The South Hartford Conveyance and Storage Tunnel

Similar documents
The Metropolitan District. Stormwater & I/I Reduction Presentation March 16, 2017

Foster Park Retrieval Shaft

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by

The Indianapolis Deep Tunnel Surge Analysis: Debugging Future Operational Issues in the Present

Deep Tunnel, Shallow Pipe - How the City of Hamilton, OH plans to save millions on SSO control. Glenn Weist, P.E.

Metropolitan St. Louis Sewer District PRIVATE INFILTRATION and INFLOW REDUCTION PROGRAM

Interim Interconnector Sewer Operational Plan

6 Preliminary Assessment of Construction Method and Constructability Issues

Alternative Construction Methods and Pipe Material provide Solutions for Cleveland WWTP Project

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016

Customer Conference Speedway, IN 46224

CSO and SEWERAGE CONVEYANCE TUNNEL DESIGN NACE CORROSION 2010

National Utility Contractors Association, Hawaii Chapter. Kaneohe-Kailua Wastewater Conveyance and Treatment Facilities January 29, 2014

Preferred Elevated Tank Site

Wastewater Flow Monitoring Services

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

Synergy: Addressing Combined Sewer Overflows and Nitrogen

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

Environmental Information Worksheet

Turning a Negative into a Positive Negotiating a Consent Decree to Develop a Reasonable Endpoint

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

SANITARY SEWER OVERFLOWS AND THE TEXAS COMMISSION ON ENVIRONMENTAL

Updating the MWRD s Excessive Infiltration and Inflow Control Program. February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

Take Me to the Other Side:

Design Considerations for Selection of Pipe Material for Large Diameter CSO Force Main

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA

KANSAS CITY S OVERFLOW CONTROL PROGRAM ANNUAL REPORT Reporting Period: January 1 to December 31, 2015

Unique Riverbank Filtration System Provides 80 MGD

Update The Don River and Central Waterfront Project and The Ashbridges Bay Treatment Plant outfall

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel

Wastewater Master Facility Report. (Project Name) (Project Basin Location)

Large Decentralized Systems a Sustainable Wastewater Solution

Mill Creek/Peaks Branch/State- Thomas Drainage Relief Tunnel

10.0 Storm Sewer Systems

Management of Aging Wastewater Infrastructure -- Challenges and Strategies --

Experts in tunneling with Tunnel Boring Machines

PLANNING COMMISSION STAFF REPORT. Utah Crew Rowing Dock Conditional Use 830 S. Delong Street September 8, 2010 Petition #PLNPCM

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING

A Study to Estimate Current and Future CSOs to Bubbly Creek and Identify Impacts on the Chicago Area Waterways (CAWS)

Zoning Permits 11-1 ZONING PERMITS

Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement

2.0 PROJ ECT D ESCRI PTION

Notwithstanding article VII of this chapter, the following conditional uses may be permitted in the planned mixed use development (PMUD) zone:

E1/92. D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds. Green Evaluation. Transaction Overview. Green Evaluation Overview

Background Where did CSO systems begin? Combined Sewer Overflow (CSO) Control. Background. Background. Background

FY2018 CIRP Detailed Summary

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

SOS. City of Akron Combined Sewer Overflow (CSO) Long Term Control Plan. Separate Our Sewers Save Our Streams. Ohio OWEA Collection Systems Workshop

CERTIFICATION AND FINANCING PROPOSAL

Storm Water and Sanitary Sewer

Module 2 : System of Sanitation. Lecture 2 : System of Sanitation

STORMWATER AND EROSION CONTROL PERMIT

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

South Coast Water District

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

CITY OF NEWPORT PLANNING COMMISSION WORKSHOP MEETING NEWPORT CITY HALL JUNE 8, 2017 IMMEDIATELY FOLLOWING THE PLANNING COMMISSION MEETING

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto.

