COSVR280 - SQA Unit Code F Strip and reclaim pitched roof coverings

Similar documents
COSVR186 - SQA Unit Code FW1A 04 Remove existing wall cladding systems

COSVR272 - SQA Unit Code DY1C 04 Install roofing backgrounds and components

COSVR184 - SQA Unit Code FW15 04 Install wall cladding systems

COSVR69 - SQA Unit Code DY3K 04 Lay sand and cement screeds

COSVR290 - SQA Unit Code H36A 04 Erect timber roof structures

COSVR11 - SQA Unit Code DY13 04 Erect structural carcassing components

FY4W 04 Operate Plant or Machinery for Accessing (Mobile elevated working platform boom self propelled)

COSVR50 - SQA Unit Code DY9V 04 Repair and maintain masonry structures

COSVR664 - SQA Unit Code H4HB 04 Diagnose faults in plant or machinery systems or components

COSVR649 - SQA Unit Code H0WP 04 Produce stencils designs using pre-cut stencil plates

COSVR10 - SQA Unit Code F Install second fixing components

COSVR477 SQA Unit Code HM2F 04 Machinery and equipment maintenance

COSVR332 - SQA Unit Code F Prepare surfaces for painting/decorating

COSVR333 - SQA Unit Code F Apply paint systems by brush and roller

COSVR468 - SQA UNIT CODE F28C 04 Produce sawn wood and wood-based products

COSVR472 - SQA Unit Code F28P 04 Produce wood and wood-based products using computer numerically controlled/numerically controlled (CNC/NC) machinery

SKSVR332 Prepare surfaces for painting/decorating

COSVR643(SQA Unit Code-FN2V 04) Move, handle or store resources

Overview COSVR681. Install external blinds, screens or solar shading systems

Overview COSVR678. Service and maintain or commission door, gate or shutter systems

Preparing and Operating Industrial Counterbalanced Forklifts to Lift and Transfer Loads in the Workplace

COSVR95 SQA Unit Code HL88 04 Install sheeting and cladding systems on roofs and walls

COSVR98 SQA Unit Code HL8R 04 Repair sheeting and cladding systems on roofs and walls (including rainscreen)

components in the workplace

Installing door ironmongery in the workplace

Level 2 NVQ Diploma in Trowel Occupations (Construction) (QCF) Qualification Specification

COSVR728 - SQA Unit Code F3H7 04 Evaluate and select work methods

Level 2 NVQ Certificate in Wall and Floor Tiling (Construction) Qualification Specification

Level 2 NVQ Certificate in Erection of Precast Concrete (Construction)

Level 2 NVQ Diploma in Associated Industrial Services Occupations Passive Fire Protection (Construction)

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Highways Maintenance (Construction)

Construction, Planning and the Built Environment Unit Content and Assessment Guidance (Attachments pathway)

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)

Insulation and Building Treatments (Cavity Wall Insulation) Qualification Specification

Level 2 NVQ Diploma in Roadbuilding and Maintenance (Construction) Pathway 29: Plant Road Sweeping. Qualification Specification

Level 2 NVQ Diploma in Wood Occupations (Construction)

COSVR705 - SQA Unit Code H6AP 04 Allocate and monitor the use of plant, equipment or machinery

Cskills Awards L2 NVQ Diploma in Maintenance Operations (Construction)

Level 2 NVQ Diploma in Construction Plant or Machinery Maintenance (Construction)

Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services - Roadbuilding (Construction)

Level 2 NVQ Diploma in Wood Occupations (Construction) (6571) September 2017 Version 2.6

Level 2 NVQ Diploma in Decorative Finishing and Industrial Painting Occupations (Construction) (6572) September 2017 Version 1.1

COSVR641 Conform to general workplace health, safety and welfare

Qualification and Assessment Specification

Pearson Edexcel Level 2 NVQ Diploma in Decorative Finishing and Painting Occupations Painter (Construction)

Specification. Edexcel Level 1 NVQ Diploma in Construction Operations and Civil Engineering Services (Construction) (QCF)

Qualification and Assessment Specification

Qualification and Assessment Specification

COSCCOMO01 (SQA Unit Code - HA32 04) Maintain health, safety and welfare systems in construction contracting operations management

Pearson Edexcel Level 2 NVQ Diploma in Site Logistics Operations (Construction) (QCF) Specification

COSCCOMO01 - SQA Unit Code FM74 04 Maintain health, safety and welfare systems in construction contracting operations management

Conforming to General Health, Safety and Welfare in the Workplace

Overview COGESA4.10. Solve explosives process problems. This standard comprises the following elements:

SEMFWE3-11 SQA Unit Code HF38 04 Preparing resistance spot, seam and projection welding machines for production

