Pickering Nuclear Generating Station Licence Renewal

Similar documents
Ontario Power Generation Inc. Darlington Nuclear Generating Station. Ontario Power Generation Inc. Centrale nucléaire de Darlington

Randy Lockwood, Senior Vice President CMD 18-H6.1A. PICKERING NUCLEAR GENERATING STATION Part I Hearing Licence Renewal April 4, 2018

Canada. Record of Decision. In the Matter of. Ontario Power Generation. Applicant

Également publié en français sous le titre de : Rapport de surveillance réglementaire des centrales nucléaires au Canada : 2014

Frequently Asked Questions About OPG s Deep Geologic Repository for Low and Intermediate-level Nuclear Waste

CNSC Licensing Process

Background. Introduction. Overview of vendor design review process

Record of Proceedings, Including Reasons for Decision

Challenges for Regulators

Ensuring the safety of Canada s nuclear sector Michael Binder, President Canadian Nuclear Safety Commission March 9, 2017 Gatineau, QC

Regulating Uranium Mines and Mills in Canada

Oral presentation. Exposé oral. Submission from the Concerned Citizens of Renfrew County and Area

Summary of Presentation

CNSC Evaluation of Plant-Specific SAMG

A Guide to Ventilation Requirements for Uranium Mines and Mills

Commission canadienne de sorete nucleaire. In the Matter of. AREVA Resources Canada Inc.

Readiness for Regulating Small Modular Reactors

Readiness for Regulating Advanced Reactor Projects

Licensing Nuclear Power Plants in Canada. Ensuring Safe and Environmentally Acceptable Operations

REGULATORY CONTROL OF SAFETY AT NUCLEAR FACILITIES

CNSC Oversight of Counterfeit, Fraudulent and Suspect Items

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

Oral presentation. Exposé oral. Submission from the Canadian Nuclear Association. Mémoire de l Association nucléaire canadienne CMD 18-H2.

Guidance on the Use of Deterministic and Probabilistic Criteria in Decision-making for Class I Nuclear Facilities

Oral presentation. Exposé oral. Submission from the Canadian Environmental Law Association

Stress tests specifications Proposal by the WENRA Task Force 21 April 2011

...,... \ u1" . tj.. ' ~i... . '\,,.., \ \ ~~\ i I '. ~-' ' '' f l 4',... 'lfll 6 \l ;, 0 ") \ LUI '"

The Evolution of System Safety in the Canadian Nuclear Industry

l+i Canada Annual Performance Report AECL's Nuclear Sites and Projects: 2013

A REPORT ON CANADA S LARGEST CLEAN POWER PROJECT DARLINGTON REFURBISHMENT

IAEA Safety Standards for NPPs Operation

Plant Life Management Canada

Date: December 13, From: W. Turner. To: Lucia Abellan, Environmental Assessment Officer Canadian Nuclear Safety Commission

Oral presentation. Exposé oral. Submission from Women in Nuclear Canada. Mémoire de Women in Nuclear Canada CMD 18-H2.18

Reactor Facilities Licence to Prepare Site and Site Evaluation for New Reactor Facilities REGDOC-1.1.1

Introduction to the 2015 Darlington NGS Probabilistic Safety Assessment. Carlos Lorencez and Robin Manley Ontario Power Generation August 2015

Presentation to NAS Workshop Oct 2016 M. Garamszeghy, NWMO, Canada

In the Matter of. Atomic Energy of Canada Limited

DRAFT SCREENING REPORT ON:

Management System Standards in the Canadian Nuclear Industry

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

Type II Inspection Worksheet

Rapport national du Canada pour la Convention sur la sûreté nucléaire Quatrième Rapport

Regulatory Oversight Report for Canadian Nuclear Power Plants: Rapport de surveillance réglementaire des centrales nucléaires au Canada : 2014

Major: Title change does not reflect that the intent of the document is the design of NEW nuclear power plants.

