European Mobility Network EU TEN-T Policy & CEF Pawel Stelmaszczyk European Commission DG MOVE

Similar documents
Connecting Europe Facility (CEF) Financing Opportunities

2015 CEF Transport Calls

CEF Transport Info day 2016 Greece

The process of developing and financing port development

EUROPEAN UNION. Brussels, 22 November 2013 (OR. en) 2011/0294 (COD) PE-CONS 42/13 TRANS 316 ECOFIN 533 ENV 546 RECH 265 CODEC 1403

TEN-T POLICY REVIEW. UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE Geneva, 7-8 September 2010

2016 Connecting Europe Facility (CEF) Transport Calls for Proposals COUNTRY FACTSHEET. Spain

Motorways of the Sea. Who What When How Much? NOVEMBER 2015 Goteborg Jose Anselmo Policy Advisor TEN-T/MoS

WHITE PAPER Roadmap to a Single European Transport Area Towards a competitive and resource efficient transport system

NORWAY (NO) The tables work in the following way: Dear TEN-TaNS partner.

FREIGHT CORRIDORS AND GATEWAYS: DEVELOPMENT APPROACH AND EVALUATION CRITERIA COMPARISON IN NORTH AMERICA AND THE EUROPEAN UNION

Orient-East Med Corridor

Trans-European Networks for Transport - Focus on Innovation & New Technologies - Towards egovernance (TENtec)

Supply and Demand Analysis

Roadmaps to 2050 FFE (Madrid, Spain) 21 September 2017

Sustainable logistics in Europe

Inland navigation developments in the EU 2016

Promoting sustainable mobility: natural gas and biomethane as a fuel for transport

DIGITALISATION AND THE EU SINGLE TRANSPORT AREA : LEGAL PERSPECTIVES

Use of ITS technologies for multimodal transport operations River Information Services (RIS) transport logistics services

TEN-T policy, TENtec System and related data needs

DG TREN Making Co-Modality work BESTUFSII 24-25TH May John Berry - European Commission DG TREN

Rail R&D in Europe New opportunities:

EU and urban mobility. Transport

EU policies on clean and sustainable urban mobility

WHAT IS RAIL BALTICA?

STRATEGIC INFRASTRUCTURES AND TRANSPORT PLAN PEIT. FIGURE 25. The rail network. Actions under the PEIT

EUTRAIN Europe Neighbourhood Cooperation Countries (incl. Russia, CIS, Black Sea, Balkan States) 3rd Regional Workshop Moscow, Russia

THE ROUTE MAP TO A CONNECTED EUROPE

Transatlantic Cooperation in. Transportation

Joint contribution of the Conference of Atlantic Arc Cities-CAAC and the Atlantic Arc Commission Transport Group-AATG

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Freight Transport Logistics Action Plan {SEC(2007) 1320} {SEC(2007) 1321}

13489/15 AS/AD/cs 1 DGG 2B

Draft Federal Transport Infrastructure Plan

European Commission. Trans-European transport network policy. December Information - Communication 1

A Digital Single European Railway Area. Kathrin Obst Unit B2-Single European Rail Area European Commission Directorate General Transport and Mobility

European Maritime and Fisheries Fund (EMFF)

EU RESEARCH POLICY IN THE TRANSPORT SECTOR

ITS Action Plan- Internet Consultation

Key Speech: Programme character towards real projects

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

EUROPEAN SEA PORTS ORGANISATION ASBL/VZW ORGANISATION DES PORTS MARITIMES EUROPEENS ASBL/VZW

Helsinki-Tallinn Transport Link Feasibility Study of a Railway Tunnel February 2018

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN])

DECEMBER This report represents the opinion of the European Coordinator and does not prejudice the official position of the European Commission.