IMIARBG1 Contribute to housekeeping in motor vehicle environments

Overview IMICA01. Contribute to Housekeeping in Motor Vehicle Environments. Contribute to Housekeeping in Motor Vehicle Environments

Level 2 NVQ Diploma in Decorative Finishing and Industrial Painting Occupations (Construction) (6572) July 2013 Version 2.0

Overview SEMPW306. Deal with incidents and contingencies within the railway environment

COSBEDO01 - SQA Unit Code F50H 04 Produce and recommend detailed design solutions in built environment design

The Advantage of Implementing a Safety Management System. Integrating Occupational Safety Management into Other Management Functions

SEMLATA3-05 Provide technical advice and guidance for scientific or technical activities

PROHSP4 SQA Unit Code H8WD 04 Develop and implement effective communication systems for health and safety information

This standard deals with the following:

SEMLATA3-08 Carry out complex scientific or technical sampling operations

Gain an NVQ qualification for your skills

SEMPEO SQA Unit Code FP45 04 Producing Composite Assemblies

SEMPEO SQA Unit Code FP46 04 Finishing surfaces by applying coatings or coverings

ASTCO3 Ensure that your own actions reduce risks to health and safety

EUSWM01 Manage the reception of waste

SEMPEO SQA Unit Code H Assembling mechanical components

WORK HEALTH AND SAFETY AUDIT STANDARD

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd

The main outcomes of this standard are:

Policy Work Health and Safety (WHS) RCPA Introduction WHS legislation

SEMPEO SQA Unit Code FP2D 04 Producing aircraft detail assemblies

The Horse Rangers Association Health & Safety Policy

HEALTH AND SAFETY POLICY

COSCCOO10 - SQA Unit Code F Implement contract work in construction

SEMEMI SQA Unit Code H2AN 04 Carrying out scheduled maintenance activities on mechanical equipment

OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)

Site Safety Plus. Site Management Safety Training Scheme (SMSTS) Course appendix G

ENVIRONMENT, HEALTH & SAFETY POLICY Up date

Level 2 NVQ in Heating and Ventilating Ductwork Installation (6088)

COSCCOC02 (SQA Unit Code - HA3N 04) Prepare programmes and schedules of work in construction

SEMMME SQA Unit Code H2AF 04 Assembling Fluid Power Components to Mechanical Equipment

Designer and CDM Co-ordinator Guidance

Waste Management Policy

PROHSP7. Develop, implement and review proactive monitoring systems for health and safety. Overview

National self-insurer OHS management system audit tool. Version 3

SKAC18 - SQA Unit Code H53X 04 Assemble and install purpose made equipment and components for sport/play

SEMEMI SQA Unit Code H2B0 04 Carrying out scheduled maintenance tasks on service systems and equipment

SEMMME SQA Unit Code H2AC 04 Operating CNC Electro-Discharge Machines

Overview IMIARBBP20. Carry Out Motor Vehicle Body Resistance Spot Welding Operations. Carry Out Motor Vehicle Body Resistance Spot Welding

Centre for Rail Skills. National Occupational Standards. for the. Maintenance and Repair of. Traction and Rolling Stock

SEMPEO SQA Unit Code H Carrying out pipe fitting activities

SEMLATA SQA Unit Code H00L 04 Carry out scientific or technical testing operations

COSCSMO05 SQA Unit Code H99M 04 Prepare and agree a project brief and outline programme in construction management

CHAS Assessment Standards

SEMLATA4-06 Write scientific or technical reports for workplace activities

Transcription:

Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 removing and/or reclaiming existing roof coverings for immediate and/or future use and disposing of unsuitable materials 5 preparing surfaces for re-roofing COSVR280 1

Performance criteria You must be able to: P1 interpret the given information relating to the work and resources to confirm its relevance P2 comply with the given, relevant legislation and official guidance to carry out your work and maintain safe work practices P3 select the required quantity and quality of resources for the methods of work P4 comply with organisational procedures to minimise the risk of damage to the work and surrounding area P5 comply with the given contract information to carry out the work efficiently to the required specification P6 complete the work within the allocated time, in accordance with the programme of work COSVR280 2

Knowledge and understanding Performance Criteria 1 Interpretation of information K1 the organisational procedures developed to report and rectify inappropriate information and unsuitable resources, and how they are implemented K2 the types of information, their source and how they are interpreted K3 the organisational procedures to solve problems with the information and why it is important they are followed Performance Criteria 2 Safe work practices K4 the level of understanding operatives must have of information for relevant, current legislation and official guidance and how it is applied K5 how emergencies should be responded to and who should respond K6 the organisational security procedures for tools, equipment and personal belongings K7 what the accident reporting procedures are and who is responsible for making the report K8 why and when personal protective equipment (PPE) should be used Performance Criteria 3 Selection of resources K9 the characteristics, quality, uses, limitations and defects associated with the resources and how defects should be rectified K10 how the resources should be used and how any problems associated with the resources are reported K11 the organisational procedures to select resources, why they have been developed and how they are used K12 the hazards associated with the resources and methods of work and how they are overcome Performance Criteria 4 Minimise the risk of damage K13 how to protect work from damage and the purpose of protection K14 why disposal of waste should be carried out safely and how it is achieved COSVR280 3