For reference, the key elements of a StarCore Nuclear (StarCore) reactor plant project are:

Regulation of UK Nuclear New Build

Ontario Power Generation Inc. Application for a Licence to Prepare Site for the Future Construction of OPG New Nuclear at Darlington

Operating Performance Accident Management. REGDOC-2.3.2, Version 2

Comments on the Environmental Assessment Review Guidelines for Ontario Power Generation s Darlington Refurbishment and Life-Extension Project

Use of PSA to Support the Safety Management of Nuclear Power Plants

CNSC Type I Inspections of Activities and Devices for Nuclear Substances and Radiation Device Licensees Group 3.1 Licensees

PROBABILISTIC SAFETY ANALYSIS IN SAFETY MANAGEMENT OF NUCLEAR POWER PLANTS

Applicability of EPRI Decommissioning Pre-Planning Manual to International Decommissioning Projects

Safety and Security of Supply of Medical Isotope Production

Canadian Nuclear Laboratories Comments on REGDOC 2.9.1: Environmental Protection: Environmental Policy, Assessments and Protection Measures

Regulation of existing and new nuclear power stations in South Africa in the light of the Fukushima Accident

Date: December 19 th From: Kerrie Blaise (Canadian Environmental Law Association)

Canadian National Report for the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

Reliability Programs for Nuclear Power Plants

Canadian uclear Safety Commission. Commission canadienne de sûreté nucléaire. Public hearing. Audience publique. Le 4 avril 2018.

SNC-Lavalin Nuclear Comments on Draft Discussion Paper DIS Small Modular Reactors: Regulatory Strategy, Approaches and Challenges

Terms of Reference for Assessment of Water System Infrastructure and Water Supply Sources for Semi-Public Water Systems

Low-Level Waste and Radiation Management

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea

DNSR Newsletter. Evaluation of the role of radiation safety officers. In this Issue. Spring 2018

Decommissioning Planning

STRUCTURAL RADIATION SAFETY AT A NUCLEAR FACILITY

Safety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident. Ryodai NAKAI Japan Atomic Energy Agency

Update on CANDU Safety Issues, COG Large LOCA and Severe Accident Projects

Module X. Operational safety including operational feedback

Radiation and Nuclear Safety Authority Regulation on the Safety of Disposal of Nuclear Waste Adopted in Helsinki on 22 December 2015

Decommissioning plans for TVO's new reactors

The Nuclear Safety Authority (ASN),

Comment on Ontario Power Generation s Application to Renew and Merge the Power Reactor Operating Licences for the

Nuclear Substances in Canada: A Safety Performance Report for 2013

Class II Nuclear Facilities and Prescribed Equipment Licence Application Guide REGDOC-1.4.1

National Sealed Source Registry and Sealed Source Tracking System. Annual Report 2014

ANSTO s POLICY for MOATA & HIFAR. Prepared by John Rowling November 2007

Power Generation. Ronaldo Jenkins Electrical Engineering Branch Chief Office of New Reactors (NRO)

The Stress Test Process in France (CSA*) Its impact on Research Facilities

Preliminary ALARA Assessment

Management of Non-Nuclear Radioactive Wastes in Canada

Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development

LEGAL AND REGULATORY FRAMEWORK FOR RADIOACTIVE WASTE MANAGEMENT AND DECOMMISSIONING IN SLOVAK REPUBLIC

Proposed Regulations to Ship Large Objects as Surface Contaminated Objects

LEARNING OBJECTIVES FOR SECTION 4. Inspection and Enforcement by the Regulatory Body

Regulatory Issues and Challenges in Preparing for the Regulation of New Reactor Siting: Malaysia s Experience

Regulatory Oversight Report on the Use of Nuclear Substances in Canada: 2014

Joint ICTP-IAEA Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects Important to Safety. Trieste,12-23 October 2015

Probabilistic Safety Assessment Safety & Regulatory Framework

Type II Inspection Worksheet

NUCLEAR SAFETY REQUIREMENTS BSR

Safeguards and Nuclear Material Accountancy REGDOC

Long Term Operation of Nuclear Power Plants in Spain: Preparing for the Future

Commission canadienne de sorete nucleaire. Hydro-Quebec

Implementation of Lessons Learned from Fukushima Accident in CANDU Technology

Summary of LAKE ONTARIO Policies. 1. Requiring SPC approval: LO SEW 3 LO FUEL 2

Chapter 18 Environment Regulating Landfills 1.0 MAIN POINTS

ROMANIA National Commission for Nuclear Activities Control (CNCAN) Report. on in Decommissioning Activities. Dr. Lucian BIRO Director General

Transcription:

Pickering Nuclear Generating Station Licence Renewal Commission Hearing (Part 2), June 25-29, 2018 CNSC Staff Presentation e-doc 5510377 (PPTX) e-doc 5558535 (PDF)