HORIZON Smart, green and integrated Transport Work Programme Maria Cristina Marolda European Commission DG MOVE

COUNCIL OF THE EUROPEAN UNION. Brussels, 29 May /1/07 REV 1

North Adriatic Intelligent Transport System Technical seminar

Brochure of Project Results. FUNDED BY EUROPEAN COMMISSION 7TH RTD PROGRAMME

The relevance of MoS in the EU transportation system and TEN-T

International Corridor Rhine-Alpine Conference

Logistical and environmental considerations for the Far East to Europe corridor

SHIFT2RAIL STRATEGIC MASTER PLAN

The Voice of European Railways POSITION PAPER

Consultation on the draft of the limited revision of the TSI relating the subsystem rolling stock Noise (TSI Noise)

Rail Freight Corridor North Sea - Baltic. Corridor Information Document. Book 1

Horizon 2020: Towards the 2018, 2019, 2020 Transport Work Programme. Louise Mothersole Horizon 2020 UK National Contact Point for Transport

DIRECTIVE 2012/34/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 21 November 2012 establishing a single European railway area (recast)

Boosting International Rail Freight. Sector Statement on Rail Freight Corridors

Overview of Calls in the H2020 Workprogram Transport

SITL Digital Data Exchange in Logistics : How to Enable a Joined-Up Approach for Trade and Govnerment? Digital Transport and Logistics Forum

CEF Action n 2016-EU-SA-0009 "CYnergy"

Trade & Transport Corridors. European Projects & Initiatives

Smart, green and integrated Transport Work Programme

Atlantic Area Transnational Cooperation Programme

DRAFT REPORT. EN United in diversity EN. European Parliament 2015/2348(INI)

SEETAC South East European Transport Axis Cooperation

THE BALTIC SEA MOTORWAY - RECENT DEVELOPMENT AND OUTLOOK FOR THE FUTURE

25 % 20 % 15 % 10 % 5 % Share rail, inland waterways and oil pipelines 0 %

Economic and Social Council

1. What is SHIFT²RAIL?

LIFE Programme

Commission initiatives for a better railway in Europe

The modifications highlighted in bold are those in comparison to the revised versions (corrigendum) presented by the Commission on 14 March 2012.

WORK PROGRAMME Cooperation THEME 7 TRANSPORT (INCLUDING AERONAUTICS) Revised. (European Commission C(2010) 9012 of 15 December 2010)

GNSS opportunities in Transport

BARCELONA, October 2015

INTERMODAL TRANSPORT IN THE POLICY DOCUMENTS CONTEXT

The Mediterranean corridor From a road corridor to a multimodal corridor A success story for the regional economy

Standard Summary Project Fiche IPA centralised programmes

EU Policy framework and what BPO is doing concerning LNG bunkering infrastructure LNG Training for Port Communities LNG in Baltic Sea Ports II Project

Vassilis DEMETRIADES Directorate-General for Mobility and Transport

REPORT. of the Slovenian Expert Group on the next Framework Programme for Research and Innovation (FP9)

CENTRAL EUROPE Annual event 2009 Cross fertilization workshop

Transport and infrastructure in Poland: the current state and projects for the future

Szczecin-Świnoujście as a point infrastructure of the Baltic-Adriatic Corridor. Opatija, Nov. 2017

Short Sea Promotion Centre Spain

MoS: the paradigm for the development of modern ports

CORE LNGas hive: Project Presentation

Alternative fuels for road transport

POST-2020 MULTIANNUAL FINANCIAL FRAMEWORK

Delegations will find in Annex the above, as it resulted from the informal trilogue meeting on 27 November 2012.

Shift2Rail and rail research within Horizon 2020

UKRAINE: KEY FACTS GROWTH DRIVERS PRODUCTION TRADE. Ukraine GDP (current US$): $131,8billion in 2014 by World Bank estimation

CORE LNGas hive PROJECT PRESENTATION

CORE LNGas hive PROJECT PRESENTATION. Coordination:

Port Emissions and the Air Quality Package: Health Risks and Costs for European Citizens and Policy Responses

COMMISSION STAFF WORKING DOCUMENT. Country Factsheet Malta. Accompanying the document

ERDF & ESF Priorities & Objectives (Updated 4/8/15)

PRIORITY AXIS 1: A well connected region

Transcription:

European Mobility Network EU TEN-T Policy & CEF Pawel Stelmaszczyk European Commission DG MOVE

Key elements of the new TEN-T policy Support implementation of White Paper through new infrastructure policy, including: Dual layer approach based on an objective methodology: core and comprehensive network Ambitious standards for all infrastructures Common deadlines to achieve network (2030/2050) Corridors and coordinators for implementation New legislation: Regulation (EU) No 1315/2013

