engineering options. As the BiM model is dynamically linked to the requisite quantities we were able to quantify each option quickly.
Shaft
Shaft
Shaft Section
Station Tunnels Whitechapel Station
Station Tunnels Whitechapel Station
Rendered image of train station
CASE STUDY Example: Building (School)
Case Study Bill of Quantities for New Build School HC BiM QS were appointed to produce the of bills of quantities for all sections of the building works including the external works for a client who was tendering for the works. Using the BiM cost modelling process we produced the full bill of quantities for the school within the 4 week timeframe
Case Study
Case Study
Case Study
Case Study
Case Study
CASE STUDY Example: Superstore and Retail Units
Case Study Bill of Quantities for New Superstore Using the BiM cost modelling process HC BiM QS were appointed to produce the of bills of quantities for a new superstore and associated retail units for a client who was tendering for the works.
Retail Block
Loading Bay
Superstore
CASE STUDY C178 Westbourne Bus Park
Option 60 Capacity
Option 116 Capacity
Earthworks Cut & Fill calculation
Earthworks Cut & Fill calculation
Outputs 1 Traditional Bill
Outputs 2 Client Customised Bill
Outputs 3 - Estimate Customised
Outputs 4 Cost Plan
Benefit Overview HC BiM QS Modelling provides: 1. Speed and Efficiency The system is being used on live projects providing time and cost savings 2. Flexibility The system can incorporate changes in design and specifications quickly 3. Clarity The quantities and changes can be checked live in BiM Model, providing traceability 4. Accuracy Digital BiM models are created and linked to design drawings
Cost Saving Through Efficiency and Flexibility Cost Saving Design Stages
Secondary Benefits HC BiM Cost Modelling provides: 1. Value Engineering a. Optioneering, b. Co-ordination and clash reports 2. Presentation / Visualisation a. Clear / attractive tender presentations b. Construction sequence images c. Stakeholder communication 3. 3D + PLANNING + COST BiM
5D: Model Schedule - Cost
5D: Model Schedule - Cost
BiM: Model Schedule - Cost
BiM: Model Schedule - Cost