Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) Title 1 Principles

Implementation of the Balancing Network Code: an overview of TSOs main challenges

Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network FG-2011-G August 2011

Virtual Reverse Flow: at Interconnection Points. Implementing EU Regulations. Code Modification No. A064. Business Rules. 17 th July Version 3.

Virtual Reverse Flow: at Interconnection Points. Implementing EU Regulations. Code Modification No. A064. Business Rules. Version 2.

AB AMBER GRID RULES FOR ACCESS TO THE NATURAL GAS TRANSMISSION SYSTEM

LNG TERMINALLING PROGRAMME

LNG TERMINALLING PROGRAMME.

Description of the nature and purpose of the modification

Towards efficient and effective congestion management of the European gas transmission network:

Applicable TSO Terms for Use of the PRISMA Capacity Platform. 01 November 2015

SASOL GAS NETWORK CODE FOR THE TRANSMISSION SYSTEM

ACCESS CODE FOR TRANSMISSION. Attachment F: Plan for Incident Management

ERGEG Guidelines for Good Practice on Open Season Procedures (GGPOS) Ref: C06-GWG-29-05c 21 May 2007

Annex I to Regulation (EC) 715/2009 Link Further Information a) 1.

PETRONAS GAS BERHAD NETWORK CODE FOR PENINSULAR GAS UTILISATION TRANSMISSION SYSTEM

Vector Pipeline L.P. Original Sheet No. 30 FERC Gas Tariff First Revised Volume No. 1 v0.0.0 RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE

We appreciate your feedback

Two Years of TPA in Italy: Snam Rete Gas experience. Deux années de accés tiers au réseau de transport en Italie: l expérience de Snam Rete Gas

TENP JOINT INFORMATION MEMORANDUM FOR THE DEVELOPMENT OF SOUTH-NORTH GAS TRANSMISSION CAPACITY FROM ITALY TO GERMANY AND BELGIUM THROUGH SWITZERLAND

The present ACER Guidance to ENTSOG provides a framework for the development of a

GRTGAZ NETWORK TRANSMISSION CONTRACT

Report on the Interim Measures Planned for the Implementation by GAZ-SYSTEM S.A. in connection with the entry into force of Commission Regulation

TSOs proposal for the methodology for Coordinated Redispatching and Countertrading in accordance with Article 35(1) of Commission Regulation (EU)

Workshop CAM, CMP. GTS shippermeeting, 21 November 2012

Coordinated implementation of the Network Code on Capacity Allocation Mechanisms. Information Memorandum

The Dutch Balancing Regime

Appendix 1 Entry/Exit Contract Terms & Conditions (entry/exit system) Section 1 Conclusion of contract

I-SEM Interconnectors Project

Moffat Virtual Reverse Flow

Shippers Day LNG. 13 April Jean-Paul PINON Director Gas Market Commission for Electricity and Gas Regulation (CREG)

27 October Allegato A

Target Model for the European Natural Gas Market

Appendix 1: General Terms & Conditions for Entry/Exit Contracts (entry/exit sys- tem) Contents

COMMISSION STAFF WORKING DOCUMENT. Guidance on best practices for congestion management procedures in natural gas transmission networks

Applicable for gas stored by the Utility within its service territory.

Electricity Market Code

TABLE OF CONTENTS. Page 2 of 6

Consultation on the integration of gas markets of Czech Republic and Austria

CRE consultation on the creation of a single gas market area

Institutional Arrangements for Virtual Reverse Flow at Moffat

CAPACITY BOOKING... 1 PART I - REQUIREMENTS FOR ACCESS TO THE TRANSPORTATION SERVICE ) REQUIREMENTS... 5

Proposal for a common set of requirements used for the continuous trading matching algorithm

Clean Energy for all Europeans

1. How can Ofgem ensure that sharper Cash Out incentives from the Significant Code Review:

Introduction of South North Entry Point to BGE(NI) Network: Physical Forward Flow

Decision. on 1 st April Decision of 30 October 2014 forming a ruling on the changes to the ATRT5 tariff concerning the interim measures

