User Manual. IWB Internally Wired Bar. Version 12/10.

Similar documents
Z5033 E3 Ball joint adapter Mounting instructions

Z5043 MAX Horizontal bracket Mounting instructions

Z5378 E6 Horizontal bracket Mounting instructions (1.0 EN)

Z5010 (Version 2) TV spigot with fixing plate Mounting instructions

Installation & User Manual

Z5377 E6 Swivel bracket Mounting instructions (1.2 EN)

Installation, Inspection and Maintenance of Dry Type Transformers

Aegis Heavy Capacity 20K Floor Scale. MODEL: 6200 Series. Installation Manual

Z5352 E12 Flying bracket Mounting instructions (1.0 EN)

ELECTRONIC EARTHING EQUIPMENT SERIES GRD 4200

SEMPEO SQA Unit Code FP3G 04 Forming and assembling electrical cable enclosure and support systems

Platform stair lift PLG7

Z5028 E3/Ci80 Horizontal bracket Mounting instructions

2-Finger-Parallel-Gripper RH

Shackles. Applications. Range. Design. CAD drawings. Finish

SECURE. UNIVERSAL. MOUNTING. Tilt Kit Installation Manual

Protective Capony RTC-16

Good Husband Brand Remote Lighting Lifter

NPS/001/024 Technical Specification for Low Voltage Aerial Bundled Conductor Fittings

Same As Client Address SPECIMEN. operational limitations. of the inspection and. agreed with):

Safety Barrier Solutions

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

Allround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans

Adjustable Pallet Racking Installation Guide

2016 V1 SERAPHIM ECLIPSE PHOTOVOLTAIC MODULE JIANGSU SERAPHIM PHOTOVOLTAIC SYSTEM CO. LTD. ADDRESS: JIANGSU CITY OF CHANGZHOU PROVINCE WANG ZHEN HENG

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

SCAFFOLDING RUNWAY SYSTEM

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE

INSTALLATION INSTRUCTIONS FOR ELECTRICAL CONTRACTORS

All panels can be supplied in a range of styles, to suit the applications pictured below.

PART 7 Technical Specification for Overhead and Underground Service Connection works for the Year

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit

Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content

At last! Construction bracing made easy...

Installation plan. Washer-extractor PW 6107 EL. en - GB M.-Nr / 01

Fixings, bonds and clamps

ELECTRICAL SAFETY INSPECTION REPORT

Air flue duct for use with ecotec boilers

Service Entrance Cable Fittings

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

Installation plan. Tumble dryer. PT 8807 EL (Electrically heated) en - US Mat. NR / 02

TESTING PTE EARTHING

2-finger angular gripper SGB 32-50

Electric Service Handbook

SoliTek PV Modules INSTALLATION MANUAL

AP5K-C Precision AC Double-Pulse Spot Welding Machine User s Manual Shenzhen Will-Best Electronics Co., Ltd

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SEMPEO SQA Unit Code FP2D 04 Producing aircraft detail assemblies

ST XX28 Stainless Steel Thermostatically Controlled Electric Model

Bulk Bag Lifting Frame

Axiom. SURFACE MOUNTED ARRAY Patient Headwall. Installation Guidelines. Installation Instructions.


USER S MANUAL release 1.0

SEMPEO SQA Unit Code H Assembling mechanical components

Industrial flue gas probes. Instruction manual

Electrical safety Dwellings

Manual Rotary Heat Sealers. Type: F108TX. List of content : Introduction 2. General description 3. Application 4. Safety precautions 5

Water Level Meter User Manual

HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION

DJ Switch 10F V2 ORDERCODE 50365

Universal Tilting TV Mount 32" to 60" Installation Instructions

Producing mechanical assemblies

SECTION OUTLET, PULL, AND JUNCTION BOXES

UNIVERSITY OF SHEFFIELD IN-SERVICE INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT POLICY AND GUIDANCE

BIRSTA 1P N2 WORKING DESCRIPTION INSTALLATION, REPAIRS AND MAINTENANCE. Doc. No.: Birsta 1P N2 - Rev. 0

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

FEATURES APPLICATIONS. Technical data sheet SSW - STEEL STRONG-WALL FOR TIMBER FRAME RACKING RESISTANCE.

KENYA STANDARD KS 574:2017. Steel fabric for reinforcement of concrete Specification

ST 19 Aluminium Manually Controlled Electric Model

COMPILED BY APPROVED BY FUNCTIONAL RESP AUTHORISED BY V SINGH. Date: 16/03/2009. Date: 16/03/2009. Date: 19/03/2009 Date: 26/03/2009

Turbocharger / TPL-C Original assembly instructions English

ST 19 T Aluminium Thermostatically Controlled Electric Model

PE45 AMAZON MONKEY BARS OWNER'S MANUAL

Span 300 Instruction Manual

Electric Service Standards

HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL

Assembling, wiring and testing electrical panels/components mounted in enclosures

INSTALLATION INSTRUCTION (U.S.A) FOR LUMI-O DRY NICHE INGROUND LIGHT.

