Concrete Cloth. Geosynthetic Cementitious Composite Mat (GCCM)

Similar documents
Concrete Impregnated Fabric 1511.EN.UG MADE IN UK 2007 Winner D&AD Yellow Pencil Award Product Design

Concrete Impregnated Fabric 1511.EN.BR MADE IN UK 2007 Winner D&AD Yellow Pencil Award Product Design

Concrete Impregnated Fabric UK CHAMBER AWARDS MADE IN UK Knowledge Transfer Network NATIONAL WINNER

Appendix J: Storm Conveyance Design Parameters

LOW WATER CROSSINGS, fords, or drifts, as they

A. ASTM C 150 Standard Specification for Portland Cement. B. ASTM C 595 Standard Specification for Blended Hydraulic Cements.

Concrete Waste Management

ENGINEERED SOLUTIONS. Terre Arch Concrete Detention/Infiltration. Solutions Guide

GEOWEB. slope and shoreline protection. environments. creating sustainable APPLICATION OVERVIEW

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

Crusher equipment - WA solutions for crushers maintenance and repair

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR RIPRAP. Conditions Where Practice Applies

PRODUCT DATA SHEET SikaProof Bentonite

Solving Slope Protection Problems Geoweb Cellular Confinement System

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

ADVANCED PROTECTIVE COATING SYSTEM Breakthrough Protective Top Coat and High Performance Epoxy Primer

Best Practice Selection of Culvert Types (Guidelines for Culvert Material Selection)

QuakeWrap, Inc. Pipe Repair October 2012

North Umpqua Hydroelectric Project (FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form

Strong-Seal Sealant Specification, a permanent method of sealing the interior of the chimney and casting in manholes and catch basins.

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

Construction Inspection Checklists

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

Integral Waterproofing

Irrigation System. BWCDD Zanjero Training 2/13/2008

Press Release. Rehabilitation of oil pipelines with flexible high pressure pipes

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

A new method for protecting construction joints and through-penetrations from fire, water, smoke and sound.

ARMORMAX ENGINEERED EARTH ARMORING SOLUTIONS

Floor Underlayment Selector High-Strength Flooring Solutions

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS

Section 401. PIPE CULVERTS

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9

FIVE STAR PRODUCTS, INC.

Installation and Maintenance of Erosion Control BMPs

Hancor, Inc. Drainage Handbook Hydraulics 3-1

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase.

10:00 AM, Wednesday, April 8, 2015

Flood Hazard Assessment Report Falls Gulch, Larimer County, Colorado January 16, 2013

SIKA S STROKE OF INNOVATION AT REBECCA ADLINGTON SWIMMING CENTRE

AEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION

Wabo Crete StripSeal Parking Series Armored joint and elastomeric concrete expansion joint system

Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

4. Floor Substrate Testing Prior to Floor Paint application

nalcofabtech.com A Nalco Champion Company

SECTION 07530CP EPDM MEMBRANE ROOFING

MS-2A LINER SPECIFICATIONS: for STRUCTURAL REPAIR and SEALING of MANHOLES

OTEC 2017 Spray Applied Pipe Liner Supplemental Specifications 833 Calculations for the Resin Based Liner Presented by Peter Blais, PE

RESIDENTIAL BUILDING PERMIT

Commercial Roof Cover Maintenance and Repair Risk Engineering Your Business Insurance Specialists

When demanding consistent quality, specify FIRM-FILL SCM-250 to assist in achieving highly improved IIC sound performance in multifamily

SAN ANTONIO WATER SYSTEM 2013 REHABILITATION WORK ORDER CONSTRUCTION CONTRACT 4 SAWS Job No SAWS Solicitation No.

Planning & Building Department. Requirements for Erosion and Sediment Control

Modcrete. Modcrete OVERVIEW COMPONENTS COMPONENTS

B. All work of the section shall comply with the conditions of the contract, the drawings and any special conditions forming a part of the contract.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

TION GUIDE ALLA T INS

FIRM-FILL SCM-400 can be installed under a FIRM-FILL Gypsum Concrete Floor Underlayment to produce an exceptional vibration isolation floor system.