OPEN SEASON. I. The BKEP Condensate Pipeline Project

GUIDANCE NOTE ON THE APPLICATION OF ARTICLE 5 OF REMIT ON THE PROHIBITION OF MARKET MANIPULATION TRANSMISSION CAPACITY HOARDING

Slovenia. Key issues. General overview

CODE OPERATIONNEL DE RESEAU ACHEMINEMENT

REPORT OF THE HELLENIC GAS TRANSMISSION SYSTEM OPERATOR (DESFA S.A.) ON THE IMPLEMENTATION OF INTERIM MEASURES

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for

CALL FOR MARKET INTEREST NOTICE

... Art. 30 (1)(b)(i) Information on the allowed and/or target revenue

Casework Technical Support (Social Welfare - Project Management)

Procurement Guidelines

OPEN SEASON second capacity enhancement. 03 february 2011

All NEMOs proposal for the back-up methodology in accordance with Article 36(3) of the Commission Regulation (EU) 2015/1222 of 24 July 2015

Report on Transparency

Object: Re: Centrica Storage Limited s response to National Grid Informal Consultation on Exit Capacity Substitution and Revision

DNV KEMA Energy & Sustainability. Country factsheets

Long Island Power Authority Seventh Revised Leaf No. 16

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for

3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the

FERC NGA GAS TARIFF. THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) SEA ROBIN PIPELINE COMPANY, LLC.

COMMISSION STAFF WORKING PAPER INTERPRETATIVE NOTE ON DIRECTIVE 2009/73/EC CONCERNING COMMON RULES FOR THE INTERNAL MARKET IN NATURAL GAS

BUSINESS RULES III. Cost Allocation and Determination of the Reference Price

Alberta Capacity Market

NordREG memo to EMG on the price peaks in the NPS market

Consultation document. Redesigning the Austrian gas balancing system

Transportation. Tariff. Vector Pipeline Limited Partnership

Version dated [01/11/2017] SPECIAL TERMS

15 January FCR Cooperation Draft Proposal

Flexible gas markets for variable renewable generation

Connect and Manage Guidance March 2013

GB Balancing Arrangements

Market Procedure: Network Control Services

I-SEM Testing Tariff High Level Options Consultation

Energy Supply Costs Information Paper

Electricity trading and transmission arrangements. Towards better electricity trading and transmission arrangements

FERC GAS TARIFF. First Revised Volume No. 1 MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION

THE HARMONISED ELECTRICITY MARKET ROLE MODEL

BALANCING CODE NO. 1 (BC1)

Update on the implementation of GR-BG Projects. Angeliki D. Mourtzikou, Head of Oil & Gas Dept. Regulatory Authority for Energy

FAR PROCEDURES Forecasting, Allocation, Reconciliation

Ontario Energy Board

Business Practice Manual for The Transmission Planning Process

Black Start Procurement Methodology

APPENDIX D TO GAS TRANSPORTATION TARIFF OF NOVA GAS TRANSMISSION LTD. TERMS AND CONDITIONS RESPECTING CUSTOMER S INVENTORIES AND RELATED MATTERS

Economic analysis of the sunset clause

Issue Paper. Direct Participation of Demand Response Resources in CAISO Electricity Markets. December 22, CAISO JEP / BDC/ JDG 12/22/08, page 1

17th April Page 1 of 7

Long Island Power Authority Seventh Revised Leaf No. 16

REG. no. 301 of 11 March 1999

MISO MODULE B FERC Electric Tariff TRANSMISSION SERVICE MODULES Effective On: November 19, 2013

Invitation to Tender for the Provision of

Federal Network Agency for Electricity, Gas, Telecommunications, Post and Railway Ruling Chamber 7 Tulpenfeld Bonn

FUTURE ROLES AND RESPONSIBILITIES FOR THE DELIVERY OF ANCILLARY SERVICES

Transcription:

IUK Access Agreement Summary 10 Oct 2013

Preface This document (the IUK Access Agreement Summary or IAAS ) describes the transportation model and the related services offered by Interconnector (UK) Limited ( IUK ) for the period to 30 September 2018 through the IUK Access Agreement ( IAA ). The IAAS is provided for the purpose of assisting potential shippers in deciding whether or not they wish to partake in the services offered by IUK under the IAA. As such, the IAAS should not be construed as giving rise to any contractual relationship between IUK (or any of its affiliated entities) and any other party. October 2013 2