5505L FLANGE BOLT DISCS

nual k Excella E-1 Open Air Shaker N) manual New Brunswick Excella E-1 Open Air Shaker Operating manual

Tower Site Inspection Procedures

SYSTEM S7-RHOMBOS INSTALLATION MANUAL

MOUNTING SYSTEM FOR PITCHED ROOF WITH TILES. mounting system for pitched roof with tiles for solar panels in landscape setup. Rev

High Strength Epoxy Tested in Accordance with ICC-ES AC308

801-MORD Mordred FIXING: Ground. ORDER No: CUSTOMER: Complied by Date AB 30/06/15 ISSUE ECN DATE SIGN /07/15 AB

K364. Fitting Kit. Fitting Instructions for Basic Carrier. x 6 x 1 x 1 x 2. x 6 x 2 x 2 x 2. x 1 x 1. Revision No: 5C 1

GroundTrac. Installation Manual

Installer Guide. Item

Agilent 16047D Test Fixture

SPECIFICATION FOR REINFORCED SOIL WALL

P.V.C. INSULATED ALUMINIUM SERVICE MAIN WIRE-FINISHED PRODUCT

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

SERVICE LEVEL PROCEDURE

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

Electrical Metallic Tubing (EMT) Fittings

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS

Ordering Information. Conductive Level Controller 61F-GP-N2. Accessories (Order Separately) Selection Guide for Electrode Holders and Separators

Transcription:

User Manual IWB Internally Wired Bar Version 12/10

Purpose Purpose Title To support and power items of equipment used within the entertainment industry (TV, Film, and Theatre) such as specialist luminaires, fog machines, audio equipment etc. Cautions 1. IWBs ARE FOR INDOOR USE ONLY 2. Fixings should only be made to a safe structure, using proprietary products and should never be further than 2m apart. 3. This product should be installed by competent persons only, and in such a way as to conform to any local regulations which may prevail. 4. The Safe Working Load must be adhered to: 39Kg per linear meter evenly distributed or 19.5Kg point load, between any two fixing points at 2m spacing grater loads are acceptable with closer fixings, see BS 7906 1 for further information. 5. This product MUST be adequately earthed and the socket outlets must be protected with a protective over current device, e.g. RCD, fuse, etc. 6. It is the responsibility of the installer to ensure the product and the cabling it is connected to meets or exceeds the electrical safety standards which prevail in the territory in which it is fitted. 7. The product should be installed/rigged in such a way as to ensure it is secure and not likely to be a safety hazard. 8. Ensure no flammable items are placed close to or over the bar or any equipment rigged from it; particular cautions should be exercised when using drapes. 9. Ensure the weight load is evenly distributed along the length of the IWB. 10. An inspection of the bar, associated rigging and electrical connections should be regularly made by a suitably qualified person. 11. Maximum current rating must not be exceeded under any circumstance: NUMBER OF OUTLETS OVERALL MAXIMUM CURRENT 3 45Amps 4+ 60Amps See rating plate for further details. 12. Electrical phases not to be mixed on IWBs Single Phase only - Do Not Cross Patch. 13. Caution should be exercised in relation to working at height, risk of electric shock and any other factors which may present a hazard. 14. Items connected to this equipment should be firmly secured by appropriately rated proprietary clamps and always protected by a secondary safety bond with a suitable safe working load. 15. Items should not be plugged or unplugged while the power is connected. 16. Disconnection of Mains power may take place remotely from the bar and may be via the buildings electrical infrastructure ensure you know where this is, how it is operated and that it can not be inadvertently re-connected while you are Rigging. 17. Ensure the rigging clamp is fully tightened to the IWB and the item being rigged. 18. Ensure that if extension leads are used from other bars these are on the same phase as the IWB.