TEN-T Network Comprehensive and Core Network Inland waterways and ports

TEN-T Network Comprehensive and Core Network Railways (freight), ports and rail-road terminals

TEN-T Network Comprehensive and Core Network Railways (passengers), airports

TEN-T Network Comprehensive and Core Network Roads, ports, rail-road terminals and airports

TEN-T: deadlines By 2030: replace the patchwork of priority projects by a single European core network By 2050: develop the comprehensive network as ground layer to ensure accessibility and common standards

TEN-T standards Rail Comprehensive Network Electrification ERTMS 1435mm gauge Connection with freight terminals Core Network [see Comprehensive network plus] freight lines (>100 km/h, 750m train length, 22,5t axle load)

TEN-T standards Roads Comprehensive Network High quality roads i.e. motorways, expressways, conventional strategic roads Core Network [see Comprehensive network plus] Rest areas on motorways all 100 km including appropriate parking space for commercial road users Availability of clean fuels

TEN-T standards Other modes Comprehensive Network Implementation and deployment of telematic applications (RIS, VTMIS, e- maritime services, SESAR) Connection of airports and ports to TEN- T network Core Network [see Comprehensive network plus] Availability of clean fuels at airports and ports Connection of ANNEX II ports and airports to TEN-T network by 2030/2050

Connecting Europe Facility One instrument three sectors Connecting Europe Facility Financing framework 2014-2020 Guidelines Energy Guidelines Telecom Guidelines The "European Infrastructure Package" (European Commission proposal, October 2011) Sectoral policy frameworks (setting priorities for 2020, 2030, 2050)

Connecting Europe Facility New funding framework: Exploitation of cross-sectoral synergies Stronger concentration of financial support on EU added-value projects Higher emphasis on the use of innovative financial instruments Flexibility: midterm revision of amounts between three sectors based on performance and absorption of funds Complementarity (and not duplication) with other EU instruments (ESIF and Horizon 2020)

CEF: budget 33.2 billion in current prices 26.250 billion for transport (Vs ~ 8bn for 2007 2013) 14 945 billion for all 28 MS 11 305 billion for the MS eligible to the Cohesion Fund 1.141 billion for broadband and digital services 5.850 billion for energy infrastructure

CEF : 11.3 bn transfer from the Cohesion Fund - specific elements Exclusively for transport projects in Member States (MS) eligible for the Cohesion Fund Aim: to finance difficult projects that the MS would not finance with the Cohesion Fund Projects of high EU added value Rail and Inland Waterways, cross-border (including road) and main bottlenecks on main European routes Road: max. 10% of the budget Only for projects listed in Annex and projects on the Core Network Common project pipeline for Cohesion Fund and CEF, in line with the transport strategy Need to ensure network effect, notably on Core Network Corridors

CEF: eligibility 80 85 % of available budget (~ 22bn) for preidentified projects listed in Annex 1 Horizontal priorities (TMS, innovation & new technologies focusing on decarbonisation, safe and secure infrastructure, Core Network Ports and airports) 9 core network corridors and other important cross-border and bottleneck sections 15 20 % (~ 5bn) for Other projects of the core network Projects of comprehensive network (max 5%) For financial instruments (10%)

Co-funding rates Types of Projects All Member States Member States eligible for Cohesion Fund (a) Studies (all modes) 50% 85% (b)works on Cross border 40% 85% Rail Bottleneck 30% 85% Other projects of common interest 20% 85% Cross border 40% 85% Inland waterways Bottleneck 40% 85% Other projects of common interest 20% 85% Inland transport connections to ports and airports (rail and road) Development of ports Development of multi-modal platforms Reduce rail freight noise by retrofitting of existing rolling stock 20% 85% 20% 85% 20% 85% 20% 20% Freight transport services Secure parkings on road core network Motorways of the sea Traffic management systems Cross border road sections 20% 20% 20% 20% 30% 85% SESAR, RIS, VTMIS (ground/onboard) 50/20% 85% ERTMS 50% 85% ITS for road 20% 85% 10% 85%