INTRODUCTION Interconnector (UK) Limited own and operate the Interconnector gas pipeline. The Interconnector links the GB and Belgian gas markets physically and commercially, offering trading opportunities in the Northwest European market areas of NBP, ZPT and Zee Beach, and access to the wider European markets. Since its inauguration in October 1998, the Interconnector has been a major catalyst in the creation of the spot gas market within Europe and a key factor in the liberalisation of energy markets. In addition, ours is the only facility to offer a fully flexible commercial and physical bi-directional service between the gas markets of GB and continental Europe. As such, we provide important security of supply across the whole European region. Regulatory Obligations IUK is certified as a Transmission System Operator by the National Regulatory Authorities of GB and Belgium, Ofgem 1 and CREG 2. Together with our NRAs and connected transporters, National Grid Gas and Fluxys, we are helping to harmonise the European Energy Market through the implementation of the Third Energy Package and associated legislation 3. The Interconnector Access Agreement ( IAA ) In response to new legislation, IUK have developed congestion management procedures designed to facilitate cross-border trade and market liquidity. These procedures include provisions that: Enable parties to buy capacity directly from IUK, in addition to existing secondary market mechanisms Introduce auctions for additional capacity, on an over-subscription basis, that will be made available on a day-ahead basis Introduce a new Buy-back mechanism Parties can access these new service provisions by signing up to the IUK Access Agreement ( IAA ). This document provides the reader with an overview of the services offered under the IAA. The service provisions contained within the IAA have been developed in co-ordination with our stakeholders and are designed to meet a real market need. As a valued stakeholder, we are keen to help you understand how these provisions can help you and hear your views on the continued development of our service. Please contact us to discuss the IAA further on +44 (0)20 7092 6500, or email iukinfo@interconnector.com. 1 Office of Gas and Electricity Markets 2 La Commission de Régulation de l'electricité et du Gaz 3 Amended guidelines for CMP in Annex I of Regulation (EC) No 715/2009 were published in the European Official Journal, on 24 August 2012, following approval by the European Parliament and Council: http://eurlex. europa.eu/lexuriserv/lexuriserv.do?uri=oj:l:2012:231:0016:0020:en:pdf 3

THE IUK SYSTEM Physical Operations The IUK system comprises: A compression/reception terminal at Bacton, GB, with connections to the National Grid Gas transmission system and SILK Pipeline 4 A compression/reception terminal at Zeebrugge, Belgium, with a connection to the Fluxys transmission system A 235 kilometre pipeline between the two terminals, within the GB and Belgium sectors of the southern North Sea. The technical capacity of our facilities varies with operating conditions and Gross Calorific Value (GCV). The average GCV value over the previous five years is illustrated in the table below. Entry at Bacton and Exit at Zeebrugge Entry at Zeebrugge and Exit at Bacton GCV (KWh/Nm 3 ) Capacity (bcm/y) Capacity (GWh/d) GCV (KWh/Nm 3 ) Capacity (bcm/y) Capacity (GWh/d) Average 11.5 20.0 630.1 Average 11.5 25.5 803.4 Note: Entry means entry into the Interconnector system and Exit means exit from the Interconnector system Transportation Model IUK offers transportation services to the market within an entry/exit model. Under this model, gas enters the IUK system at an Entry Point from National Grid Gas, Fluxys or the SILK Pipeline, and can either leave the system at an Exit Point to National Grid Gas or Fluxys. There is no exit from the IUK system at the connection point with SILK. The Entry and Exit Points with National Grid Gas and Fluxys are Interconnection Points 5 with the transmission grids operated by these TSOs. Balancing Regime IAA Shipper Responsibility To ensure the reliable and efficient operation of the Interconnector system, the total quantities of gas entering the system must, on a hourly basis, be in balance with the total quantities of gas leaving the system. IAA Shippers are responsible for ensuring that their nominations are balanced across the system every hour of the day. Linepack Although IAA Shippers do not own any inventory in the system, a small inventory imbalance within a defined tolerance is allowable until the Shipper s next transaction. This may arise due to steering differences. However after 3 months inactivity, if the contract is terminated, or following a potential constraint situation taking the IAA Shipper outside of their tolerance, IUK will cash-out the imbalance position back to zero. 4 The SILK Pipeline can deliver upstream gas directly to the IUK system 5 Interconnection Point means a fixed or virtual point connecting adjacent entry-exit systems or connecting an entry-exit system with an interconnector, in so far as these points are subject to booking procedures by network users (CAM NWC) 4