PRELIMINARY DEVELOPMENT PLAN INFORMATION

Recyclex TRM TURF REINFORCEMENT MAT SPECIFICATION

Curlex Enforcer EROSION CONTROL BLANKET SPECIFICATION

The Rehabilitation of Existing Building Drains and Building Sewers by the

Soil Erosion and Sedimentation Control. Authorized Public Agency Procedures Manual

A. Road Maintenance Activities, Temporary Haul Roads and Borrow Sites.

The ultimate low shrinkage flooring solution

ROAD TO SUCCESS A2 MOTORWAY ŚWIECKO NOWY TOMYŚL

Sika Galvashield CC Embedded Galvanic Anodes for Corrosion Control in Contaminated but Sound Concrete

CIVIL ENGINEERING BENEFITS OF BIM. Helping Civil Engineers do more with BIM

Start the installation at one corner of the building. Unroll the first sheet of MiraPLY-H square/parallel to the building wall, starting at one corner

DESIGN & CONSTRUCTION CONSIDERATIONS OF REINFORCED CONCRETE STRUCTURES FOR WATER UTILITIES

CITY OF ATLANTIC BEACH BID NUMBER PURCHASING DEPARTMENT 800 SEMINOLE ROAD ATLANTIC BEACH, FLORIDA (904)

Watershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan)

Contractor Support for the Concrete Repair and Protection of Chimneys and Cooling Towers (in Accordance with EN 1504)

ITEM 458 WATERPROOFING FOR STRUCTURES

CW 3615 RIPRAP TABLE OF CONTENTS

BIO-AQUIFER STORM SYSTEM

Advanced technologies for enhancing the building envelope. 3M Building and Construction Market

Waterproofing and Damp-proofing Cementitious Slurry

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

GWINNETT COUNTY STORM SEWER PIPE STANDARDS

Specifications for the Selection and Application of Erosion Control Blanket on Slopes or Channels

General Overview SECTION PBR & R PANEL - PREFORMED ROOF AND WALL PANELS

Wabo Modular STM and D Series Large movement expansion joint system

A5 PC Series Pressure Compensating Ag Dripline

San Antonio Water System Standard Specifications for Construction ITEM NO. 852 SANITARY SEWER MANHOLES

SECTION EXTERIOR GRILLS AND SCREENS

PRODUCT GUIDE SPECIFICATION

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

Series 400 Structural repair system that doubles the strength of the original timber pile. SeaShield Marine Systems. Features

Curlex II EROSION CONTROL BLANKET SPECIFICATION

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

The Good, The Bad, and The Ugly

Dual Purpose. Sustainable. Sound Attenuation

San Antonio Water System Standard Specifications for Construction ITEM NO. 850 SANITARY SEWER STRUCTURES

PRODUCT SHOWN W2B24250 PRODUCT SHOWN TU1

Transcription:

Concrete Cloth Geosynthetic Cementitious Composite Mat (GCCM)

Milliken Infrastructure Solutions At Milliken Infrastructure Solutions, LLC, we solve infrastructure challenges differently. More than just a materials provider, we partner with the industry to deliver smart, practical, innovative solutions. Our breadth of solutions rehabilitate, strengthen and protect infrastructure components. Backed by our engineering expertise and support, these systems install easier and faster than functional equivalents. Whether you are building new or repairing existing infrastructure, we can help you strengthen your structures to deliver the performance you need. Delivering Value Engineering Expertise Assess challenges and recommend customized solutions Leverage multiple technology platforms Provide in-depth documentation and third-party validation Technical Support Deliver in-field training and support Provide responsive and on-demand service Project Optimization Lower total project cost Improve contractor productivity Reduce user impact Extend asset life cycle Reduce installation time Minimize surface/soil preparation Avoid weather-related delays

Applications Ditch and Channel Lining Concrete Cloth GCCM can be rapidly unrolled to form a ditch or channel lining. When comparing erosion control methods, it is a cost-effective alternative to riprap, cement stabilized soil, plastic inserts, and shotcrete. Minimizes installation time Conforms to ditch geometry Lowers total project cost Requires no specialized equipment Installs at a rate of 20,000 sf per day Acts as an effective weed suppressant Culvert Ideal as a protective wear surface in metal culvert applications, Concrete Cloth GCCM is a cost-effective alternative to topical invert coatings and relining systems. Additionally, it can be used at the headwall, inlet and outfall to prevent erosion and undermining of the existing structure. Extends the life of existing culvert asset Hydrates with existing water source Offers easy handling and installation with a small crew