PURPOSE OF PRESENTATION e-doc 5510377

Purpose of CNSC Staff Presentation Summarize OPG safety performance during the current licence period Present CNSC staff position on issues raised in public interventions Present updates to proposed Power Reactor Operating Licence (PROL) and draft Licence Condition Handbook (LCH) Provide CNSC staff conclusions and recommendations 3

OPG Request for Licence Renewal Current Pickering NGS Licence expires on August 31, 2018 OPG has requested Licence renewal for a period of 10 years, to August 31, 2028 Authorization to operate Units 5-8 up to a maximum of 295,000 EFPH Periodic Safety Review support the licence application Part 1 Hearing held in Ottawa, April 4, 2018 4

OPG Request for Licence Renewal The requested 10-year licence period will include three stages o Continued commercial operation to the end of 2024 o Stabilization activities (e.g., post-shutdown defueling and dewatering) o Beginning of safe storage with surveillance 5

SCA Performance Assessments SAFETY AND CONTROL AREA PICKERING RATING 2013 2014 2015 2016 2017 Management System SA SA SA SA SA Human Performance Management SA SA SA SA SA Operating Performance SA SA FS FS FS Safety Analysis SA SA FS FS FS Physical Design SA SA SA SA SA Fitness for Service SA SA SA SA SA Radiation Protection FS FS FS SA SA Conventional Health and Safety SA SA FS FS FS Environmental Protection SA SA SA SA SA Emergency Management and Fire Protection SA SA SA SA SA Waste Management SA SA FS FS FS Security FS FS SA SA SA Safeguards and Non-Proliferation SA SA SA SA SA Packaging and Transport SA SA SA SA SA 6

SUMMARY OF WHAT WE HEARD e-doc 5510377

Participation in Commission Hearing Process Notice of Public Hearing posted September 29, 2017 156 submissions received by May 7, 2018 Participant Funding of $100K made available to support public participation o Canadian Environmental Law Association o Durham Nuclear Awareness o Jerry Cuttler o Lake Ontario Waterkeeper o Mohawks of the Bay of Quinte First Nation o Northwatch o Ontario Clean Air Alliance o Paul Sedran o Women in Nuclear 8

Participation in Commission Hearing Process CNSC staff reviewed each of the intervenor submissions Wide range in submissions scope, approach, premises, topics Approximately half of interventions raised issues Main themes of concerns summarized in CNSC staff s CMD and linked to CNSC Safety and Control Areas 9

Summary of What We Heard (1/2) Key issues raised by intervenors Safety and Control Area Continued operation of aging components Fitness for Service Exposure to low doses of radiation Radiation Protection Environmental Assessment under NSCA Tritium in environment Standards for emergency preparedness Adequacy of provisions under PNERP Public awareness Environmental Protection Emergency Preparedness e-doc 5510377 nuclearsafety.gc.ca 10

Summary of What We Heard (2/2) Key issues raised by intervenors Safety and Control Area Regulatory framework for nuclear waste Long-term radioactive waste disposal On-site waste storage faculties Decommissioning strategy Waste & Decommissioning Post-Fukushima lessons Containment integrity in a severe accident 10-year licence & public involvement Other Matters e-doc 5510377 nuclearsafety.gc.ca 11

Fitness for Service Aging of Major Components CNSC staff verify conclusions from OPG inspections and assessments OPG maintains Life Cycle Management Plans (LCMPs) for all major components o OPG submission describes activities to support demonstration of fitness for service Fuel Channel Readiness Plan describes research activities to enhance understanding of fuel channel aging-related degradation mechanisms OPG has adequate capabilities to assess, verify and manage the aging of major components through the remaining operational life 12

Fitness for Service Predicted EFPH and H[eq] of Pressure Tubes Unit EFPH, April 2018 EFPH, December 2024 Inlet Rolled Joint H[eq] in 2024, ppm Outlet Rolled Joint H[eq] in 2024, ppm 1 136,927 192,000 35.8 84 4 110,082 167,500 34.3 64 5 231,895 287,500 48.5 97 6 236,952 295,000 47.9 90 7 230,856 287,000 48.1 91 8 218,765 274,000 47.9 86 EFPH - Effective Full Power Hours, H[eq] - equivalent hydrogen concentration 13