OBA IUK works closely with its neighbouring transporters. An Operational Balancing Agreement with Fluxys allows IUK to meet nominations exactly and provides IUK with flexibilityto run operations in the most efficient manner without impacting Shipper flows. 5

OUR SERVICE OFFER IUK offers entry-exit services through the Interconnector, in accordance with rules set out in the IUK Access Agreement. In addition, IUK support a suite of secondary market mechanisms under its alternative contract, the Standard Transportation Agreement ( STA ). Please visit www.interconnector.com for more details about the STA and the service provision available. Entry and Exit Services on Interconnection Points Entry services enable gas to be delivered into the IUK system at a specified Entry Point. Exit services enable gas to be withdrawn from the IUK System at a specified Exit Point. The following services are available within the IAA: Location Entry Point Exit Point Capacity Firm Interruptible Bacton IBT IZT SILK IZT SILK IBT Zeebrugge IZT IBT = Service is offered and can be contracted within indicative availabilities as published on IUK Bulletin Board = Service is not available under the IAA, but is accessible via the secondary market, conditional on capacity being offered for sale Under the IAA, Entry Capacity at the IBT Entry Point must be purchased in conjunction with an equal amount of Exit Capacity at the IZT Exit Point. Similarly, Entry Capacity at the IZT Entry Point must be purchased in conjunction with an equal amount of Exit Capacity at the IBT Exit Point 6. Service Provision Under the IAA The IAA offers the opportunity for any party to become an IAA Shipper, hold an ISIS 7 account, and be ready to access Firm Capacity made available through the Oversubscription mechanism described below and the Surrender and LT UIOLI mechanisms applied through the implementation of CMP. These products are all for one day duration purchased day-ahead via a pay-as-bid auction. Oversubscription and Buy-back Oversubscription and Buy-back ( OS and BB ) is based on the idea that the right to use a commodity, capacity in this case, can be oversold (in comparison to the technical maximum capacity) with an expectation that not all buyers will exercise their right to use at the same time. Should difficulties arise in meeting the resulting aggregate net nomination, a mechanism is in place for capacity to be bought back by IUK in order to reduce the aggregate net nomination to within the system capability, i.e. Buy-back. 6 This condition may be lifted as the IAA is developed in line with further EU regulatory requirements. 7 The Interconnector Shippers Information System ( ISIS ) is IUK s web-based gas management tool. ISIS allows Shippers to communicate with IUK and specify their gas flow requirements. 6

Under the IAA, Shippers are able to bid for Firm Day-Ahead Capacity through the Interconnector made available via the Oversubscription mechanism (or Surrender or LT UIOLI), on a Ship or Pay basis. Capacity sold under the IAA does not have associated inventory or inventory flexibility; as a result nominations must be balanced on an hourly basis such that entry equals exit. IUK determine and announce if, and how much, OS Capacity is to be made available on a day-ahead basis. The calculation is based on a statistical scenario model which includes risk profiling to minimise the need for Buy-back 8. Current flow rates for today are to be used to forecast nominations for tomorrow 9. Bulletin Board All available capacity is advertised on IUK s Bulletin Board. This is accessible via ISIS and IUK s website, http://www.interconnector.com/operational-data/capacity-summary IUK will, when circumstances require, advertise its Buy-back requirements on the Bulletin Board. Secondary Market Mechanisms Within the IUK system, capacity 10 can be traded on a secondary market, with available capacity advertised on the Bulletin Board. IUK support the following secondary market mechanisms: 8 At very high flows, the Interconnector operates at or very close to its design limits and consequently there is no further capacity available on a firm basis and limited, if any, capacity available on an interruptible basis without incurring undue safety and system integrity risks. Not making OS Capacity available in the prevailing flow direction when demand is forecast to exceed 75% reflects the fact that Shippers nominations can change considerably within-day in response to events and/or pricing signals, and consequently ensures that the requirement to buy back will be not be excessive. 9 The quantity of OS Capacity made available is at the discretion of IUK; whilst the quantity will be based upon today s flowrates, IUK made deem it prudent to reduce the quantity of OS Capacity made available tomorrow, given additional market information, in order to ensure safe and efficient operations. 10 This refers to (a) capacity bought under the Standard Transportation Agreement, and to (b) capacity bought under the Interconnector Standard Sub-Let Contract (or alternative) and therefore operating under the terms of the STA via their Sub-lessor. 7

