Area B Groundwater Investigation Fort Detrick

Similar documents
ENVIRONMENTAL RESTORATION SERVICES FORT DETRICK, FREDERICK MD

November 8, 2016 International Petroleum Environmental Conference. Tim Nickels Pastor, Behling & Wheeler, LLC

BACKGROUND OFFSITE FACILITIES/RELEASE CASES

Alaska Department of Environmental Conservation. Contaminated Sites Database

MARYLAND DEPARTMENT OF THE ENVIRONMENT

STRATEGIES FOR CHARACTERIZING SUBSURFACE RELEASES OF GASOLINE CONTAINING MTBE

Fort George G. Meade. Performance Based Acquisition (PBA) Five-Year Summary. Restoration Advisory Board Meeting November 20, 2014

Restoration Advisory Board Horsham Air Guard Station

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore Maryland

Armen Cleaners Indoor Air Quality Investigation. Jon Gulch, OSC U.S. EPA, Region V, ERB

AECOM tel 8000 Virginia Manor Road, Suite fax Beltsville, MD 20705

MEMO. Kris Hinskey

Soil Vapor Migration Through Subsurface Utilities

PA Vapor Intrusion Guidance

Excavation of petroleum-contaminated soil and tank removal sampling Petroleum Remediation Program

State of Oregon Department of Environmental Quality

Closed Castner Firing Range Remedial Investigation. Technical Project Planning (TPP) Meeting #4 07 November :00 AM 11:00 AM

A REVIEW OF VAPOR INTRUSION GUIDANCE BY STATE

Hazardous Materials December 9, Hazardous Materials Existing Conditions

AR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet NOTES:

Indoor Air Quality Testing at the Middle River Complex. Indoor Air Quality Testing at the Middle River Complex. For More Information

(this cover page left intentionally blank)

Steps in Conducting Structural Vapor Intrusion Potential Evaluations Under the Inactive Hazardous Sites Branch 13 February 2017

Grid Soil Sampling Outside of Source Areas

Comments provided by Dave Kacheck, CENWO-ED-GG Dated: November 2, 2007

H&H Job No. DS0-05. April 29, South Tryon Street Suite 100 Charlotte, NC

Site Profiles - View. General Information. Contaminants: Site Hydrology:

Closed Castner Firing Range Remedial Investigation

Overview of Pepco Benning Facility RI/FS

MEMORANDUM. To: Billy Meyer. Christie Zawtocki, PE Timothy Klotz. Date: April 8, 2014

Passive Gas Environmental Site Assessment and Monitoring

SUBSURFACE INVESTIGATION REPORT

Marine Corps Base Camp Lejeune Restoration Advisory Board Meeting Minutes

Site Investigation of Ground Water

USE OF HIGH RESOLUTION CHARACTERIZATION DATA TO OPTIMIZE SOURCE AREA REMEDIATION AT AOC 50 AT FORMER BASE FORT DEVENS

A. INTRODUCTION AND METHODOLOGY

ISOTEC Case Study No. 67 ISCO TREATMENT PROGRAM: IMPACTED GROUNDWATER TREATMENT UTILIZING ACTIVATED SODIUM PERSULFATE

Community Environmental Newsletter

Catalyzed Persulfate Remediation of Chlorinated and Recalcitrant Compounds in Soil

ROUX ASSOCIATES, INC. Environmental Consulting & Management

In-Situ Remediation of Chlorinated Solvent Source Zone using ZVI-Clay Treatment Technology

Example Application of Long Term Stewardship for the Chlorinated Vapor Intrusion Pathway (and VOC sources)

Ground Water Remedy Optimization Progress Report: Office of Superfund Remediation and Technology Innovation

Groundwater Protection Plan in Response to Release of Fracking Fluids in Shallow Sandstone

Lessons from Petroleum Hydrocarbon and Chlorinated Solvent Sites Extensively Monitored for Vapor Intrusion

Contaminated Media Management Plan. DEQ UST Site # Del Oeste Veterinary Clinic Prairie Road Eugene, Oregon

OCTOBER 2014 UPDATE: A YEAR OF REAL PROGRESS IN ALL AREAS

JAXPORT Overview. JAXPORT Dealing with Legacy Contamination Issues

Town of Chelmsford, Massachusetts. Community Relations Plan Former Silicon Transistor Corporation 27 Katrina Road. EPA Brownfields Cleanup Program

GUIDE FOR THE SUBMISSION OF REMEDIAL ACTION WORKPLANS

Executive Summary. 2. Property Investigations Groundwater Sampling Soil Sampling Soil Vapor Sampling 5

Environmental Site Assessment for Limited Remediation Protocol

Vapor Intrusion Attenuation Factors Based On Long Term Monitoring Data

Abstract. Thomas R. Eschner and David Dinsmore, Woodard & Curran.