FY 2018 Proposed Capital Improvement Program

Brooklyn Station Construction Open House

HUDSON TUNNEL PROJECT

SECTION 8.0 DELTA DIABLO SANITATION DISTRICT WASTEWATER SERVICE

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

Project Purpose. Federal Railroad Administration

Springfield Water and Sewer Commission. Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016

When the land division tree preservation requirements apply

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

TOWN OF BEEKMAN DOVER RIDGE WATER AND SEWER SYSTEMS. Overview and Recommendations

CHAPTER 6. Sanitary Sewer

Boise City Public Works General Drainage Plan Review Requirements Checklist

Public Works Commission Meeting Underground Storage Facility Alternatives Process & Progress Update. September 2016

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information

LAFCO ANNEXATION TO JURUPA COMMUNITY SERVICES DISTRICT (TTM RIVERBEND)

INFRASTRUCTURE ELEMENT

MSDGC MODELING GUIDELINES AND STANDARDS VOLUME I SYSTEM WIDE MODEL

Chapter 4 Environmental Setting, Impacts, and Mitigation 4.6 NOISE Environmental Setting. Approach to Analysis

Chapter 9: Alternative Analysis

OFFICE OF THE COMMUNITY & NEIGHBORHOOD SERVICES City Hall Holland, Michigan

MEMORANDUM. The general findings of the assessment are as follows:

Sidewalk Repair Program. Charter Township of Canton Engineering Services

CONSENT ITEM LOCAL AGENCY FORMATION COMMISSION EXECUTIVE OFFICER'S REPORT FOR MEETING OF: SEPTEMBER 11, 2017

Franklin County Communique to the Planning Board

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF SANITARY SEWERS

JCK UNDERGROUND INCORPORATED STATEMENT OF QUALIFICATIONS

Slurry MTBM in Alluvial Soils and 25k Rock Chris L. Windley, P.E. McKim & Creed Inc. Stephen D. Leitch, P.E. Hazen and Sawyer, P.C. Joshua P.

Depth Perception Tracking Sewer Performance Using Design Guidelines & Regulatory Expectations

CERTIFICATION AND FINANCING PROPOSAL

Ground Freezing for Tunnel, Shafts, and Adits

City of Grosse Pointe Park Sanitary Sewer System Inflow and Infiltration Investigation Smoke Testing

Village of Lincolnwood

Transcription:

The South Hartford Conveyance and Storage Tunnel South Hartford The Metropolitan District June 16 th -17 th, 2015

Purpose of This Public Meeting Communicate with Residents Directly Adjacent to the Project Provide information regarding: Project Background Project Scope Project Schedule 2

The Metropolitan District (MDC) Nonprofit, specially chartered municipal corporation created by the CT General Assembly 1929. Provides water, sewer and household hazardous waste collection services to its member municipalities. In addition, under a series of special agreements, the MDC supplies treated water to portions of Glastonbury, South Windsor, Farmington, East Granby and Portland. 3

4 Combined Sewer Overflows (CSOs) are a Significant Regional Issue

5 How a CSO Works

6 CSOs Result in Degraded Water Quality

The Clean Water Project (CWP) The CWP is the MDC s Response to: 1. Consent Order from CT DEEP to address combined sewer overflows 2. Consent Decree from EPA to address sanitary sewer overflows 7 Multiphase program that will take 20 years to complete Project Goals: 1. Reduce the CSOs to streams/rivers 2. Eliminate CSO outfalls to Wethersfield Cove & North Branch Park River 3. Reduce Nitrogen discharged to CT River 4. Address sanitary sewer overflows (SSOs) outside of Hartford

The Clean Water Project 1. Expand HWPCF capacity to 200 MGD 2. 670 acres of sewer separation 3. Tunnel storage and conveyance 4. Reduce stormwater inflow/ groundwater infiltration (I/I) 8

Storage Tunnels Common Approach to Combined Sewer Overflow (CSO) Management Providence is closest recent example, operational in 2008 Others include Chicago (1980 s) Milwaukee (1990 s) Boston (2000 s) Atlanta (2000 s) Portland (2000 s) Cleveland (2010 s) Indianapolis (2010 s) Washington (2010 s) 9