Assignment Sub-letting Capacity Transfer Third-party shipping service Pooling For more information about these mechanisms, please visit http://www.interconnector.com/accessservices/access-to-capacity In order to ensure a liquid market, IUK have developed rules allowing the trading on of traded capacity. 8

SERVICE SUBSCRIPTION AND CAPACITY RULES In order to subscribe and use the entry-exit services outlined above, a party must first sign the IUK Access Agreement ( IAA ) and adhere to the capacity utilisation rules contained therein. The IUK Access Agreement The IAA is a suite of documents designed to enable you to use IUK s entry-exit services. The IAA is concluded for an indefinite period, with termination rights defined; the service confirmation will be set out on the Interconnector Shipper Information System ( ISIS ), the IUK online communication platform and gas-flow management system. Capacity Booking Capacity made available through OS, Surrendered and/or LT UIOLI Capacity is allocated via an auction process. Firm Capacity is offered to Shippers on a day-ahead basis, the amount available at each Entry and Exit Point to be determined and published day-ahead by IUK. All Shippers will then be eligible to partake in the auction, to be held via ISIS. Successful bidders will be notified following closure of the auction. 9

The daily timetable for booking capacity will be as follows: 14:15 UKT/ 15:15 CET 14:30 UKT/ 15:30 CET 16:00 UKT/ 17:00 CET 17:00 UKT/ 18:00 CET IUK calculate the amount of capacity to make available for tomorrow IUK advertise the amount of capacity and the reserve price on the IUK Bulletin Board Shippers enter bids for capacity The capacity bid process closes IUK notify successful bidders Capacity for tomorrow is transferred to the successful bidders Buy-Back If aggregate nominations exceed, or are predicted to exceed, the physical capability of the IUK system, and OS Capacity has been sold, then a Buy-back process will be initiated. IUK will determine the quantity of capacity to be bought back to reduce the aggregate net nominations to within the physical capability of the IUK system. IUK will publish a notification on the Bulletin Board making Shippers aware that Buy-back is required and providing details of the quantity and direction of capacity sought. All Shippers will be invited to offer capacity, which will be bought by IUK through a pay-as-bid auction. IUK will accept offers of capacity in order of price, starting with the lowest offer until the required Buy-back volume is met 11. The process will be completed within 4 hours: hh:mm IUK publish on Bulletin Board that Buy-back is required including quantity and entry/exit direction hh:mm Shippers can enter an offer to sell Firm Capacity back to IUK at a price set by the Shipper hh:mm + exactly 1hr hh:00 + 2:00 hh:00 + 4:00 Buy-back capacity offer process closed IUK accepts the offers from the lowest priced offer until required Buy-back volume met All successful capacity offers for Buy-back accepted Capacity transferred 11 IUK will set a maximum Buy-back price in advance of any Buy-back auction, based on a pre-agreed methodology. Shippers may offer to sell capacity to IUK for a price greater than this maximum Buy-back price, however IUK will be required to reject any such bids. If IUK receives insufficient bids at or below this maximum Buy-back price to fulfil the full Buy-back requirement, the remaining capacity will be bought back via the Forced Buy-back mechanism. 10

Forced Buy-back will be triggered if insufficient capacity can be bought back through the auction process or if the requirement to Buy-back occurs after 10pm. Forced Buy-back will occur for all capacity bought under the IAA to the extent needed to bring nominations within the physical capability of the system. After the day the normal allocation process will result in an underallocation and Buy-back payments will be due from IUK to each IAA Shipper. 11