Slope Concrete Cloth GCCM can be used to protect slopes as a replacement for shotcrete, riprap, and other hard armor systems. The material is easy to install, requiring limited equipment, and can be used by standard maintenance crews. Reduces installation time Lowers total project cost Features small equipment footprint Acts as an effective weed suppressant Installs in rain, if needed, maximizing schedule flexibility Berm Compared to poured or sprayed concrete, Concrete Cloth GCCM is a cost-effective alternative for lining secondary berms. Its ability to be installed quickly reduces time on site, while the availability of man-portable rolls allows for installation in areas with reduced access. Acts as an effective weed suppressant Installs easily around existing structures Provides additional levels of impermeability Lowers total project costs Reduces maintenance costs Offers fire protection Other Applications Geosynthetic liner protection Irrigation Mining Remediation

Changing the Way You Think About Concrete Imagine being able to use concrete on slopes, in water, and in other hard to reach locations - with no forms, no mixing and minimal equipment. Concrete Cloth geosynthetic cementitious composite mat (GCCM) is a flexible fabric that will bend and curve, enabling it to follow the natural contours of the land including ditches and slopes. The material can t be overhydrated, so it can be installed in the rain or under water, even salt water. And, because it comes in a variety of sizes, including rolls small enough for two men to carry, it reduces the need for heavy machinery. An ideal alternative to rip-rap, shotcrete and poured concrete, Concrete Cloth GCCM can be used in any place that needs protection from erosion or wear, and can be used to channel or contain water or other liquids. To meet the needs of your application, three thicknesses are available: CC5 (5 mm or 0.2 inches), CC8 (8 mm or 0.3 inches) and CC13 (13 mm or 0.5 inches). APPLICATION CC5 CC8 CC13 COMMENT Ditch Lining Slope Protection Berm Lining Concrete Remediation Culvert Lining Weed Suppression Outfalls/Spillways Gabion Protection Mining Vent/Blast Walls Recommend CC8 CC5 or CC13 may be used depending on specific conditions. CC8 may be used on unstable ground or for high flow conditions. CC8 or CC13 may be used for areas of heavy traffic. CC8 or CC13 may be used where voids are large, or end use involves high flow rates or turbulent flow. Recommend CC8 CC13 may be used for flows with high levels of debris or high flow conditions. CC5 may be used for low flow conditions and low levels of debris. Recommend CC8 CC13 may be used for outfalls with a high level of debris or with high flow conditions. or CC8 CC13 may be used for applications with high flow conditions or prone to impacts. for vent wall applications. Recommend CC8 for walls exposed to blast, depending on pressure loading. Recommended Recommended for specific applications

Meeting Infrastructure Challenges with Science Milliken is an innovation company that has been exploring, discovering, and creating ways to enhance people s lives since 1865. Our community of innovators has developed one of the largest collections of patents held by a private company. With expertise across a breadth of disciplines including specialty chemicals, floor coverings, and performance materials, we work around the world to add value to people s lives, improve health and safety, and help make the world more sustainable. For more information, visit www.milliken.com or infrastructure.milliken.com. infrastructure.milliken.com 855-655-6750 Milliken Infrastructure Solutions, LLC is a subsidiary of Milliken & Company. The Milliken logo is used under license by Milliken Infrastructure Solutions, LLC, all rights reserved. Concrete Cloth TM is a trademark of Concrete Canvas Technology Limited Company, UK. 2015 Milliken Infrastructure Solutions, LLC. Because Milliken Infrastructure Solutions, LLC cannot anticipate all variations in end-user conditions, it makes no warranties and assumes no liability whatsoever in connection with its customers use of any advice, consultation, or technical support relating to the product ( Services ). Services are provided as an accommodation and; (i) do not constitute engineering services and/or are done pursuant to a licensing exemption; (ii) are incidental to the manufacture and sale of the product; (iii) are incidental to and part of a contract for an entire job and subject to approval and acceptance by licensed architects and engineers responsible for the supervision and construction; (iv) are done under the responsible charge of and verified by an individual holding a certificate of licensure whom the customer agrees to retain for that purpose; and/or (v) are offered with the understanding that the customer assumes responsibility to ensure that the requirements of the state s licensing laws are met. All sales are exclusively subject to our standard terms of sale posted at www.milliken.com/terms (all additional/different terms are rejected) unless explicitly agreed otherwise in a signed writing. CC1003-0915