Performance Criteria 5 Meet the contract specification K15 how methods of work, to meet the specification, are carried out and problems reported K16 how maintenance of tools and equipment is carried out Performance Criteria 6 Allocated time K17 what the programme is for the work to be carried out in the estimated, allocated time and why deadlines should be kept COSVR280 4

Additional Information Scope/range related to performance criteria Performance Criteria 1 1 interpretation of contractor s working instructions related to the work to be carried out Performance Criteria 2 2 safe use of personal protective equipment (PPE) and access equipment/working platforms to carry out the activity and/or handle asbestos materials and/or ancillary products, in accordance with legislation and/or organisational requirements 3 safe use and storage of tools and equipment Performance Criteria 3 4 selection of resources associated with own work 4.1 tools and equipment Performance Criteria 4 5 protection of the work and its surrounding area from damage 6 minimise damage and maintain a clean work space 7 disposal of waste in accordance with legislation 8 consultation with client regarding protection of property and grounds 9 storage of reclaimed materials for future use Performance Criteria 5 10 demonstration of work skills to remove, reclaim, de-nail and clean 11 use and maintain hand tools and ancillary equipment 12 remove, reclaim and/or dispose of weathering materials and ancillary components from standard and/or non-standard/complex roof formations to given working instructions, plus any two from the following 12.1 natural slates; plain tiles; single-lap tiles (variable gauge); single-lap tiles (fixed gauge); stone slates; concrete slates; double-lap artificial slates (fibre/asbestos cement); shingles 13 prepare surface and materials in accordance with given working instructions ready for re-roofing Performance Criteria 6 14 completion of own work within the estimated, allocated time to meet the needs of other occupations and/or client COSVR280 5

Scope/range related to knowledge and understanding Disposal of waste 1 environmental responsibilities, organisational procedures, manufacturers information, statutory regulations and official guidance Emergencies 2 operative's response to situations in accordance with organisational authorisation and personal skills when involved with 2.1 fires, spillages, injuries Hazards 3 those identified by method of work (asbestos materials), manufacturers technical information, statutory regulations and official guidance Information 4 contractor s working instructions, manufacturers' information and regulations governing buildings Legislation and official guidance 5 this relates to the operative's responsibilities regarding potential accidents and health hazards whilst working in the workplace, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting Maintenance 6 operative care of hand tools and ancillary equipment Methods of work 7 application of knowledge for safe work practices, procedures and skills, relating to the method/area of work and materials used, to 7.1 remove existing roof coverings 7.2 reclaim reusable tiles and natural slates, shingles, stone and weathering appropriate to the covering 7.3 assess the suitability of materials to be reclaimed 7.4 determine sizes of imperial and metric slates 7.5 handle asbestos and/or ancillary materials 7.6 stack/store materials for reuse 7.7 use hand tools and equipment 7.8 work at height 7.9 use access equipment 8 converse with clients regarding procedures for carrying out the work and protecting property and the surrounding area 9 team work and communication 10 needs of other occupations associated with stripping and reclaiming pitched roof coverings COSVR280 6

Personal protective equipment (PPE) 11 occupational use, types, purpose of each type and work situations Problems 12 those arising from information, resources and methods of work 12.1 own authority to rectify 12.2 organisational reporting procedures Programme 13 types of progress charts, timetables and estimated times 14 organisational procedures for reporting circumstances which will affect the work programme Protect work 15 protect work against damage from general workplace activities, other occupations and adverse weather conditions Resources 16 types, quantity, quality and sizes of standard and/or specialist 16.1 hand tools and ancillary equipment 17 methods of calculating quantity associated with the method/procedure to strip existing pitched roof coverings Security procedures 18 site, company and operative COSVR280 7

Developed by ConstructionSkills Version number 1 Date approved March 2005 Indicative review date Validity Status Originating organisation Original URN Relevant occupations Suite Key words July 2015 Current Original ConstructionSkills VR280 Roofers, Roof Tilers and Slaters Roofing Occupations (Construction) Stripping-slates; Reclaiming-tiles; Reclaiming roof-coverings; Tiles; Slates; Shingles; Asbestos-cement; Stone-slates; Concrete-slate; Natural-slates COSVR280 8