Multiannual work programmes (80 to 85%) Priority Specific objective concerned Min - Max for 14.9bn (in million EUR) Min - Max for 11.3bn (in million EUR) Major Projects on the Corridors bottleneck, missing links, cross-border and rail interoperability 4,000-5,000 Other projects of the Core Network and its corridors, incl. rail interoperability, inland connections to ports & airports bottleneck, missing links, cross-border and rail interoperability 3,500-4,500 10,000-11,000 SESAR integration - interoperability 2,000-2,500 300-500 ERTMS bottleneck, missing links, cross-border and rail interoperability 600-700 200-400 Other TMS, including ITS for road, RIS and VTMIS Motorways of the Sea (incl. LNG projects and development of ports) integration - interoperability 250-400 integration - interoperability 400-600 100-300 New technologies & innovation sustainability - innovation 200-300 50-100

Annual Work Programmes (15 to 20%) Priorities Specific objective concerned Min - Max for 14.9bn (in million EUR) Min - Max for 11.3bn (in million EUR) Projects on the comprehensive network (cap of 5%) bottleneck, missing links, cross-border, rail interoperability 600-1000 Projects to connect the trans-european transport network with infrastructure networks of neighbouring countries bottleneck, missing links, cross-border 50-100 For freight transport services sustainability - innovation 150-200 For actions to reduce freight noise sustainability - innovation 200-260 Financial instruments All 1,300-2,400 Programme support actions 150-150 110-110

Synergies (and not duplication) between CEF and ESIF Strategic framework for Cohesion Policy support to investments in transport Focus on TEN-T Consistency with the comprehensive national transport strategy (Ex Ante Conditionality) for PT ~1.1 B CEF: 11.3bn EUR transferred from the Cohesion Fund To be spent exclusively in Member States eligible for the Cohesion Fund initial envelope for PT ~510 M Co-funding rates applicable for the Cohesion Fund A common and complementary list of projects aiming at the network effect

Complementarity CEF - ESIF CEF will concentrate on projects with a high EU added value and more sustainable modes of transport rail, IWW (as pre-identified in the Annex of the CEF Regulation) CF/ERDF will concentrate on high EU added-value projects to remove bottlenecks in transport networks by supporting TEN-T infrastructure, for both the core and comprehensive networks CF/ERDF is eligible for other modes of transport: urban, maritime, as well as renovation projects Member States and Commission should define early under which support scheme individual TEN-T infrastructure projects should be implemented: CEF, CF or ERDF

CEF : 11.3 bn transfer from the Cohesion Fund Respect of national allocations under the Cohesion Fund until end 2016 Binding national envelopes between 2014 2016: no MS can be allocated more funding for projects than its corresponding allocation European Commission targets to allocate the totality before 2017, through calls for proposals in 2014, 2015, 2016 If the 11.3bn are not all spent after the last call in 2016, new calls from 2017 to absorb the remainder, without national allocations No contribution for financial instruments before 2016

CEF : 2014 Work Programmes and calls - main features Work Programmes Structure to follow structure of Delegated act C(2013) 9690 Date for calls: 1 September 2014 end of February 2015 Decided with Member States Size of the calls will be evaluated on the basis of MS project pipelines In cooperation with MS authorities and DG REGIO, especially for Cohesion MS 1 Multiannual Work Programme (MAP) for the 11.3bn (Cohesion MS) All key projects on the Core Network are included in the Annex, covered by the MAP Discussions regarding possibility to have an Annual Work Programme (AP) for the 11.3bn 1 MAP & 1 AP for the 14.9bn

CEF: Programme Support Actions (1) Art.11 CEF: Particular attention given to Programme Support Actions aimed at strengthening administrative capacity for Member States eligible for the Cohesion Fund to develop the project pipeline

CEF: Programme Support Actions (2) Several types of Programme Support Actions: Grants for preparatory studies for projects Targeted technical assistance to potential beneficiaries (e.g. railway infrastructure managers) for preparation of project proposals

The implementation tools Coordinators and Core Network Corridors 9 Core Network Corridors defined until 2020 Support the implementation of the core network Synchronise investments in order to optimise network benefits Multimodal, involving at least 3 Member States Flexible governance structures Involvement of stakeholders Core Network Corridors aligned with Rail Freight Corridors Coordinators for ERTMS and Motorways of the Sea

The 9 core network corridors defined in CEF Regulation

How to make a corridor 1 2 3 4 5 6 Nomination of coordinators Analysis of the Corridor Consultation of Corridor Forum Drawing up work plan Approval of work plan by Member States Implementing decision

Thank you for your attention!