Appendix K: Soil Erosion and Sedimentation Control Plan Check List

Similar documents
NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Richland County Department of Public Works Engineering (Land Development) Division

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

SECTION 903 EROSION CONTROL

Diversion Dikes. Fe=0.95

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

APPENDIX C DURING CONSTRUCTION BMP TABLES

GRASS-LINED CHANNEL (acre) CODE 840

CITY UTILITIES DESIGN STANDARDS MANUAL

Stormwater Local Design Manual For Houston County, Georgia

Erosion and Sediment Control Plan for a Timber Harvesting Operation

Stormwater Management and Sediment and Erosion Control Plan Review Checklist for Design Professionals

Installation and Maintenance of Erosion Control BMPs

PART 1 GENERAL REQUIREMENTS

MODEL Stormwater Local Design Manual. City of Centerville

Planning & Building Department. Requirements for Erosion and Sediment Control

Block or Log forms of PAM and PAM blends are manufactured for specific use in drainage waterways to remove suspended particulates from runoff.

Best Management Practice (BMP) Guidance Manual

SOIL EROSION CONTROL PERMIT APPLICATION

ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS

Erosion & Sedimentation Control Policy

Ordinance No Lot Surface Drainage

Erosion Control for Home Builders

Standard Erosion Control Plan

Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

Construction Inspection Checklists

Appendix J: Storm Conveyance Design Parameters

INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

Soil Erosion and Sedimentation Control. Authorized Public Agency Procedures Manual

General Permit No.: OHR Page 53 of 146

Cass County Soil Erosion & Sedimentation Control Program

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

WOODFORD COUNTY, ILLINOIS EROSION, SEDIMENT AND STORM WATER CONTROL ORDINANCE

Review of State and Federal Stormwater Regulations November 2007

The Good, The Bad, and The Ugly

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

U.S. ARMY CORPS OF ENGINEERS. Little Rock District

E. STORMWATER MANAGEMENT

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

Stormwater Management and Sediment and Erosion Control Plan Review Checklist For Design Professionals

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.

Chapter 12 Erosion and Sediment Control

TEMPORARY SEDIMENT TRAP CODE

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Construction Application for Permit (CAP) Instructions

SITE DESIGN ENGINEER'S STATEMENT:

Alternative BMPs for Erosion Prevention & Sediment Control

Choctaw Lake Property Owners Association DRAINAGE SPECIFICATIONS (Approved by the Board of Trustees January 9, 2018)

Storm Drain Inlet Protection

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

SECTION 2 DESIGN CRITERIA

CHAPTER 3.20 STORM WATER HYDROLOGY

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

Index. Composition and Order of Plan Set. Utility Plan... 5

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist

Town of Fortville Utility Street Standards

CITY OF MIDDLETOWN, OHIO EROSION AND SEDIMENT CONTROL RULES & REGULATIONS

STORMWATER MANAGEMENT DESIGN MANUAL

4.8. Subsurface Infiltration

Forsyth County Procurement

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

SACHSE EROSION CONTROL GUIDELINES

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

SECTION 17.1 STORMWATER MANAGEMENT AND EROSION CONTROL

RESIDENTIAL BUILDING PERMIT

Stormwater Management Criteria

CITY OF RAPID CITY STORMWATER QUALITY MANUAL 2009 EDITION

Municipal Stormwater Ordinances Summary Table

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

JEFFERSON COUNTY STORM WATER MANAGEMENT

Unit E: Basic Principles of Soil Science. Lesson 7: Understanding Soil Erosion and Management Practices

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

BID TABULATION ( BIDS OPENED MONDAY, APRIL 24, 1:00 P.M. ) CONSTRUCT PARALLEL TAXIWAY - PHASE 3 HABERSHAM COUNTY AIRPORT, CORNELIA, GEORGIA

CHAPTER 2 STORMWATER MANAGEMENT

BMP 6.4.4: Infiltration Trench

Construction Site Erosion Control and Phase II of the Stormwater Permit Program

4.8. Subsurface Infiltration

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

Stormwater Management and Sediment and Erosion Control Plan Review Checklist For Design Professionals

STORMWATER POLLUTION PREVENTION PLAN (SWP3)

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

MACOMB COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE. Adopted August 16, 2007 by Resolution of the Macomb County Board of Commissioners

STORMWATER AND EROSION CONTROL PERMIT

SECTION TRENCHING & BACKFILLING

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

Transcription:

Appendix K: Soil Erosion and Sedimentation Control Plan Check List Drain Commissioner 46 February 2005

SOIL EROSION AND SEDIMENTATION CONTROL PLAN CHECK LIST Items listed below must be clearly depicted on plans for review Cover Page Seal of A State of Michigan Registered Professional Engineer. North arrow Location Map Sheet index Legend Legal Description of entire project. Timing Sequence. Project Name Owners Name Job Number Amount of area to be disturbed. Drainage tributary map A note clearly stating that the Detention / Retention / Sedimentation Ponds shall be excavated, top soiled, seeded, mulched and tacked prior to the start of the massive earth disruption. Soil Survey Soil Borings data indicating surfacial soil types or information provided from the Livingston County Soil Survey. Overall Site & Grading Plan Distance to any and all wetlands, lakes, county drains etc. Predominant land features, (critical areas, swale s, wetlands, lakes, steams, county drains, steep slopes, buildings, roads, property lines etc.). Slope Contours on and off site. Silt Fence or Straw Bale location, clearly indicated on plans. Limits of grading for entire project. A Maintenance schedule is needed for all soil erosion controls, both temporary and permanent. (A maintenance schedule should be designed to reflect the preventative maintenance practices during the course of the project by the managers). Drain Commissioner 47 February 2005