K ATALYST, INC. adding value to our natural resources facilitating community change

Manufactured Gas Plant Site Management - Program 50

Harford County Health Department Resource Protection Division

Determining the Influence of Background Sources on Indoor Air Concentrations in Vapor Intrusion Assessment

Fort George G. Meade. Military Munitions Response Program Mortar Range Munitions Response Area. Public Meeting July 19, 2012

August Vapor Intrusion Guidance FAQs

APPENDIX M: Hazardous Waste Technical Report

Injection Wells. An injection well is a vertical pipe in the ground into which water, other liquids, or gases are

Floater/Sinker Site Assessment Complicated By Asbestos

Groundwater Monitoring Requirements of the CCR Rule What s Next?

Treatment Technologies for Site Cleanup: Annual Status Report (Twelfth Edition)

SUB-SLAB DEPRESSURIZATION SYSTEM DESIGN AND INSTALLATION

Mobile Water Treatment Trailer

Mixed Plume Remediation using EHC In-Situ Chemical Reduction and Oxidation Technologies

Phytoremediation Technology Evaluation and Preliminary Design

PROPOSED DECISION DOCUMENT. CE - E. 19th St. Station Voluntary Cleanup Program New York, New York County Site No. V00542 October 2017

Sub-Slab Sampling and Analysis to Support Assessment of Vapor Intrusion at the Raymark Superfund Site

In Situ Thermal NAPL Remediation at the Northeast Site Pinellas Environmental Restoration Project

ENVIRONET Conceptual Site Model

The Transport of MTBE through Groundwater in the Bootheel, an Alluvial Setting

Green Remediation at. LUST Technical Workshop Stephen G. Reuter New Mexico Environment Department

Full Scale Implementation Of Sulfate Enhanced Biodegradation To Remediate Petroleum Impacted Groundwater

Waterfront Substation

Environmental Management Division. David Amidei NASA HQ

ANALYSIS OF BROWNFIELD CLEANUP ALTERNATIVES (ABCA) US EPA BROWNFIELD CLEANUP GRANT PROGRAM Sibley Mill 1717 Goodrich Street Augusta, GA

Cost Estimate for Removal and Disposal of Contaminated Soil

Thermal Remediation Services, Inc.

In Situ Chemical Oxidation of Volatile Organic Compounds in a Fractured Bedrock Aquifer

Final Report. Pilot Region-Based Optimization Program for Fund-Lead Sites in EPA Region 3

FACT PATTERN THE RESERVATION

Waterfront Substation

Project Background. Project Purpose

EPA Internet Seminar

NJDEP Vapor Intrusion Guidance

Mass Flux Characterization for Vapor Intrusion Assessment

Egyptian Lacquer Manufacturing Company, Franklin, Tennessee Comments to the Revised Comprehensive Corrective Action Plan

RULE 68. DISPOSAL OF NATURALLY OCCURRING RADIOACTIVE MATERIALS (NORM) ASSOCIATED WITH THE EXPLORATION AND PRODUCTION OF OIL AND GAS

September 20, 2015 PN:

Marine Corps Base Camp Lejeune Restoration Advisory Board Meeting Minutes

DIVISION 02 EXISTING CONDITIONS

October 9, U. S. Army Corps of Engineers Omaha District Attn: CENWO-ED-ED (Jeffery Skog) 215 North 17 th Street Omaha, NE

Michigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals

GEOTHERMAL HEAT PUMPS CONFIGURATIONS/INSTALLATION

6. Organic Compounds: Hydrocarbons. General Comments Borden, Canada, tracer test Laurens, SC, gasoline spill Bemidji, MN, crude oil spill