Installation Installation 1. Fixing type will depend upon building structure but should always be secure and adequately specified to take the weight of the bar as well as any load to be placed on it, consider allowing a safety factor. The safe working load of the bar will be dependent upon its fixings and the structure they are attached to, if in doubt consult a structural engineer, Doughty Engineering Ltd will not accept responsibility for ascertaining the safe working load of its products that are dependant upon factors outside of its control. 2. Doughty Engineering Ltd recommends the bar is rigged using M12 threaded rod or quality wire rope and associated fittings. Various primary fixing methods are available dependant upon the structure being fitted to. 3. Ensure safety issues are observed and risk assessment/method statements are undertaken. KNOW THE RISKS 4. Fixings should be arranged to equally distribute the load along the bar and superstructure. 5. Lay the bar out to check fixing positions and orientation of sockets etc. 6. If the Bar is made in two sections, take care not to damage internal cable when securing the joiner. Ensure the Joiner M6 earthing screw is tightened through the Bar Joiner and into the tapped receiver in the adjoining Bar. This will serve to earth Bar Joiner and to locate the adjoining Bar in the Bar Joiner. Ensure that both sections of bar are close together and that the tube joiner is centered across the two bars, thus fixing to equal lengths of tube. 7. When drilling the cable entry point in the termination box, take care to ensure the electrical components and cable insulation are not damaged by the hole-saw, hot swarf, etc. 8. Fixings should be between 1.5 and 2.0 meters apart, if necessary add additional fixings to ensure compliance. See Figure 1 below. 9. Fit primary fixings to building structure in accordance with manufacturer s instructions. If using a chemical anchor ensures that it has fully cured before applying a load, ensure any bolts or nuts are tightened to require torque setting. 10. Load test fixing points to ensure they are capable of taking the specified load - including safety factor. 11. Attach threaded rod or Wire rope to primary fixing point, fit universal clamps or wire rope hanging clamps as appropriate and tighten. 12. The bar should now be lifted into place and offered to the fixings, if possible temporarily tie the bar off whilst fixings are fitted around the aluminium tubing. 13. Do not slide or twist bar through clamps as this may damage the finish. 14. If applicable bring the cable into the termination box via the hole and appropriate gland and terminate in accordance with local wiring or electrical regulations, taking care to ensure the bar is Earthed. 15. Perform appropriate Electrical and load Tests Ensure Earth Bolt Is Fully Tightened Ino Adjoining Bar EARTH DO NOT REMOVE

1. 2. 3. 4. 5. 6. 7. Service & Maintenance Title The bar should be inspected by appropriately qualified personnel for both electrical and mechanical integrity at least once a year, more frequently if local regulations require. Before a load test, all fixing fasteners should be checked to ensure they are free from damage and are tight. Load tests should be carried out under the constraints of any local regulations which prevail, e.g. Lifting Operations and Lifting Equipment Regulations 1998 in the UK. The bar should be kept dry and free from excessive dust build up disconnect from mains and clean with a dry cloth or brush do not use water or solvents. Sockets and covers should not be interfered with by unqualified personnel. If the bar requires replacement parts or servicing please contact Doughty Engineering Ltd for the details of an approved service agent. If the IWB requires dismantling and folding (7 meters or greater) e.g. If re locating, ensure any exposed cables are adequately protected.

Illustrations Fixings should be no further than 2m apart, this provides Max UDL = 39 Kg between any two fixings Max point load = 19.5 Kg in any meter see Cautions on Page 2.

Declaration of Conformity Title Doughty Engineering Limited CROW ARCH LANE, RINGWOOD, HANTS, BH24 1NZ. ENGLAND Telephone: +44 (0) 1425 478961 Fax: +44 (0) 1425 474481 email:sales@doughty-engineering.co.uk EC DECLARATION OF CONFORMITY Doughty Engineering Limited hereby certify that the equipment stated below has been designed to comply with all relevant sections of the specifications referenced below and complies with all the applicable Essential Requirements of the EC Directives and amendments and the National Laws and Regulations adopting these Directives. Description: Lighting Bar Model/s: All Doughty Engineering IWB s within the parameters shown in the table below 15a Outlets 1.5 to 12 metres 3 to 12 mains sockets With or Without Data Sockets Silver or Black 16a Outlets 1.5 to 12 metres 3 to 12 mains sockets With or Without Data Sockets Silver or Black 15a & 16a Outlets 1.5 to 12 metres 3 to 12 mains sockets With or Without Data Sockets Silver or Black are in conformity with the provision of the following EC Directives: 2006/95EC: Low Voltage Directive - as implemented into English Law under Statutory Instrument 1994 No. 3260 - The Electrical (Safety) Regulations 1994. Harmonised Standards applied: BS EN 60059: Electric Current, Rated Current, Electrical equipment, Electrical power systems, measuring instruments, electronically operated devices. EN 69965: Audio, Video and similar electronic apparatus - Safety Requirements BS EN 600659: Section 3 - Ratings. National Technical Standards & Specifications applied: BS EN ISO 9001:1994 Signed: Date: 25-04-08 Name: Nigel Curtis Position: Technical Director Being the responsible person appointed by the manufacturer. DEQ 083 Rev 4 Company Registration No. London 972614 Registered Office: Crow Arch Lane, Ringwood, Hants, BH24 1NZ Directors: M.B.Lister. J.C.G. Chiverton. N.D. Curtis. S.C. Wright

Contact Doughty Engineering Ltd Crow Arch Lane Ringwood, Hampshire, BH24 1NZ Tel: +44 (0) 1425 478961 Fax: +44 (0) 1425 474481 email: sales@doughty-engineering.co.uk Web: Note: Whilst every effort has been made to ensure that the information contained within this manual is correct, Doughty Engineering does not accept any liability for errors or omissions. Specifications and technical data are intended for guidance purposes only and may vary.