Radiation Protection Exposure to Low Doses of Radiation CMD 17-M46 Biological Mechanisms Acting at Low Doses of Radiation, provides current scientific understanding of health risk from exposure to doses below 100 msv No epidemiological or medical evidence of a measureable effect Any additional unknown cancer risks are further minimized with the application of the ALARA principle Canadian radiation protection framework informed by Linear Non- Threshold Model Canadian framework is robust and workers and public are protected 14

Environmental Protection CNSC Environmental Assessment Environmental Assessment Report considered the following sources of information Environmental Assessment (EA) under the NSCA as rigorous as EA under CEAA 2012 Part of ongoing regulatory and environmental oversight Incorporates new knowledge and allows for adaptive management Pickering Environmental Protection Program Results of CNSC s Independent Environmental Monitoring Program Pickering Environmental Risk Assessment Results of Other Regional Monitoring CNSC EA concluded public and environment protected from Pickering NGS releases Annual Compliance Reports Preliminary Decommissioning Plan e-doc 5510377 nuclearsafety.gc.ca 15

Environmental Protection Tritium in Drinking Water Canadian guideline of 7000 Bq/L is based on international recommendations 2017 Pickering Environmental Monitoring Program o Tritium averages at water supply plants were below Ontario Drinking Water Advisory Council recommendation of 20 Bq/L Public dose from tritium releases is very small fraction of the regulatory dose limit Adequate regulatory mechanisms to protect Canadians from exposure to tritium releases 16

Environmental Protection Tritium in Groundwater Tritium concentrations in groundwater within site have remained constant or decreased Spike of tritium concentrations in monitoring wells of Unit 5 and 6 Reactor Building areas observed in 2016 o Source identified and repaired (sealant degradation in concrete foundation joints) Monitoring results confirmed site perimeter concentrations remain low No off-site impacts indicated 17

Emergency Preparedness: Regulatory Framework for Emergency Preparedness REGDOC-2.10.1 consistent with modern national and international standards and guidelines Modern, risk-informed approach to the categorization of accidents 18

Emergency Preparedness Provisions Under the Revised PNERP Revised Provincial Nuclear Emergency Response Plan (PNERP) planning zones adequate to address protective actions to minimize public health risks o Conforms with CSA N1600 General Requirements for Nuclear Emergency Management Programs Thyroid blocking Protective Action Levels align with provincial, federal and international guidance PNERP implementing plan for Pickering NGS available on OFMEM website: www.emergencymanagementontario.ca 19

Emergency Preparedness Provisions Under the Revised PNERP Response Zones DRAFT 20

Waste Management Framework and Strategy Pickering Waste Management Facility Phase I Processing building Storage buildings 1 and 2 Phase II Storage building 3, future building 4 Future new processing building Future Storage Building 4 All on-site waste safely stored Pickering Waste Management Facility Phase I and Phase II 21

Waste Management Inventory of On-Site High Level Radioactive Waste Timeline Wet Storage (No. of bundles) Dry Storage (No. of bundles) Total Storage (No. of bundles) Dry Storage Containers in Storage Current (June 30, 2017) 399,703 337,114 736,817 867 Projected (Dec 31, 2024) 418,453 + 27,600 (end of life defueling) 481,114 927,167 1,242 Irradiated Fuel Bays fully unloaded (~2038) 0 927,167 927,167 2,415 22

Waste Management Inventory of On-Site Radioactive Waste Intermediate and Low Level Radioactive Waste (ILW and LLW) Facility ILW (m 3 ) LLW (m 3 ) Pickering Waste Management Facility Current Projected Current Projected 1,012 1,012 0 0 The Retube Component Storage Area is closed to further ILW All LLW is stored at the Western Waste Management Facility Source Natural Resources Canada 23

Waste Management On-site Waste Storage Pickering Waste Management Facility Phase I with retube component storage area (left) and used fuel dry storage buildings (right). Used fuel Dry Storage Containers, Pickering Waste Management Facility. 24

Waste Management Decommissioning Pickering decommissioning strategy o Safe storage with surveillance from 2028 to 2050 o Station dismantling and demolition from 2051 to 2061, and o Site restoration from 2061 to 2065 Pickering Preliminary Decommissioning Plan (PDP) complies with CSA N294-09 Serves as basis for decommissioning cost estimate and financial guarantee Current consolidated financial guarantee for all OPG-owned nuclear facilities ~ $21 B 25