EXAMINING RISK APPROACHES. Moderator: Carl Spreng Colorado Department Of Public Health And Environment

U.S. EPA s Vapor Intrusion Database: Preliminary Evaluation of Attenuation Factors

Transcription:

Area B Groundwater Investigation Fort Detrick Progress Report to the RAB November 6, 2013 John Cherry ARCADIS Imagine 1 the result

Overview of Topics Groundwater Tracer Study Overview Shallow Off-Post DPT Drilling Update Schedule for Additional On- and Off-Post Drilling New Site Inspection Task for Area A and Area B Locations 2

Work Completed Since the Last RAB Continued groundwater tracer study. To date, we ve completed 14 of 15 planned rounds of comprehensive tracer sampling. Mobilization for additional on- and offpost deep drilling. Planning phases for upcoming Site Inspections on Area A and Area B 3

Status of Original RI Work Plan Activities Existing well assessment and repair Feb 2011 to Apr 2011 New well installation (onsite) April 2011 to Mar 2012 Direct Push Investigation March 2012 Spring and Seep Surveys March 2012 Groundwater/Surface Water Sampling April 2012 /Sept 2012 Vapor Intrusion Sampling (2 rounds) Jan/Aug 2013 Groundwater tracer study (on-going) Spring 2013 to Fall 2013 Grey = completed 4

Vapor Intrusion Sampling Update Due to the presence of groundwater contaminated with volatile organic compounds (VOCs) including Trichloroethene (TCE) and Tetrachloroethene (PCE), Vapor Intrusion (VI) testing was performed to check for potential impacts to indoor air. 4 offsite, 1 onsite locations (commercial and industrial properties) Two rounds of testing completed (January and August 2013) Multiple compounds detected Results do not indicate that TCE and PCE impacting indoor air at action levels Several compounds detected slightly above industrial screening level Source of compounds may be local Data results provided to EPA and MDE and meeting pending. Next Step: Meet with property owners to discuss results.

6 Area B Conceptual Site Model Review

Groundwater Tracer Study Update

Groundwater Tracer Study What is a groundwater tracer study? - A tracer is introduced to the groundwater and monitored over time to see where and when the tracer appears at other monitoring points in the study area (e.g. wells, springs, surface water bodies). - Useful for evaluating the groundwater flow velocity and direction of groundwater movement. 8

Generalized Patterns of Groundwater Flow Easterly flow from the topographically higher areas to the west NEW OXFORD CONGLOMERATE Primary Area B Discharge Area Westerly flow across Area A FREDERICK LIMESTONE 9 Flow direction on this property inferred from historical measurements in existing monitoring wells Easterly flow across Area B

Tracer Study Area Tracer introduction area near B-11 Primary Area B Discharge Area Area A Tracer most likely to discharge to springs and surface water in the primary discharge area based on CSM Rock Creek -Approximately 100 monitoring locations within the study area. -Monitoring locations include wells, springs, surface water bodies. 10

Groundwater Tracer Study Updates Two tracers introduced in deep wells in May 13 at these depths: Tracer A: 140-155 feet deep Tracer B: 313-328 feet deep Tracer A: In 2-3 weeks Tracer A was detected in springs in the center of Area B. In 5-7 weeks, Tracer A detected in on-post monitoring wells east/southeast of the introduction area. After 8-10 weeks Tracer A has been detected in springs in the primary discharge area. To date, detections are consistent with the conceptual site model for Area B groundwater and contaminant migration east/south east across Area B. Monitoring and data evaluation is on-going and these are only preliminary observations available at this point. 11

Preliminary Study Observations for Tracer A (Results through 10/10/13 spanning 5 months since the tracer introduction) Tracer A introduced in this area Primary Area B Discharge Area Consistent with the CSM, the Tracer A confirms flow to the east and discharge at seeps and springs in the Primary Discharge Area after 8-10 weeks. No confirmed detections of Tracer A at any other monitoring locations Tracer introduction location Confirmed tracer detection location Tentative tracer detection location 12