OPERATING RULES Nominations To flow gas through the IUK system, Shippers must ensure they have matching capacity rights in the adjacent transportation system, or have sold their gas to another Shipper with the relevant capacity rights. Matching data provided by Shippers to IUK and connected transporters is used to create a nomination. A nomination is the quantity of gas that a Shipper wishes to flow into or out of the IUK system at each Entry or Exit point. Renominations can also be generated, should a Shipper s flowrequirements change, according to the procedure detailed in the IUK Access Code. A nomination takes the form of a standardised electronic message, issued by Shippers, on ISIS. The message relates to a particular Gas Day (which begins at 06:00 hours and terminates at 06:00 hours the following day, UK time) and to a specific point, and provides for each hour of the relevant Gas Day the quantities of gas, expressed in kwh, that the Shipper wishes to deliver or offtake under its subscribed services at the relevant point. The nomination process comprises the following steps: A Shipper sends nominations to IUK Nominations are then processed by IUK and matched with nominations in the adjacent system IUK calculates the scheduled quantities to be delivered/offtaken to/from the IUK System IUK sends a confirmation message in order to communicate to the Shipper the results of the process Shippers may revise their nominations on a day-ahead or intraday basis by sending renominations, with a lead time of full hour + 2. Nominations for Entry and Exit must be balanced on an hourly basis. Metering and Allocations IUK s metering arrangements are outlined in the IUK Access Code. Once IUK have metered the gas entering and leaving the IUK system, gas is allocated at each Entry and Exit Point on an hourly basis. This data is provided to the relevant Shipper in kwh. Data Transparency IUK publish the following information on its website and, where appropriate, the European Transparency platform: Available capacity and Buy-back notifications, on a daily basis The number and volume of unsuccessful, valid requests for Firm Capacity with a duration of one month or longer, on a bi-annual basis The total capacity made available through each of the Congestion Management Procedures mechanisms, on a rolling monthly basis 12

COSTS AND INVOICING Sign-up Costs 12 A 10,000 registration fee will cover the legal, administrative, set-up and training costs associated with signing the IAA and becoming an IAA Shipper. A 500 monthly fee is payable by all IUK Shippers to cover ISIS access charges and on-going administration costs. Auction and Reserve Price The reserve price for Entry and Exit Capacity will be set by IUK to ensure equitable and nondiscriminatory treatment across all Shippers. The same reserve price will be set for both Entry and Exit Capacity, since the same service is provided in each flow direction. The auction will be pay as bid with the highest bids being accepted first. In the case of over-demand with bids at the same price then quantities will be accepted on a pro-rata basis. Fuel When capacity is nominated against, fuel gas and/or electricity is required. When gas is physically being entered into the system at Bacton, fuel gas is used principally by the gas turbines that power the compressors located at Bacton. When gas is physically being entered into the system at Zeebrugge, electricity is used by the electric motors that power the compressors located at Zeebrugge and a small amount of fuel gas is consumed in heating gas exiting the IUK system. Shippers are invoiced for their share of fuel each month; in Sterling for fuel gas and in Euros for electricity. Electricity charges are estimated at the start of each Gas Year and Shippers are then subject to an annual reconciliation to balance IUK s costs against revenue. Invoicing Process Shippers will be invoiced and must pay the initial registration fee before they will be granted ISIS access and be able to participate in the daily capacity auction process. Thereafter, Shippers will be invoiced on a monthly basis in arrears for the following 1. Monthly administration fee; plus 2. Sum of daily Entry and Exit Capacity charges; plus 3. Sum of any balancing charges for negative balances; plus 4. Sum of fuel charges, less 5. Sum of any Buy-back Costs; and 6. Sum of any balancing charges for positive balances. 12 These charges, applicable to the 2013/14 Gas Year, will be inflated each Gas Year 13

How to Contact Us If you would like to find out more about the services offered by IUK, please do not hesitate to contact us on +44 (0)20 7092 6500, or email iukinfo@interconnector.com. Disclaimer The IAAS may be amended from time to time to reflect changing regulatory requirements and other modifications to the model and/or services on offer. Whilst IUK make every effort to ensure the IAAS is current and complete, it hereby disclaims any and all liability for changes to the services described herein. 14