Other Matters Fukushima Actions Fukushima Action Items are closed resulting safety enhancements include o o o o o o o Increased reliability of safety significant equipment, Multiple means to supply power and cooling water to key components, Strengthened heat sinks to remove energy from containment, Measures to prevent hydrogen combustion in containment, Options for controlled filtered containment venting, Portable equipment stored on- and off-site Implementation of robust accident management Multiple design and procedural modifications to prevent and mitigate severe accidents o Probabilistic Safety Analysis shows reduced likelihood of accidents 26

Other Matters Containment Integrity Periodic Safety Review (PSR) identified additional actions to enhance safety Strengthen provisions for controlled filtered venting to protect containment integrity to be completed in 2019 Upgrades to make up cooling Increase redundancy in power supply to air cooling and igniters OPG implementing additional safety enhancements 27

Other Matters End of Commercial Operation (ECO) Periodic Safety Review in support of 10-year licence and encompasses the end of commercial operation Licence condition LC 15.4 imposes ECO requirements Commission approval would be required to operate any unit beyond December 31, 2024 Sustainable Operations Plan and Stabilization Activity Plan will be in place Opportunity for public comment during public proceedings of annual Canadian Nuclear Power Plants Regulatory Oversight Report 28

Developments since Part 1 Hearing No outstanding regulatory issues or concerns regarding 2017 Pickering Environmental Risk Assessment CNSC acceptance of the revised Derived Release Limits and Environmental Action Levels for Pickering in accordance with CSA N288.1 Provincial Nuclear Emergency Response Plan updated Pickering implementation plan available Observations and recommendations following Exercise Unified Control confirm response capability 29

UPDATES TO PROPOSED PROL AND DRAFT LCH e-doc 5510377

Updates to Proposed PROL Licence condition (LC) 15.3 language strengthened following Part 1 Hearing in April LC 15.3 assures presence of adequate compliance verification criteria if projected hydrogen equivalent concentration in pressure tubes exceeds 120 ppm before the end of commercial operation Old proposed LC 15.3 New proposed LC 15.3 The licensee shall maintain pressure tube fracture toughness sufficient for safe operation. Before hydrogen equivalent concentrations exceed 120 ppm, the licensee shall demonstrate that pressure tube fracture toughness will be sufficient for safe operation beyond 120 ppm 31

Changes to draft Licence Conditions Handbook Clarified compliance verification criteria (CVC) for revised LC 15.3 o At least one year prior to any pressure tube reaching an Heq concentration of 120 ppm, OPG shall submit a technical basis document for the Fracture Toughness Model that is intended to support operation of pressure tubes with Heq predictions in excess of 120 ppm. Added remaining implementation dates for new REGDOCs and CSA standards Clarified and corrected CVC where necessary 32

CONCLUSIONS AND RECOMMENDATIONS e-doc 5510377

Conclusions CNSC staff conclude that OPG: Is qualified to carry on the activity authorized by the licence. Will, in carrying out that activity, make adequate provision for the protection of the environment, the health and safety of persons and the maintenance of national security and measures required to implement international obligations to which Canada has agreed. 34

Recommendations (1/2) CNSC staff recommend that the Commission: 1. Renew the Pickering licence to authorize OPG to carry out the activities listed in Part IV of the licence, from September 1, 2018 to August 31, 2028 2. Authorize OPG to operate Pickering NGS Units 5-8 up to a maximum of 295,000 EFPH 3. Authorize delegation of authority for a person authorized by the Commission for LC 3.2 - restart after a serious process failure Director, Pickering Regulatory Program Division Director General, Directorate of Power Reactor Regulation Executive Vice-President and Chief Regulatory Operations Officer, Regulatory Operations Branch 35

Recommendations (2/2) 4. Accept the station-specific conditions requiring OPG to: Implement the Integrated Implementation Plan (LC 15.1) Maintain Units 2 and 3 in a safe storage state (LC 15.2) Before hydrogen equivalent concentrations exceed 120 ppm, demonstrate that pressure tube fracture toughness will be sufficient for safe operation beyond 120 ppm (LC 15.3) Implement and maintain plans for the end of commercial operation (LC 15.4) Implement and maintain a Cobalt 60 program (LC 15.5) Limit the activities of import and export of nuclear substances to those occurring as contaminants in laundry, packaging, shielding or equipment (LC 15.6) 36

Connect With Us nuclearsafety.gc.ca