Groundwater Tracer Study Updates Two tracers introduced in deep wells in May 13 at these depths: Tracer A: 140-155 feet deep Tracer B: 313-328 feet deep Tracer B: In 2-3 weeks Tracer B was detected in shallow monitoring wells very close to the introduction area. After 8-10 weeks, Tracer B has not been detected in any other monitoring locations on Area B, or in the primary discharge area, or in off-post areas. All observations at this time are preliminary pending completion of the study, but appear to indicate: Limited flow at the depth within this portion of the aquifer. Connectivity between the deeper and shallower portion of the aquifer. 13

Preliminary Study Observations for Tracer B (Results through 10/10/13 spanning 5 months since the tracer introduction) Tracer B introduced in this area After 5 months of monitoring, Tracer B has only been confirmed in shallow wells close to the introduction location No confirmed detections for Tracer B at other locations. Tracer introduction location Confirmed tracer detection location 14

Preliminary Study Observations for Tracer B (Results through 10/10/13 spanning 5 months since the tracer introduction) Tracer B only detected to date in shallow wells near introduction location 8-10 Weeks: Tracer A detected in primary discharge area. Tracers introduced in this area 15 5-7 Weeks: Tracer A detected in multiple monitoring wells across Area B. 2-3 Weeks: Tracer A detected at the ground surface in a spring on Area B. 20 Weeks: Tracer A detected at property boundary.

Groundwater Tracer Study Schedule EPA and MDE oversight: Status discussions with EPA and MDE to review laboratory results and observations to date.: August 7, 2013 September 30, 2013 Comprehensive tracer monitoring rounds continue into November 2013. Supplemental sampling rounds will continue. The Army and ARCADIS will continue to provide status updates during future community RAB meetings. A tracer study report will be prepared and submitted to EPA, MDE, and the RAB at the conclusion of the study. 16

Shallow Off-Post DPT Drilling Update

Supplemental Shallow DPT A light weight drilling rig is used to hydraulically push sampling rods into the ground for collecting soil/groundwater samples and installing shallow small diameter wells. Drilling depths in this area are limited to ~30-40 feet below ground surface due to shallow bedrock, and sometimes much shallower. Approximately 50 DPT locations were completed in the study area in Spring 2012. August 2013: Additional DPT drilling completed in three off-post areas. 18

Shallow Direct Push (DPT) Drilling Investigation February/March 2012

Supplemental Sampling Planned Based on Observations in 3 Areas TCE and PCE detected at or above the drinking water standard PCE detected just below drinking water standard No previous sampling in this area.

3 Supplemental DPT Study Areas Completed in August 2013 14 drilling locations attempted in these three areas.

3 Supplemental DPT Study Areas Completed in August 2013 14 drilling locations attempted. Shallow bedrock prevented drilling and groundwater sampling in some areas. 7 shallow wells installed and sampled in August 2013. Shallow well installed and sampled. Bedrock encountered, no groundwater sample.

3 Supplemental DPT Study Areas Completed in August 2013 14 drilling locations attempted. Shallow bedrock prevented drilling and groundwater sampling in some areas. 7 shallow wells installed and sampled in August 2013. Shallow well installed and sampled. Bedrock encountered, no groundwater sample. Chloroform at 0.3 J All ND Acetone at 5.3 Benzene at 0.1 J Toluene at 0.4 J TCE at 0.2 J 1,1-TCA at 0.2 J Chloroform at 0.7 All ND All ND MTBE at 0.2 J Xylene at 0.1 J

Schedule for Additional On- and Off-Post Drilling

Additional Deep On-Post & Off-Post Drilling Right of entry agreements signed for planned off-post drilling locations. Drilling methodology will follow the same techniques employed during the 2011/2012 drilling program (including geophysical logging and packer testing). Maximum drilling depths anticipated to be ~400-500 feet below ground surface at some new locations. Multiple nested wells to be installed to aid in vertical delineation. Approximately 7 new borings with up to 11 nested wells installed. 25

Supplemental Deep Drilling Locations 1. Vertical delineation downgradient of B- 11 to depths greater than 325 ft. (~ 2 nested wells) Generalized patterns of flow Primary Area B Discharge Area 2. Delineation south of B-11 area (Waverley Property) (~3 drilling areas w/ ~7 nested wells) 2 1 3 3. Horizontal delineation east of Carroll Creek (underflow) (~ 2 nested wells) 26