Similar Local Tunnel Project(s) Park River Auxiliary Conduit (PRAC) Built in 1979 22 ID/150 deep/9,000 LF PRAC Tunnel N 10 South Tunnel

Combined Sewer Overflows (CSOs) in Your Neighborhood N Existing CSO 11

Alignments Evaluated During Early Studies N 12 Existing SSO Existing CSO

Stakeholder Concerns Drove Alignment Selection High Impact on Alignment Selection Medium Impact on Alignment Selection Low Impact on Alignment Selection Cost Perception of Odor at Shafts Potential for Property Damage Impacts to Business Benefit to Community Reduction in Tax Base (Permanent Surface Easement) Impacts to Traffic Noise/Construction Impacts Impacts to Property Values Public Safety Impact of Construction Vehicles Schedule Easements Duration of Surface Impacts Increase to Sewer Rates O&M Environmental Justice Maximize Local Contractors Long Term Health Perception 13

The South Tunnel Project Components: 4 miles long (21,800 LF) 18 foot internal diameter 175 to 250 feet deep 6 Intermediate Hydraulic Drop Shafts 7,300 LF of Consolidation Conduits 50 MGD deep pump station N 14

West Hartford Hartford South Tunnel - Geological Profile Ground Surface Bedrock Surface 15

Subterranean Easements Required for about 250 parcels no surface or shallow easements at these locations MDC will not retain any rights at the surface nor adversely affect the use of any parcel Grants MDC the right to construct and operate ~200-foot deep tunnel under each parcel Defines depth envelope of MDC rights to construct the tunnel N 16

17 Hard Rock Tunnel Boring Machine (TBM)

18 Building the Tunnel

19 Drop Shaft Schematic

20 Hydraulic Drop Shafts in Operation

Construction of Elliot Street Drop Shaft for MDC on Wethersfield Ave (Franklin Separation 13) 21

Brookfield Street Drop Shaft Location N 22

Location of Drop Shaft #2 City of Hartford Housing Authority N Drop Shaft #2 Adit Tunnel Deep Rock Tunnel 23

Franklin Area Drop Shaft Locations N 24

Location of Drop Shaft #3 Bank of America Drop Shaft #3 N West Preston St Adit Tunnel 25

Franklin Area Drop Shaft Locations N 26

Location of Drop Shaft #4 N Adit Tunnel Canicattinese Society Deep Rock Tunnel South End Fire Station Drop Shaft #4 27

Franklin Area Drop Shaft Locations N 28

Location of Drop Shaft #5 N Adit Tunnel Drop Shaft #5 Deep Rock Tunnel 29

Franklin Area Drop Shaft Locations N 30

Location of Drop Shaft #6 N Adit Tunnel Metzner Early Learning Center (City of Hartford Office for Young Children) Franklin Avenue Recreation Center Drop Shaft #6 31

Typical Layout of Drop Shaft N New CSO Diversion Manhole Hanmer St Consolidation Sewer Gate Chamber Air Treatment Enclosure Drop Shaft Adit Tunnel Deep Rock Tunnel 32

Air Treatment System Activated Carbon Ventilation Fan 33

34 Typical Site View of Air Treatment Enclosure

35 Constructing Consolidation Conduits

36 Microtunnel Work Sites

Franklin Area Drop Shaft Location N 37

Franklin Conduit Drop and Access Shaft N D&D Market People s Bank Rite Aide Franklin Conduit Drop Shaft Franklin Conduit (66 ) 38

Anticipated Schedule 39 Key Dates: Sept/Oct 2015 Construction Begins Fall 2017 Tunnel boring (and muck hauling) begins Late Fall 2018 Tunnel drive completed 2022 Construction complete/facility in operation

Summary of Facility Operations Unmanned Facilities Will Comply with Hartford Noise Ordinance Zero Traffic Impacts. Weekly Visits by MDC Maintenance. Gated and Fenced Facility. No Nighttime Lighting Unless Maintenance is Required 40

Questions? For additional questions and information requests, please contact the MDC at communication@themdc.com 41