Storm Sewer Calculations Storm sewer drainage calculations must be on the plans or accompanied as an attachment. Top Soil & Soil Storage Areas Location of Top soil or soil storage areas. Top soil or soil storage areas shall be seeded and mulched, or matted with straw, immediately after the stripping process is completed, to prevent wind and water erosion. Top soil storage areas should be shown on plans depicting all Soil Erosion Controls. Slopes and Ditches On site ditches shall be of the flat bottom type minimum width of 2' with a minimum of 3' horizontal to 1' vertical side slopes, 3:1. Side slopes in excess of 3' horizontal to 1' vertical shall not be used except with a mechanical device such as a retaining wall, terracing. Ditches with steep grades will need stone flow checks to prevent scouring of the ditch bottoms. They may be used as a temporary measure and removed once sufficient stabilization has been established. These shall be depicted on plans by the engineer. Indicate flow checks on all slopes 3.00% and greater. Detention / Retention, Sedimentation Ponds New land developments within Livingston County shall be equipped with detention / retention facilities for storm water in accordance with the Drainage Policies of the Livingston County Drain Commissioner. Inlets into detention ponds must not discharge at the same location as the outlet structure. Detention Pond Stand Pipe Outlet Detail must be the Livingston County Drain Commissioners standard Detention Pond outlet, e.g. orifice outlets without sedimentation control devices are prohibited. Stand pipe structure must have a 2 ft. Sump. Detention Pond stand pipe structure shall show staggering of outlet holes at different elevations. This will minimize plugging and provide for more effective filtering. A note should be placed on the plans stating that prior to the completion of the project, the stone around the stand pipe structure shall be refreshed with clean stone. Drain Commissioner 48 February 2005

Detail of Detention/Retention pond depicting slope %, Spillway and ultimate outlets from project are needed. Detention/Retention, Sedimentation Ponds shall be excavated, top soiled, seeded, mulched and tacked prior to the start of massive earth disruption. (This must be called out and depicted on the plans). Inlets into Detention/Retention Ponds must be located within two feet of the bottom floor of the pond. Detention Pond Spillway The plan should identify the spillway location. Rip-rap proposed in the construction of the emergency spillway must be placed over keyed-in geo-fabric blanket. Drainage Easements All on site and off site drainage easements shall be clearly shown on plans. Silt Fence All commercial projects constructed in Livingston County shall install 36" silt fence. Inlet Protection Sedimentation protection for catch-basin inlets. Silt sacks are the preferred choice in the winter months, because they are less likely to be disturbed by the process of snow plowing. Open-Pipe, inlet protection must be provided with straw bales, stone or geo - fabric. Outlet Protection For each outlet location, provide the pipe size, slope, and design discharge to determine the proper amount and size of rip/rap. All storm drains 15" in diameter or larger shall have animal guards installed to prevent entrance to the system. All rip-rap must be placed over keyed in geo-fabric and detailed as such on plans. Storm drain outlets that do not empty into the retention/detention pond shall have a temporary 5' x 1O x 3' sump installed at the termination of the storm sewer. Upon completion of the stabilization work the sump area shall be filled and rip rapped with cobble stone over keyed in filter fabric. Silt traps shall be inspected after each storm. Drain Commissioner 49 February 2005

Splash blocks may be required depending on outlet flow rate or velocity. Tracking onto public roadway It is required that each development have an ingress/egress of crushed stone to restrict tracking of material onto the Public Roadway. All commercial construction sites require a minimum 75-foot tracking mat shown at ingress/egress. Each development may have different circumstances. Stabilization Standards For subdivision and site condominium developments: As of May 01, 2000, it is required that temporary stabilization of the entire site be completed and approval from the Livingston County Drain Commissioner s Office obtained prior to the issuance of single family dwelling permits. For commercial or industrial sites, common areas shall be called out on plans, in accordance with Part 17, prescribed by R 323.1709 and R 323.1710, pursuant to PART 91, Soil Erosion and Sedimentation Control, of the Natural Resources and Environmental Protection Act (Previously known as P.A. 347 of 1972) of Act 347, Public Acts of 1972, as amended) indicating areas to be stabilized after 15 days of grade work. Areas to be outlined are as follows: detention/retention, drainage easements, utility easements, boulevards, etc. Seeding, Fertilizer and Mulch Bare Ground Ratio This information shall be detailed on the construction plans. Top-Soil 3" in depth Grass Seed 217.84lbs per acre Fertilizer 150lbs per acre Straw Mulch 3" in depth (All mulching must have a tie down (asphalt tackifier, net binding, etc.) Hydroseeding is not acceptable for slopes exceeding 1%, in such cases stabilization shall be done with seed and straw mulch with a tackifier. Details Detention pond stand pipe outlet detail. Detail of detention/retention pond depicting slope %. Spillway and ultimate outlets from project are needed. Details for rip-rap, geo-fabric Details for silt fence (36"), straw bales, diversion berms. Details for storm structure protection. Detail of emergency spillway Drain Commissioner 50 February 2005

Detail of animal guard Detail of stabilization blankets, mulch, fertilizer and seeding. (Type, size and installation procedure). Detail of tracking mat. Drain Commissioner 51 February 2005

Appendix L: Storm Drain Backfill Detail Drain Commissioner 52 February 2005