New Site Inspection Task for Area A and Area B Locations

Site Inspection (SI) Task The Army s review of historical archive records identified sites at Fort Detrick Area A and Area B that warrant initial evaluation and screening. ARCADIS team will be completing CERCLA Site Inspections at these locations. The objective is to achieve Final SI reports for these sites with to determine appropriate next steps: 1. No further action needed (Site Evaluation Accomplished), or 2. Recommendation for more comprehensive sampling (e.g., CERCLA Remedial Investigation). 28

Site Inspection (SI) Locations Work plans for screening the SI locations will be prepared and submitted for regulatory review. Field work is anticipated to begin in Spring 2014, and will include a variety of soil, groundwater, and sediment sampling based on the historical uses and activities at the SI locations. The SI locations have been grouped into 8 categories for evaluation. 29

Group 1: Former herbicide sites Ten historical anti-crop herbicide sites will be sampled during the SI testing. These are areas where historical aerial imagery or other records indicate controlled field experiments may have been conducted on small test plots during the 1940s and 1950s. Today these areas are covered by a mix of parking lots, buildings, trees, and grassy areas. Records indicate a low likelihood for detecting residual herbicides but testing will be conducted in these areas for confirmation. 30

Group 2: Low-level Radiation Areas Eighteen current or former Area A buildings were identified for historical use of sealed-source or by-product radioactive materials for laboratory experiments beginning in the late 1940s. The likelihood of environmental impact is considered low and there is no evidence of a prior release. Testing for radioactive isotopes will be completed in the vicinity of these buildings to confirm. Several examples of the types of locations in this grouping are shown below: Several rooms in this building had documented use of radioactive isotopes in the 1960s Location of former Dental X-Ray Department Records show a radioactive isotope was previously used in a test tank in this building. 31

Group 3: Incinerator Sites Eleven former incinerator locations in Area A dating back to World War II previously used for disposal of burnable wastes and decontamination of air from test facilities. Environmental impacts from air deposition is possible in the vicinity of these locations. The historical use and storage of fuel oil for firing the incinerators also warrants evaluation. Most locations have been reutilized for other purposes for many decades. 32

Group 4: TCE Sites Records identified the documented use of TCE in three Area A buildings for refrigeration and/or freeze-drying purposes. These activities were associated with test chambers and other activities dating back to the 1960s. Environmental impacts are possible and warrant groundwater sampling near these buildings. One of the buildings had been inactive since 1971 and was razed in 2003. TCE was used in the 1960s to early 1970s in a former building located in this parking lot. The building was razed in 2003 and the cream-colored building was constructed in it s place. 33

Group 5: Petroleum, Oil, and Lubricant (POL) Sites Records identified 15 locations with historic POL storage, use, or dispensing. These locations include former underground fuel lines, pumping/dispensing areas, and possible underground storage tanks. Environmental impacts are possible due to the historical use of gasoline, diesel, and fuel oil in these areas. 34

Group 6: Dispersion Test Areas Records identified 3 areas in Area A that were previously used as outdoor test grids for simulants and crop agents. The tests were intended to evaluate how the simulants, such as a yeast slurry, were dispersed from 20mm rounds and small-arms fire (e.g., shotgun shells). The likelihood for environmental impacts is considered low but further evaluation will be completed. 35

Group 7: Vehicle Maintenance Areas Historical records review identified two former vehicle maintenance areas, including motor repair shops, wash racks, and a gasoline station. Site evaluation needed to assess whether these historical activities could have impacted soil or groundwater and to determine if USTs may still be present. Gas station and motor repair shop located in this area until the 1950s. Motor repair shop and wash rack located in this area until 1975. 36

Group 8: General disposal, storage, or other use areas This group includes a mix of Area A and Area B locations, including small storage/test sheds, a locomotive shed, a photo lab, paint shops, and former storage or disposal areas. Site inspection sampling will be tailored based on the types of historical activities and uses in these areas. 37

Next Steps

Next Steps Conduct remaining groundwater tracer sampling rounds and complete thorough data evaluation and reporting. Complete follow-on drilling activities and supplemental investigations based on identified data needs. Prepare Site Inspection Work Plans for Area A and Area B SI locations for regulatory review and mobilize for field work in Spring 2014. Regular updates to be provided during community RAB meetings. 39

Questions and Discussion